Enterprise Project Management
and the U.S. Armed Forces
Brian Wiedower; EPC Group.net
EPM Practice Lead, Senior Solution Architect




                   0
CONTENTS
                                                                                                                                              Fall
                                                                                                                                                             08
EXECUTIVE SUMMARY ........................................................................................................................................... 2

NECESSITY FOR AN ENTERPRISE PROJECT MANAGEMENT SOLUTION .................................................................... 2

APPROACH RECOMMENDATION............................................................................................................................ 2

ENVISIONING PROCESS AND ASSESSMENT RESULTS .............................................................................................. 3

   INITIAL STATE FINDINGS ...................................................................................................................................................4
   RISK PLANNING AND MITIGATION STRATEGY........................................................................................................................4

ACTUAL IMPLEMENTATION ................................................................................................................................... 5

POSITIVE IMPACT................................................................................................................................................... 6




                                        Copyright © 2010 EPC Group.net all rights reserved. No part
                                         of this document may be reproduced or transmitted in any
                                          form or by any means, electronic or mechanical, for any
                                            purpose, without written permission from EPC Group.




          1
EXECUTIVE SUMMARY

A branch of the U.S. Armed Forces had an objective to implement an Enterprise Project Management (EPM)
solution in order to bring into line newly formed organizational goals and objectives related to its enterprise
project management practices and to better manage resources and assignments with greater efficiency. EPC
Group set out to assist the client in achieving the EPM solution by recommending a phased approach to the
implementation. After an Envisioning phase to determine the common vision and goals of the project,
recommendations were made to the client about how to solve issues in 5 different key areas: Business Challenges
or Opportunity for Improvement, Objectives of the EPM System Initiative, Process Readiness, People
(Organizational Change), and Technology Readiness. Additional risk management strategies were analyzed to
alleviate potential shocks from the implementation of new technologies, as well. The actual implementation then
occurred, and the realized benefits for the client could be observed. These benefits aligned with the needs of the
client; in addition, extra positive consequences were also achieved. This case study focuses on the process that
was taken to ensure that the Enterprise Project Management (EPM) solution solved the needs of the client through
a phased approach beginning with an assessment phase and ending with the actual implementation.

NECESSITY FOR AN ENTERPRISE PROJECT MANAGEMENT SOLUTION

Initially, when a division of the U. S. Military approached EPC Group with a desire to implement an Enterprise
Project Management (EPM) solution, the organization faced a myriad of problems related to its organizational
structure and handling of enterprise projects. No formal Project Management Process existed, and no standards
were used consistently across the organization. Without the adoption of standardized processes and methods, it
made it difficult to measure project performance against a set of common benchmarks. In turn, this made it
difficult to determine areas for improvement before starting new projects. Additionally, the client did not currently
have the tools to proactively manage the allocation of its resources, making it more difficult to commit to
customer deadlines.

The purpose of the EPM solution was to serve as a way to identify and standardize enterprise project management
practices and provide the executive leadership with a strategic view of all programs. This would help optimize
internal resources and manage contracts efficiently. Additional objectives were to:

        Improve overall portfolio performance and achieve strategic objectives.
        Achieve more efficient utilization of resources.
        Reduce program management cost per unit of program benefit due to better management of project
         schedules and more efficient resource allocation.
        Improve program benefit realization from new business opportunities pursued using cost savings.

APPROACH RECOMMENDATION

A phased approach was recommended as the implementation method during the project in order to provide a
viable EPM solution. Each phase had specific deliverables to provide functionality and ensure a successful
implementation. Items listed in each phase give an understanding of what would be delivered.

        Phase I - Perform Envisioning and Assessment: This phase outlines the findings and recommendation for
         moving toward a successful Enterprise Project Management (EPM) implementation. This effort would

        2
include assessment of organizational and project structure, project management processes and resource
        allocations, infrastructure analysis, system notification requirements, gap analysis, user group definition
        and design, and system and organization requirements.
       Phase II – Requirements Analysis and Design: Detail requirements would be documented and a design of
        the system and project management processes and templates would be created. EPC Group would
        conduct requirements gathering sessions to work with the client to identify all the detailed requirements
        needed. These requirements would cover Program, Project, Task and Resource custom field information,
        Key Task and Milestones, reporting, views and dashboards, security, system, environment, software
        functionality, time tracking and task updates, testing, training, resource information, resource utilization
        and management, documentation, status reporting, issue tracking, risk management, organizational
        policies, work products, program dependencies, project tracking, PM standards and processes, project
        templates, enterprise calendars, and configuration needs. In addition to those requirement categories,
        additional categories could be added. Project Workspace and Collaboration requirements would also be
        defined within this phase. Within the requirements gathering session, Subject Matter Experts would
        provide best practices recommendations when needed to assist with requirement decisions.
       Phase III – Software Installation and Configuration: This phase would include the installation of MS
        Project Server 2007 on a Windows 2003 Server, as well as connections to other components such as
        SharePoint Portal Server 2007 Server (MOSS) and MS SQL Server 2005 or greater. The system would be
        configured to deploy in a workable EPM test environment. During this phase custom templates, calendars
        and resources would be added to give the system all working aspects to replicate a production
        environment for testing (as close as possible). Additionally, In-house staff assisted and observed the
        installation and configuration. This ensures knowledge transfer and to give the support staffs more in-
        depth knowledge of the EPM system.
       Phase IV – Testing/Training/Deployment: Testing would be performed on the EPM Solution. Two pilot
        teams would be established for the testing phase. System Administration, Project Management and
        Project Web Access hands-on training would be conducted to ensure resources are prepared to enter the
        system, as well as future resource training needs. The training and production environments would be
        installed, fully configured and tested for operation. These environments would be setup with all
        enterprise templates and calendars, as well as resources pool information. In addition to the
        environment setups, training, and testing, a deployment of the enterprise project management solution
        would be rolled-out to the organization.

ENVISIONING PROCESS AND ASSESSMENT RESULTS

The Envisioning process was the primary focus of the initial Discovery phase of the implementation. It provided key
stakeholders with an orientation of the Enterprise Project Management (EPM) solution and an opportunity to
collaborate and gain consensus on a common vision for EPM within the organization. This vision included an
enterprise wide view of the primary business challenges addressing the organization, the key business objectives
for implementing EPM, and an agreed upon decision regarding the use and strategy for the initiative.

The Envisioning process also incorporated a review of collaboration and communication needs outside of EPM.
This involved a capabilities review of the Microsoft SharePoint technologies and how they may be used to meet
objectives that cannot be accomplished solely with the EPM solution. The Envisioning workshops conducted on
this project did include sessions on Collaboration and Communication.


        3
As part of the EPM Envisioning process, the following sets of activities were conducted:

        Questionnaire and Key Messages Summary: A questionnaire was completed to gain a better
         understanding of how the client currently managed its business, people and processes. The results were
         compiled and communicated during the Envisioning Workshop.
        Kick-off Meeting: A formal meeting was conducted to communicate EPM project goals & objectives,
         scope, roles and responsibilities, and timeline.
        Envisioning Workshops: A series of workshops were conducted to secure feedback on the client’s vision in
         the areas of project management and scheduling, resource management, timesheets, issues and risk.

INITIAL STATE FINDINGS

The findings of the envisioning workshop sessions, surveys collections, and personal interviews were categorized
into five main organizational groups of findings:

    1.   Prioritization of Business Challenges or Opportunity for Improvement: The business challenges or
         opportunities for improvements were ranked based upon the respective consequences for not
         responding.
    2.   Prioritization of Objectives of the EPM System Initiative: The objectives of the EPM System Objectives
         were ranked, as well.
    3.   Process Readiness: The EPM capability areas were rated in the categories of priority to the organization,
         whether a formal or informal process existed, and what the perception of the process was as viewed by
         the organization.
    4.   People (Organizational Change): Important considerations for managing change in the client as well as
         EPC Group’s observations throughout the Envisioning process in the areas of successful communication,
         implantation, and way to better understand the user community.
    5.   Technology Readiness: The client had invested in their resources and the structuring of the EPM technical
         team. By identifying the team that would support the EPM implementation, as well as leveraging staff
         development in the appropriate tools, this would assist the organization in the preparation for the
         implementation. The client had already leveraged Windows SharePoint Services (WSS) in a limited
         capacity as well as investments in other Microsoft technologies (e.g. SQL Server, Active Directory, etc.).
         Supporting the previously mentioned technologies would require the combination of technical and non-
         technical staff. Both sets of technologies (Project Server & SharePoint) included routine responsibilities to
         maintain the applications as well as enhancement abilities to make them more productive for the user
         communities for which they serve. Additional application administration training on all mentioned
         technologies would be needed for the support staff.

By performing the above phases and activities included within them, the areas of improvement, processes, and
EPM objectives were addressed and recommendations were made.

RISK PLANNING AND MITIGATION STRATEGY

Primary risks associated with this initiative centered around the cultural shifts from informal to more structured
and consistent processes, as well as a shift to increased visibility of information regarding resource utilization and
project status. Successful adoption with an adequate level of training on the tool was necessary, and the processes


         4
it supports. In addition, executive management had to foster an environment of continuous learning and shared
organizational goals. Successful user adoption within the organization was critical before deploying EPM to the
entire organization.

This section addressed the factors that the client had to put into place to increase initiative success. The
organization had to be aware of conditions that will introduce risk and look for these conditions, document them,
and bring them to the sponsor’s attention. By raising awareness of risks, the team initiated the process of
developing mitigations and enabled informed decisions.

Conditions that can introduce significant risk to an EPM initiative include:
        Insufficient formal project management expertise among organization staff.
        The expectation that the introduction of the technology will drive the business-process changes (Note:
         Processes may be developed and rolled out in tandem with the technology. However, the technology
         should not be the sole driver for the process.)
        Sponsorship that is unwilling to champion the necessary process discipline and technology use.
        An aggressive implementation schedule that cannot be met due to the complexity of the business-process
         changes.
        A lack of sufficient technology, project management, or change-management skills in the EPM team.
        Lack of user involvement in the design of the business processes or technology configurations.
        Lack of EPM initiative support from key roles or groups within the organization.
        Lack of commitment by the EPM pilot teams.
        A shift to EPM may threaten people who are accustomed to keeping their project data private.
        An increase in the visibility of project data will expose people’s skills in both project management
         processes and the use of the Microsoft Office Project 2007 technology.

ACTUAL IMPLEMENTATION


In the Approach Recommendation section, each phase was outlined as to what ought to be implemented during
the project. The following section tracks the actual implementation process that occurred.


First, EPC Group and the client established a consensus on the information contained within the Envisioning and
Initial State Findings sections of this case study (e.g. business objectives, current state, recommendations, risks,
and next steps). Phase I then took place as planned. Requirements for the EPM implementation were developed,
including but not limited to business, functional, reporting, training, testing, security, process and documentation,
system and environment requirements. Pilot team members and projects were identified and planning for the
pilot and selecting the best projects for the pilot of EPM occurred. Next, organizational training was delivered
including EPM Administration, Project Management, and Project Web Access training, as well as job assistance
tools (“How to” documentation, cheat sheets, etc).


Based off of the detailed requirements, EPC Group created the technical design and specifications of the EPM
system and creation of process documentation. Guided instructions and support from EPC Group for the on-site
support staff to setup hardware and server software and the configuration of the system took place. This was
followed by the preparation for the EPM deployment, including the testing of the system, training of resources,
and planning for the EPM rollout.


        5
Afterwards, Functional Administrators, Project Managers and End Users were identified and formally trained. The
client subsequently developed the plan for preparing the User Community for Change and the Communication
Plan for EPM Go-Live. Finally, the launch of two pilot projects and the utilization of the system began. Resources
reported task updates, monitored and controlled project schedules, as well as obtained feedback for process
improvements.

POSITIVE IMPACT

After the implementation of the EPM solution occurred, the following positive results were realized for the branch
of the military:

       The client is able to better understand the time spent on IT projects vs. time spent on support activities
        and staff accordingly.
       Through standardized and institutionalized processes, a formal Product Management Organization (PMO)
        and extensive hands on training, a formal Project Management Process is being followed for managing
        projects from initiation to production.
       Executives are gaining the visibility needed for project/work priorities across the organization and are able
        to now monitor project performance based on more accurate data and remediate problems in a more
        timely manner.
       The Military Branch now has the tools to proactively manage the allocation of resources and achieve
        more efficient utilization of resources.
       Management is now obtaining total project costs including labor, equipment and operational costs for
        projects.
       Standards are now being used consistently across the organization allowing for improved reporting and
        data analysis.
       Project Workspaces are giving the client the capabilities for storing and collaborating on documents and
        work activities for each project which is providing consistencies of processes and reducing duplication of
        project documentation.

Through the formalized phased approach outlined in this case study, this branch of the U.S. Armed Forces was able
to not only able to streamline enterprise project management practices, but provide organizational leadership
with a tactical view of all programs to maintain efficiency throughout the client’s coverage. The EPM Solution
allowed the client to meet its organization goals and needs beginning with the assessments phase, progressing
with recommendations and creating a proactive risk management policy, and continuing with the actual
implementation.




        6

Mais conteúdo relacionado

Mais procurados

Presentation by saurabh chandra
Presentation by saurabh chandraPresentation by saurabh chandra
Presentation by saurabh chandraPMI_IREP_TP
 
IRJET- Agile Management in Construction Industry
IRJET-  	  Agile Management in Construction IndustryIRJET-  	  Agile Management in Construction Industry
IRJET- Agile Management in Construction IndustryIRJET Journal
 
14 voigt dsmd_ausarbeitung
14 voigt dsmd_ausarbeitung14 voigt dsmd_ausarbeitung
14 voigt dsmd_ausarbeitungÖmer Yener
 
Agile project management framework
Agile project management frameworkAgile project management framework
Agile project management frameworkstefanhenry
 
Software Process Improvement
Software Process ImprovementSoftware Process Improvement
Software Process ImprovementBilal Shah
 
CMMI-DEV 1.3 Tool (checklist)
CMMI-DEV 1.3 Tool (checklist)CMMI-DEV 1.3 Tool (checklist)
CMMI-DEV 1.3 Tool (checklist)Robert Levy
 
Presentation by subhajit bhattacharya2
Presentation by subhajit bhattacharya2Presentation by subhajit bhattacharya2
Presentation by subhajit bhattacharya2PMI_IREP_TP
 
Presentation by pavan adipuram
Presentation by pavan adipuramPresentation by pavan adipuram
Presentation by pavan adipuramPMI_IREP_TP
 
Software Engineering Practice - Project management
Software Engineering Practice - Project managementSoftware Engineering Practice - Project management
Software Engineering Practice - Project managementRadu_Negulescu
 
Agile project management is systems management
Agile project management is systems managementAgile project management is systems management
Agile project management is systems managementGlen Alleman
 
CMMI Project Planning Presentation
CMMI Project Planning PresentationCMMI Project Planning Presentation
CMMI Project Planning PresentationTiago Teixeira
 
CMMI with Digité Universal Process Framework
CMMI with Digité Universal Process FrameworkCMMI with Digité Universal Process Framework
CMMI with Digité Universal Process FrameworkDigite Inc
 
Role of Functional Organization in Large Engineering and Construction Programs
Role of Functional Organization in Large Engineering and Construction ProgramsRole of Functional Organization in Large Engineering and Construction Programs
Role of Functional Organization in Large Engineering and Construction ProgramsBob Prieto
 
Presentation by jv rao
Presentation by jv raoPresentation by jv rao
Presentation by jv raoPMI_IREP_TP
 
Presentation by Gaurav Sapra
Presentation by Gaurav SapraPresentation by Gaurav Sapra
Presentation by Gaurav SapraPMI_IREP_TP
 
Presentation by meghna jadhav
Presentation by meghna jadhavPresentation by meghna jadhav
Presentation by meghna jadhavPMI_IREP_TP
 
Presentation by dakshinamoorthi g
Presentation by dakshinamoorthi  gPresentation by dakshinamoorthi  g
Presentation by dakshinamoorthi gPMI_IREP_TP
 

Mais procurados (20)

Presentation by saurabh chandra
Presentation by saurabh chandraPresentation by saurabh chandra
Presentation by saurabh chandra
 
IRJET- Agile Management in Construction Industry
IRJET-  	  Agile Management in Construction IndustryIRJET-  	  Agile Management in Construction Industry
IRJET- Agile Management in Construction Industry
 
14 voigt dsmd_ausarbeitung
14 voigt dsmd_ausarbeitung14 voigt dsmd_ausarbeitung
14 voigt dsmd_ausarbeitung
 
Agile project management framework
Agile project management frameworkAgile project management framework
Agile project management framework
 
Software Process Improvement
Software Process ImprovementSoftware Process Improvement
Software Process Improvement
 
CMMI-DEV 1.3 Tool (checklist)
CMMI-DEV 1.3 Tool (checklist)CMMI-DEV 1.3 Tool (checklist)
CMMI-DEV 1.3 Tool (checklist)
 
PMP Preparation - 03 Framework
PMP Preparation - 03 FrameworkPMP Preparation - 03 Framework
PMP Preparation - 03 Framework
 
Presentation by subhajit bhattacharya2
Presentation by subhajit bhattacharya2Presentation by subhajit bhattacharya2
Presentation by subhajit bhattacharya2
 
Presentation by pavan adipuram
Presentation by pavan adipuramPresentation by pavan adipuram
Presentation by pavan adipuram
 
Software Engineering Practice - Project management
Software Engineering Practice - Project managementSoftware Engineering Practice - Project management
Software Engineering Practice - Project management
 
Agile project management is systems management
Agile project management is systems managementAgile project management is systems management
Agile project management is systems management
 
CMMI Project Planning Presentation
CMMI Project Planning PresentationCMMI Project Planning Presentation
CMMI Project Planning Presentation
 
Project managemen concept
Project managemen conceptProject managemen concept
Project managemen concept
 
CMMI with Digité Universal Process Framework
CMMI with Digité Universal Process FrameworkCMMI with Digité Universal Process Framework
CMMI with Digité Universal Process Framework
 
Role of Functional Organization in Large Engineering and Construction Programs
Role of Functional Organization in Large Engineering and Construction ProgramsRole of Functional Organization in Large Engineering and Construction Programs
Role of Functional Organization in Large Engineering and Construction Programs
 
Presentation by jv rao
Presentation by jv raoPresentation by jv rao
Presentation by jv rao
 
Spm unit1
Spm unit1Spm unit1
Spm unit1
 
Presentation by Gaurav Sapra
Presentation by Gaurav SapraPresentation by Gaurav Sapra
Presentation by Gaurav Sapra
 
Presentation by meghna jadhav
Presentation by meghna jadhavPresentation by meghna jadhav
Presentation by meghna jadhav
 
Presentation by dakshinamoorthi g
Presentation by dakshinamoorthi  gPresentation by dakshinamoorthi  g
Presentation by dakshinamoorthi g
 

Destaque

SharePoint 2010 - Mobility, Browser Compatibility, Compliance, and its Contin...
SharePoint 2010 - Mobility, Browser Compatibility, Compliance, and its Contin...SharePoint 2010 - Mobility, Browser Compatibility, Compliance, and its Contin...
SharePoint 2010 - Mobility, Browser Compatibility, Compliance, and its Contin...EPC Group
 
Infonomics AIIM SharePoint Article - January Issue
Infonomics AIIM SharePoint Article - January IssueInfonomics AIIM SharePoint Article - January Issue
Infonomics AIIM SharePoint Article - January IssueEPC Group
 
Copy or Move Lists by Using List Templates - EPC Group - SharePoint 2010
Copy or Move Lists by Using List Templates - EPC Group - SharePoint 2010Copy or Move Lists by Using List Templates - EPC Group - SharePoint 2010
Copy or Move Lists by Using List Templates - EPC Group - SharePoint 2010EPC Group
 
Navigating the World of SharePoint 2010 and All It Encompasses - Part 1 - EPC...
Navigating the World of SharePoint 2010 and All It Encompasses - Part 1 - EPC...Navigating the World of SharePoint 2010 and All It Encompasses - Part 1 - EPC...
Navigating the World of SharePoint 2010 and All It Encompasses - Part 1 - EPC...EPC Group
 
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group
 

Destaque (6)

INS VIKARMADITYA
INS VIKARMADITYAINS VIKARMADITYA
INS VIKARMADITYA
 
SharePoint 2010 - Mobility, Browser Compatibility, Compliance, and its Contin...
SharePoint 2010 - Mobility, Browser Compatibility, Compliance, and its Contin...SharePoint 2010 - Mobility, Browser Compatibility, Compliance, and its Contin...
SharePoint 2010 - Mobility, Browser Compatibility, Compliance, and its Contin...
 
Infonomics AIIM SharePoint Article - January Issue
Infonomics AIIM SharePoint Article - January IssueInfonomics AIIM SharePoint Article - January Issue
Infonomics AIIM SharePoint Article - January Issue
 
Copy or Move Lists by Using List Templates - EPC Group - SharePoint 2010
Copy or Move Lists by Using List Templates - EPC Group - SharePoint 2010Copy or Move Lists by Using List Templates - EPC Group - SharePoint 2010
Copy or Move Lists by Using List Templates - EPC Group - SharePoint 2010
 
Navigating the World of SharePoint 2010 and All It Encompasses - Part 1 - EPC...
Navigating the World of SharePoint 2010 and All It Encompasses - Part 1 - EPC...Navigating the World of SharePoint 2010 and All It Encompasses - Part 1 - EPC...
Navigating the World of SharePoint 2010 and All It Encompasses - Part 1 - EPC...
 
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
 

Semelhante a Enterprise Project Management and the US Armed Forces - EPC Group

Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Lightweight Processes: A Definition
Lightweight Processes: A DefinitionLightweight Processes: A Definition
Lightweight Processes: A DefinitionGlen Alleman
 
19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittalsatyaragha786
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic AbundanceGlen Alleman
 
Critical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management SolutionCritical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management SolutionDevOps.com
 
Managing Software Project
Managing Software ProjectManaging Software Project
Managing Software ProjectAnas Bilal
 
Toward Customer Satisfaction SEC ERP Implementation Project
Toward Customer Satisfaction SEC ERP Implementation ProjectToward Customer Satisfaction SEC ERP Implementation Project
Toward Customer Satisfaction SEC ERP Implementation ProjectBaker Khader Abdallah, PMP
 
Chapter1 Advanced Software Engineering overview
Chapter1 Advanced Software Engineering overviewChapter1 Advanced Software Engineering overview
Chapter1 Advanced Software Engineering overviewBule Hora University
 
SQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar GhoshSQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar GhoshSuman Ghosh
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software EngineeringMajane Padua
 
Fandamental quality mgt-Ch-6 and Ch-9
Fandamental quality mgt-Ch-6 and Ch-9Fandamental quality mgt-Ch-6 and Ch-9
Fandamental quality mgt-Ch-6 and Ch-9Sarvesh Soni
 
Unleash IT Casestudy
Unleash IT CasestudyUnleash IT Casestudy
Unleash IT Casestudymaghamsameera
 
Unleash It Casestudy
Unleash It CasestudyUnleash It Casestudy
Unleash It Casestudypradeep501
 
Aula 1 - Project Management Concepts by Roger Pressman
Aula 1 - Project Management Concepts by Roger PressmanAula 1 - Project Management Concepts by Roger Pressman
Aula 1 - Project Management Concepts by Roger PressmanRogerio P C do Nascimento
 
Capacity Planning and Demand Management
Capacity Planning and Demand ManagementCapacity Planning and Demand Management
Capacity Planning and Demand ManagementLawrence Putnam Jr
 

Semelhante a Enterprise Project Management and the US Armed Forces - EPC Group (20)

Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Lightweight Processes: A Definition
Lightweight Processes: A DefinitionLightweight Processes: A Definition
Lightweight Processes: A Definition
 
Aim crisp handout
Aim crisp handoutAim crisp handout
Aim crisp handout
 
19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal
 
Master Project Manager for Information Technology: sysenegacademy@gmail.com
Master Project Manager for Information Technology: sysenegacademy@gmail.comMaster Project Manager for Information Technology: sysenegacademy@gmail.com
Master Project Manager for Information Technology: sysenegacademy@gmail.com
 
Week_02.pptx
Week_02.pptxWeek_02.pptx
Week_02.pptx
 
Process Models IN software Engineering
Process Models IN software EngineeringProcess Models IN software Engineering
Process Models IN software Engineering
 
Heliotropic Abundance
Heliotropic AbundanceHeliotropic Abundance
Heliotropic Abundance
 
Critical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management SolutionCritical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management Solution
 
Managing Software Project
Managing Software ProjectManaging Software Project
Managing Software Project
 
Toward Customer Satisfaction SEC ERP Implementation Project
Toward Customer Satisfaction SEC ERP Implementation ProjectToward Customer Satisfaction SEC ERP Implementation Project
Toward Customer Satisfaction SEC ERP Implementation Project
 
Chapter1 Advanced Software Engineering overview
Chapter1 Advanced Software Engineering overviewChapter1 Advanced Software Engineering overview
Chapter1 Advanced Software Engineering overview
 
SQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar GhoshSQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar Ghosh
 
Introduction to Software Engineering
Introduction to Software EngineeringIntroduction to Software Engineering
Introduction to Software Engineering
 
Fandamental quality mgt-Ch-6 and Ch-9
Fandamental quality mgt-Ch-6 and Ch-9Fandamental quality mgt-Ch-6 and Ch-9
Fandamental quality mgt-Ch-6 and Ch-9
 
Unleash IT Casestudy
Unleash IT CasestudyUnleash IT Casestudy
Unleash IT Casestudy
 
Unleash It Casestudy
Unleash It CasestudyUnleash It Casestudy
Unleash It Casestudy
 
Aula 1 - Project Management Concepts by Roger Pressman
Aula 1 - Project Management Concepts by Roger PressmanAula 1 - Project Management Concepts by Roger Pressman
Aula 1 - Project Management Concepts by Roger Pressman
 
Capacity Planning and Demand Management
Capacity Planning and Demand ManagementCapacity Planning and Demand Management
Capacity Planning and Demand Management
 

Mais de EPC Group

Power BI vs Tableau - An Overview from EPC Group.pptx
Power BI vs Tableau - An Overview from EPC Group.pptxPower BI vs Tableau - An Overview from EPC Group.pptx
Power BI vs Tableau - An Overview from EPC Group.pptxEPC Group
 
EPC Group Intune Practice and Capabilities Overview
EPC Group Intune Practice and Capabilities OverviewEPC Group Intune Practice and Capabilities Overview
EPC Group Intune Practice and Capabilities OverviewEPC Group
 
Pop the Hood on Microsoft Teams - EPC Group
Pop the Hood on Microsoft Teams - EPC GroupPop the Hood on Microsoft Teams - EPC Group
Pop the Hood on Microsoft Teams - EPC GroupEPC Group
 
Windows Server 2012 Deep-Dive - EPC Group
Windows Server 2012 Deep-Dive - EPC GroupWindows Server 2012 Deep-Dive - EPC Group
Windows Server 2012 Deep-Dive - EPC GroupEPC Group
 
Understanding Windows Azure’s Active Directory (AD) and PowerShell Tools
Understanding Windows Azure’s Active Directory (AD) and PowerShell ToolsUnderstanding Windows Azure’s Active Directory (AD) and PowerShell Tools
Understanding Windows Azure’s Active Directory (AD) and PowerShell ToolsEPC Group
 
PowerShell with SharePoint 2013 and Office 365 - EPC Group
PowerShell with SharePoint 2013 and Office 365 - EPC GroupPowerShell with SharePoint 2013 and Office 365 - EPC Group
PowerShell with SharePoint 2013 and Office 365 - EPC GroupEPC Group
 
Understanding Office 365’s Identity Solutions: Deep Dive - EPC Group
Understanding Office 365’s Identity Solutions: Deep Dive - EPC GroupUnderstanding Office 365’s Identity Solutions: Deep Dive - EPC Group
Understanding Office 365’s Identity Solutions: Deep Dive - EPC GroupEPC Group
 
System Center 2012 SP1 - Overview - EPC Group
System Center 2012 SP1 - Overview - EPC GroupSystem Center 2012 SP1 - Overview - EPC Group
System Center 2012 SP1 - Overview - EPC GroupEPC Group
 
Windows Azure Pack Enabling Virtual Machines - IaaS & Virtual Machine Role - ...
Windows Azure Pack Enabling Virtual Machines - IaaS & Virtual Machine Role - ...Windows Azure Pack Enabling Virtual Machines - IaaS & Virtual Machine Role - ...
Windows Azure Pack Enabling Virtual Machines - IaaS & Virtual Machine Role - ...EPC Group
 
Lync 2013 - Audio - Quick Reference - 2 Page Reference - EPC Group
Lync 2013 - Audio - Quick Reference - 2 Page Reference - EPC GroupLync 2013 - Audio - Quick Reference - 2 Page Reference - EPC Group
Lync 2013 - Audio - Quick Reference - 2 Page Reference - EPC GroupEPC Group
 
Lync 2013 - Sharing and Collaboration - Quick Reference 2 Pager
Lync 2013 - Sharing and Collaboration - Quick Reference 2 PagerLync 2013 - Sharing and Collaboration - Quick Reference 2 Pager
Lync 2013 - Sharing and Collaboration - Quick Reference 2 PagerEPC Group
 
Windows Server 2012 Deep-Dive - EPC Group
Windows Server 2012 Deep-Dive - EPC GroupWindows Server 2012 Deep-Dive - EPC Group
Windows Server 2012 Deep-Dive - EPC GroupEPC Group
 
Hyper-V’s Virtualization Enhancements - EPC Group
Hyper-V’s Virtualization Enhancements - EPC GroupHyper-V’s Virtualization Enhancements - EPC Group
Hyper-V’s Virtualization Enhancements - EPC GroupEPC Group
 
High Level Overview of Windows Azure - EPC Group
High Level Overview of Windows Azure - EPC GroupHigh Level Overview of Windows Azure - EPC Group
High Level Overview of Windows Azure - EPC GroupEPC Group
 
SharePoint 2013 and Office 365 External Sharing
SharePoint 2013 and Office 365 External SharingSharePoint 2013 and Office 365 External Sharing
SharePoint 2013 and Office 365 External SharingEPC Group
 
BizTalk Server 2010 - Invoking Restful Services - EPC Group
BizTalk Server 2010 - Invoking Restful Services - EPC GroupBizTalk Server 2010 - Invoking Restful Services - EPC Group
BizTalk Server 2010 - Invoking Restful Services - EPC GroupEPC Group
 
BizTalk Sever 2010 - Basic Principles of Maps - EPC Group
BizTalk Sever 2010 - Basic Principles of Maps - EPC GroupBizTalk Sever 2010 - Basic Principles of Maps - EPC Group
BizTalk Sever 2010 - Basic Principles of Maps - EPC GroupEPC Group
 
EPC Group and Continental Airlines ECM Case Study - SharePoint 2007 Global Study
EPC Group and Continental Airlines ECM Case Study - SharePoint 2007 Global StudyEPC Group and Continental Airlines ECM Case Study - SharePoint 2007 Global Study
EPC Group and Continental Airlines ECM Case Study - SharePoint 2007 Global StudyEPC Group
 
Driving End User Adoption in SharePoint 2013 & 2010 - EPC Group
Driving End User Adoption in SharePoint 2013 & 2010 - EPC GroupDriving End User Adoption in SharePoint 2013 & 2010 - EPC Group
Driving End User Adoption in SharePoint 2013 & 2010 - EPC GroupEPC Group
 
Join EPC Group's Monthly Newsletter
Join EPC Group's Monthly NewsletterJoin EPC Group's Monthly Newsletter
Join EPC Group's Monthly NewsletterEPC Group
 

Mais de EPC Group (20)

Power BI vs Tableau - An Overview from EPC Group.pptx
Power BI vs Tableau - An Overview from EPC Group.pptxPower BI vs Tableau - An Overview from EPC Group.pptx
Power BI vs Tableau - An Overview from EPC Group.pptx
 
EPC Group Intune Practice and Capabilities Overview
EPC Group Intune Practice and Capabilities OverviewEPC Group Intune Practice and Capabilities Overview
EPC Group Intune Practice and Capabilities Overview
 
Pop the Hood on Microsoft Teams - EPC Group
Pop the Hood on Microsoft Teams - EPC GroupPop the Hood on Microsoft Teams - EPC Group
Pop the Hood on Microsoft Teams - EPC Group
 
Windows Server 2012 Deep-Dive - EPC Group
Windows Server 2012 Deep-Dive - EPC GroupWindows Server 2012 Deep-Dive - EPC Group
Windows Server 2012 Deep-Dive - EPC Group
 
Understanding Windows Azure’s Active Directory (AD) and PowerShell Tools
Understanding Windows Azure’s Active Directory (AD) and PowerShell ToolsUnderstanding Windows Azure’s Active Directory (AD) and PowerShell Tools
Understanding Windows Azure’s Active Directory (AD) and PowerShell Tools
 
PowerShell with SharePoint 2013 and Office 365 - EPC Group
PowerShell with SharePoint 2013 and Office 365 - EPC GroupPowerShell with SharePoint 2013 and Office 365 - EPC Group
PowerShell with SharePoint 2013 and Office 365 - EPC Group
 
Understanding Office 365’s Identity Solutions: Deep Dive - EPC Group
Understanding Office 365’s Identity Solutions: Deep Dive - EPC GroupUnderstanding Office 365’s Identity Solutions: Deep Dive - EPC Group
Understanding Office 365’s Identity Solutions: Deep Dive - EPC Group
 
System Center 2012 SP1 - Overview - EPC Group
System Center 2012 SP1 - Overview - EPC GroupSystem Center 2012 SP1 - Overview - EPC Group
System Center 2012 SP1 - Overview - EPC Group
 
Windows Azure Pack Enabling Virtual Machines - IaaS & Virtual Machine Role - ...
Windows Azure Pack Enabling Virtual Machines - IaaS & Virtual Machine Role - ...Windows Azure Pack Enabling Virtual Machines - IaaS & Virtual Machine Role - ...
Windows Azure Pack Enabling Virtual Machines - IaaS & Virtual Machine Role - ...
 
Lync 2013 - Audio - Quick Reference - 2 Page Reference - EPC Group
Lync 2013 - Audio - Quick Reference - 2 Page Reference - EPC GroupLync 2013 - Audio - Quick Reference - 2 Page Reference - EPC Group
Lync 2013 - Audio - Quick Reference - 2 Page Reference - EPC Group
 
Lync 2013 - Sharing and Collaboration - Quick Reference 2 Pager
Lync 2013 - Sharing and Collaboration - Quick Reference 2 PagerLync 2013 - Sharing and Collaboration - Quick Reference 2 Pager
Lync 2013 - Sharing and Collaboration - Quick Reference 2 Pager
 
Windows Server 2012 Deep-Dive - EPC Group
Windows Server 2012 Deep-Dive - EPC GroupWindows Server 2012 Deep-Dive - EPC Group
Windows Server 2012 Deep-Dive - EPC Group
 
Hyper-V’s Virtualization Enhancements - EPC Group
Hyper-V’s Virtualization Enhancements - EPC GroupHyper-V’s Virtualization Enhancements - EPC Group
Hyper-V’s Virtualization Enhancements - EPC Group
 
High Level Overview of Windows Azure - EPC Group
High Level Overview of Windows Azure - EPC GroupHigh Level Overview of Windows Azure - EPC Group
High Level Overview of Windows Azure - EPC Group
 
SharePoint 2013 and Office 365 External Sharing
SharePoint 2013 and Office 365 External SharingSharePoint 2013 and Office 365 External Sharing
SharePoint 2013 and Office 365 External Sharing
 
BizTalk Server 2010 - Invoking Restful Services - EPC Group
BizTalk Server 2010 - Invoking Restful Services - EPC GroupBizTalk Server 2010 - Invoking Restful Services - EPC Group
BizTalk Server 2010 - Invoking Restful Services - EPC Group
 
BizTalk Sever 2010 - Basic Principles of Maps - EPC Group
BizTalk Sever 2010 - Basic Principles of Maps - EPC GroupBizTalk Sever 2010 - Basic Principles of Maps - EPC Group
BizTalk Sever 2010 - Basic Principles of Maps - EPC Group
 
EPC Group and Continental Airlines ECM Case Study - SharePoint 2007 Global Study
EPC Group and Continental Airlines ECM Case Study - SharePoint 2007 Global StudyEPC Group and Continental Airlines ECM Case Study - SharePoint 2007 Global Study
EPC Group and Continental Airlines ECM Case Study - SharePoint 2007 Global Study
 
Driving End User Adoption in SharePoint 2013 & 2010 - EPC Group
Driving End User Adoption in SharePoint 2013 & 2010 - EPC GroupDriving End User Adoption in SharePoint 2013 & 2010 - EPC Group
Driving End User Adoption in SharePoint 2013 & 2010 - EPC Group
 
Join EPC Group's Monthly Newsletter
Join EPC Group's Monthly NewsletterJoin EPC Group's Monthly Newsletter
Join EPC Group's Monthly Newsletter
 

Último

MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesrafiqahmad00786416
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...apidays
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 

Último (20)

MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 

Enterprise Project Management and the US Armed Forces - EPC Group

  • 1. Enterprise Project Management and the U.S. Armed Forces Brian Wiedower; EPC Group.net EPM Practice Lead, Senior Solution Architect 0
  • 2. CONTENTS Fall 08 EXECUTIVE SUMMARY ........................................................................................................................................... 2 NECESSITY FOR AN ENTERPRISE PROJECT MANAGEMENT SOLUTION .................................................................... 2 APPROACH RECOMMENDATION............................................................................................................................ 2 ENVISIONING PROCESS AND ASSESSMENT RESULTS .............................................................................................. 3 INITIAL STATE FINDINGS ...................................................................................................................................................4 RISK PLANNING AND MITIGATION STRATEGY........................................................................................................................4 ACTUAL IMPLEMENTATION ................................................................................................................................... 5 POSITIVE IMPACT................................................................................................................................................... 6 Copyright © 2010 EPC Group.net all rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, for any purpose, without written permission from EPC Group. 1
  • 3. EXECUTIVE SUMMARY A branch of the U.S. Armed Forces had an objective to implement an Enterprise Project Management (EPM) solution in order to bring into line newly formed organizational goals and objectives related to its enterprise project management practices and to better manage resources and assignments with greater efficiency. EPC Group set out to assist the client in achieving the EPM solution by recommending a phased approach to the implementation. After an Envisioning phase to determine the common vision and goals of the project, recommendations were made to the client about how to solve issues in 5 different key areas: Business Challenges or Opportunity for Improvement, Objectives of the EPM System Initiative, Process Readiness, People (Organizational Change), and Technology Readiness. Additional risk management strategies were analyzed to alleviate potential shocks from the implementation of new technologies, as well. The actual implementation then occurred, and the realized benefits for the client could be observed. These benefits aligned with the needs of the client; in addition, extra positive consequences were also achieved. This case study focuses on the process that was taken to ensure that the Enterprise Project Management (EPM) solution solved the needs of the client through a phased approach beginning with an assessment phase and ending with the actual implementation. NECESSITY FOR AN ENTERPRISE PROJECT MANAGEMENT SOLUTION Initially, when a division of the U. S. Military approached EPC Group with a desire to implement an Enterprise Project Management (EPM) solution, the organization faced a myriad of problems related to its organizational structure and handling of enterprise projects. No formal Project Management Process existed, and no standards were used consistently across the organization. Without the adoption of standardized processes and methods, it made it difficult to measure project performance against a set of common benchmarks. In turn, this made it difficult to determine areas for improvement before starting new projects. Additionally, the client did not currently have the tools to proactively manage the allocation of its resources, making it more difficult to commit to customer deadlines. The purpose of the EPM solution was to serve as a way to identify and standardize enterprise project management practices and provide the executive leadership with a strategic view of all programs. This would help optimize internal resources and manage contracts efficiently. Additional objectives were to:  Improve overall portfolio performance and achieve strategic objectives.  Achieve more efficient utilization of resources.  Reduce program management cost per unit of program benefit due to better management of project schedules and more efficient resource allocation.  Improve program benefit realization from new business opportunities pursued using cost savings. APPROACH RECOMMENDATION A phased approach was recommended as the implementation method during the project in order to provide a viable EPM solution. Each phase had specific deliverables to provide functionality and ensure a successful implementation. Items listed in each phase give an understanding of what would be delivered.  Phase I - Perform Envisioning and Assessment: This phase outlines the findings and recommendation for moving toward a successful Enterprise Project Management (EPM) implementation. This effort would 2
  • 4. include assessment of organizational and project structure, project management processes and resource allocations, infrastructure analysis, system notification requirements, gap analysis, user group definition and design, and system and organization requirements.  Phase II – Requirements Analysis and Design: Detail requirements would be documented and a design of the system and project management processes and templates would be created. EPC Group would conduct requirements gathering sessions to work with the client to identify all the detailed requirements needed. These requirements would cover Program, Project, Task and Resource custom field information, Key Task and Milestones, reporting, views and dashboards, security, system, environment, software functionality, time tracking and task updates, testing, training, resource information, resource utilization and management, documentation, status reporting, issue tracking, risk management, organizational policies, work products, program dependencies, project tracking, PM standards and processes, project templates, enterprise calendars, and configuration needs. In addition to those requirement categories, additional categories could be added. Project Workspace and Collaboration requirements would also be defined within this phase. Within the requirements gathering session, Subject Matter Experts would provide best practices recommendations when needed to assist with requirement decisions.  Phase III – Software Installation and Configuration: This phase would include the installation of MS Project Server 2007 on a Windows 2003 Server, as well as connections to other components such as SharePoint Portal Server 2007 Server (MOSS) and MS SQL Server 2005 or greater. The system would be configured to deploy in a workable EPM test environment. During this phase custom templates, calendars and resources would be added to give the system all working aspects to replicate a production environment for testing (as close as possible). Additionally, In-house staff assisted and observed the installation and configuration. This ensures knowledge transfer and to give the support staffs more in- depth knowledge of the EPM system.  Phase IV – Testing/Training/Deployment: Testing would be performed on the EPM Solution. Two pilot teams would be established for the testing phase. System Administration, Project Management and Project Web Access hands-on training would be conducted to ensure resources are prepared to enter the system, as well as future resource training needs. The training and production environments would be installed, fully configured and tested for operation. These environments would be setup with all enterprise templates and calendars, as well as resources pool information. In addition to the environment setups, training, and testing, a deployment of the enterprise project management solution would be rolled-out to the organization. ENVISIONING PROCESS AND ASSESSMENT RESULTS The Envisioning process was the primary focus of the initial Discovery phase of the implementation. It provided key stakeholders with an orientation of the Enterprise Project Management (EPM) solution and an opportunity to collaborate and gain consensus on a common vision for EPM within the organization. This vision included an enterprise wide view of the primary business challenges addressing the organization, the key business objectives for implementing EPM, and an agreed upon decision regarding the use and strategy for the initiative. The Envisioning process also incorporated a review of collaboration and communication needs outside of EPM. This involved a capabilities review of the Microsoft SharePoint technologies and how they may be used to meet objectives that cannot be accomplished solely with the EPM solution. The Envisioning workshops conducted on this project did include sessions on Collaboration and Communication. 3
  • 5. As part of the EPM Envisioning process, the following sets of activities were conducted:  Questionnaire and Key Messages Summary: A questionnaire was completed to gain a better understanding of how the client currently managed its business, people and processes. The results were compiled and communicated during the Envisioning Workshop.  Kick-off Meeting: A formal meeting was conducted to communicate EPM project goals & objectives, scope, roles and responsibilities, and timeline.  Envisioning Workshops: A series of workshops were conducted to secure feedback on the client’s vision in the areas of project management and scheduling, resource management, timesheets, issues and risk. INITIAL STATE FINDINGS The findings of the envisioning workshop sessions, surveys collections, and personal interviews were categorized into five main organizational groups of findings: 1. Prioritization of Business Challenges or Opportunity for Improvement: The business challenges or opportunities for improvements were ranked based upon the respective consequences for not responding. 2. Prioritization of Objectives of the EPM System Initiative: The objectives of the EPM System Objectives were ranked, as well. 3. Process Readiness: The EPM capability areas were rated in the categories of priority to the organization, whether a formal or informal process existed, and what the perception of the process was as viewed by the organization. 4. People (Organizational Change): Important considerations for managing change in the client as well as EPC Group’s observations throughout the Envisioning process in the areas of successful communication, implantation, and way to better understand the user community. 5. Technology Readiness: The client had invested in their resources and the structuring of the EPM technical team. By identifying the team that would support the EPM implementation, as well as leveraging staff development in the appropriate tools, this would assist the organization in the preparation for the implementation. The client had already leveraged Windows SharePoint Services (WSS) in a limited capacity as well as investments in other Microsoft technologies (e.g. SQL Server, Active Directory, etc.). Supporting the previously mentioned technologies would require the combination of technical and non- technical staff. Both sets of technologies (Project Server & SharePoint) included routine responsibilities to maintain the applications as well as enhancement abilities to make them more productive for the user communities for which they serve. Additional application administration training on all mentioned technologies would be needed for the support staff. By performing the above phases and activities included within them, the areas of improvement, processes, and EPM objectives were addressed and recommendations were made. RISK PLANNING AND MITIGATION STRATEGY Primary risks associated with this initiative centered around the cultural shifts from informal to more structured and consistent processes, as well as a shift to increased visibility of information regarding resource utilization and project status. Successful adoption with an adequate level of training on the tool was necessary, and the processes 4
  • 6. it supports. In addition, executive management had to foster an environment of continuous learning and shared organizational goals. Successful user adoption within the organization was critical before deploying EPM to the entire organization. This section addressed the factors that the client had to put into place to increase initiative success. The organization had to be aware of conditions that will introduce risk and look for these conditions, document them, and bring them to the sponsor’s attention. By raising awareness of risks, the team initiated the process of developing mitigations and enabled informed decisions. Conditions that can introduce significant risk to an EPM initiative include:  Insufficient formal project management expertise among organization staff.  The expectation that the introduction of the technology will drive the business-process changes (Note: Processes may be developed and rolled out in tandem with the technology. However, the technology should not be the sole driver for the process.)  Sponsorship that is unwilling to champion the necessary process discipline and technology use.  An aggressive implementation schedule that cannot be met due to the complexity of the business-process changes.  A lack of sufficient technology, project management, or change-management skills in the EPM team.  Lack of user involvement in the design of the business processes or technology configurations.  Lack of EPM initiative support from key roles or groups within the organization.  Lack of commitment by the EPM pilot teams.  A shift to EPM may threaten people who are accustomed to keeping their project data private.  An increase in the visibility of project data will expose people’s skills in both project management processes and the use of the Microsoft Office Project 2007 technology. ACTUAL IMPLEMENTATION In the Approach Recommendation section, each phase was outlined as to what ought to be implemented during the project. The following section tracks the actual implementation process that occurred. First, EPC Group and the client established a consensus on the information contained within the Envisioning and Initial State Findings sections of this case study (e.g. business objectives, current state, recommendations, risks, and next steps). Phase I then took place as planned. Requirements for the EPM implementation were developed, including but not limited to business, functional, reporting, training, testing, security, process and documentation, system and environment requirements. Pilot team members and projects were identified and planning for the pilot and selecting the best projects for the pilot of EPM occurred. Next, organizational training was delivered including EPM Administration, Project Management, and Project Web Access training, as well as job assistance tools (“How to” documentation, cheat sheets, etc). Based off of the detailed requirements, EPC Group created the technical design and specifications of the EPM system and creation of process documentation. Guided instructions and support from EPC Group for the on-site support staff to setup hardware and server software and the configuration of the system took place. This was followed by the preparation for the EPM deployment, including the testing of the system, training of resources, and planning for the EPM rollout. 5
  • 7. Afterwards, Functional Administrators, Project Managers and End Users were identified and formally trained. The client subsequently developed the plan for preparing the User Community for Change and the Communication Plan for EPM Go-Live. Finally, the launch of two pilot projects and the utilization of the system began. Resources reported task updates, monitored and controlled project schedules, as well as obtained feedback for process improvements. POSITIVE IMPACT After the implementation of the EPM solution occurred, the following positive results were realized for the branch of the military:  The client is able to better understand the time spent on IT projects vs. time spent on support activities and staff accordingly.  Through standardized and institutionalized processes, a formal Product Management Organization (PMO) and extensive hands on training, a formal Project Management Process is being followed for managing projects from initiation to production.  Executives are gaining the visibility needed for project/work priorities across the organization and are able to now monitor project performance based on more accurate data and remediate problems in a more timely manner.  The Military Branch now has the tools to proactively manage the allocation of resources and achieve more efficient utilization of resources.  Management is now obtaining total project costs including labor, equipment and operational costs for projects.  Standards are now being used consistently across the organization allowing for improved reporting and data analysis.  Project Workspaces are giving the client the capabilities for storing and collaborating on documents and work activities for each project which is providing consistencies of processes and reducing duplication of project documentation. Through the formalized phased approach outlined in this case study, this branch of the U.S. Armed Forces was able to not only able to streamline enterprise project management practices, but provide organizational leadership with a tactical view of all programs to maintain efficiency throughout the client’s coverage. The EPM Solution allowed the client to meet its organization goals and needs beginning with the assessments phase, progressing with recommendations and creating a proactive risk management policy, and continuing with the actual implementation. 6