Toyota Production System
and Lean Manufacturing
TOYOTA PRODUCTION SYSTEM
The Toyota Production System was adopted by
many Japanese companies in the aftermath of the
1973 oil shock
“Waste” Elimination Philosophy:
“.. Above all, one of our most important purposes was increased
productivity and reduced cost. To achieve this purpose, we put our
emphasis on the notion of eliminating all kinds of unnecessary
functions in the factories. Our approach has been to investigate one by
one the causes of various "unnecessaries" in manufacturing operations
and to devise methods for their solution, often by trial and error ...”
Taiicho Ohno, Former Vice President, Toyota Motor Corp., Former President, Japan Industrial Management
Association; Former Chairman, Toyoda Spinning and Weaving Co., Ltd.
PURPOSES OF JIT
Primary Purpose:
Profit through cost reduction (or improvement of
Productivity)
This is attained through WASTE elimination.
Other important purposes:
Quantity control:
JIT, Kanban & Autonomation (visual control system)
Quality control:
Autonomation, improvement by small groups, functional
management
Respect for humanity:
Flexible work force (adapt to demand changes), capitalize
workers ideas.
TYPES OF WASTE
Excessive production resources (primary waste):
excessive workforce
excessive facilities
excessive inventories
unnecessary capital investment
Overproduction (secondary waste - the WORST waste):
leads to
Excessive inventories (tertiary waste):
extra jobs make overproduction invisible.
adds losses in opportunity cost
lead to
Unnecessary capital investment (fourth waste):
adds facility depreciations and overhead cost
TO ACHIEVE THESE PUPOSES
7 Wastes Elimination
Just-In-Time (JIT) Production
Kanban System
Production Smoothing
5S
Setup Time Reduction
Machine Layout & Multi-function Worker
Autonomation (Visual Management)
Identification and Elimination of Waste
Philosophy
•Identification and elimination of waste is the central theme of a lean
manufacturing production system
•Lean manufacturing is a dynamic and constantly improving process
dependent upon understanding and involvement by all employees
•Successful implementation requires that all employees must be
trained to identify and eliminate waste from their work
•Waste exists in all work and at all levels in the organization
t
,
Identification and Elimination of Waste
Philosophy
Effectiveness is the result of the integration of:- Man
- Method
- Material
- Machine
At the worksite
• Waste exists in all work and at all levels in the organization
Seven Types of Waste
Over-production
Wait time
Transportation
Processing
Inventory
Motion
Defects
Over-production Waste
Definition
Producing more than needed Producing faster than needed
Over-production Waste
Characteristics:
•Inventory Stockpiles
•Extra equipment/oversized equipment
•Unbalanced Material Flow
•Extra Part Storage racks
•Extra Manpower
•Batch Processing
•Complex Inventory Management
•Excessive Capacity/Investment
•Additional Floor Space/Outside Storage
•Hidden Problems
•Excessive Obsolescence
•Large Lot Sizes
•Building Ahead
Over-production Waste
Causes:
•Incapable Processes
•Just in Case Reward System
•Lack of Communication
•Local Optimization
•Automation in the Wrong Places
•Cost Accounting Practices
•Low Uptimes
•Lack of Stable/Consitent Schedules
Waiting Time Waste
Definition
Idle Time That is Produced When Two Dependant Variables are not
Fully Synchronized.
•Man Wait Time
•Machine Wait Time
Waiting Time Waste
Characteristics:
•Man Waiting for Machine
•Machine/Materials Waiting for Man
•Unbalanced Operations (Work)
•Lack of Operator Concern for Equipment Breakdowns
•Unplanned Equipment Downtime
Waiting Time Waste
Causes:
•Inconsistent Work Methods
•Long Machine Change Over Time
•Low Man/Machine Effectiveness
•Lack of Proper Equipment/Materials
Transportation Waste
Definition
Any Material Movement That Does Not Directly Support a Lean
Manufacturing System
Transportation Waste
Characteristics:
•Extra carts, fork lifts, dollies
•Multiple Storage Locations
•Extra Material Racks
•Complex Inventory Management
•Extra Facility Space
•Incorrect Inventory Counts
•Damaged Material
Transportation Waste
Causes:
•Large Lot Processing
•Unleveled Schedules
•Lack of 5 S’s
•Lack of Visual Controls
•Improper Facility Layout
•Large Buffers and In Process Kanbans
Processing Waste
Definitio
n
Effort Which Adds No Value To a Product or Service.
Enhancements which are Transparent to The Customers or
Work Which Could Be Combined with Another Process.
Processing Waste
Characteristics:
•Process Bottlenecks
•Lack of Clear Customer Specifications
•Endless Refinement
•Redundant Approvals
•Extra Copies/Excessive Information
Processing Waste
Causes:
•Engineering Changes Without Processing
Changes
•Decision Making at Inappropriate Levels
•Inefficient Policies and Procedures
•Lack of Customer Input Concerning
Requirements
Inventory Waste
Definition
Any Supply in Excess of Process Requirements Necessary to
Produce Goods or Services Just in Time.
Inventory Waste
Characteristics:
•Extra Space on Receiving Docks
•Material Between Processes
•Stagnated Material Flow
•LIFO instead of FIFO
•Extensive Rework When Problems Surface
•Long Lead Time for Engineering Changes
•Additional Material Handling Resources (Men, Equipment,
Racks, Storage Space)
Inventory Level
Over
Production
Wait Time
Inventory Waste
Causes:
•Incapable Processes
•Uncontrolled Bottleneck Processes
•Incapable Suppliers
•Long Change Over Times
•Management Decisions
•Local Optimization
•In times
Process Defects
Motion Waste
Definition
Any Movement of People Which Does Not Contribute Added
Value To The Product or Service
Motion Waste
Characteristics:
•Looking for Tools
•Excessive Reaching or Bending
•Material Too Far Apart (Walk Time)
•Equipment for Moving Parts
•Extra “Busy” Movements While Waiting
Motion Waste
Causes:
•Equipment, Office & Plant Layout
•Lack of 5 S’s
•Lack of Visual Controls
•Inconsistent Work Methods (Standardized Work)
•Large Batch Sizes
Rework or Correction Waste
Definitio
n
Repair of a Product or Service To Fulfill Customer requirements
Rework or Correction Waste
Characteristics:
•Extra Floor Space/Tools/Equipment
•Extra Manpower To Inspect/Rework/Repair
•Stockpiling Inventory
•Complex Material Flow
•Questionable Quality
•Missed Shipments/Deliveries
•Lower Profits Due To Scrap
•Reactive Organization
Rework or Correction Waste
Causes:
•Incapable Processes
•Excessive Variation
•Incapable Suppliers
•Management Decisions
•Insufficient Training
•Inadequate Tools/Equipment
•Poor Layouts/Unnecessary Handling
•High Inventory Levels
Seven Types of Waste
Over-production
Wait
Transportation
Processing
Inventory
Motion
Defects
Seven Types of Waste

Mais conteĂşdo relacionado

Mais procurados

Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jitajithsrc
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jitajithsrc
 
Jit (us), kanban, lean
Jit (us), kanban, leanJit (us), kanban, lean
Jit (us), kanban, leanNishit Patel
 
Just in time
Just in timeJust in time
Just in timeyashpalsg
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in TimeMusfiqur Rahman
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyotarushin202003
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)Manoj Subedi
 
Just in time technology (JIT)
Just in time technology (JIT)Just in time technology (JIT)
Just in time technology (JIT)Akash Dutta
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production Systemjasonhian
 
Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory managementiWriteEssays
 
Gagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan Pareek, PMP
 

Mais procurados (20)

Just In Time & Kanban
Just In Time & KanbanJust In Time & Kanban
Just In Time & Kanban
 
ITFT--JIT
ITFT--JITITFT--JIT
ITFT--JIT
 
Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jit
 
Just in time
Just in timeJust in time
Just in time
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jit
 
Jit systems
Jit systemsJit systems
Jit systems
 
Jit (us), kanban, lean
Jit (us), kanban, leanJit (us), kanban, lean
Jit (us), kanban, lean
 
Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean production
 
Just in time
Just in timeJust in time
Just in time
 
JIT and Lean Manufacturing
JIT and Lean Manufacturing JIT and Lean Manufacturing
JIT and Lean Manufacturing
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in Time
 
Just In Time Management
Just In Time ManagementJust In Time Management
Just In Time Management
 
Jit In Toyota
Jit In ToyotaJit In Toyota
Jit In Toyota
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)
 
Just in time technology (JIT)
Just in time technology (JIT)Just in time technology (JIT)
Just in time technology (JIT)
 
Jit
JitJit
Jit
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
 
Just In Time (jit) inventory management
Just In Time (jit) inventory managementJust In Time (jit) inventory management
Just In Time (jit) inventory management
 
jit
jitjit
jit
 
Gagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmtGagan toyota jit_production_mgmt
Gagan toyota jit_production_mgmt
 

Destaque

Becoming lean john shook lean manufacturing
Becoming lean john shook lean manufacturingBecoming lean john shook lean manufacturing
Becoming lean john shook lean manufacturingJohn Gillis
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturingAdeel Javaid
 
The Toyota Production System - A Transition from Mass Production to Lean Manu...
The Toyota Production System - A Transition from Mass Production to Lean Manu...The Toyota Production System - A Transition from Mass Production to Lean Manu...
The Toyota Production System - A Transition from Mass Production to Lean Manu...Nurhazman Abdul Aziz
 
Continuous Improvement Strategy
Continuous Improvement StrategyContinuous Improvement Strategy
Continuous Improvement StrategyCraig Marton
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation pptbwu.nl
 
Key principles in continuous improvement culture
Key principles in continuous improvement cultureKey principles in continuous improvement culture
Key principles in continuous improvement cultureGopala P.
 

Destaque (6)

Becoming lean john shook lean manufacturing
Becoming lean john shook lean manufacturingBecoming lean john shook lean manufacturing
Becoming lean john shook lean manufacturing
 
Tps and lean manufacturing
Tps and lean manufacturingTps and lean manufacturing
Tps and lean manufacturing
 
The Toyota Production System - A Transition from Mass Production to Lean Manu...
The Toyota Production System - A Transition from Mass Production to Lean Manu...The Toyota Production System - A Transition from Mass Production to Lean Manu...
The Toyota Production System - A Transition from Mass Production to Lean Manu...
 
Continuous Improvement Strategy
Continuous Improvement StrategyContinuous Improvement Strategy
Continuous Improvement Strategy
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Key principles in continuous improvement culture
Key principles in continuous improvement cultureKey principles in continuous improvement culture
Key principles in continuous improvement culture
 

Semelhante a Seven wastes

lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountsSabaKhalid48
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Lean-TAREQ.pptx
Lean-TAREQ.pptxLean-TAREQ.pptx
Lean-TAREQ.pptxfaiazjoy
 
OM1 e06 (1).pptx
OM1 e06 (1).pptxOM1 e06 (1).pptx
OM1 e06 (1).pptxroli13
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing Marico Ltd.
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturingsandeep mandal
 
Just In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationJust In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationSINGHZEE
 
JIT and lean operations
JIT and lean operationsJIT and lean operations
JIT and lean operationsRajThakuri
 
Jit and lean operations
Jit and lean operationsJit and lean operations
Jit and lean operationsSumit Malhotra
 
Introductionto business ppt-ch10
Introductionto business ppt-ch10Introductionto business ppt-ch10
Introductionto business ppt-ch10Siegel High School
 
Lean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptLean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptrahul368457
 
Just in time
Just in timeJust in time
Just in timeRakesh Doshi
 
TQM UNIT 4.pptx
TQM UNIT 4.pptxTQM UNIT 4.pptx
TQM UNIT 4.pptxPradeep482741
 
Presentation on Lean Manufacturing and waste elimination
Presentation on Lean Manufacturing and waste eliminationPresentation on Lean Manufacturing and waste elimination
Presentation on Lean Manufacturing and waste eliminationshivithakur110
 

Semelhante a Seven wastes (20)

lean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accountslean manufacturing.ppt cost profit accounts
lean manufacturing.ppt cost profit accounts
 
WASTE ELIMINATION
WASTE ELIMINATIONWASTE ELIMINATION
WASTE ELIMINATION
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
 
Lean-TAREQ.pptx
Lean-TAREQ.pptxLean-TAREQ.pptx
Lean-TAREQ.pptx
 
OM1 e06 (1).pptx
OM1 e06 (1).pptxOM1 e06 (1).pptx
OM1 e06 (1).pptx
 
Lean
LeanLean
Lean
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Just In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationJust In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter Presentation
 
Session 1 2
Session 1 2Session 1 2
Session 1 2
 
Production management
Production managementProduction management
Production management
 
JIT and lean operations
JIT and lean operationsJIT and lean operations
JIT and lean operations
 
Jit and lean operations
Jit and lean operationsJit and lean operations
Jit and lean operations
 
Introductionto business ppt-ch10
Introductionto business ppt-ch10Introductionto business ppt-ch10
Introductionto business ppt-ch10
 
Lean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.pptLean_Manufacturing___Just-in-Time.ppt
Lean_Manufacturing___Just-in-Time.ppt
 
Just in time
Just in timeJust in time
Just in time
 
TQM UNIT 4.pptx
TQM UNIT 4.pptxTQM UNIT 4.pptx
TQM UNIT 4.pptx
 
Presentation on Lean Manufacturing and waste elimination
Presentation on Lean Manufacturing and waste eliminationPresentation on Lean Manufacturing and waste elimination
Presentation on Lean Manufacturing and waste elimination
 
Just in Time
Just in TimeJust in Time
Just in Time
 
Kaizen
KaizenKaizen
Kaizen
 

Último

Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 

Último (20)

Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 

Seven wastes

  • 1. Toyota Production System and Lean Manufacturing TOYOTA PRODUCTION SYSTEM The Toyota Production System was adopted by many Japanese companies in the aftermath of the 1973 oil shock “Waste” Elimination Philosophy: “.. Above all, one of our most important purposes was increased productivity and reduced cost. To achieve this purpose, we put our emphasis on the notion of eliminating all kinds of unnecessary functions in the factories. Our approach has been to investigate one by one the causes of various "unnecessaries" in manufacturing operations and to devise methods for their solution, often by trial and error ...” Taiicho Ohno, Former Vice President, Toyota Motor Corp., Former President, Japan Industrial Management Association; Former Chairman, Toyoda Spinning and Weaving Co., Ltd.
  • 2. PURPOSES OF JIT Primary Purpose: Profit through cost reduction (or improvement of Productivity) This is attained through WASTE elimination. Other important purposes: Quantity control: JIT, Kanban & Autonomation (visual control system) Quality control: Autonomation, improvement by small groups, functional management Respect for humanity: Flexible work force (adapt to demand changes), capitalize workers ideas. TYPES OF WASTE Excessive production resources (primary waste): excessive workforce excessive facilities excessive inventories unnecessary capital investment Overproduction (secondary waste - the WORST waste): leads to Excessive inventories (tertiary waste): extra jobs make overproduction invisible. adds losses in opportunity cost lead to Unnecessary capital investment (fourth waste): adds facility depreciations and overhead cost
  • 3. TO ACHIEVE THESE PUPOSES 7 Wastes Elimination Just-In-Time (JIT) Production Kanban System Production Smoothing 5S Setup Time Reduction Machine Layout & Multi-function Worker Autonomation (Visual Management)
  • 4. Identification and Elimination of Waste Philosophy •Identification and elimination of waste is the central theme of a lean manufacturing production system •Lean manufacturing is a dynamic and constantly improving process dependent upon understanding and involvement by all employees •Successful implementation requires that all employees must be trained to identify and eliminate waste from their work •Waste exists in all work and at all levels in the organization
  • 5. t , Identification and Elimination of Waste Philosophy Effectiveness is the result of the integration of:- Man - Method - Material - Machine At the worksite • Waste exists in all work and at all levels in the organization Seven Types of Waste Over-production Wait time Transportation Processing Inventory Motion Defects
  • 6. Over-production Waste Definition Producing more than needed Producing faster than needed Over-production Waste Characteristics: •Inventory Stockpiles •Extra equipment/oversized equipment •Unbalanced Material Flow •Extra Part Storage racks •Extra Manpower •Batch Processing •Complex Inventory Management •Excessive Capacity/Investment •Additional Floor Space/Outside Storage •Hidden Problems •Excessive Obsolescence •Large Lot Sizes •Building Ahead
  • 7. Over-production Waste Causes: •Incapable Processes •Just in Case Reward System •Lack of Communication •Local Optimization •Automation in the Wrong Places •Cost Accounting Practices •Low Uptimes •Lack of Stable/Consitent Schedules Waiting Time Waste Definition Idle Time That is Produced When Two Dependant Variables are not Fully Synchronized. •Man Wait Time •Machine Wait Time
  • 8. Waiting Time Waste Characteristics: •Man Waiting for Machine •Machine/Materials Waiting for Man •Unbalanced Operations (Work) •Lack of Operator Concern for Equipment Breakdowns •Unplanned Equipment Downtime Waiting Time Waste Causes: •Inconsistent Work Methods •Long Machine Change Over Time •Low Man/Machine Effectiveness •Lack of Proper Equipment/Materials
  • 9. Transportation Waste Definition Any Material Movement That Does Not Directly Support a Lean Manufacturing System Transportation Waste Characteristics: •Extra carts, fork lifts, dollies •Multiple Storage Locations •Extra Material Racks •Complex Inventory Management •Extra Facility Space •Incorrect Inventory Counts •Damaged Material
  • 10. Transportation Waste Causes: •Large Lot Processing •Unleveled Schedules •Lack of 5 S’s •Lack of Visual Controls •Improper Facility Layout •Large Buffers and In Process Kanbans Processing Waste Definitio n Effort Which Adds No Value To a Product or Service. Enhancements which are Transparent to The Customers or Work Which Could Be Combined with Another Process.
  • 11. Processing Waste Characteristics: •Process Bottlenecks •Lack of Clear Customer Specifications •Endless Refinement •Redundant Approvals •Extra Copies/Excessive Information Processing Waste Causes: •Engineering Changes Without Processing Changes •Decision Making at Inappropriate Levels •Inefficient Policies and Procedures •Lack of Customer Input Concerning Requirements
  • 12. Inventory Waste Definition Any Supply in Excess of Process Requirements Necessary to Produce Goods or Services Just in Time. Inventory Waste Characteristics: •Extra Space on Receiving Docks •Material Between Processes •Stagnated Material Flow •LIFO instead of FIFO •Extensive Rework When Problems Surface •Long Lead Time for Engineering Changes •Additional Material Handling Resources (Men, Equipment, Racks, Storage Space)
  • 13. Inventory Level Over Production Wait Time Inventory Waste Causes: •Incapable Processes •Uncontrolled Bottleneck Processes •Incapable Suppliers •Long Change Over Times •Management Decisions •Local Optimization •In times Process Defects Motion Waste Definition Any Movement of People Which Does Not Contribute Added Value To The Product or Service
  • 14. Motion Waste Characteristics: •Looking for Tools •Excessive Reaching or Bending •Material Too Far Apart (Walk Time) •Equipment for Moving Parts •Extra “Busy” Movements While Waiting Motion Waste Causes: •Equipment, Office & Plant Layout •Lack of 5 S’s •Lack of Visual Controls •Inconsistent Work Methods (Standardized Work) •Large Batch Sizes
  • 15. Rework or Correction Waste Definitio n Repair of a Product or Service To Fulfill Customer requirements Rework or Correction Waste Characteristics: •Extra Floor Space/Tools/Equipment •Extra Manpower To Inspect/Rework/Repair •Stockpiling Inventory •Complex Material Flow •Questionable Quality •Missed Shipments/Deliveries •Lower Profits Due To Scrap •Reactive Organization
  • 16. Rework or Correction Waste Causes: •Incapable Processes •Excessive Variation •Incapable Suppliers •Management Decisions •Insufficient Training •Inadequate Tools/Equipment •Poor Layouts/Unnecessary Handling •High Inventory Levels Seven Types of Waste Over-production Wait Transportation Processing Inventory Motion Defects