• Overall Phase 1 Construction - 96% complete
• Stations:
• McLean – 94%
• Tysons Corner – 92%
• Greensboro – 92%
• Spring Hill – 92%
• Wiehle – 97%
• Wiehle garage: 99% Complete
• Punch list and site work ongoing
• Record of Decision roadway improvements - 94%
complete
• Completion - Fall 2013
• Fairfax Connector bus testing at Wiehle – Aug. 16,
and Sep. 9, 2013
• West Falls Church rail yard:
• Completion – Jan. 2014
• Sound box and tail track – November 2013
• Site work – 99%
• Service & Inspection Building – 59%
• Track Work – 99%
• Systems – 80%
• Testing – 8%
• First delivery of 7000-series rail cars – February 2014
• Coordination continues among FCDOT, Macerich (Tysons
Corner Center), WMATA, and MWAA on the mall
pedestrian bridge connection

Status

September 2013

• Substantial completion/MWAA turn-over to WMATA
delayed eight weeks
• Dulles Transit Partner’s revised Scheduled
Substantial Completion Date (SSCD) – midNovember 2013
• MWAA continues to work with DTP on SSCD
• Testing, commissioning, acceptance by WMATA ongoing
thru Revenue Operations Date (ROD)
• Six and eight car test trains are now operating
• WMATA acceptance testing – SSCD to ROD (up to 90
days)
• Estimated passenger revenue service - date determined by
WMATA when testing, training, and safe operation is
achieved

Schedule

• Wiehle garage substantial completion and non-RUP – Aug.
12, 2013
• Phase 1 Maintenance & Land Conveyance process ongoing
• Regional bus service planning (Phase 1) and coordination
meeting (Fairfax Connector, WMATA, Washington Flyer,
PRTC, Loudoun County Transit) took place Sept. 11
• WMATA lead for Phase 1 marketing and outreach; public
silverlinemetro.com website went live the week of Sept. 9

Current Milestones – Past 30 Days

1
• Phase 2 design work continues

Status

• Herndon and Innovation Center Station (south) garages
• Fairfax County has committed funding for design of
the parking garages. The county has entered into a
Real Estate Exchange Agreement with an adjacent
property owner at Innovation Center Station for an
improved transit oriented development and a real
estate agreement.
• At Herndon staff has developed a number of
concept designs
• Scheduled have been developed that track
completion of the garages to the completion of
Phase 2, those schedules are included in the letter
to USDOT
• Town Center Parkway tunnel
• FCDOT conceptual design to WMATA, MWAA and
VDOT in March 2013
• Received comments in May 2013; comment
resolution meeting held June 2013 with FCDOT,
WMATA, MWAA and VDOT
• FCDOT is exploring ways to address stakeholder
comments and plans to submit a change order
package to MWAA within the next 30 days

September 2013

• Status of Phase 2 Bid Packages:
• Packet A - rail Line, station, and systems (includes
Innovation Center Station) - Awarded
• Packet B – Yard and shop – Procurement Fall 2013
• Packet C – Parking garages (may not be issued)
• Cost Estimate: $3.093B
• Cost Estimate with value engineering , Packet A savings,
and garages funding outside the project: $2.6B
• Cost to build garages in Fairfax County: $135M est.
• Substantial Completion: Summer 2018
• Revenue Operations: Late 2018

Budget/Schedule

• Fairfax County did not receive TIGER grant funding to
cover a portion of the Innovation Center station
construction
• FTA oversight of Phase 2 under discussion - Ongoing
• TIFIA Letter of Interest submitted - Ongoing
• WMATA Art in Transit – Ongoing
• Follow up meeting – Sept
• DPWES has selected architect, engineering, and parking
consultants for the Phase 2 parking garages at Herndon
and Innovation Center stations

Current Milestones – Past 30 Days

2
September 2013

West Falls Church yard sound cover box. Structural steel framing of the south portal to the loop track sound
cover box. Photo courtesy Stephen Barna, Dulles Corridor Metrorail Project (DCMP).

3
September 2013

WFC yard - train access platforms are complete except for handrails; new storage track bumpers are installed; the
Service & Inspection Building and sound cover box nearing completion. Photo courtesy Stephen Barna, DCMP.

4
September 2013

West Falls Church yard service & inspection Building. Turn tables in the shop floor have been installed. Photo
courtesy Stephen Barna, DCMP.

5
September 2013

McLean Station - construction of the entrance pavilion is complete except for punchlist items. In the foreground
the kiss and ride lot loop with lights and landscaping. Photo courtesy Stephen Barna, DCMP.

6
September 2013

Spring Hill Station north entrance pavilion – window/curtain wall glazing, entrance gates, plaza sidewalk, and site
lighting are complete. Photo courtesy Stephen Barna, DCMP.

7
September 2013

Spring Hill Station platform – WMATA test train passing through the station on the inbound track during dynamic
testing. Photo courtesy Stephen Barna, DCMP.

8
September 2013

Wiehle-Reston East Station south entrance pavilion and bus bays nearing completion. Preparations are
underway to install the perimeter handrails. Photo courtesy Stephen Barna, DCMP.

9
September 2013

Wiehle-Reston East Station – platform level finished and signage. Photo courtesy David Claypool, Kalorama.

10
September 2013

Wiehle-Reston East Station mezzanine level. Preparations are underway to install the perimeter handrails. Photo
courtesy Stephen Barna, DCMP.

11
September 2013

Reston Station (Comstock/County) plaza nearing completion with the glass-enclosed escalator/elevator lobby to
the Fairfax Connector bus platform in the background. Photo courtesy Stephen Barna, DCMP.

12
September 2013

Escalators and stair case connecting the bus platform with the pedestrian plaza. Photo courtesy Ellen Kamilakis,
FCDOT.

13
September 2013

Fairfax Connector initial bus testing at Wiehle-Reston East Station (north, Level G2 transit center). The first bus
ever to enter the facility. Photo courtesy Nick Perfili, FCDOT.

14
September 2013

Fairfax Connector initial bus testing at Wiehle-Reston East Station (north, Level G2 transit center). ADA ramp
deployment on the platform. Photo courtesy Nick Perfili, FCDOT.

15
September 2013

Fairfax Connector initial bus testing at Wiehle-Reston East Station (north, Level G2 transit center). Photo
courtesy Ellen Kamilakis, FCDOT.

16

Mais conteúdo relacionado

Mais procurados

Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017
Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017
Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017Fairfax County
 
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mason District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mason District Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mason District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mason District Fairfax County
 
Shirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyShirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyFairfax County
 
Dranesville District 2017 VDOT Repaving
Dranesville District 2017 VDOT RepavingDranesville District 2017 VDOT Repaving
Dranesville District 2017 VDOT RepavingFairfax County
 
2017 VDOT Repaving: Rose Hill Drive
2017 VDOT Repaving: Rose Hill Drive2017 VDOT Repaving: Rose Hill Drive
2017 VDOT Repaving: Rose Hill DriveFairfax County
 
Fairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County
 
Fairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County
 
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...Fairfax County
 
Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)Fairfax County
 
Braddock Road Multimodal Study: Guinea Road to I-495
Braddock Road Multimodal Study: Guinea Road to I-495Braddock Road Multimodal Study: Guinea Road to I-495
Braddock Road Multimodal Study: Guinea Road to I-495Fairfax County
 
Status Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
Status Report on the Columbia Pike Streetcar and Preview of Upcoming DecisionsStatus Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
Status Report on the Columbia Pike Streetcar and Preview of Upcoming DecisionsFairfax County
 
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Fairfax County
 
FCDOT: Silver Line, Phase 1 Bus Service Coordination
FCDOT: Silver Line, Phase 1 Bus Service CoordinationFCDOT: Silver Line, Phase 1 Bus Service Coordination
FCDOT: Silver Line, Phase 1 Bus Service CoordinationFairfax County
 
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016Fairfax County
 
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016Fairfax County
 
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...Fairfax County
 
I-66 Beltway to Haymarket - VDOT
 I-66 Beltway to Haymarket - VDOT I-66 Beltway to Haymarket - VDOT
I-66 Beltway to Haymarket - VDOTFairfax County
 
Bicycle Parking Guidelines
Bicycle Parking GuidelinesBicycle Parking Guidelines
Bicycle Parking GuidelinesFairfax County
 
2017 Repaving and Restriping – Glade Dr., April 27th Meeting
2017 Repaving and Restriping – Glade Dr., April 27th Meeting2017 Repaving and Restriping – Glade Dr., April 27th Meeting
2017 Repaving and Restriping – Glade Dr., April 27th MeetingFairfax County
 
Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Fairfax County
 

Mais procurados (20)

Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017
Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017
Citizens Information Meeting: Sleepy Hollow Road Walkway-March 29, 2017
 
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mason District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mason District Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mason District
Proposed Bicycle Facilities-VDOT Summer 2015 Repaving: Mason District
 
Shirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning StudyShirley Gate Road Extended Corridor Planning Study
Shirley Gate Road Extended Corridor Planning Study
 
Dranesville District 2017 VDOT Repaving
Dranesville District 2017 VDOT RepavingDranesville District 2017 VDOT Repaving
Dranesville District 2017 VDOT Repaving
 
2017 VDOT Repaving: Rose Hill Drive
2017 VDOT Repaving: Rose Hill Drive2017 VDOT Repaving: Rose Hill Drive
2017 VDOT Repaving: Rose Hill Drive
 
Fairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County Bicycle Master Plan
Fairfax County Bicycle Master Plan
 
Fairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction UpdateFairfax County and the NVTA TransAction Update
Fairfax County and the NVTA TransAction Update
 
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
Pardon Our Dust Meeting: Pedestrian Improvements at the Intersection of Old D...
 
Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)Herndon Metrorail Stations Access Management Study (HMSAMS)
Herndon Metrorail Stations Access Management Study (HMSAMS)
 
Braddock Road Multimodal Study: Guinea Road to I-495
Braddock Road Multimodal Study: Guinea Road to I-495Braddock Road Multimodal Study: Guinea Road to I-495
Braddock Road Multimodal Study: Guinea Road to I-495
 
Status Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
Status Report on the Columbia Pike Streetcar and Preview of Upcoming DecisionsStatus Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
Status Report on the Columbia Pike Streetcar and Preview of Upcoming Decisions
 
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017Burke Road Realignment-Citizen Information Meeting: June 1, 2017
Burke Road Realignment-Citizen Information Meeting: June 1, 2017
 
FCDOT: Silver Line, Phase 1 Bus Service Coordination
FCDOT: Silver Line, Phase 1 Bus Service CoordinationFCDOT: Silver Line, Phase 1 Bus Service Coordination
FCDOT: Silver Line, Phase 1 Bus Service Coordination
 
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
Reston Network Analysis: Tier 3 Mitigation Results: Sept. 26, 2016
 
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
Great Falls Street Sidewalk Citizens Information Meeting: Sept. 13, 2016
 
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
Burke Centre VRE Connector Ph. IV: Community Meeting for Bicycle and Pedestri...
 
I-66 Beltway to Haymarket - VDOT
 I-66 Beltway to Haymarket - VDOT I-66 Beltway to Haymarket - VDOT
I-66 Beltway to Haymarket - VDOT
 
Bicycle Parking Guidelines
Bicycle Parking GuidelinesBicycle Parking Guidelines
Bicycle Parking Guidelines
 
2017 Repaving and Restriping – Glade Dr., April 27th Meeting
2017 Repaving and Restriping – Glade Dr., April 27th Meeting2017 Repaving and Restriping – Glade Dr., April 27th Meeting
2017 Repaving and Restriping – Glade Dr., April 27th Meeting
 
Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...Reston Transportation Service District: Informational Meetings March 21 & 29,...
Reston Transportation Service District: Informational Meetings March 21 & 29,...
 

Destaque

Policy on Level of Service in Activity Centers
Policy on Level of Service in Activity CentersPolicy on Level of Service in Activity Centers
Policy on Level of Service in Activity CentersFairfax County
 
Interstate 66 Corridor Improvements
Interstate 66 Corridor ImprovementsInterstate 66 Corridor Improvements
Interstate 66 Corridor ImprovementsFairfax County
 
Urban Street Standards Progress Report
Urban Street Standards Progress ReportUrban Street Standards Progress Report
Urban Street Standards Progress ReportFairfax County
 
Operational Analysis of Dulles Toll Road Ramps to Tysons
Operational Analysis of Dulles Toll Road Ramps to TysonsOperational Analysis of Dulles Toll Road Ramps to Tysons
Operational Analysis of Dulles Toll Road Ramps to TysonsFairfax County
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Fairfax County
 
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...Fairfax County
 
Continuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on TransportationContinuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on TransportationFairfax County
 
Potential Fairfax County Photo Red Light Program
Potential Fairfax County Photo Red Light ProgramPotential Fairfax County Photo Red Light Program
Potential Fairfax County Photo Red Light ProgramFairfax County
 
Silver Line Phase 1 Status Report
Silver Line Phase 1 Status ReportSilver Line Phase 1 Status Report
Silver Line Phase 1 Status ReportFairfax County
 
Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013Fairfax County
 
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013Fairfax County
 
Fairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County
 
Dulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study InvestigationDulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study InvestigationFairfax County
 
Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Fairfax County
 

Destaque (14)

Policy on Level of Service in Activity Centers
Policy on Level of Service in Activity CentersPolicy on Level of Service in Activity Centers
Policy on Level of Service in Activity Centers
 
Interstate 66 Corridor Improvements
Interstate 66 Corridor ImprovementsInterstate 66 Corridor Improvements
Interstate 66 Corridor Improvements
 
Urban Street Standards Progress Report
Urban Street Standards Progress ReportUrban Street Standards Progress Report
Urban Street Standards Progress Report
 
Operational Analysis of Dulles Toll Road Ramps to Tysons
Operational Analysis of Dulles Toll Road Ramps to TysonsOperational Analysis of Dulles Toll Road Ramps to Tysons
Operational Analysis of Dulles Toll Road Ramps to Tysons
 
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
Continuation of Countywide Dialogue on Transportation: Project Selection A Si...
 
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
Board of Supervisors Transportation Committee-Next Steps for Urban Street Sta...
 
Continuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on TransportationContinuation of Countywide Dialogue on Transportation
Continuation of Countywide Dialogue on Transportation
 
Potential Fairfax County Photo Red Light Program
Potential Fairfax County Photo Red Light ProgramPotential Fairfax County Photo Red Light Program
Potential Fairfax County Photo Red Light Program
 
Silver Line Phase 1 Status Report
Silver Line Phase 1 Status ReportSilver Line Phase 1 Status Report
Silver Line Phase 1 Status Report
 
Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013Fairfax County Countywide Transit Network Study: Sept. 17, 2013
Fairfax County Countywide Transit Network Study: Sept. 17, 2013
 
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
Route 1 Multimodal Alternatives Analysis Status Update: Sept. 17, 2013
 
Fairfax County Bicycle Master Plan
Fairfax County Bicycle Master PlanFairfax County Bicycle Master Plan
Fairfax County Bicycle Master Plan
 
Dulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study InvestigationDulles Corridor Air Rights Study Investigation
Dulles Corridor Air Rights Study Investigation
 
Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation Stormwater and Wastewater Consolidation
Stormwater and Wastewater Consolidation
 

Semelhante a Silver Line Phase 1-Status Report: Sept. 2013

Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013Fairfax County
 
Silver Line Update: Board Transportation Committee: Dec. 13, 2016
Silver Line Update: Board Transportation Committee: Dec. 13, 2016Silver Line Update: Board Transportation Committee: Dec. 13, 2016
Silver Line Update: Board Transportation Committee: Dec. 13, 2016Fairfax County
 
Silver Line Update-Board Transportation Committee: Oct. 13, 2015
Silver Line Update-Board Transportation Committee: Oct. 13, 2015Silver Line Update-Board Transportation Committee: Oct. 13, 2015
Silver Line Update-Board Transportation Committee: Oct. 13, 2015Fairfax County
 
Agenda Item 7: Silver Line Phase II Implementation
Agenda Item 7: Silver Line Phase II ImplementationAgenda Item 7: Silver Line Phase II Implementation
Agenda Item 7: Silver Line Phase II ImplementationFairfax County
 
Silver Line Phase 1-Status Report
Silver Line Phase 1-Status ReportSilver Line Phase 1-Status Report
Silver Line Phase 1-Status ReportFairfax County
 
Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Fairfax County
 
Silver Line Phase 1 Status Report-Sept. 16, 2014
Silver Line Phase 1 Status Report-Sept. 16, 2014Silver Line Phase 1 Status Report-Sept. 16, 2014
Silver Line Phase 1 Status Report-Sept. 16, 2014Fairfax County
 
Silver Line Update July 2016
Silver Line Update July 2016Silver Line Update July 2016
Silver Line Update July 2016Fairfax County
 
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayGlade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayFairfax County
 
Silverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway ProjectSilverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway ProjectFairfax County
 
Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014Fairfax County
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Fairfax County
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Fairfax County
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadFairfax County
 
Dulles Metrorail Silver Line Phase 2 Status and Funding
Dulles Metrorail Silver Line Phase 2 Status and FundingDulles Metrorail Silver Line Phase 2 Status and Funding
Dulles Metrorail Silver Line Phase 2 Status and FundingFairfax County
 
Dulles Corridor Metrorail Project: Board Transportation Committee Update- Jul...
Dulles Corridor Metrorail Project: Board Transportation Committee Update- Jul...Dulles Corridor Metrorail Project: Board Transportation Committee Update- Jul...
Dulles Corridor Metrorail Project: Board Transportation Committee Update- Jul...Fairfax County
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...Fairfax County
 
Dulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding UpdateDulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding UpdateFairfax County
 
Silver Line Update: December 1, 2015
Silver Line Update: December 1, 2015Silver Line Update: December 1, 2015
Silver Line Update: December 1, 2015Fairfax County
 

Semelhante a Silver Line Phase 1-Status Report: Sept. 2013 (20)

Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013Dulles Rail Phase 1-Status Report: June 21, 2013
Dulles Rail Phase 1-Status Report: June 21, 2013
 
Silver Line Update: Board Transportation Committee: Dec. 13, 2016
Silver Line Update: Board Transportation Committee: Dec. 13, 2016Silver Line Update: Board Transportation Committee: Dec. 13, 2016
Silver Line Update: Board Transportation Committee: Dec. 13, 2016
 
Silver Line Update-Board Transportation Committee: Oct. 13, 2015
Silver Line Update-Board Transportation Committee: Oct. 13, 2015Silver Line Update-Board Transportation Committee: Oct. 13, 2015
Silver Line Update-Board Transportation Committee: Oct. 13, 2015
 
Agenda Item 7: Silver Line Phase II Implementation
Agenda Item 7: Silver Line Phase II ImplementationAgenda Item 7: Silver Line Phase II Implementation
Agenda Item 7: Silver Line Phase II Implementation
 
Silver Line Phase 1-Status Report
Silver Line Phase 1-Status ReportSilver Line Phase 1-Status Report
Silver Line Phase 1-Status Report
 
Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016Silver Line Update - Feb. 12, 2016
Silver Line Update - Feb. 12, 2016
 
Silver Line Phase 1 Status Report-Sept. 16, 2014
Silver Line Phase 1 Status Report-Sept. 16, 2014Silver Line Phase 1 Status Report-Sept. 16, 2014
Silver Line Phase 1 Status Report-Sept. 16, 2014
 
Silver Line Update July 2016
Silver Line Update July 2016Silver Line Update July 2016
Silver Line Update July 2016
 
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayGlade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
 
Silverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway ProjectSilverbrook Road at Monacan Road Walkway Project
Silverbrook Road at Monacan Road Walkway Project
 
Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014Silver Line Phase 1-Status Report: May 6, 2014
Silver Line Phase 1-Status Report: May 6, 2014
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
 
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
Dulles Metrorail Silver Line Phase 2: Fairfax County Parking Garages Herndon ...
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
 
Dulles Metrorail Silver Line Phase 2 Status and Funding
Dulles Metrorail Silver Line Phase 2 Status and FundingDulles Metrorail Silver Line Phase 2 Status and Funding
Dulles Metrorail Silver Line Phase 2 Status and Funding
 
Dulles Corridor Metrorail Project: Board Transportation Committee Update- Jul...
Dulles Corridor Metrorail Project: Board Transportation Committee Update- Jul...Dulles Corridor Metrorail Project: Board Transportation Committee Update- Jul...
Dulles Corridor Metrorail Project: Board Transportation Committee Update- Jul...
 
State of the City of Norman
State of the City of NormanState of the City of Norman
State of the City of Norman
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation : Boar...
 
Dulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding UpdateDulles Metrorail Silver Line Phase 2 Status and Funding Update
Dulles Metrorail Silver Line Phase 2 Status and Funding Update
 
Silver Line Update: December 1, 2015
Silver Line Update: December 1, 2015Silver Line Update: December 1, 2015
Silver Line Update: December 1, 2015
 

Mais de Fairfax County

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementFairfax County
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS Fairfax County
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22Fairfax County
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19 Fairfax County
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationFairfax County
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction ProgressFairfax County
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxFairfax County
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IVFairfax County
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Fairfax County
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxFairfax County
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilFairfax County
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptxFairfax County
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT Fairfax County
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap UpFairfax County
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Fairfax County
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Fairfax County
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectFairfax County
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual ArtsFairfax County
 

Mais de Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Último

12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxSasikiranMarri
 
lok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxlok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxdigiyvbmrkt
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptUsmanKaran
 
13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Emerging issues in migration policies.ppt
Emerging issues in migration policies.pptEmerging issues in migration policies.ppt
Emerging issues in migration policies.pptNandinituteja1
 
11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Power in International Relations (Pol 5)
Power in International Relations (Pol 5)Power in International Relations (Pol 5)
Power in International Relations (Pol 5)ssuser583c35
 
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...The Lifesciences Magazine
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 

Último (12)

12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf
 
World Economic Forum : The Global Risks Report 2024
World Economic Forum : The Global Risks Report 2024World Economic Forum : The Global Risks Report 2024
World Economic Forum : The Global Risks Report 2024
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptx
 
lok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxlok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptx
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.ppt
 
13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf
 
Emerging issues in migration policies.ppt
Emerging issues in migration policies.pptEmerging issues in migration policies.ppt
Emerging issues in migration policies.ppt
 
11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 
Power in International Relations (Pol 5)
Power in International Relations (Pol 5)Power in International Relations (Pol 5)
Power in International Relations (Pol 5)
 
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 

Silver Line Phase 1-Status Report: Sept. 2013

  • 1. • Overall Phase 1 Construction - 96% complete • Stations: • McLean – 94% • Tysons Corner – 92% • Greensboro – 92% • Spring Hill – 92% • Wiehle – 97% • Wiehle garage: 99% Complete • Punch list and site work ongoing • Record of Decision roadway improvements - 94% complete • Completion - Fall 2013 • Fairfax Connector bus testing at Wiehle – Aug. 16, and Sep. 9, 2013 • West Falls Church rail yard: • Completion – Jan. 2014 • Sound box and tail track – November 2013 • Site work – 99% • Service & Inspection Building – 59% • Track Work – 99% • Systems – 80% • Testing – 8% • First delivery of 7000-series rail cars – February 2014 • Coordination continues among FCDOT, Macerich (Tysons Corner Center), WMATA, and MWAA on the mall pedestrian bridge connection Status September 2013 • Substantial completion/MWAA turn-over to WMATA delayed eight weeks • Dulles Transit Partner’s revised Scheduled Substantial Completion Date (SSCD) – midNovember 2013 • MWAA continues to work with DTP on SSCD • Testing, commissioning, acceptance by WMATA ongoing thru Revenue Operations Date (ROD) • Six and eight car test trains are now operating • WMATA acceptance testing – SSCD to ROD (up to 90 days) • Estimated passenger revenue service - date determined by WMATA when testing, training, and safe operation is achieved Schedule • Wiehle garage substantial completion and non-RUP – Aug. 12, 2013 • Phase 1 Maintenance & Land Conveyance process ongoing • Regional bus service planning (Phase 1) and coordination meeting (Fairfax Connector, WMATA, Washington Flyer, PRTC, Loudoun County Transit) took place Sept. 11 • WMATA lead for Phase 1 marketing and outreach; public silverlinemetro.com website went live the week of Sept. 9 Current Milestones – Past 30 Days 1
  • 2. • Phase 2 design work continues Status • Herndon and Innovation Center Station (south) garages • Fairfax County has committed funding for design of the parking garages. The county has entered into a Real Estate Exchange Agreement with an adjacent property owner at Innovation Center Station for an improved transit oriented development and a real estate agreement. • At Herndon staff has developed a number of concept designs • Scheduled have been developed that track completion of the garages to the completion of Phase 2, those schedules are included in the letter to USDOT • Town Center Parkway tunnel • FCDOT conceptual design to WMATA, MWAA and VDOT in March 2013 • Received comments in May 2013; comment resolution meeting held June 2013 with FCDOT, WMATA, MWAA and VDOT • FCDOT is exploring ways to address stakeholder comments and plans to submit a change order package to MWAA within the next 30 days September 2013 • Status of Phase 2 Bid Packages: • Packet A - rail Line, station, and systems (includes Innovation Center Station) - Awarded • Packet B – Yard and shop – Procurement Fall 2013 • Packet C – Parking garages (may not be issued) • Cost Estimate: $3.093B • Cost Estimate with value engineering , Packet A savings, and garages funding outside the project: $2.6B • Cost to build garages in Fairfax County: $135M est. • Substantial Completion: Summer 2018 • Revenue Operations: Late 2018 Budget/Schedule • Fairfax County did not receive TIGER grant funding to cover a portion of the Innovation Center station construction • FTA oversight of Phase 2 under discussion - Ongoing • TIFIA Letter of Interest submitted - Ongoing • WMATA Art in Transit – Ongoing • Follow up meeting – Sept • DPWES has selected architect, engineering, and parking consultants for the Phase 2 parking garages at Herndon and Innovation Center stations Current Milestones – Past 30 Days 2
  • 3. September 2013 West Falls Church yard sound cover box. Structural steel framing of the south portal to the loop track sound cover box. Photo courtesy Stephen Barna, Dulles Corridor Metrorail Project (DCMP). 3
  • 4. September 2013 WFC yard - train access platforms are complete except for handrails; new storage track bumpers are installed; the Service & Inspection Building and sound cover box nearing completion. Photo courtesy Stephen Barna, DCMP. 4
  • 5. September 2013 West Falls Church yard service & inspection Building. Turn tables in the shop floor have been installed. Photo courtesy Stephen Barna, DCMP. 5
  • 6. September 2013 McLean Station - construction of the entrance pavilion is complete except for punchlist items. In the foreground the kiss and ride lot loop with lights and landscaping. Photo courtesy Stephen Barna, DCMP. 6
  • 7. September 2013 Spring Hill Station north entrance pavilion – window/curtain wall glazing, entrance gates, plaza sidewalk, and site lighting are complete. Photo courtesy Stephen Barna, DCMP. 7
  • 8. September 2013 Spring Hill Station platform – WMATA test train passing through the station on the inbound track during dynamic testing. Photo courtesy Stephen Barna, DCMP. 8
  • 9. September 2013 Wiehle-Reston East Station south entrance pavilion and bus bays nearing completion. Preparations are underway to install the perimeter handrails. Photo courtesy Stephen Barna, DCMP. 9
  • 10. September 2013 Wiehle-Reston East Station – platform level finished and signage. Photo courtesy David Claypool, Kalorama. 10
  • 11. September 2013 Wiehle-Reston East Station mezzanine level. Preparations are underway to install the perimeter handrails. Photo courtesy Stephen Barna, DCMP. 11
  • 12. September 2013 Reston Station (Comstock/County) plaza nearing completion with the glass-enclosed escalator/elevator lobby to the Fairfax Connector bus platform in the background. Photo courtesy Stephen Barna, DCMP. 12
  • 13. September 2013 Escalators and stair case connecting the bus platform with the pedestrian plaza. Photo courtesy Ellen Kamilakis, FCDOT. 13
  • 14. September 2013 Fairfax Connector initial bus testing at Wiehle-Reston East Station (north, Level G2 transit center). The first bus ever to enter the facility. Photo courtesy Nick Perfili, FCDOT. 14
  • 15. September 2013 Fairfax Connector initial bus testing at Wiehle-Reston East Station (north, Level G2 transit center). ADA ramp deployment on the platform. Photo courtesy Nick Perfili, FCDOT. 15
  • 16. September 2013 Fairfax Connector initial bus testing at Wiehle-Reston East Station (north, Level G2 transit center). Photo courtesy Ellen Kamilakis, FCDOT. 16