SlideShare uma empresa Scribd logo
1 de 5
Baixar para ler offline
Q&A
Q&A



1. What is the Power Cloud?
The Power Cloud is a set of renewable energy power plants built by WOR(l)D NRG in various countries. The Cloud concept derives from the fact
that the individual stations (Cloud) are connected via the Internet, so as to provide data for the production of energy in real time and to be
shown as the production of a single mega center, even if located in different countries.
The Cloud concept derives from the fact that, it’s similar to the concept of “Cloud computing” in which data can be stored on one or more
servers, and that you do not know the physical location. The owner of a Power Share (see point 3) is in fact, an electricity producer, but does
not have a power plant in the traditional sense of the term as its Power Share, so it may also be allocated on a different Cloud.


2. What is a Cloud?
A Cloud is a 1.2 MW photovoltaic power plant built in solar parks, constructed by WOR(l)D NRG, through its Power Clouds Pte Ltd subsidiary.
A Cloud consists of 5,000 photovoltaic solar panels of 240 Watts of power and all infrastructure installation that allows the production of
electricty. The 5,000 panels that make up the Cloud correspond to a Power Share.


3. What is the Power Share?
The Power Share is a property title of a photovoltaic panel of 240 Watts of power, installed, configured and connected to the distribution
network of the local energy operator. The panel is part of an entire photovoltaic power station, consisting of panels connected to each other.
All panels, furthermore, are connected to the power plant for the conversion and distribution of the energy produced and connected to the
network operator via low, medium and high voltage cabins.


4. How much does a Power Share cost?
A Power Share, or rather a 240Watt solar panel, including infrastructure installation, maintenance and connection to the electricity
network, costs $ 1,200. It is installed directly at one of photovoltaic parks made by WOR(l)D NRG. The price of a Power Share includes all
transportation, installation, configuration, connection to the power supply, maintenance costs, and includes all the facilities that allow the
production of electricity and its distribution on the local energy network. Furthermore, it provides insurance against theft, vandalism, natural
disasters and weather for 25 years. The panel is guaranteed for 25 years.


5. Why should I buy a Power Share?
A photovoltaic panel, installed in a photovoltaic park and connected to the network operator, will produce electricity that will be purchased by
the local operator of the country in which the transfer has been accomplished. In some countries, moreover, there are incentives from 15 to 20
years on the production of renewable energy, guaranteed by governments and directives of the Kyoto Protocol. This energy, plus incentives, will
produce an annual income on energy production of a single panel that will be paid to its owner after administration and management costs.
This fee can range from 15% to 20% per annum on the total value of the panel’s cost. It is also important to consider that the value of energy
is constantly increasing, so that rent can be increased year after year. The pension is subject to change based on the actual cost of energy and
government incentives for the particular Cloud panel in which you are installing.
Q&A


6. Who guarantees that the energy produced will be purchased by local
operators?
WOR(l)D NRG constructs its facilities exclusively in countries participating in the Kyoto Protocol (184). Among the provisions of the Protocol,
there are rules for all countries regarding the share of renewable energy production to producers of fossil fuels, polluting or otherwise, must
commit to make or buy. This rule guarantees and imposes obligation on the part of governments to ensure the purchase of renewable energy,
which translates into safety by WOR(l)D NRG, to sell the energy produced without any market risk.


7. What are the countries where WOR(l)D NRG constructs its Cloud?
Theoretically, WOR(l)D NRG could build its power plants in any of the 184 countries that have signed the Kyoto Protocol. However, in order to
ensure maximum yield of photovoltaic panels, WOR(l)D NRG chooses the countries in which there are some strategic conditions: the higher cost
of energy paid by the operators, existence of government incentives or other forms of incentives, infrastructure transportation and adequate
distribution infrastructures, political and financial stability of the country, security issues and better performance in terms of solar irradiation
per cm2.


8. Can I consider the Power Share a financial investment?
NO. The Power Share is not a financial investment, but on the contrary, it is the purchase of a solar panel which produces energy that WOR
(l) D NRG manages on behalf of the owner. The annuity that is paid monthly will be nothing more than the value of the energy paid by the
operators, plus any net incentives after the costs of administration and management of a photovoltaic park.


9. How can I be sure to receive the power shares income that is
declared on the marketing materials of the Power Cloud presentation?
The indicated value of 15% -20% is for demonstration purposes only and is the result of simulating production costs and the cost of more
government incentives for the production of the annual MWh produced by a Cloud of 1.2 MW, installed in Romania. Therefore, this value can
vary depending on the actual amount of energy produced (MWh), the cost of energy paid by the operator in the country in which the Cloud is
installed and the value of government incentives and their possible variation.


10. For how many years will I receive my income from the production
of my panels?
The panel’s purchase value is guaranteed by government incentives, such incentives guarantee coverage of the investment and a high gain,
but the life of the module is not limited to the duration of the incentive as WOR(l)D only uses photovoltaic made avant-garde modules with
technologies for which the manufacturer guarantees that after 25 years of operation have yet guaranteed a performance not less than 80%
(0.8% / year) of the nominal value. In this way, the performance deterioration is much less than the increase in the value of their production
(which increases by 3-4% / year).
Q&A


11. How can I get a return on my investment?
As explained in Section 8, the Power Share is not a financial investment, but an investment in the purchase of solar panels, so the return
on investment is provided only through the sale or transfer of the Power Share (panels), there are three possible ways: 1. After the first 12
months, WOR(l)D NRG guarantees the “Buy Back”, the customer can ask for it at least 12 months after the purchase of Power Share, to
exercise this option forcing WOR(l)D NRG to repurchase the panel at the same cost of the original sale, less the administrative costs of handling
the transaction ($ 25 - 4% of the total.). 2. Private sale of the panel to another individual, with transfer of ownership (administration fee of $
25). 3. Sale of the panel through the private trading platform of WOR(l)D NRG (available from 12 months after the project launch).


12. What happens to my Power Share after 25 years?
After 20 years, the yield of photovoltaic panels is expected to decline by about 10% up to 20% after the 25th year. Consequently, the
production of energy is, more or less, reduced more or less of that entity. Of course, you must consider that in the course of 25 years, the cost of
energy will be increased, more than double, according to estimates provided by various statistic entities.


13. What happens if a Cloud is damaged or destroyed
by external events?
All WOR(l)D NRG Clouds are covered by an insurance policy that covers almost all of its value in the case of such events.


14. Can I transfer or sell the Power Share?
Power Shares title ownership will be available to the bearer, for which they may be assigned, sold or given away.


15. What do I actually get when buying a Power Share?
With the purchase of a Power Share, you’re buying a solar panel including installation, configuration, and connection to the power plant
infrastructure to the distribution of the network operator produced-energy. The panel will be transported directly to the power plant site under
construction and will remain the property of the buyer. The panel will be identified by Serial Number. In addition, the Panel owner will receive,
at home, a printed property title that indicates the panel Serial Number and the certificate issue date. An online account will also be given on
the site www.worldnrg.com where you can follow the panel production progress and all of the information on its income.


16. When and how is the Power Share rent paid?
For every Cloud, an estimated production start date is indicated, which does not necessarily correspond to the actual start of production. The
production will be effective at the moment in which the operator of the local network ties up the counter. From that time, the energy produced
will be calculated and paid on a monthly basis by the operator. WOR(l)D NRG, through the “Power Share” private area site at www.worldnrg.
com provides, to the panel holder, information on the value paid by the operator, plus the value of any incentives. The sums may be paid via
bank transfer or by requesting the exclusive WOR(l)D Debit Card. The WOR(l)D Debit card may be requested, earning at least $100 of income.
Q&A


17. How many Power Shares can I buy?
Theoretically, there is no limit to the number of Power Shares purchased. Obviously, the purchase is subject to the availability of panels for sale
for each individual Cloud under construction.


18. From the time of my investment in the panels, when will I begin to
collect the annuity as time goes by?
The construction of the Clouds provides three stages, “Funding” - “Building” - “Production.” Production can start only when the first two
phases are complete. In some cases, the phases of Funding and Building may be implemented in parallel, in order to optimize the timing of
having gone into production which, however, will not be less than 3 months.


19. I begin to collect the rent on my Power Share even though
production has not started?
NO. Rent is generated from the local operator sale and any incentives. It is impossible to pay any income if the production phase has not
started.


20. How do I know that Power Cloud is legal and that there are
permits and licenses necessary to carry out the energy
producers’ activity?
WOR(l)D NRG begins the construction of power plants only after having obtained all the necessary permits and licenses in the countries
concerned. On the www.worldnrg.com page all of the legal information for each Cloud will be provided, giving data of local companies
incorporated or acquired by WOR(l)D NRG and the related permits and licenses obtained.


21. Is it possible that the Cloud project applications may not be well
accepted by manufacturers of traditional energy?
The Power Cloud project is made in full compliance with the provisions, spirit and philosophy of the Kyoto Protocol which has been supported
by 184 countries around the world.


22. I love the Power Cloud idea and its business opportunities and that
of its global mission. How can I participate in promoting this project?
The Power Cloud business model is revolutionary because it uses the power of word of mouth and awareness to move millions of people
around the world, providing both an environmentally-sustainable solution for our planet and real business opportunities through direct sales
or word of mouth.

Contact the person who informed you of Power Cloud and ask more information, or send an email to mailto: bizsupport@worldnrg.com
to learn of a promoter who can contact you.

Mais conteúdo relacionado

Mais procurados

2016 Clean Energy Trust Challenge - Silver High Energy
2016 Clean Energy Trust Challenge - Silver High Energy2016 Clean Energy Trust Challenge - Silver High Energy
2016 Clean Energy Trust Challenge - Silver High EnergyJames Woods
 
Alternative Markets - solar brochure
Alternative Markets - solar brochureAlternative Markets - solar brochure
Alternative Markets - solar brochureAlternative Markets
 
Vehicle to Grid Technology
Vehicle to Grid TechnologyVehicle to Grid Technology
Vehicle to Grid Technologyvivatechijri
 
Modesto Irrigation District: PEV Impact to Grid and Utility Bills
Modesto Irrigation District: PEV Impact to Grid and Utility BillsModesto Irrigation District: PEV Impact to Grid and Utility Bills
Modesto Irrigation District: PEV Impact to Grid and Utility BillsCenter for Sustainable Energy
 
Clean power plans - the role of the smart grid
Clean power plans  - the role of the smart gridClean power plans  - the role of the smart grid
Clean power plans - the role of the smart gridPaul Alvarez
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Gensol Engineering Limited
 
Wind Force Newsletter July, Edition, 2012
Wind Force Newsletter   July, Edition, 2012Wind Force Newsletter   July, Edition, 2012
Wind Force Newsletter July, Edition, 2012rupeshsingh_1
 
Unleashing local dispatchable solar
Unleashing local dispatchable solarUnleashing local dispatchable solar
Unleashing local dispatchable solarClean Coalition
 
Brochure 1 company profile solar insurance & finance
Brochure 1 company profile solar insurance & financeBrochure 1 company profile solar insurance & finance
Brochure 1 company profile solar insurance & financeSolar Insurance & finance
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantDr Naim R Kidwai
 
Electric Vehicle (EV) Modelling for Smart Grid
Electric Vehicle (EV) Modelling for Smart GridElectric Vehicle (EV) Modelling for Smart Grid
Electric Vehicle (EV) Modelling for Smart Gridsrikanth reddy
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014Headway Solar
 
Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...
Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...
Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...Smart Villages
 
Session 09 spvrt business models
Session 09   spvrt business modelsSession 09   spvrt business models
Session 09 spvrt business modelsChirag Jain
 
Embedded projects in chennai
Embedded projects in chennaiEmbedded projects in chennai
Embedded projects in chennaiPhoenix Systems
 
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringAnil Kumar Bohra
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE
 

Mais procurados (20)

2016 Clean Energy Trust Challenge - Silver High Energy
2016 Clean Energy Trust Challenge - Silver High Energy2016 Clean Energy Trust Challenge - Silver High Energy
2016 Clean Energy Trust Challenge - Silver High Energy
 
Alternative Markets - solar brochure
Alternative Markets - solar brochureAlternative Markets - solar brochure
Alternative Markets - solar brochure
 
Vehicle to Grid Technology
Vehicle to Grid TechnologyVehicle to Grid Technology
Vehicle to Grid Technology
 
THE BALANCE OF POWER
THE BALANCE OF POWERTHE BALANCE OF POWER
THE BALANCE OF POWER
 
Modesto Irrigation District: PEV Impact to Grid and Utility Bills
Modesto Irrigation District: PEV Impact to Grid and Utility BillsModesto Irrigation District: PEV Impact to Grid and Utility Bills
Modesto Irrigation District: PEV Impact to Grid and Utility Bills
 
Clean power plans - the role of the smart grid
Clean power plans  - the role of the smart gridClean power plans  - the role of the smart grid
Clean power plans - the role of the smart grid
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
 
Wind Force Newsletter July, Edition, 2012
Wind Force Newsletter   July, Edition, 2012Wind Force Newsletter   July, Edition, 2012
Wind Force Newsletter July, Edition, 2012
 
Unleashing local dispatchable solar
Unleashing local dispatchable solarUnleashing local dispatchable solar
Unleashing local dispatchable solar
 
Brochure 1 company profile solar insurance & finance
Brochure 1 company profile solar insurance & financeBrochure 1 company profile solar insurance & finance
Brochure 1 company profile solar insurance & finance
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plant
 
Electric Vehicle (EV) Modelling for Smart Grid
Electric Vehicle (EV) Modelling for Smart GridElectric Vehicle (EV) Modelling for Smart Grid
Electric Vehicle (EV) Modelling for Smart Grid
 
Manipur solar policy 2014
Manipur solar policy 2014Manipur solar policy 2014
Manipur solar policy 2014
 
Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...
Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...
Dhaka | Aug-15 | Village level energy access in Bangladesh: Solar Home System...
 
Session 09 spvrt business models
Session 09   spvrt business modelsSession 09   spvrt business models
Session 09 spvrt business models
 
Solar Companies
Solar CompaniesSolar Companies
Solar Companies
 
Embedded projects in chennai
Embedded projects in chennaiEmbedded projects in chennai
Embedded projects in chennai
 
Maximum Energy Case Studies - EUPVSEC
Maximum Energy Case Studies - EUPVSECMaximum Energy Case Studies - EUPVSEC
Maximum Energy Case Studies - EUPVSEC
 
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
 
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013RCREEE-enerMENA_NREA Srategy_ jordan august 2013
RCREEE-enerMENA_NREA Srategy_ jordan august 2013
 

Destaque

Perspectives de l'économie mondiale. Oct. 2009
Perspectives de l'économie mondiale. Oct. 2009Perspectives de l'économie mondiale. Oct. 2009
Perspectives de l'économie mondiale. Oct. 2009phdouroux
 
Taux d'intérêt sur les crédit Sept. 2009
Taux d'intérêt sur les crédit Sept. 2009Taux d'intérêt sur les crédit Sept. 2009
Taux d'intérêt sur les crédit Sept. 2009phdouroux
 
Rapport Tsunami Cour des Comptes
Rapport Tsunami Cour des ComptesRapport Tsunami Cour des Comptes
Rapport Tsunami Cour des Comptesphdouroux
 
Pay plan en (worId)
Pay plan en (worId)Pay plan en (worId)
Pay plan en (worId)fahde12
 
Irsn Rapport Surete Du Parc 2008
Irsn Rapport Surete Du Parc 2008Irsn Rapport Surete Du Parc 2008
Irsn Rapport Surete Du Parc 2008phdouroux
 
Request Bn Pa Transcript 2009 07 24 T07 30
Request Bn Pa Transcript 2009 07 24 T07 30Request Bn Pa Transcript 2009 07 24 T07 30
Request Bn Pa Transcript 2009 07 24 T07 30phdouroux
 

Destaque (6)

Perspectives de l'économie mondiale. Oct. 2009
Perspectives de l'économie mondiale. Oct. 2009Perspectives de l'économie mondiale. Oct. 2009
Perspectives de l'économie mondiale. Oct. 2009
 
Taux d'intérêt sur les crédit Sept. 2009
Taux d'intérêt sur les crédit Sept. 2009Taux d'intérêt sur les crédit Sept. 2009
Taux d'intérêt sur les crédit Sept. 2009
 
Rapport Tsunami Cour des Comptes
Rapport Tsunami Cour des ComptesRapport Tsunami Cour des Comptes
Rapport Tsunami Cour des Comptes
 
Pay plan en (worId)
Pay plan en (worId)Pay plan en (worId)
Pay plan en (worId)
 
Irsn Rapport Surete Du Parc 2008
Irsn Rapport Surete Du Parc 2008Irsn Rapport Surete Du Parc 2008
Irsn Rapport Surete Du Parc 2008
 
Request Bn Pa Transcript 2009 07 24 T07 30
Request Bn Pa Transcript 2009 07 24 T07 30Request Bn Pa Transcript 2009 07 24 T07 30
Request Bn Pa Transcript 2009 07 24 T07 30
 

Semelhante a Faq en

Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...Ajjay Kumar Gupta
 
Community Solar: Overview of an Emerging Growth Market
Community Solar: Overview of an Emerging Growth MarketCommunity Solar: Overview of an Emerging Growth Market
Community Solar: Overview of an Emerging Growth MarketScottMadden, Inc.
 
Presentation to Baran Group Ltd. in summer 2015
 Presentation to Baran Group Ltd. in summer 2015 Presentation to Baran Group Ltd. in summer 2015
Presentation to Baran Group Ltd. in summer 2015Haim R. Branisteanu
 
"Smart Cities" - Peer to Peer Clarifications
"Smart Cities" - Peer to Peer Clarifications"Smart Cities" - Peer to Peer Clarifications
"Smart Cities" - Peer to Peer ClarificationsHaim R. Branisteanu
 
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in IndonesiaHosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in IndonesiaSyamsirAbduh2
 
Draft Article - V1
Draft Article - V1Draft Article - V1
Draft Article - V1Ajay Nanda
 
Impact of CfDs for 5+MW solar installations in the UK post 1.4.15 - URN 14D/114
Impact of CfDs for 5+MW solar installations in the UK post 1.4.15 - URN 14D/114Impact of CfDs for 5+MW solar installations in the UK post 1.4.15 - URN 14D/114
Impact of CfDs for 5+MW solar installations in the UK post 1.4.15 - URN 14D/114Bhalindra Bath - projects & M&A law
 
NanoGrids for Home Application in a Power Cloud Framework
NanoGrids for Home Application in a Power Cloud Framework NanoGrids for Home Application in a Power Cloud Framework
NanoGrids for Home Application in a Power Cloud Framework Alessandro Burgio
 
Distributed Energy Think Savings Webinar
Distributed Energy Think Savings Webinar Distributed Energy Think Savings Webinar
Distributed Energy Think Savings Webinar Ruchir Punjabi
 
IRJET- Vehicle Battery Charger Booth using Hybrid Power System
IRJET- Vehicle Battery Charger Booth using Hybrid Power SystemIRJET- Vehicle Battery Charger Booth using Hybrid Power System
IRJET- Vehicle Battery Charger Booth using Hybrid Power SystemIRJET Journal
 
60230 nrel securiyzation
60230 nrel securiyzation60230 nrel securiyzation
60230 nrel securiyzationEdwin Santiago
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Gensol Engineering Limited
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentivesChirag Jain
 
AUTOMATIC SWITCHING TECHNIQUE IN VEHICLE CHARGING STATION USING IoT
AUTOMATIC SWITCHING TECHNIQUE IN VEHICLE CHARGING STATION USING IoTAUTOMATIC SWITCHING TECHNIQUE IN VEHICLE CHARGING STATION USING IoT
AUTOMATIC SWITCHING TECHNIQUE IN VEHICLE CHARGING STATION USING IoTIRJET Journal
 
Solar Wind Energy Tower - Corporate Presentation
Solar Wind Energy Tower - Corporate PresentationSolar Wind Energy Tower - Corporate Presentation
Solar Wind Energy Tower - Corporate PresentationCompany Spotlight
 
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...IRJET Journal
 
Rooftop Solar Systems
Rooftop Solar SystemsRooftop Solar Systems
Rooftop Solar SystemsJay Ranvir
 

Semelhante a Faq en (20)

Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
Solar Photovoltaic Module Industry, Solar PV Module Manufacturing Plant, Deta...
 
Why Solar rg
Why Solar rgWhy Solar rg
Why Solar rg
 
Community Solar: Overview of an Emerging Growth Market
Community Solar: Overview of an Emerging Growth MarketCommunity Solar: Overview of an Emerging Growth Market
Community Solar: Overview of an Emerging Growth Market
 
Presentation to Baran Group Ltd. in summer 2015
 Presentation to Baran Group Ltd. in summer 2015 Presentation to Baran Group Ltd. in summer 2015
Presentation to Baran Group Ltd. in summer 2015
 
"Smart Cities" - Peer to Peer Clarifications
"Smart Cities" - Peer to Peer Clarifications"Smart Cities" - Peer to Peer Clarifications
"Smart Cities" - Peer to Peer Clarifications
 
beavers-comments
beavers-commentsbeavers-comments
beavers-comments
 
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in IndonesiaHosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
Hosting Capacity Analysis for Photovoltaic Rooftop in Indonesia
 
Draft Article - V1
Draft Article - V1Draft Article - V1
Draft Article - V1
 
Impact of CfDs for 5+MW solar installations in the UK post 1.4.15 - URN 14D/114
Impact of CfDs for 5+MW solar installations in the UK post 1.4.15 - URN 14D/114Impact of CfDs for 5+MW solar installations in the UK post 1.4.15 - URN 14D/114
Impact of CfDs for 5+MW solar installations in the UK post 1.4.15 - URN 14D/114
 
NanoGrids for Home Application in a Power Cloud Framework
NanoGrids for Home Application in a Power Cloud Framework NanoGrids for Home Application in a Power Cloud Framework
NanoGrids for Home Application in a Power Cloud Framework
 
Distributed Energy Think Savings Webinar
Distributed Energy Think Savings Webinar Distributed Energy Think Savings Webinar
Distributed Energy Think Savings Webinar
 
IRJET- Vehicle Battery Charger Booth using Hybrid Power System
IRJET- Vehicle Battery Charger Booth using Hybrid Power SystemIRJET- Vehicle Battery Charger Booth using Hybrid Power System
IRJET- Vehicle Battery Charger Booth using Hybrid Power System
 
60230 nrel securiyzation
60230 nrel securiyzation60230 nrel securiyzation
60230 nrel securiyzation
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 
AUTOMATIC SWITCHING TECHNIQUE IN VEHICLE CHARGING STATION USING IoT
AUTOMATIC SWITCHING TECHNIQUE IN VEHICLE CHARGING STATION USING IoTAUTOMATIC SWITCHING TECHNIQUE IN VEHICLE CHARGING STATION USING IoT
AUTOMATIC SWITCHING TECHNIQUE IN VEHICLE CHARGING STATION USING IoT
 
Solar Wind Energy Tower - Corporate Presentation
Solar Wind Energy Tower - Corporate PresentationSolar Wind Energy Tower - Corporate Presentation
Solar Wind Energy Tower - Corporate Presentation
 
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
 
Rooftop Solar Systems
Rooftop Solar SystemsRooftop Solar Systems
Rooftop Solar Systems
 
SORALITE POWER
SORALITE POWERSORALITE POWER
SORALITE POWER
 

Mais de fahde12

worId ngr
worId ngrworId ngr
worId ngrfahde12
 
Power conference en
Power conference enPower conference en
Power conference enfahde12
 
Pay plan en_2
Pay plan en_2Pay plan en_2
Pay plan en_2fahde12
 
الاسهم الذهبية
الاسهم الذهبيةالاسهم الذهبية
الاسهم الذهبيةfahde12
 
wor(i)d gmn
wor(i)d gmnwor(i)d gmn
wor(i)d gmnfahde12
 
Pay plan
Pay plan Pay plan
Pay plan fahde12
 

Mais de fahde12 (6)

worId ngr
worId ngrworId ngr
worId ngr
 
Power conference en
Power conference enPower conference en
Power conference en
 
Pay plan en_2
Pay plan en_2Pay plan en_2
Pay plan en_2
 
الاسهم الذهبية
الاسهم الذهبيةالاسهم الذهبية
الاسهم الذهبية
 
wor(i)d gmn
wor(i)d gmnwor(i)d gmn
wor(i)d gmn
 
Pay plan
Pay plan Pay plan
Pay plan
 

Faq en

  • 1. Q&A
  • 2. Q&A 1. What is the Power Cloud? The Power Cloud is a set of renewable energy power plants built by WOR(l)D NRG in various countries. The Cloud concept derives from the fact that the individual stations (Cloud) are connected via the Internet, so as to provide data for the production of energy in real time and to be shown as the production of a single mega center, even if located in different countries. The Cloud concept derives from the fact that, it’s similar to the concept of “Cloud computing” in which data can be stored on one or more servers, and that you do not know the physical location. The owner of a Power Share (see point 3) is in fact, an electricity producer, but does not have a power plant in the traditional sense of the term as its Power Share, so it may also be allocated on a different Cloud. 2. What is a Cloud? A Cloud is a 1.2 MW photovoltaic power plant built in solar parks, constructed by WOR(l)D NRG, through its Power Clouds Pte Ltd subsidiary. A Cloud consists of 5,000 photovoltaic solar panels of 240 Watts of power and all infrastructure installation that allows the production of electricty. The 5,000 panels that make up the Cloud correspond to a Power Share. 3. What is the Power Share? The Power Share is a property title of a photovoltaic panel of 240 Watts of power, installed, configured and connected to the distribution network of the local energy operator. The panel is part of an entire photovoltaic power station, consisting of panels connected to each other. All panels, furthermore, are connected to the power plant for the conversion and distribution of the energy produced and connected to the network operator via low, medium and high voltage cabins. 4. How much does a Power Share cost? A Power Share, or rather a 240Watt solar panel, including infrastructure installation, maintenance and connection to the electricity network, costs $ 1,200. It is installed directly at one of photovoltaic parks made by WOR(l)D NRG. The price of a Power Share includes all transportation, installation, configuration, connection to the power supply, maintenance costs, and includes all the facilities that allow the production of electricity and its distribution on the local energy network. Furthermore, it provides insurance against theft, vandalism, natural disasters and weather for 25 years. The panel is guaranteed for 25 years. 5. Why should I buy a Power Share? A photovoltaic panel, installed in a photovoltaic park and connected to the network operator, will produce electricity that will be purchased by the local operator of the country in which the transfer has been accomplished. In some countries, moreover, there are incentives from 15 to 20 years on the production of renewable energy, guaranteed by governments and directives of the Kyoto Protocol. This energy, plus incentives, will produce an annual income on energy production of a single panel that will be paid to its owner after administration and management costs. This fee can range from 15% to 20% per annum on the total value of the panel’s cost. It is also important to consider that the value of energy is constantly increasing, so that rent can be increased year after year. The pension is subject to change based on the actual cost of energy and government incentives for the particular Cloud panel in which you are installing.
  • 3. Q&A 6. Who guarantees that the energy produced will be purchased by local operators? WOR(l)D NRG constructs its facilities exclusively in countries participating in the Kyoto Protocol (184). Among the provisions of the Protocol, there are rules for all countries regarding the share of renewable energy production to producers of fossil fuels, polluting or otherwise, must commit to make or buy. This rule guarantees and imposes obligation on the part of governments to ensure the purchase of renewable energy, which translates into safety by WOR(l)D NRG, to sell the energy produced without any market risk. 7. What are the countries where WOR(l)D NRG constructs its Cloud? Theoretically, WOR(l)D NRG could build its power plants in any of the 184 countries that have signed the Kyoto Protocol. However, in order to ensure maximum yield of photovoltaic panels, WOR(l)D NRG chooses the countries in which there are some strategic conditions: the higher cost of energy paid by the operators, existence of government incentives or other forms of incentives, infrastructure transportation and adequate distribution infrastructures, political and financial stability of the country, security issues and better performance in terms of solar irradiation per cm2. 8. Can I consider the Power Share a financial investment? NO. The Power Share is not a financial investment, but on the contrary, it is the purchase of a solar panel which produces energy that WOR (l) D NRG manages on behalf of the owner. The annuity that is paid monthly will be nothing more than the value of the energy paid by the operators, plus any net incentives after the costs of administration and management of a photovoltaic park. 9. How can I be sure to receive the power shares income that is declared on the marketing materials of the Power Cloud presentation? The indicated value of 15% -20% is for demonstration purposes only and is the result of simulating production costs and the cost of more government incentives for the production of the annual MWh produced by a Cloud of 1.2 MW, installed in Romania. Therefore, this value can vary depending on the actual amount of energy produced (MWh), the cost of energy paid by the operator in the country in which the Cloud is installed and the value of government incentives and their possible variation. 10. For how many years will I receive my income from the production of my panels? The panel’s purchase value is guaranteed by government incentives, such incentives guarantee coverage of the investment and a high gain, but the life of the module is not limited to the duration of the incentive as WOR(l)D only uses photovoltaic made avant-garde modules with technologies for which the manufacturer guarantees that after 25 years of operation have yet guaranteed a performance not less than 80% (0.8% / year) of the nominal value. In this way, the performance deterioration is much less than the increase in the value of their production (which increases by 3-4% / year).
  • 4. Q&A 11. How can I get a return on my investment? As explained in Section 8, the Power Share is not a financial investment, but an investment in the purchase of solar panels, so the return on investment is provided only through the sale or transfer of the Power Share (panels), there are three possible ways: 1. After the first 12 months, WOR(l)D NRG guarantees the “Buy Back”, the customer can ask for it at least 12 months after the purchase of Power Share, to exercise this option forcing WOR(l)D NRG to repurchase the panel at the same cost of the original sale, less the administrative costs of handling the transaction ($ 25 - 4% of the total.). 2. Private sale of the panel to another individual, with transfer of ownership (administration fee of $ 25). 3. Sale of the panel through the private trading platform of WOR(l)D NRG (available from 12 months after the project launch). 12. What happens to my Power Share after 25 years? After 20 years, the yield of photovoltaic panels is expected to decline by about 10% up to 20% after the 25th year. Consequently, the production of energy is, more or less, reduced more or less of that entity. Of course, you must consider that in the course of 25 years, the cost of energy will be increased, more than double, according to estimates provided by various statistic entities. 13. What happens if a Cloud is damaged or destroyed by external events? All WOR(l)D NRG Clouds are covered by an insurance policy that covers almost all of its value in the case of such events. 14. Can I transfer or sell the Power Share? Power Shares title ownership will be available to the bearer, for which they may be assigned, sold or given away. 15. What do I actually get when buying a Power Share? With the purchase of a Power Share, you’re buying a solar panel including installation, configuration, and connection to the power plant infrastructure to the distribution of the network operator produced-energy. The panel will be transported directly to the power plant site under construction and will remain the property of the buyer. The panel will be identified by Serial Number. In addition, the Panel owner will receive, at home, a printed property title that indicates the panel Serial Number and the certificate issue date. An online account will also be given on the site www.worldnrg.com where you can follow the panel production progress and all of the information on its income. 16. When and how is the Power Share rent paid? For every Cloud, an estimated production start date is indicated, which does not necessarily correspond to the actual start of production. The production will be effective at the moment in which the operator of the local network ties up the counter. From that time, the energy produced will be calculated and paid on a monthly basis by the operator. WOR(l)D NRG, through the “Power Share” private area site at www.worldnrg. com provides, to the panel holder, information on the value paid by the operator, plus the value of any incentives. The sums may be paid via bank transfer or by requesting the exclusive WOR(l)D Debit Card. The WOR(l)D Debit card may be requested, earning at least $100 of income.
  • 5. Q&A 17. How many Power Shares can I buy? Theoretically, there is no limit to the number of Power Shares purchased. Obviously, the purchase is subject to the availability of panels for sale for each individual Cloud under construction. 18. From the time of my investment in the panels, when will I begin to collect the annuity as time goes by? The construction of the Clouds provides three stages, “Funding” - “Building” - “Production.” Production can start only when the first two phases are complete. In some cases, the phases of Funding and Building may be implemented in parallel, in order to optimize the timing of having gone into production which, however, will not be less than 3 months. 19. I begin to collect the rent on my Power Share even though production has not started? NO. Rent is generated from the local operator sale and any incentives. It is impossible to pay any income if the production phase has not started. 20. How do I know that Power Cloud is legal and that there are permits and licenses necessary to carry out the energy producers’ activity? WOR(l)D NRG begins the construction of power plants only after having obtained all the necessary permits and licenses in the countries concerned. On the www.worldnrg.com page all of the legal information for each Cloud will be provided, giving data of local companies incorporated or acquired by WOR(l)D NRG and the related permits and licenses obtained. 21. Is it possible that the Cloud project applications may not be well accepted by manufacturers of traditional energy? The Power Cloud project is made in full compliance with the provisions, spirit and philosophy of the Kyoto Protocol which has been supported by 184 countries around the world. 22. I love the Power Cloud idea and its business opportunities and that of its global mission. How can I participate in promoting this project? The Power Cloud business model is revolutionary because it uses the power of word of mouth and awareness to move millions of people around the world, providing both an environmentally-sustainable solution for our planet and real business opportunities through direct sales or word of mouth. Contact the person who informed you of Power Cloud and ask more information, or send an email to mailto: bizsupport@worldnrg.com to learn of a promoter who can contact you.