Background

     The 495 Express Lanes are a Public-Private
     Partnership between VDOT and Flour-Transurban

     The project will construct two new lanes in each
     direction the along the Capital Beltway

     A unique opportunity for transit service by providing
     a semi-dedicated lane on which the bus can achieve
     much higher speeds.

2
Planning

     Transportation Development Plan (TDP)
     Staff review
        Certain assumptions have changed since TDP
        Revised routes/proposed service plan
     Elected Officials
     Public meetings
     Revised plan/Final



3
Transit Development
    Plan (TDP)
     Lorton – Tysons: This route will provide peak period express service connecting Lorton with Tysons Corner via the
     Franconia-Springfield Metro Station. Lorton is a fast growing area that should generate significant ridership for
     commuting to growing employment opportunities in Tysons. This route would begin at the Sydenstricker Park and
     Ride and follow the alignment of the proposed new route 309 until the I-95 entrance ramp. Reverse peak trips which
     otherwise would deadhead on this route would provide revenue service to the Engineering Proving Ground (EPG),
     providing access to the new NGA campus for people who currently reside in northern Fairfax County and the
     Tysons Corner area. 68 Upon serving the NGA, this route would continue to the Sydenstricker Park and Ride via
     Rolling Road and the Fairfax County Parkway. The route would also complement Fairfax Connector 401, which
     would continue to provide local service.

     Tysons – Ft. Belvoir: This route would provide an opportunity for easy access to Springfield and Ft. Belvoir by
     providing a direct and fast transit option for North County residents that work at Fort Belvoir. Secondarily, it would
     provide additional capacity for Springfield area residents traveling to the Tysons area supplementing the Lorton
     route. This route would continue past Fort Belvoir and terminate at Sacramento Drive and serve the proposed park
     and ride lot at Woodlawn Center upon its completion.

     Burke Centre – Tysons: This route will provide express bus service from the Braddock District to Tysons connecting
     the Braddock residential communities with the Tyson area employment opportunities. Further discussion can be
     found in Section 7.7.4.

     Huntington Metrorail – Tysons: This route will provide express bus service from the Huntington Metrorail Station to
     Tysons. The route will enter the Capital Beltway (I-495) just north of the Huntington Metrorail Station and run along
     the Beltway entering the HOT Lane in Springfield. This express route will provide a quicker, more convenient trip for
     residents of the Mount Vernon District and portions of Alexandria in place of using Metrorail service which will
     require making at least two transfers to reach the future Silver Line service for travel to Tysons.



4
Proposed Express
    Lanes Service Plan
         Description           Days of Operation        Headway       Span of Service
    Burke VRE to Tysons     Weekday Peak Servcie Only      15     5:30-9:30A; 3:30-7:30P
    Springfield to Tysons   Weekday Peak Service Only      15     5:30-9:30A; 3:30-7:30P
    Lorton VRE to Tysons    Weekday Peak Servcie Only      15     5:30-9:30A; 3:30-7:30P



      Outstanding Issues
            Circulation in Tysons TBA
            Burke VRE – As described in TDP; Serve other
             Park & Rides?
            Springfield/Lorton – Circulation TBA
            Saratoga P&R – Opportunity

5
Burke VRE
    Express Lanes


      Burke VRE Express to Tysons
         Via Guinea Road, Braddock Road, 495 Express Lanes
         Serve other Park & Rides along Braddock?
         Other Stops?




6
Burke VRE
    Express Lanes




7
Lorton VRE
    Express Lanes


      Lorton VRE to Tysons
         Via Lorton I95 Park & Ride
         Serve the Saratoga Park & Ride Lot?




8
Lorton VRE
    Express Lanes




9
Springfield
     Express Lanes


       Springfield to Tysons
          Via Greater Springfield? Franconia-Springfield Metrorail
           Station? Saratoga Park & Ride?




10
Springfield
     Express Lanes




11

Mais conteúdo relacionado

Mais procurados

Fall 2011 South County and BRAC-related Fairfax Connector Service Changes
Fall 2011 South County and BRAC-related Fairfax Connector Service ChangesFall 2011 South County and BRAC-related Fairfax Connector Service Changes
Fall 2011 South County and BRAC-related Fairfax Connector Service ChangesFairfax County
 
FCDOT: Proposed Service Changes Routes 304 and 371
FCDOT: Proposed Service Changes Routes 304 and 371FCDOT: Proposed Service Changes Routes 304 and 371
FCDOT: Proposed Service Changes Routes 304 and 371Fairfax County
 
December 2017 Proposed Service Changes
December 2017 Proposed Service ChangesDecember 2017 Proposed Service Changes
December 2017 Proposed Service ChangesFairfax County
 
BRAC in VA - by Peggy Tadej - VA BRAC
BRAC in VA - by Peggy Tadej - VA BRACBRAC in VA - by Peggy Tadej - VA BRAC
BRAC in VA - by Peggy Tadej - VA BRACMobility Lab
 
Fairfax Connector Survey Routes 304: January 2013
Fairfax Connector Survey Routes 304: January 2013Fairfax Connector Survey Routes 304: January 2013
Fairfax Connector Survey Routes 304: January 2013Fairfax County
 
Dublin bus 2011
Dublin bus 2011Dublin bus 2011
Dublin bus 2011ExSite
 
Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)novacsi
 
FCDOT: Silver Line Phase 1 Bus Service Plan-Second Round Public Meetings
FCDOT: Silver Line Phase 1 Bus Service Plan-Second Round Public MeetingsFCDOT: Silver Line Phase 1 Bus Service Plan-Second Round Public Meetings
FCDOT: Silver Line Phase 1 Bus Service Plan-Second Round Public MeetingsFairfax County
 
December 2015 Service Change Proposal
December 2015 Service Change ProposalDecember 2015 Service Change Proposal
December 2015 Service Change ProposalFairfax County
 
PROPOSED January 2015 Service Change Public Comment Meeting
PROPOSED January 2015 Service Change Public Comment MeetingPROPOSED January 2015 Service Change Public Comment Meeting
PROPOSED January 2015 Service Change Public Comment MeetingCOTA BUS
 
Additional Work Experience
Additional Work ExperienceAdditional Work Experience
Additional Work ExperienceJoel Cummings
 
FCDOT: Silver Line Phase 1 Bus Service Plan
FCDOT: Silver Line Phase 1 Bus Service PlanFCDOT: Silver Line Phase 1 Bus Service Plan
FCDOT: Silver Line Phase 1 Bus Service PlanFairfax County
 
Spring 2017-service-change-external-memo -final-feb-27-en
Spring 2017-service-change-external-memo -final-feb-27-enSpring 2017-service-change-external-memo -final-feb-27-en
Spring 2017-service-change-external-memo -final-feb-27-enDevyn Barrie
 
Proposed May 2014 Service Changes
Proposed May 2014 Service ChangesProposed May 2014 Service Changes
Proposed May 2014 Service Changescotabus
 
Bus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility ImprovementsBus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility ImprovementsFairfax County
 
State Bridge Profile Arkansas 2014
State Bridge Profile Arkansas 2014State Bridge Profile Arkansas 2014
State Bridge Profile Arkansas 2014artba
 
September Service Change Public Comment Meetings
September Service Change Public Comment MeetingsSeptember Service Change Public Comment Meetings
September Service Change Public Comment MeetingsCOTA BUS
 
January 2015 Public Information Meetings
January 2015 Public Information MeetingsJanuary 2015 Public Information Meetings
January 2015 Public Information MeetingsCOTA BUS
 
May 2015 Public Information Meeting
May 2015 Public Information MeetingMay 2015 Public Information Meeting
May 2015 Public Information MeetingCOTA BUS
 

Mais procurados (20)

Fall 2011 South County and BRAC-related Fairfax Connector Service Changes
Fall 2011 South County and BRAC-related Fairfax Connector Service ChangesFall 2011 South County and BRAC-related Fairfax Connector Service Changes
Fall 2011 South County and BRAC-related Fairfax Connector Service Changes
 
FCDOT: Proposed Service Changes Routes 304 and 371
FCDOT: Proposed Service Changes Routes 304 and 371FCDOT: Proposed Service Changes Routes 304 and 371
FCDOT: Proposed Service Changes Routes 304 and 371
 
December 2017 Proposed Service Changes
December 2017 Proposed Service ChangesDecember 2017 Proposed Service Changes
December 2017 Proposed Service Changes
 
BRAC in VA - by Peggy Tadej - VA BRAC
BRAC in VA - by Peggy Tadej - VA BRACBRAC in VA - by Peggy Tadej - VA BRAC
BRAC in VA - by Peggy Tadej - VA BRAC
 
Fairfax Connector Survey Routes 304: January 2013
Fairfax Connector Survey Routes 304: January 2013Fairfax Connector Survey Routes 304: January 2013
Fairfax Connector Survey Routes 304: January 2013
 
Dublin bus 2011
Dublin bus 2011Dublin bus 2011
Dublin bus 2011
 
Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)Silver Line Update (February 2013 Meeting)
Silver Line Update (February 2013 Meeting)
 
FCDOT: Silver Line Phase 1 Bus Service Plan-Second Round Public Meetings
FCDOT: Silver Line Phase 1 Bus Service Plan-Second Round Public MeetingsFCDOT: Silver Line Phase 1 Bus Service Plan-Second Round Public Meetings
FCDOT: Silver Line Phase 1 Bus Service Plan-Second Round Public Meetings
 
December 2015 Service Change Proposal
December 2015 Service Change ProposalDecember 2015 Service Change Proposal
December 2015 Service Change Proposal
 
PROPOSED January 2015 Service Change Public Comment Meeting
PROPOSED January 2015 Service Change Public Comment MeetingPROPOSED January 2015 Service Change Public Comment Meeting
PROPOSED January 2015 Service Change Public Comment Meeting
 
Additional Work Experience
Additional Work ExperienceAdditional Work Experience
Additional Work Experience
 
FCDOT: Silver Line Phase 1 Bus Service Plan
FCDOT: Silver Line Phase 1 Bus Service PlanFCDOT: Silver Line Phase 1 Bus Service Plan
FCDOT: Silver Line Phase 1 Bus Service Plan
 
Transportation Plan
Transportation PlanTransportation Plan
Transportation Plan
 
Spring 2017-service-change-external-memo -final-feb-27-en
Spring 2017-service-change-external-memo -final-feb-27-enSpring 2017-service-change-external-memo -final-feb-27-en
Spring 2017-service-change-external-memo -final-feb-27-en
 
Proposed May 2014 Service Changes
Proposed May 2014 Service ChangesProposed May 2014 Service Changes
Proposed May 2014 Service Changes
 
Bus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility ImprovementsBus Stop Safety and Accessibility Improvements
Bus Stop Safety and Accessibility Improvements
 
State Bridge Profile Arkansas 2014
State Bridge Profile Arkansas 2014State Bridge Profile Arkansas 2014
State Bridge Profile Arkansas 2014
 
September Service Change Public Comment Meetings
September Service Change Public Comment MeetingsSeptember Service Change Public Comment Meetings
September Service Change Public Comment Meetings
 
January 2015 Public Information Meetings
January 2015 Public Information MeetingsJanuary 2015 Public Information Meetings
January 2015 Public Information Meetings
 
May 2015 Public Information Meeting
May 2015 Public Information MeetingMay 2015 Public Information Meeting
May 2015 Public Information Meeting
 

Destaque

Fairfax County: A Commitment to Environmental/Energy Conservation
Fairfax County: A Commitment to Environmental/Energy ConservationFairfax County: A Commitment to Environmental/Energy Conservation
Fairfax County: A Commitment to Environmental/Energy ConservationFairfax County
 
FCDOT-Countywide Dialogue on Transportation: September-October 2012
FCDOT-Countywide Dialogue on Transportation: September-October 2012FCDOT-Countywide Dialogue on Transportation: September-October 2012
FCDOT-Countywide Dialogue on Transportation: September-October 2012Fairfax County
 
Health and Safety Podcast: July 28, 2010
Health and Safety Podcast: July 28, 2010Health and Safety Podcast: July 28, 2010
Health and Safety Podcast: July 28, 2010Fairfax County
 
2010-11 Fairfax County Youth Survey: Bullying & Cyberbullying
2010-11 Fairfax County Youth Survey: Bullying & Cyberbullying2010-11 Fairfax County Youth Survey: Bullying & Cyberbullying
2010-11 Fairfax County Youth Survey: Bullying & CyberbullyingFairfax County
 
Winter 2012 Quarterly Meeting: Agency COOP Plan Reviews
Winter 2012 Quarterly Meeting: Agency COOP Plan ReviewsWinter 2012 Quarterly Meeting: Agency COOP Plan Reviews
Winter 2012 Quarterly Meeting: Agency COOP Plan ReviewsFairfax County
 
2010-11 Fairfax County Youth Survey: Mental Health-Depression & Suicide
2010-11 Fairfax County Youth Survey: Mental Health-Depression & Suicide2010-11 Fairfax County Youth Survey: Mental Health-Depression & Suicide
2010-11 Fairfax County Youth Survey: Mental Health-Depression & SuicideFairfax County
 

Destaque (6)

Fairfax County: A Commitment to Environmental/Energy Conservation
Fairfax County: A Commitment to Environmental/Energy ConservationFairfax County: A Commitment to Environmental/Energy Conservation
Fairfax County: A Commitment to Environmental/Energy Conservation
 
FCDOT-Countywide Dialogue on Transportation: September-October 2012
FCDOT-Countywide Dialogue on Transportation: September-October 2012FCDOT-Countywide Dialogue on Transportation: September-October 2012
FCDOT-Countywide Dialogue on Transportation: September-October 2012
 
Health and Safety Podcast: July 28, 2010
Health and Safety Podcast: July 28, 2010Health and Safety Podcast: July 28, 2010
Health and Safety Podcast: July 28, 2010
 
2010-11 Fairfax County Youth Survey: Bullying & Cyberbullying
2010-11 Fairfax County Youth Survey: Bullying & Cyberbullying2010-11 Fairfax County Youth Survey: Bullying & Cyberbullying
2010-11 Fairfax County Youth Survey: Bullying & Cyberbullying
 
Winter 2012 Quarterly Meeting: Agency COOP Plan Reviews
Winter 2012 Quarterly Meeting: Agency COOP Plan ReviewsWinter 2012 Quarterly Meeting: Agency COOP Plan Reviews
Winter 2012 Quarterly Meeting: Agency COOP Plan Reviews
 
2010-11 Fairfax County Youth Survey: Mental Health-Depression & Suicide
2010-11 Fairfax County Youth Survey: Mental Health-Depression & Suicide2010-11 Fairfax County Youth Survey: Mental Health-Depression & Suicide
2010-11 Fairfax County Youth Survey: Mental Health-Depression & Suicide
 

Semelhante a Fairfax Connector Express Lanes to Tysons: January 2013

Fairfax Connector: Express Lanes Bus Service To Tysons Corner
Fairfax Connector: Express Lanes Bus Service To Tysons CornerFairfax Connector: Express Lanes Bus Service To Tysons Corner
Fairfax Connector: Express Lanes Bus Service To Tysons CornerFairfax County
 
Metrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and MitigationMetrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and MitigationFairfax County
 
Metrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and MitigationMetrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and MitigationFairfax County
 
OneCenterCity Service Restructures
OneCenterCity Service RestructuresOneCenterCity Service Restructures
OneCenterCity Service RestructuresZach Shaner
 
Reston Network Analysis: 2030 Results and Roadway Classifications
Reston Network Analysis: 2030 Results and Roadway ClassificationsReston Network Analysis: 2030 Results and Roadway Classifications
Reston Network Analysis: 2030 Results and Roadway ClassificationsFairfax County
 
Substantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectFairfax County
 
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...Fairfax County
 
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014SCVTA
 
Melbourne metro tunnel project
Melbourne metro tunnel projectMelbourne metro tunnel project
Melbourne metro tunnel projectJumpingJaq
 
Triangle Transit's presentation to EDPP on Orange County Draft Plan
Triangle Transit's presentation to EDPP on Orange County Draft PlanTriangle Transit's presentation to EDPP on Orange County Draft Plan
Triangle Transit's presentation to EDPP on Orange County Draft PlanKristen Smith
 
WMATA Blue and Yellow Lines Station Shutdown Bus Service Plans
WMATA Blue and Yellow Lines Station Shutdown Bus Service PlansWMATA Blue and Yellow Lines Station Shutdown Bus Service Plans
WMATA Blue and Yellow Lines Station Shutdown Bus Service PlansFairfax County
 
Franklin rRute 140 - Traffic Assessment
Franklin rRute 140 - Traffic AssessmentFranklin rRute 140 - Traffic Assessment
Franklin rRute 140 - Traffic AssessmentFranklin Matters
 

Semelhante a Fairfax Connector Express Lanes to Tysons: January 2013 (20)

Fairfax Connector: Express Lanes Bus Service To Tysons Corner
Fairfax Connector: Express Lanes Bus Service To Tysons CornerFairfax Connector: Express Lanes Bus Service To Tysons Corner
Fairfax Connector: Express Lanes Bus Service To Tysons Corner
 
Metrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and MitigationMetrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and Mitigation
 
Metrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and MitigationMetrorail SafeTrack Overview and Mitigation
Metrorail SafeTrack Overview and Mitigation
 
February Transit Update Presentation
February Transit Update PresentationFebruary Transit Update Presentation
February Transit Update Presentation
 
OneCenterCity Service Restructures
OneCenterCity Service RestructuresOneCenterCity Service Restructures
OneCenterCity Service Restructures
 
Reston Network Analysis: 2030 Results and Roadway Classifications
Reston Network Analysis: 2030 Results and Roadway ClassificationsReston Network Analysis: 2030 Results and Roadway Classifications
Reston Network Analysis: 2030 Results and Roadway Classifications
 
Substantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road Project
 
Space 134 - Potential for Transit Connections
Space 134 - Potential for Transit ConnectionsSpace 134 - Potential for Transit Connections
Space 134 - Potential for Transit Connections
 
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
Bus Stop Safety and Accessibility Improvements: Springfield and Mount Vernon ...
 
division-transit-project
division-transit-projectdivision-transit-project
division-transit-project
 
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
VTA Light Rail Efficiency Project Mountain View newsletter Spring 2014
 
Melbourne metro tunnel project
Melbourne metro tunnel projectMelbourne metro tunnel project
Melbourne metro tunnel project
 
Triangle Transit's presentation to EDPP on Orange County Draft Plan
Triangle Transit's presentation to EDPP on Orange County Draft PlanTriangle Transit's presentation to EDPP on Orange County Draft Plan
Triangle Transit's presentation to EDPP on Orange County Draft Plan
 
Presentation to EDPP by Triangle Transit
Presentation to EDPP by Triangle TransitPresentation to EDPP by Triangle Transit
Presentation to EDPP by Triangle Transit
 
WMATA Blue and Yellow Lines Station Shutdown Bus Service Plans
WMATA Blue and Yellow Lines Station Shutdown Bus Service PlansWMATA Blue and Yellow Lines Station Shutdown Bus Service Plans
WMATA Blue and Yellow Lines Station Shutdown Bus Service Plans
 
Franklin rRute 140 - Traffic Assessment
Franklin rRute 140 - Traffic AssessmentFranklin rRute 140 - Traffic Assessment
Franklin rRute 140 - Traffic Assessment
 
RRL-workpackages
RRL-workpackagesRRL-workpackages
RRL-workpackages
 
Rails and Railbanking
Rails and RailbankingRails and Railbanking
Rails and Railbanking
 
Beaches to Bay
Beaches to Bay Beaches to Bay
Beaches to Bay
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 

Mais de Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

Mais de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Último

Por estos dos motivos, defensa de JOH solicita repetir juicio
Por estos dos motivos, defensa de JOH solicita repetir juicioPor estos dos motivos, defensa de JOH solicita repetir juicio
Por estos dos motivos, defensa de JOH solicita repetir juicioAlexisTorres963861
 
One India vs United India by Dream Tamilnadu
One India vs United India by Dream TamilnaduOne India vs United India by Dream Tamilnadu
One India vs United India by Dream TamilnaduDreamTamilnadu
 
19032024_First India Newspaper Jaipur.pdf
19032024_First India Newspaper Jaipur.pdf19032024_First India Newspaper Jaipur.pdf
19032024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Européennes 2024 : projection du Parlement européen à trois mois du scrutin
Européennes 2024 : projection du Parlement européen à trois mois du scrutinEuropéennes 2024 : projection du Parlement européen à trois mois du scrutin
Européennes 2024 : projection du Parlement européen à trois mois du scrutinIpsos France
 
Another Day, Another Default Judgment Against Gabe Whitley
Another Day, Another Default Judgment Against Gabe WhitleyAnother Day, Another Default Judgment Against Gabe Whitley
Another Day, Another Default Judgment Against Gabe WhitleyAbdul-Hakim Shabazz
 
Anantkumar Hegde
Anantkumar Hegde  Anantkumar Hegde
Anantkumar Hegde NewsFeed1
 
Ministry of Justice Extradition Eswatini 3.pdf
Ministry of Justice Extradition Eswatini 3.pdfMinistry of Justice Extradition Eswatini 3.pdf
Ministry of Justice Extradition Eswatini 3.pdfSABC News
 
Light Rail in Canberra: Too much, too little, too late: Is the price worth th...
Light Rail in Canberra: Too much, too little, too late: Is the price worth th...Light Rail in Canberra: Too much, too little, too late: Is the price worth th...
Light Rail in Canberra: Too much, too little, too late: Is the price worth th...University of Canberra
 
Green Aesthetic Ripped Paper Thesis Defense Presentation_20240311_111012_0000...
Green Aesthetic Ripped Paper Thesis Defense Presentation_20240311_111012_0000...Green Aesthetic Ripped Paper Thesis Defense Presentation_20240311_111012_0000...
Green Aesthetic Ripped Paper Thesis Defense Presentation_20240311_111012_0000...virgfern3011
 

Último (9)

Por estos dos motivos, defensa de JOH solicita repetir juicio
Por estos dos motivos, defensa de JOH solicita repetir juicioPor estos dos motivos, defensa de JOH solicita repetir juicio
Por estos dos motivos, defensa de JOH solicita repetir juicio
 
One India vs United India by Dream Tamilnadu
One India vs United India by Dream TamilnaduOne India vs United India by Dream Tamilnadu
One India vs United India by Dream Tamilnadu
 
19032024_First India Newspaper Jaipur.pdf
19032024_First India Newspaper Jaipur.pdf19032024_First India Newspaper Jaipur.pdf
19032024_First India Newspaper Jaipur.pdf
 
Européennes 2024 : projection du Parlement européen à trois mois du scrutin
Européennes 2024 : projection du Parlement européen à trois mois du scrutinEuropéennes 2024 : projection du Parlement européen à trois mois du scrutin
Européennes 2024 : projection du Parlement européen à trois mois du scrutin
 
Another Day, Another Default Judgment Against Gabe Whitley
Another Day, Another Default Judgment Against Gabe WhitleyAnother Day, Another Default Judgment Against Gabe Whitley
Another Day, Another Default Judgment Against Gabe Whitley
 
Anantkumar Hegde
Anantkumar Hegde  Anantkumar Hegde
Anantkumar Hegde
 
Ministry of Justice Extradition Eswatini 3.pdf
Ministry of Justice Extradition Eswatini 3.pdfMinistry of Justice Extradition Eswatini 3.pdf
Ministry of Justice Extradition Eswatini 3.pdf
 
Light Rail in Canberra: Too much, too little, too late: Is the price worth th...
Light Rail in Canberra: Too much, too little, too late: Is the price worth th...Light Rail in Canberra: Too much, too little, too late: Is the price worth th...
Light Rail in Canberra: Too much, too little, too late: Is the price worth th...
 
Green Aesthetic Ripped Paper Thesis Defense Presentation_20240311_111012_0000...
Green Aesthetic Ripped Paper Thesis Defense Presentation_20240311_111012_0000...Green Aesthetic Ripped Paper Thesis Defense Presentation_20240311_111012_0000...
Green Aesthetic Ripped Paper Thesis Defense Presentation_20240311_111012_0000...
 

Fairfax Connector Express Lanes to Tysons: January 2013

  • 1. Fairfax County Department of Transportation Express Lanes to Tysons January 2013 1
  • 2. Background The 495 Express Lanes are a Public-Private Partnership between VDOT and Flour-Transurban The project will construct two new lanes in each direction the along the Capital Beltway A unique opportunity for transit service by providing a semi-dedicated lane on which the bus can achieve much higher speeds. 2
  • 3. Planning Transportation Development Plan (TDP) Staff review  Certain assumptions have changed since TDP  Revised routes/proposed service plan Elected Officials Public meetings Revised plan/Final 3
  • 4. Transit Development Plan (TDP) Lorton – Tysons: This route will provide peak period express service connecting Lorton with Tysons Corner via the Franconia-Springfield Metro Station. Lorton is a fast growing area that should generate significant ridership for commuting to growing employment opportunities in Tysons. This route would begin at the Sydenstricker Park and Ride and follow the alignment of the proposed new route 309 until the I-95 entrance ramp. Reverse peak trips which otherwise would deadhead on this route would provide revenue service to the Engineering Proving Ground (EPG), providing access to the new NGA campus for people who currently reside in northern Fairfax County and the Tysons Corner area. 68 Upon serving the NGA, this route would continue to the Sydenstricker Park and Ride via Rolling Road and the Fairfax County Parkway. The route would also complement Fairfax Connector 401, which would continue to provide local service. Tysons – Ft. Belvoir: This route would provide an opportunity for easy access to Springfield and Ft. Belvoir by providing a direct and fast transit option for North County residents that work at Fort Belvoir. Secondarily, it would provide additional capacity for Springfield area residents traveling to the Tysons area supplementing the Lorton route. This route would continue past Fort Belvoir and terminate at Sacramento Drive and serve the proposed park and ride lot at Woodlawn Center upon its completion. Burke Centre – Tysons: This route will provide express bus service from the Braddock District to Tysons connecting the Braddock residential communities with the Tyson area employment opportunities. Further discussion can be found in Section 7.7.4. Huntington Metrorail – Tysons: This route will provide express bus service from the Huntington Metrorail Station to Tysons. The route will enter the Capital Beltway (I-495) just north of the Huntington Metrorail Station and run along the Beltway entering the HOT Lane in Springfield. This express route will provide a quicker, more convenient trip for residents of the Mount Vernon District and portions of Alexandria in place of using Metrorail service which will require making at least two transfers to reach the future Silver Line service for travel to Tysons. 4
  • 5. Proposed Express Lanes Service Plan Description Days of Operation Headway Span of Service Burke VRE to Tysons Weekday Peak Servcie Only 15 5:30-9:30A; 3:30-7:30P Springfield to Tysons Weekday Peak Service Only 15 5:30-9:30A; 3:30-7:30P Lorton VRE to Tysons Weekday Peak Servcie Only 15 5:30-9:30A; 3:30-7:30P Outstanding Issues  Circulation in Tysons TBA  Burke VRE – As described in TDP; Serve other Park & Rides?  Springfield/Lorton – Circulation TBA  Saratoga P&R – Opportunity 5
  • 6. Burke VRE Express Lanes Burke VRE Express to Tysons  Via Guinea Road, Braddock Road, 495 Express Lanes  Serve other Park & Rides along Braddock?  Other Stops? 6
  • 7. Burke VRE Express Lanes 7
  • 8. Lorton VRE Express Lanes Lorton VRE to Tysons  Via Lorton I95 Park & Ride  Serve the Saratoga Park & Ride Lot? 8
  • 9. Lorton VRE Express Lanes 9
  • 10. Springfield Express Lanes Springfield to Tysons  Via Greater Springfield? Franconia-Springfield Metrorail Station? Saratoga Park & Ride? 10
  • 11. Springfield Express Lanes 11