BHAVINI’s NOMINATION FOR ENGINEERING
EXCELLENCE AWARD - 2013

Presentation by

Dr. Prabhat Kumar
Distinguished Scientist and
Chairman & Managing Director
Bharatiya Nabhikiya Vidyut Nigam Limited (BHAVINI)
Department of Atomic Energy
A Government of India Enterprise
Kalpakkam 603 102, Tamilnadu, India
INDIA’S THREE STAGE NUCLEAR
POWER PROGRAMME

12 GWe, 30 Yr

Natural
Uranium

Th

E LE CT RI CIT Y

PHWR

Depleted U
Pu

300 GWe, 30 Yr
Pu FUELLED
FAST BREEDERS

Th

E LE CT RI CIT Y

500 GWe, 500 Yr
Pu

U-233

U-233 FUELLED
BREEDERS

E LECTRICITY

U-233

STAGE 1

STAGE 2

STAGE 3

BHAVINI has commenced activities on second stage
• Prototype
Fast
Breeder
Reactor (PFBR) is first of its
kind nuclear reactor in the
country
• India’s very important and
prestigious project
• Advanced construction stage
Fuel

: PuO2+ UO2

Thermal Power

: 1250 MWth

Electrical output

: 500 MWe

Coolant

: Liquid Na

Thermal Efficiency

: 40%
Prototype Fast Breeder Reactor Flow Chart
Fukushima incident could have been avoided if passive
decay heat removal system like PFBR exist in their reactor

PFBR, the only nuclear reactor in
the country has secondary loop
No power required for
removal of decay heat
PFBR REACTOR ASSEMBLY COMPONENTS
Huge size reactor with
complex constructional
features

Man standing

1

Main Vessel

2

Core Support Structure

3

Core Catcher

4

Grid Plate

5

Core

6

Inner vessel

7

Roof slab

8

Large Rotatable Plug

9

Small Rotatable Plug

10 Control Plug
11 Absorber Rod Drive Mechanism
12 Transfer Arm
13 Intermediate Heat Exchanger
14 Primary Sodium Pump
15 Safety Vessel
Stringent administrative and quality
controls at every stage
What all makes PFBR project eligible for
Engineering Excellence Award 2013
Indigenous and New Technology
Many Challenges overcome successfully and
Innovations in many activities
Achievements and high success rate in every
activities
Manufacture
of
thin
walled
gigantic
components for the first time in the country
Handling & Erection of over dimensional
equipment without single dent
Design, Construction, Equipment fabrication
and Regulatory approval in parallel
Few points which make PFBR project
innovative
 First of its kind nuclear reactor in the country
- Generates more Plutonium than it consumes

 Manufacturing of gigantic equipment at site due
to transportation constraints meeting all the
stringent specification requirements
 Development of special grade materials in large
scale in the country never done in the past
 Development of Novel equipment erection
techniques
 Huge quantity of highly reactive Sodium transfer
without a single drop of leak
- 1750 tones !!!
Highly reactive Liquid
Sodium transfer
Largest and deepest excavated pit in Indian
nuclear plants immediately next to sea
(200 meters from the sea)
National record of largest concrete pouring in
single stretch ever done by any industry in India
Initially 5000 cubic meter concreting during
2005 and then surpassed BHAVINI’s own
record by pouring 5800 cubic meter concrete
Off Shore Submarine Tunnel
Under sea Tunnel 567 meters
length at 50 meters below the sea

Constructed for the first time in the country
Tsunami bund/Shore Protection/Outfall Channel

Tsunami bund

Shore
protection

Outfall Channel

15

15
Coastal plantation

Engineered sand dune

Unique method of Tsunami protection
system for the reactor site
INCREASE IN ELEVATION
The nuclear island finished floor level
is raised to 15.7 meters for reactor
protection from future Tsunami if any
Fabrication of gigantic reactor
components for PFBR
Fabrication of over dimensional, thin
walled reactor components at PFBR site
FABRICATION OF MAIN VESSEL
Great
Challenge
Made for
the first
time in the
country

Diameter achieved within 10mm tolerance for total 12900 mm
INNER VESSEL
Positional accuracy,
alignment and
orientation has to
be maintained
during fabrication
To be lifted during
erection without swing

Man standing

Safety Vessel with Thermal Insulation Panels
Primary Pipe-Grid Plate assembly

The Grid Plate supports all the
core subassemblies of PFBR

Welding to be done in
constrained space meeting
stringent specification
requirements
WELDING
BETWEEN
ROOF SLAB
(RS) AND MAIN
VESSEL (MV)

Very important joint
Weld carries about
2500 tones of
weight
Welding to be carried
out
insitu
in
confined space
Tube to Tubesheet welding, Post Weld Heat Treatment and
Micro-Focal radiography for PFBR Steam Generators

Welding
Nuclear Clean Hall

Local Heat Treatment

Micro-Focal Radiography
Fabrication of 26 meters length
Steam Generators in shop
FABRICATED STEAM GENERATORS

Straightness achieved within 3mm on 26,000 mm length of SG !!!!!!
Challenges in header pullout to bend tubes
welding for Sodium to Air Heat Exchangers

Extremely
Difficult
Header Welding - Needs highly qualified and skilled welders
Header Welding- Extremely difficult

Challenge
Reactor equipment erection
Erection of
PFBR
equipment
without
single dent
ERECTION OF MAJOR COMPONENTS

Safety Vessel

Main Vessel

Thermal Baffle
Safety Vessel is being lowered into Reactor Vault
in a constrained space without swing
Erection of Thermal Baffle
ERECTION OF MAJOR COMPONENTS

Grid Plate

Inner Vessel

Roof Slab
Massive
Argon
Buffer
Tank
erection
STEAM GENERATOR (SG)
ERECTION

SPECIAL ARRANGEMENT FOR
SHIFTING SG (25 METER LONG
COMPONENT)

PLACING SG IN SPECIAL
TILTING MECHANISM
TILTING
FOR
ERECTION

CONNECTION
OF LIFTING
SLINGS

LOWERING OF SG IN
STEAM GENERATOR
BUILDING
SG LIFTED WITH HEAVY
DUTY CRAWLER CRANE

POSITIONING &
ALIGNMENT

FIXING OF
HEATERS
ON SG
Operational excellence of the project
 Meticulous planning and Management






Technical aspects
Finance
Human Resources
Contracts and Material Management
Safety & Security

 Adjust as per design
 No damage/dent on any equipment during
erection
 Financial Management


NIL report during the CIG audits

 Awards
INDUSTRIAL SAFETY AWARDS
High performance in safety in
the construction sector !!!!!

“Industrial Safety Award” by Atomic Energy Regulatory Board
“Suraksha Puraskar” by National Safety Council of India
AWARDS - HUMAN RESOURCES
Development and inspiration of
true potential of human capital

“Best HR Practices–2012 Award” by National
Institute of Personnel Management (NIPM)
Award for outstanding Concrete Structure

“ICI (TNCC) - Ultratech Award”
by Indian Concrete Institute
How PFBR project has added to the self
reliance of India in the chosen sector
 Excellences by young team with an average
age of 30 years
 Documentation/Technical Papers
- More than 300 papers in National/International
Conferences/Journals by young company

 Visit of 23,000 students at PFBR project site as
a part of outreach programme
Key impacts which PFBR project has made
 Sustainability
 Improvement in the quality standards
 Creation of new and indigenous technological
capability in terms of machining, welding,
fabrication, testing, handling and erection
 First Time right approach
 Neighborhood Development
•
•
•
•
•
•
•

Indirect employment
Education
Infrastructure
Health & hygiene
Water supply
Outreach programme
Sports
Science Lab Apparatus & Models donated to Annamalai Middle School,
Desumughipet, Thirukalukundram

Donated PC and books to Govt. Higher Sec. School,
Pudupattinam on 28.04.2008

Donation of Personal computers to the schools

Vocational Training Programme for Neighborhood village youth from 27.09.2005

Water Pump & Pump room for Panchayat Union
Primary School Meiyur

Vocational Training courses II batch commenced on 02.10.2006

Construction of Compound Wall- Panchayath
Union Primary School Sadhrangapattinam

Water Tank & Hand Wash Facility Panchayath
Union Primary School Sadhrangapattinam
Epidemiological Health Survey with
Assistance from BHAVINI

One R.O. Plant has been installed at Sadras Meyyur
kuppam, Kalpakkam

`
Sadras Primary Health Centre – Maternity Ward

Sprayed mosquito repellant in the
surrounding villages as preventive
measure for chickengunia

In co-ordination with Dr.M.S.Swaminathan Research
Foundation, Chennai, action has been initiated to set up
Village Knowledge Centre
Bio-shield
Hatchery – Self Help Groups
Few points which illumine more on the future
readiness of the project
 Robust feedback system for
-Knowledge management
-Sharing of experiences with industry and academia
-Win Win situation for all

 Training, qualification & capability developmen
 Strengthening of Industries

-Tools/fixtures
- Facilities
- Techniques
- Manufacture
- Inspection

 Standardized design and manufacturing
 Modular concept to the possible extent
Over all Night View

PFBR the pride of
nation
53
Thank
You

Mais conteúdo relacionado

Mais procurados

super critical power plant
super critical power plantsuper critical power plant
super critical power plantsridurga88
 
Overview of Fast Breeder Reactors
Overview of Fast Breeder ReactorsOverview of Fast Breeder Reactors
Overview of Fast Breeder ReactorsMd. Ghulam Zakir
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plantGaurav Kaushik
 
Epc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisEpc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisNikhil Kumar Rai
 
METHODS OF IMPROVING STEAM TURBINE PERFORMANCE
METHODS OF IMPROVING STEAM TURBINE PERFORMANCEMETHODS OF IMPROVING STEAM TURBINE PERFORMANCE
METHODS OF IMPROVING STEAM TURBINE PERFORMANCEVanita Thakkar
 
Gas turbine power plant
Gas turbine power plantGas turbine power plant
Gas turbine power plantTarek Erin
 
Candu reactor ppt
Candu reactor pptCandu reactor ppt
Candu reactor pptASHWIN A
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPPAmit Bansal
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power planttmishra3
 
Power Plant Engineering: Pressurised Water Reactor
Power Plant Engineering: Pressurised Water ReactorPower Plant Engineering: Pressurised Water Reactor
Power Plant Engineering: Pressurised Water ReactorNaisarg Sagathiya
 
Safety and nuclear power plant in india
Safety and nuclear power plant  in india Safety and nuclear power plant  in india
Safety and nuclear power plant in india Yoga Sathish
 
Types of Nuclear Reactors
Types of Nuclear ReactorsTypes of Nuclear Reactors
Types of Nuclear ReactorsSunny Chauhan
 
Components of nuclear reactor
Components of nuclear reactorComponents of nuclear reactor
Components of nuclear reactorB.k. Das
 
Design of Mini Compressorless Solar Powered Refrigerator
Design of Mini Compressorless Solar Powered RefrigeratorDesign of Mini Compressorless Solar Powered Refrigerator
Design of Mini Compressorless Solar Powered RefrigeratorGirish Gupta
 
Components of nuclear power plant
Components of  nuclear power plant Components of  nuclear power plant
Components of nuclear power plant Muhammad Talha Khan
 

Mais procurados (20)

Gas cooled reactors
Gas cooled reactorsGas cooled reactors
Gas cooled reactors
 
super critical power plant
super critical power plantsuper critical power plant
super critical power plant
 
Overview of Fast Breeder Reactors
Overview of Fast Breeder ReactorsOverview of Fast Breeder Reactors
Overview of Fast Breeder Reactors
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plant
 
Epc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisEpc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysis
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
METHODS OF IMPROVING STEAM TURBINE PERFORMANCE
METHODS OF IMPROVING STEAM TURBINE PERFORMANCEMETHODS OF IMPROVING STEAM TURBINE PERFORMANCE
METHODS OF IMPROVING STEAM TURBINE PERFORMANCE
 
Gas turbine power plant
Gas turbine power plantGas turbine power plant
Gas turbine power plant
 
Candu reactor ppt
Candu reactor pptCandu reactor ppt
Candu reactor ppt
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Power Plant Engineering: Pressurised Water Reactor
Power Plant Engineering: Pressurised Water ReactorPower Plant Engineering: Pressurised Water Reactor
Power Plant Engineering: Pressurised Water Reactor
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Safety and nuclear power plant in india
Safety and nuclear power plant  in india Safety and nuclear power plant  in india
Safety and nuclear power plant in india
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Nuclear Reactors
Nuclear  ReactorsNuclear  Reactors
Nuclear Reactors
 
Types of Nuclear Reactors
Types of Nuclear ReactorsTypes of Nuclear Reactors
Types of Nuclear Reactors
 
Components of nuclear reactor
Components of nuclear reactorComponents of nuclear reactor
Components of nuclear reactor
 
Design of Mini Compressorless Solar Powered Refrigerator
Design of Mini Compressorless Solar Powered RefrigeratorDesign of Mini Compressorless Solar Powered Refrigerator
Design of Mini Compressorless Solar Powered Refrigerator
 
Components of nuclear power plant
Components of  nuclear power plant Components of  nuclear power plant
Components of nuclear power plant
 

Semelhante a Bharatiya nabhikiya vidyut nigam limited (bhavini)

Performance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power PlantPerformance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power PlantGirish Gupta
 
A brief overview of drilling and blasting process for tunnel excavation used ...
A brief overview of drilling and blasting process for tunnel excavation used ...A brief overview of drilling and blasting process for tunnel excavation used ...
A brief overview of drilling and blasting process for tunnel excavation used ...kimilsungLimbu
 
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MINING
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MININGTHE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MINING
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MININGiQHub
 
RENOVATION OF OLD LIME STONE PORTICO SLAB AT ST THOMAS MOUNT WITH FILLER BLOC...
RENOVATION OF OLD LIME STONE PORTICO SLAB AT ST THOMAS MOUNT WITH FILLER BLOC...RENOVATION OF OLD LIME STONE PORTICO SLAB AT ST THOMAS MOUNT WITH FILLER BLOC...
RENOVATION OF OLD LIME STONE PORTICO SLAB AT ST THOMAS MOUNT WITH FILLER BLOC...IRJET Journal
 
Lokesh Training report from BHEL
Lokesh Training report from BHELLokesh Training report from BHEL
Lokesh Training report from BHELLokesh Khatri
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitaeSunil Singh
 
Appropriate technology part 2
Appropriate technology   part 2Appropriate technology   part 2
Appropriate technology part 2Shirish Avrani
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectRubnawaz Bhatti
 
Industrial visit Report
 Industrial visit Report Industrial visit Report
Industrial visit ReportANANDU KB
 
Kalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdfKalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdfAbhinava Tripathi
 
AME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESAME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESCarlo Avanzini
 
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBMIRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBMIRJET Journal
 
Scenario of Power Production and distribution in India
Scenario of Power Production and distribution in IndiaScenario of Power Production and distribution in India
Scenario of Power Production and distribution in IndiaTyMechSeminar
 
Profile of the saravana global energy ltd
Profile of the saravana global energy ltdProfile of the saravana global energy ltd
Profile of the saravana global energy ltdKumar TS
 
Power engineerng notes by manojkumar yadav
Power engineerng notes by manojkumar yadavPower engineerng notes by manojkumar yadav
Power engineerng notes by manojkumar yadavManojkumar yadav
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptxAmirShafiq25
 

Semelhante a Bharatiya nabhikiya vidyut nigam limited (bhavini) (20)

Performance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power PlantPerformance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power Plant
 
A brief overview of drilling and blasting process for tunnel excavation used ...
A brief overview of drilling and blasting process for tunnel excavation used ...A brief overview of drilling and blasting process for tunnel excavation used ...
A brief overview of drilling and blasting process for tunnel excavation used ...
 
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MINING
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MININGTHE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MINING
THE VERTICAL APPROACH – TRANSITIONING FROM SAMPLING TO SUSTAINABLE MINING
 
RENOVATION OF OLD LIME STONE PORTICO SLAB AT ST THOMAS MOUNT WITH FILLER BLOC...
RENOVATION OF OLD LIME STONE PORTICO SLAB AT ST THOMAS MOUNT WITH FILLER BLOC...RENOVATION OF OLD LIME STONE PORTICO SLAB AT ST THOMAS MOUNT WITH FILLER BLOC...
RENOVATION OF OLD LIME STONE PORTICO SLAB AT ST THOMAS MOUNT WITH FILLER BLOC...
 
Shashi
ShashiShashi
Shashi
 
Lokesh Training report from BHEL
Lokesh Training report from BHELLokesh Training report from BHEL
Lokesh Training report from BHEL
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Appropriate technology part 2
Appropriate technology   part 2Appropriate technology   part 2
Appropriate technology part 2
 
Report on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic projectReport on Neelum Jhelum Hyrdoelectic project
Report on Neelum Jhelum Hyrdoelectic project
 
Summer Training Presentation
Summer Training PresentationSummer Training Presentation
Summer Training Presentation
 
4th yer ppt
4th yer  ppt4th yer  ppt
4th yer ppt
 
Industrial visit Report
 Industrial visit Report Industrial visit Report
Industrial visit Report
 
Kalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdfKalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdf
 
AME POWER PLANT REFERENCES
AME POWER PLANT REFERENCESAME POWER PLANT REFERENCES
AME POWER PLANT REFERENCES
 
Report on practical training NTPC BARH
Report on practical training NTPC BARHReport on practical training NTPC BARH
Report on practical training NTPC BARH
 
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBMIRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
IRJET- Water Supply through Underground Tunnel from Thane to Bhandup using TBM
 
Scenario of Power Production and distribution in India
Scenario of Power Production and distribution in IndiaScenario of Power Production and distribution in India
Scenario of Power Production and distribution in India
 
Profile of the saravana global energy ltd
Profile of the saravana global energy ltdProfile of the saravana global energy ltd
Profile of the saravana global energy ltd
 
Power engineerng notes by manojkumar yadav
Power engineerng notes by manojkumar yadavPower engineerng notes by manojkumar yadav
Power engineerng notes by manojkumar yadav
 
20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx20220817 Presentation wapda.pptx
20220817 Presentation wapda.pptx
 

Mais de engineeringwatch

Engineering Watch Fellowship Portfolio
Engineering Watch Fellowship PortfolioEngineering Watch Fellowship Portfolio
Engineering Watch Fellowship Portfolioengineeringwatch
 
Engineering Watch Fellowship Questionnaire Booklet
Engineering Watch Fellowship Questionnaire BookletEngineering Watch Fellowship Questionnaire Booklet
Engineering Watch Fellowship Questionnaire Bookletengineeringwatch
 
Presentation :: Curtain Raiser :: Re-Engineering India 2014
Presentation :: Curtain Raiser :: Re-Engineering India 2014 Presentation :: Curtain Raiser :: Re-Engineering India 2014
Presentation :: Curtain Raiser :: Re-Engineering India 2014 engineeringwatch
 
A novel drip irrigation system
A novel drip irrigation systemA novel drip irrigation system
A novel drip irrigation systemengineeringwatch
 
Wankhede nomination 31-08-2013
Wankhede nomination   31-08-2013Wankhede nomination   31-08-2013
Wankhede nomination 31-08-2013engineeringwatch
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013engineeringwatch
 
Ongc tripura power company limited
Ongc tripura power company limitedOngc tripura power company limited
Ongc tripura power company limitedengineeringwatch
 
Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructionsengineeringwatch
 
Airports authority of india,kolkata
Airports authority of india,kolkataAirports authority of india,kolkata
Airports authority of india,kolkataengineeringwatch
 
Braithwaite & co. limited,kolkata
Braithwaite & co. limited,kolkataBraithwaite & co. limited,kolkata
Braithwaite & co. limited,kolkataengineeringwatch
 

Mais de engineeringwatch (20)

Eduindia UPTU Portfolio
Eduindia UPTU PortfolioEduindia UPTU Portfolio
Eduindia UPTU Portfolio
 
Engineering Watch Fellowship Portfolio
Engineering Watch Fellowship PortfolioEngineering Watch Fellowship Portfolio
Engineering Watch Fellowship Portfolio
 
Eduindia Portfolio
Eduindia PortfolioEduindia Portfolio
Eduindia Portfolio
 
Engineering Watch Fellowship Questionnaire Booklet
Engineering Watch Fellowship Questionnaire BookletEngineering Watch Fellowship Questionnaire Booklet
Engineering Watch Fellowship Questionnaire Booklet
 
Edu india presentation
Edu india presentationEdu india presentation
Edu india presentation
 
Presentation :: Curtain Raiser :: Re-Engineering India 2014
Presentation :: Curtain Raiser :: Re-Engineering India 2014 Presentation :: Curtain Raiser :: Re-Engineering India 2014
Presentation :: Curtain Raiser :: Re-Engineering India 2014
 
A novel drip irrigation system
A novel drip irrigation systemA novel drip irrigation system
A novel drip irrigation system
 
Wankhede nomination 31-08-2013
Wankhede nomination   31-08-2013Wankhede nomination   31-08-2013
Wankhede nomination 31-08-2013
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013
 
Globus infocom limited
Globus infocom limitedGlobus infocom limited
Globus infocom limited
 
Ongc tripura power company limited
Ongc tripura power company limitedOngc tripura power company limited
Ongc tripura power company limited
 
Hll lifecare ltd.
Hll lifecare ltd.Hll lifecare ltd.
Hll lifecare ltd.
 
Csir cftri
Csir cftriCsir cftri
Csir cftri
 
Hll lifecare ltd.
Hll lifecare ltd.Hll lifecare ltd.
Hll lifecare ltd.
 
Beml limited
Beml limitedBeml limited
Beml limited
 
Beml limited
Beml limitedBeml limited
Beml limited
 
Larsen & toubro constructions
Larsen & toubro constructionsLarsen & toubro constructions
Larsen & toubro constructions
 
Hscc (india) ltd
Hscc (india) ltdHscc (india) ltd
Hscc (india) ltd
 
Airports authority of india,kolkata
Airports authority of india,kolkataAirports authority of india,kolkata
Airports authority of india,kolkata
 
Braithwaite & co. limited,kolkata
Braithwaite & co. limited,kolkataBraithwaite & co. limited,kolkata
Braithwaite & co. limited,kolkata
 

Último

Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Pitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business ProposalPitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business ProposalEvelina300651
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 

Último (20)

Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Pitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business ProposalPitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business Proposal
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 

Bharatiya nabhikiya vidyut nigam limited (bhavini)

  • 1. BHAVINI’s NOMINATION FOR ENGINEERING EXCELLENCE AWARD - 2013 Presentation by Dr. Prabhat Kumar Distinguished Scientist and Chairman & Managing Director Bharatiya Nabhikiya Vidyut Nigam Limited (BHAVINI) Department of Atomic Energy A Government of India Enterprise Kalpakkam 603 102, Tamilnadu, India
  • 2. INDIA’S THREE STAGE NUCLEAR POWER PROGRAMME 12 GWe, 30 Yr Natural Uranium Th E LE CT RI CIT Y PHWR Depleted U Pu 300 GWe, 30 Yr Pu FUELLED FAST BREEDERS Th E LE CT RI CIT Y 500 GWe, 500 Yr Pu U-233 U-233 FUELLED BREEDERS E LECTRICITY U-233 STAGE 1 STAGE 2 STAGE 3 BHAVINI has commenced activities on second stage
  • 3. • Prototype Fast Breeder Reactor (PFBR) is first of its kind nuclear reactor in the country • India’s very important and prestigious project • Advanced construction stage Fuel : PuO2+ UO2 Thermal Power : 1250 MWth Electrical output : 500 MWe Coolant : Liquid Na Thermal Efficiency : 40%
  • 4. Prototype Fast Breeder Reactor Flow Chart Fukushima incident could have been avoided if passive decay heat removal system like PFBR exist in their reactor PFBR, the only nuclear reactor in the country has secondary loop No power required for removal of decay heat
  • 5. PFBR REACTOR ASSEMBLY COMPONENTS Huge size reactor with complex constructional features Man standing 1 Main Vessel 2 Core Support Structure 3 Core Catcher 4 Grid Plate 5 Core 6 Inner vessel 7 Roof slab 8 Large Rotatable Plug 9 Small Rotatable Plug 10 Control Plug 11 Absorber Rod Drive Mechanism 12 Transfer Arm 13 Intermediate Heat Exchanger 14 Primary Sodium Pump 15 Safety Vessel
  • 6.
  • 7. Stringent administrative and quality controls at every stage
  • 8. What all makes PFBR project eligible for Engineering Excellence Award 2013 Indigenous and New Technology Many Challenges overcome successfully and Innovations in many activities Achievements and high success rate in every activities Manufacture of thin walled gigantic components for the first time in the country Handling & Erection of over dimensional equipment without single dent Design, Construction, Equipment fabrication and Regulatory approval in parallel
  • 9. Few points which make PFBR project innovative  First of its kind nuclear reactor in the country - Generates more Plutonium than it consumes  Manufacturing of gigantic equipment at site due to transportation constraints meeting all the stringent specification requirements  Development of special grade materials in large scale in the country never done in the past  Development of Novel equipment erection techniques  Huge quantity of highly reactive Sodium transfer without a single drop of leak - 1750 tones !!!
  • 11. Largest and deepest excavated pit in Indian nuclear plants immediately next to sea (200 meters from the sea)
  • 12. National record of largest concrete pouring in single stretch ever done by any industry in India Initially 5000 cubic meter concreting during 2005 and then surpassed BHAVINI’s own record by pouring 5800 cubic meter concrete
  • 14. Under sea Tunnel 567 meters length at 50 meters below the sea Constructed for the first time in the country
  • 15. Tsunami bund/Shore Protection/Outfall Channel Tsunami bund Shore protection Outfall Channel 15 15
  • 16. Coastal plantation Engineered sand dune Unique method of Tsunami protection system for the reactor site
  • 17. INCREASE IN ELEVATION The nuclear island finished floor level is raised to 15.7 meters for reactor protection from future Tsunami if any
  • 18. Fabrication of gigantic reactor components for PFBR
  • 19. Fabrication of over dimensional, thin walled reactor components at PFBR site
  • 20. FABRICATION OF MAIN VESSEL Great Challenge Made for the first time in the country Diameter achieved within 10mm tolerance for total 12900 mm
  • 21. INNER VESSEL Positional accuracy, alignment and orientation has to be maintained during fabrication
  • 22. To be lifted during erection without swing Man standing Safety Vessel with Thermal Insulation Panels
  • 23. Primary Pipe-Grid Plate assembly The Grid Plate supports all the core subassemblies of PFBR Welding to be done in constrained space meeting stringent specification requirements
  • 24.
  • 25. WELDING BETWEEN ROOF SLAB (RS) AND MAIN VESSEL (MV) Very important joint Weld carries about 2500 tones of weight Welding to be carried out insitu in confined space
  • 26. Tube to Tubesheet welding, Post Weld Heat Treatment and Micro-Focal radiography for PFBR Steam Generators Welding Nuclear Clean Hall Local Heat Treatment Micro-Focal Radiography
  • 27. Fabrication of 26 meters length Steam Generators in shop
  • 28. FABRICATED STEAM GENERATORS Straightness achieved within 3mm on 26,000 mm length of SG !!!!!!
  • 29. Challenges in header pullout to bend tubes welding for Sodium to Air Heat Exchangers Extremely Difficult
  • 30. Header Welding - Needs highly qualified and skilled welders
  • 31. Header Welding- Extremely difficult Challenge
  • 34. ERECTION OF MAJOR COMPONENTS Safety Vessel Main Vessel Thermal Baffle
  • 35. Safety Vessel is being lowered into Reactor Vault in a constrained space without swing
  • 37. ERECTION OF MAJOR COMPONENTS Grid Plate Inner Vessel Roof Slab
  • 39. STEAM GENERATOR (SG) ERECTION SPECIAL ARRANGEMENT FOR SHIFTING SG (25 METER LONG COMPONENT) PLACING SG IN SPECIAL TILTING MECHANISM TILTING FOR ERECTION CONNECTION OF LIFTING SLINGS LOWERING OF SG IN STEAM GENERATOR BUILDING SG LIFTED WITH HEAVY DUTY CRAWLER CRANE POSITIONING & ALIGNMENT FIXING OF HEATERS ON SG
  • 40. Operational excellence of the project  Meticulous planning and Management      Technical aspects Finance Human Resources Contracts and Material Management Safety & Security  Adjust as per design  No damage/dent on any equipment during erection  Financial Management  NIL report during the CIG audits  Awards
  • 41. INDUSTRIAL SAFETY AWARDS High performance in safety in the construction sector !!!!! “Industrial Safety Award” by Atomic Energy Regulatory Board “Suraksha Puraskar” by National Safety Council of India
  • 42.
  • 43.
  • 44. AWARDS - HUMAN RESOURCES Development and inspiration of true potential of human capital “Best HR Practices–2012 Award” by National Institute of Personnel Management (NIPM)
  • 45. Award for outstanding Concrete Structure “ICI (TNCC) - Ultratech Award” by Indian Concrete Institute
  • 46.
  • 47.
  • 48. How PFBR project has added to the self reliance of India in the chosen sector  Excellences by young team with an average age of 30 years  Documentation/Technical Papers - More than 300 papers in National/International Conferences/Journals by young company  Visit of 23,000 students at PFBR project site as a part of outreach programme
  • 49. Key impacts which PFBR project has made  Sustainability  Improvement in the quality standards  Creation of new and indigenous technological capability in terms of machining, welding, fabrication, testing, handling and erection  First Time right approach  Neighborhood Development • • • • • • • Indirect employment Education Infrastructure Health & hygiene Water supply Outreach programme Sports
  • 50. Science Lab Apparatus & Models donated to Annamalai Middle School, Desumughipet, Thirukalukundram Donated PC and books to Govt. Higher Sec. School, Pudupattinam on 28.04.2008 Donation of Personal computers to the schools Vocational Training Programme for Neighborhood village youth from 27.09.2005 Water Pump & Pump room for Panchayat Union Primary School Meiyur Vocational Training courses II batch commenced on 02.10.2006 Construction of Compound Wall- Panchayath Union Primary School Sadhrangapattinam Water Tank & Hand Wash Facility Panchayath Union Primary School Sadhrangapattinam
  • 51. Epidemiological Health Survey with Assistance from BHAVINI One R.O. Plant has been installed at Sadras Meyyur kuppam, Kalpakkam ` Sadras Primary Health Centre – Maternity Ward Sprayed mosquito repellant in the surrounding villages as preventive measure for chickengunia In co-ordination with Dr.M.S.Swaminathan Research Foundation, Chennai, action has been initiated to set up Village Knowledge Centre Bio-shield Hatchery – Self Help Groups
  • 52. Few points which illumine more on the future readiness of the project  Robust feedback system for -Knowledge management -Sharing of experiences with industry and academia -Win Win situation for all  Training, qualification & capability developmen  Strengthening of Industries -Tools/fixtures - Facilities - Techniques - Manufacture - Inspection  Standardized design and manufacturing  Modular concept to the possible extent
  • 53. Over all Night View PFBR the pride of nation 53