SlideShare a Scribd company logo
1 of 65
Download to read offline
Hello !!!
   My Name is
Muhammad MarZouK
And This is My Traditional Resume
Presentations Objectives



Presenting:
1.My Educations, Certificates,
  Qualifications, Experiences and Skills.
2.My Achievements and Successes.
3.My Strengths and Weaknesses.
4. My Objectives.
Educations And Certifications
Bachelor’s degree in Mechanical Design and Production
Faculty of Engineering-Cairo University (2007)
                                           5
I Attended and Successfully Completed
Certified Associate in Project Management and I am
 Preparing for The “PMP” Exam Certificate (2008)
Passed 10 from 15 subjects of Quality Control diploma in
  Ain Shams University, Faculty of engineering. (2008)
   (Canceled by because of the death of 2 professors).
CERTIFIED QUALITY
    AUDITOR FOR ISO
      9001:2008
from TUV NORD (2009).
SALES DIPLOMA from the
 CTCHD (Canadian Training
      Center For Human
Development) (2010) BY THE
 INTERNATIONAL PROF. DR.
  “IBRAHIM EL FIKY” (2010)
CERTIFIED
  LEAN SIX SIGMA BLACK BELT
from Symbios Consulting (2011)
Career Related Experience
Production Planner in “UNIONAIRE”
        Planning Department




  Maintenance Engineer for
diesel engines in “Nubian Sea”
Member in the IT and
    E-Marketing Departments in
Bedaya Team for Human Development




                 Small businesses:
                 1.(Designing and
                 Printing on Metals).
                 2.Website Designer.
                 2.Marketing for both
                 projects.
Achievements
Achievements:
1. Finished the technical drawings of
   137 products using AutoCAD.
2. Established Quality Control System.
3. Established Preventive Maintenance
   System.
4. Established the ISO 180001
   Instructions.
Achievements:
1.  Established Quality Control System
    And Got the ISO 9001:2008.
2.  Established Preventive Maintenance
    System.
3.  Established monitor system to
    measure, monitor and control the
    production.
4.  Improve 3 products’ design to
    decrease cost and production
    processes.
1.Increase employees’ morale and satisfaction from 68% to 83%
2.Established Quality Control System
3.Established 5/11 of Lean System task list

          1. 6S And Visualization
3.Established 5/11 of Lean System task list

          2.Culture Awareness
3.Established 5/11 of Lean System task list

       3.Continuous Improvement
3.Established 5/11 of Lean System task list

                    4.Quick Change Over

                                 Redesigning The Molds
                                 to Be More Simple That
                                 Decrease The Assembly
                                        Time 17%




      Redesigning The
Transformers to Decrease The
  Lead-time Of Casting And
 Decrease Cost of The EBOXY
          Material
3.Established 5/11 of Lean System task list

           5.QUALITY AND ERROR PROOFING

  ERROR                     Quality
PROOFING                    Boards
 DEVICES
4. Got 33 Points in The
LAT (Lean Assessment Tool)
5. Increase the productivity
“21%” And Achieve “100%” OTD
6.Created Monitoring and Planning system using MS Excel and Visual Basic

                          Monitoring System
6. Create Monitoring and Planning system using MS Excel and Visual Basic

                   Offers Short And Long Term Plan
7. Established an Integrated Management System
          (ISO 9001, 18001 and 14001).
8. Established a Very
Effective Traceability System
    for the Transformers.
9. Moving the Company From the Orange Zone to the
   Green zone Through the Yellow Zone of the SAM
     (Schneider Electric Approval Module) Audit.
10. Improve Products Specifications By Using
                         “Analytical Analysis and Minitab”
                                  Summary for KV @ 50 PC
                                  Casting Velocity (Kilo/m) = 2.80
                                                                      A nderson-D arling N ormality Test
                                                                           A -S quared         0.62
                                                                           P -V alue          0.096
                                                                           M ean             23.247
                                                                           S tD ev            5.328
                                                                           V ariance         28.383
                                                                           S kew ness      0.347451
                                                                           Kurtosis        0.577401
                                                                           N                     32

                                                                           M inimum          13.000
                                                                           1st Q uartile     20.000
                                                                           M edian           23.000
              15           20            25             30   35            3rd Q uartile     25.000
                                                                           M aximum          35.000
                                                                     95% C onfidence Interv al for M ean
                                                                           21.326            25.168
                                                                     95% C onfidence Interv al for M edian
                                                                           21.000            24.002
                        9 5 % C onfidence Inter v als                95% C onfidence Interv al for S tD ev

 Mean                                                                      4.271              7.083

Median
                                                                                                                        Summary for KV @ 50 PC
         21        22               23             24        25                                                         Casting Velocity (Kilo/m) = 2.25
                                                                                                                                                            A nderson-D arling N ormality Test
                                                                                                                                                                 A -S quared        1.56
                                                                                                                                                                 P -V alue <       0.005
                                                                                                                                                                 M ean             18.903
                                                                                                                                                                 S tD ev            3.190
                                                                                                                                                                 V ariance         10.174
                                                                                                                                                                 S kew ness      -0.02590
                                                                                                                                                                 Kurtosis        -1.53307
                                                                                                                                                                 N                     32

                                                                                                                                                                 M inimum         14.000
                                                                                                                                                                 1st Q uartile    15.500
                                                                                                                                                                 M edian          20.500
                                                                                             15               20             25            30        35          3rd Q uartile    21.300
                                                                                                                                                                 M aximum         24.000
                                                                                                                                                           95% C onfidence Interv al for M ean
                                                                                                                                                                 17.753           20.053
                                                                                                                                                           95% C onfidence Interv al for M edian
                                                                                                                                                                 16.000           21.000
                                                                                                           9 5 % C onfidence Inter v als                   95% C onfidence Interv al for S tD ev

                                                                          Mean                                                                                   2.557             4.241

                                                                        Median

                                                                                    16            17               18             19            20    21
   1- Passed the organization installation,
    startup and qualification phases.
2-Create and implement the “Continuous Cost Saving” SOP with
cost saving in first 3 months “13000 Euro”.
3- Design the layout of the production hall and the warehouse.
4- Preparing the Lean deployment agenda and action plan.
                                                                                                                           kick off

                                                                                                                           Baseline

                                                                                                                     Agree on future state
                                                       Lean              Culture
                                                     Enterprise         Awareness                                     Master Action Plan

                                                                                                                      leadership training

                               Constraint                                                    Continuous                 KPIs and target
                              Management                                                    Improvement               agreement setting
                                                                                                                       resources & area
                                     •6 -9 months                                   •6 -9 months
                                                                                                                      owners allocation
                                                                                                                         Skill Matrix
       Exit                                          Phase IV         Phase I                                                CIP
                       Material                      Pull System       Stability
                      Control/Pull                                                                   Visualization            6S
       SSGB             Systems
                                                                                                                         Warehouses
  Lean Enterprise
                                                     Phase III        Phase II                                             Lean GB
    Constraint                                       Synchronized    Continuous
   Management                                         Production        Flow                                                 R&R
                            Quick                                                                   In Station
   Pull System &           Change                                                                    Process
                                      •6 -9 months                                  •6 - 9 months                            ISPC
      Kanban                Over                                                                     control
                                                                                                                         waste walks
       QCO

                                         Quality                                    Flexible                             ergonomics
 Quality and Error
    Proofing                            and Error                                   Operatio
                                        Proofing                                    ns/Flow                            communication
                                                                  Total
quarter assessments                                            Productive
                                                              Maintenance                                                 cell design

    War room                                                                                                                 TPM
5- Preparing for Lean Culture awareness plan .
6- Start implementing the 5S and Visualization system.
7- Design powerful monthly evaluation system for the operators
8- Preparing and implementing training system “plan, matrix and agenda” for
transferring the operational and technical knowledge from the German expats.
9- Create a Monitoring and Planning system using MS Excel, It is a broad set of activities
that helps a totally monitor the important parts of all the departments, provides high
ability to measure (KPIs) like RTY, OEE and OTD.
Computer Skills
Strengths
High communication skills
Taking Initiatives
I have a creative mind
Rich                              Random
Pictures                            Creativity
                                                 Affinity
                           Brain                 Diagram
                         Storming


            Mind
           Mapping
                     Concept
                       Fan




   Always Trying to Think Out Of The Box
8        A Problem Solver       Control
    Disciplines                          charts



Fishbone
Diagram
                                                   FMEA




    5                                        “What If“
   WHYs                                      Analysis


                               Statistical
                                Analysis
And Also Decision Maker
Multivoting
                Solution Selection Matrix
                                            Prioritization
Consensus                                      Matrix
                     Six Thinking
 Building
                         Hats
                                       Decision
                                                       SWOT
                                        Trees
                                                      Analysis
I Possess Leadership skills




I possess leadership skills
Certified Lean Six                                       ISO
                        Operations     SAM Audit
 Sigma Black Belt                                     Preparation
                       Section Head     Official
                                                         Team
Supervision of Three     One Black
Green Belts Projects    Belt Project   Quality Team     Leading Small
                                         Leader           Business




Where I have lead peoples many times in projects
I believe in
“Teamwork”
And able to work independently
Always seeking for
    continuous
 development with
High availability for
   self- learning
Finalizing projects with extreme high quality.
       (Tiny details always makes the big difference)
Weaknesses
Interests
My Objectives:
Seeking a position where I can develop and improve my career in the field of
Planning Production, Managing, Developing and Improvement Manufacturing
Systems in which I would utilize my training experience, educational
background and interpersonal skills that would create an added value at any
corporation, where I have the experience in the area that qualifies me in:
Setup and manage Lean (Toyota) Manufacturing System, planning and
directing the activities concerned with development, application for industrial
processes, materials, and products that will increase the ability of
competition and customer satisfaction.
You Can
Reach Me In
My visual resume

More Related Content

Similar to My visual resume

High-brightness fiber coupled pumps
High-brightness fiber coupled pumpsHigh-brightness fiber coupled pumps
High-brightness fiber coupled pumpsOleg Maksimov
 
IRJET- Design and Implementation of High Speed, Low Power Charge Shared R...
IRJET-  	  Design and Implementation of High Speed, Low Power Charge Shared R...IRJET-  	  Design and Implementation of High Speed, Low Power Charge Shared R...
IRJET- Design and Implementation of High Speed, Low Power Charge Shared R...IRJET Journal
 
Case Study: Cyclic Voltametric Measurement
Case Study: Cyclic Voltametric MeasurementCase Study: Cyclic Voltametric Measurement
Case Study: Cyclic Voltametric MeasurementHasnain Ali
 
Multi-Objective design optimization of a Superconducting Fault Current Limiter
Multi-Objective design optimization of a Superconducting Fault Current LimiterMulti-Objective design optimization of a Superconducting Fault Current Limiter
Multi-Objective design optimization of a Superconducting Fault Current LimiterFranco Moriconi
 
Micro Coulomb Analyzer by ACMAS Technologies Pvt Ltd.
Micro Coulomb Analyzer by ACMAS Technologies Pvt Ltd.Micro Coulomb Analyzer by ACMAS Technologies Pvt Ltd.
Micro Coulomb Analyzer by ACMAS Technologies Pvt Ltd.Acmas Technologies Pvt. Ltd.
 
Numerical Investigation of Aerodynamic Performance of H-Rotor Darrieus Wind T...
Numerical Investigation of Aerodynamic Performance of H-Rotor Darrieus Wind T...Numerical Investigation of Aerodynamic Performance of H-Rotor Darrieus Wind T...
Numerical Investigation of Aerodynamic Performance of H-Rotor Darrieus Wind T...Bharath Ningaraj
 
Ibeko Eging Series
Ibeko Eging SeriesIbeko Eging Series
Ibeko Eging Seriesarturveloso
 
Solon Black 230
Solon Black 230Solon Black 230
Solon Black 230natec1
 
KO-CAP for High-Reliability Applications (Space Tech Expo 2017)
KO-CAP for High-Reliability Applications (Space Tech Expo 2017)KO-CAP for High-Reliability Applications (Space Tech Expo 2017)
KO-CAP for High-Reliability Applications (Space Tech Expo 2017)KEMET Electronics Corporation
 
Design and Implementation of an Efficient Soft Switching Inverter Fed Ac Drive
Design and Implementation of an Efficient Soft Switching Inverter Fed Ac DriveDesign and Implementation of an Efficient Soft Switching Inverter Fed Ac Drive
Design and Implementation of an Efficient Soft Switching Inverter Fed Ac DriveIRJET Journal
 
Catalog ls susol mc_leaflet_e_0901_dienhathe.vn
Catalog ls susol mc_leaflet_e_0901_dienhathe.vnCatalog ls susol mc_leaflet_e_0901_dienhathe.vn
Catalog ls susol mc_leaflet_e_0901_dienhathe.vnDien Ha The
 
Catalog ls susol mc_leaflet_e_0901
Catalog ls susol mc_leaflet_e_0901Catalog ls susol mc_leaflet_e_0901
Catalog ls susol mc_leaflet_e_0901Dien Ha The
 
Current transformers
Current transformersCurrent transformers
Current transformersBhairav Joshi
 
TRANSFORMER TEST acceptance criteria
TRANSFORMER TEST acceptance criteriaTRANSFORMER TEST acceptance criteria
TRANSFORMER TEST acceptance criteriaRajuGupta88
 
Zoltun Illustration Portfolio
Zoltun Illustration Portfolio Zoltun Illustration Portfolio
Zoltun Illustration Portfolio Jane Zoltun
 

Similar to My visual resume (20)

High-brightness fiber coupled pumps
High-brightness fiber coupled pumpsHigh-brightness fiber coupled pumps
High-brightness fiber coupled pumps
 
IRJET- Design and Implementation of High Speed, Low Power Charge Shared R...
IRJET-  	  Design and Implementation of High Speed, Low Power Charge Shared R...IRJET-  	  Design and Implementation of High Speed, Low Power Charge Shared R...
IRJET- Design and Implementation of High Speed, Low Power Charge Shared R...
 
Case Study: Cyclic Voltametric Measurement
Case Study: Cyclic Voltametric MeasurementCase Study: Cyclic Voltametric Measurement
Case Study: Cyclic Voltametric Measurement
 
Multi-Objective design optimization of a Superconducting Fault Current Limiter
Multi-Objective design optimization of a Superconducting Fault Current LimiterMulti-Objective design optimization of a Superconducting Fault Current Limiter
Multi-Objective design optimization of a Superconducting Fault Current Limiter
 
Micro Coulomb Analyzer by ACMAS Technologies Pvt Ltd.
Micro Coulomb Analyzer by ACMAS Technologies Pvt Ltd.Micro Coulomb Analyzer by ACMAS Technologies Pvt Ltd.
Micro Coulomb Analyzer by ACMAS Technologies Pvt Ltd.
 
Test Requirements for Microprocessor Relays
Test Requirements for Microprocessor RelaysTest Requirements for Microprocessor Relays
Test Requirements for Microprocessor Relays
 
IESL PRESENTATION
IESL PRESENTATIONIESL PRESENTATION
IESL PRESENTATION
 
Numerical Investigation of Aerodynamic Performance of H-Rotor Darrieus Wind T...
Numerical Investigation of Aerodynamic Performance of H-Rotor Darrieus Wind T...Numerical Investigation of Aerodynamic Performance of H-Rotor Darrieus Wind T...
Numerical Investigation of Aerodynamic Performance of H-Rotor Darrieus Wind T...
 
Ibeko Eging Series
Ibeko Eging SeriesIbeko Eging Series
Ibeko Eging Series
 
Br24457460
Br24457460Br24457460
Br24457460
 
Solon Black 230
Solon Black 230Solon Black 230
Solon Black 230
 
KO-CAP for High-Reliability Applications (Space Tech Expo 2017)
KO-CAP for High-Reliability Applications (Space Tech Expo 2017)KO-CAP for High-Reliability Applications (Space Tech Expo 2017)
KO-CAP for High-Reliability Applications (Space Tech Expo 2017)
 
Design and Implementation of an Efficient Soft Switching Inverter Fed Ac Drive
Design and Implementation of an Efficient Soft Switching Inverter Fed Ac DriveDesign and Implementation of an Efficient Soft Switching Inverter Fed Ac Drive
Design and Implementation of an Efficient Soft Switching Inverter Fed Ac Drive
 
Catalog ls susol mc_leaflet_e_0901_dienhathe.vn
Catalog ls susol mc_leaflet_e_0901_dienhathe.vnCatalog ls susol mc_leaflet_e_0901_dienhathe.vn
Catalog ls susol mc_leaflet_e_0901_dienhathe.vn
 
Catalog ls susol mc_leaflet_e_0901
Catalog ls susol mc_leaflet_e_0901Catalog ls susol mc_leaflet_e_0901
Catalog ls susol mc_leaflet_e_0901
 
P045078991
P045078991P045078991
P045078991
 
Current transformers
Current transformersCurrent transformers
Current transformers
 
TRANSFORMER TEST acceptance criteria
TRANSFORMER TEST acceptance criteriaTRANSFORMER TEST acceptance criteria
TRANSFORMER TEST acceptance criteria
 
Zoltun Illustration Portfolio
Zoltun Illustration Portfolio Zoltun Illustration Portfolio
Zoltun Illustration Portfolio
 
TRANSFORMERS
TRANSFORMERSTRANSFORMERS
TRANSFORMERS
 

Recently uploaded

Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 

Recently uploaded (20)

No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 

My visual resume

  • 1. Hello !!! My Name is Muhammad MarZouK
  • 2. And This is My Traditional Resume
  • 3. Presentations Objectives Presenting: 1.My Educations, Certificates, Qualifications, Experiences and Skills. 2.My Achievements and Successes. 3.My Strengths and Weaknesses. 4. My Objectives.
  • 5. Bachelor’s degree in Mechanical Design and Production Faculty of Engineering-Cairo University (2007) 5
  • 6. I Attended and Successfully Completed Certified Associate in Project Management and I am Preparing for The “PMP” Exam Certificate (2008)
  • 7. Passed 10 from 15 subjects of Quality Control diploma in Ain Shams University, Faculty of engineering. (2008) (Canceled by because of the death of 2 professors).
  • 8. CERTIFIED QUALITY AUDITOR FOR ISO 9001:2008 from TUV NORD (2009).
  • 9. SALES DIPLOMA from the CTCHD (Canadian Training Center For Human Development) (2010) BY THE INTERNATIONAL PROF. DR. “IBRAHIM EL FIKY” (2010)
  • 10. CERTIFIED LEAN SIX SIGMA BLACK BELT from Symbios Consulting (2011)
  • 12. Production Planner in “UNIONAIRE” Planning Department Maintenance Engineer for diesel engines in “Nubian Sea”
  • 13. Member in the IT and E-Marketing Departments in Bedaya Team for Human Development Small businesses: 1.(Designing and Printing on Metals). 2.Website Designer. 2.Marketing for both projects.
  • 14.
  • 15.
  • 16.
  • 18. Achievements: 1. Finished the technical drawings of 137 products using AutoCAD. 2. Established Quality Control System. 3. Established Preventive Maintenance System. 4. Established the ISO 180001 Instructions.
  • 19. Achievements: 1. Established Quality Control System And Got the ISO 9001:2008. 2. Established Preventive Maintenance System. 3. Established monitor system to measure, monitor and control the production. 4. Improve 3 products’ design to decrease cost and production processes.
  • 20. 1.Increase employees’ morale and satisfaction from 68% to 83%
  • 22. 3.Established 5/11 of Lean System task list 1. 6S And Visualization
  • 23. 3.Established 5/11 of Lean System task list 2.Culture Awareness
  • 24. 3.Established 5/11 of Lean System task list 3.Continuous Improvement
  • 25. 3.Established 5/11 of Lean System task list 4.Quick Change Over Redesigning The Molds to Be More Simple That Decrease The Assembly Time 17% Redesigning The Transformers to Decrease The Lead-time Of Casting And Decrease Cost of The EBOXY Material
  • 26. 3.Established 5/11 of Lean System task list 5.QUALITY AND ERROR PROOFING ERROR Quality PROOFING Boards DEVICES
  • 27. 4. Got 33 Points in The LAT (Lean Assessment Tool)
  • 28. 5. Increase the productivity “21%” And Achieve “100%” OTD
  • 29. 6.Created Monitoring and Planning system using MS Excel and Visual Basic Monitoring System
  • 30. 6. Create Monitoring and Planning system using MS Excel and Visual Basic Offers Short And Long Term Plan
  • 31. 7. Established an Integrated Management System (ISO 9001, 18001 and 14001).
  • 32. 8. Established a Very Effective Traceability System for the Transformers.
  • 33. 9. Moving the Company From the Orange Zone to the Green zone Through the Yellow Zone of the SAM (Schneider Electric Approval Module) Audit.
  • 34. 10. Improve Products Specifications By Using “Analytical Analysis and Minitab” Summary for KV @ 50 PC Casting Velocity (Kilo/m) = 2.80 A nderson-D arling N ormality Test A -S quared 0.62 P -V alue 0.096 M ean 23.247 S tD ev 5.328 V ariance 28.383 S kew ness 0.347451 Kurtosis 0.577401 N 32 M inimum 13.000 1st Q uartile 20.000 M edian 23.000 15 20 25 30 35 3rd Q uartile 25.000 M aximum 35.000 95% C onfidence Interv al for M ean 21.326 25.168 95% C onfidence Interv al for M edian 21.000 24.002 9 5 % C onfidence Inter v als 95% C onfidence Interv al for S tD ev Mean 4.271 7.083 Median Summary for KV @ 50 PC 21 22 23 24 25 Casting Velocity (Kilo/m) = 2.25 A nderson-D arling N ormality Test A -S quared 1.56 P -V alue < 0.005 M ean 18.903 S tD ev 3.190 V ariance 10.174 S kew ness -0.02590 Kurtosis -1.53307 N 32 M inimum 14.000 1st Q uartile 15.500 M edian 20.500 15 20 25 30 35 3rd Q uartile 21.300 M aximum 24.000 95% C onfidence Interv al for M ean 17.753 20.053 95% C onfidence Interv al for M edian 16.000 21.000 9 5 % C onfidence Inter v als 95% C onfidence Interv al for S tD ev Mean 2.557 4.241 Median 16 17 18 19 20 21
  • 35. 1- Passed the organization installation, startup and qualification phases.
  • 36. 2-Create and implement the “Continuous Cost Saving” SOP with cost saving in first 3 months “13000 Euro”.
  • 37. 3- Design the layout of the production hall and the warehouse.
  • 38. 4- Preparing the Lean deployment agenda and action plan. kick off Baseline Agree on future state Lean Culture Enterprise Awareness Master Action Plan leadership training Constraint Continuous KPIs and target Management Improvement agreement setting resources & area •6 -9 months •6 -9 months owners allocation Skill Matrix Exit Phase IV Phase I CIP Material Pull System Stability Control/Pull Visualization 6S SSGB Systems Warehouses Lean Enterprise Phase III Phase II Lean GB Constraint Synchronized Continuous Management Production Flow R&R Quick In Station Pull System & Change Process •6 -9 months •6 - 9 months ISPC Kanban Over control waste walks QCO Quality Flexible ergonomics Quality and Error Proofing and Error Operatio Proofing ns/Flow communication Total quarter assessments Productive Maintenance cell design War room TPM
  • 39. 5- Preparing for Lean Culture awareness plan .
  • 40. 6- Start implementing the 5S and Visualization system.
  • 41. 7- Design powerful monthly evaluation system for the operators
  • 42. 8- Preparing and implementing training system “plan, matrix and agenda” for transferring the operational and technical knowledge from the German expats.
  • 43. 9- Create a Monitoring and Planning system using MS Excel, It is a broad set of activities that helps a totally monitor the important parts of all the departments, provides high ability to measure (KPIs) like RTY, OEE and OTD.
  • 46.
  • 49. I have a creative mind
  • 50. Rich Random Pictures Creativity Affinity Brain Diagram Storming Mind Mapping Concept Fan Always Trying to Think Out Of The Box
  • 51. 8 A Problem Solver Control Disciplines charts Fishbone Diagram FMEA 5 “What If“ WHYs Analysis Statistical Analysis
  • 52. And Also Decision Maker Multivoting Solution Selection Matrix Prioritization Consensus Matrix Six Thinking Building Hats Decision SWOT Trees Analysis
  • 53. I Possess Leadership skills I possess leadership skills
  • 54. Certified Lean Six ISO Operations SAM Audit Sigma Black Belt Preparation Section Head Official Team Supervision of Three One Black Green Belts Projects Belt Project Quality Team Leading Small Leader Business Where I have lead peoples many times in projects
  • 56. And able to work independently
  • 57. Always seeking for continuous development with High availability for self- learning
  • 58. Finalizing projects with extreme high quality. (Tiny details always makes the big difference)
  • 60.
  • 62.
  • 63. My Objectives: Seeking a position where I can develop and improve my career in the field of Planning Production, Managing, Developing and Improvement Manufacturing Systems in which I would utilize my training experience, educational background and interpersonal skills that would create an added value at any corporation, where I have the experience in the area that qualifies me in: Setup and manage Lean (Toyota) Manufacturing System, planning and directing the activities concerned with development, application for industrial processes, materials, and products that will increase the ability of competition and customer satisfaction.