Executive Summary
                 Electricity rates in the Philippines is 3rd highest in Asia1
                 The Electric Power Industry Reform Act of 2001 (EPIRA)
                  aims to bring down power rates and improve delivery of
                  supply through greater competition and efficiency in the
                  industry. It has failed to achieve both.
                 3 necessary amendments to EPIRA:
                      1.    Strengthen safeguards against cross-ownership and
                            abuse of market power
                      2.    Reevaluate the practicability of the Wholesale
                            Electricity Spot Market (WESM)
                      3.    Overhaul the Energy Regulatory Commission (ERC)
                 Beyond EPIRA: fast track implementation of Renewable
                  Energy Act of 2008

1 RP   Power 3rd most costly in Asia: http://newsinfo.inquirer.net/breakingnews/regions/view/20100404-262343/RP-power-3rd-most-costly-in-Asia   2
Presentation Overview
         1.      Anatomy of High Electricity Rates
         2.      Nine Years After: A Review of EPIRA
                   ◦  Privatization, Rent Seeking and the Power Oligarchy
                   ◦  Gaming the WESM, Delays in Implementation of
                      Open Access and Retail Competition
                   ◦  An Ineffectual ERC
         3.      Reforming EPIRA and the Power Industry
         4.      Securing a Sustainable Energy Future


Image from: http://rfestin.files.wordpress.com/2008/12/transco31aug07-0061.jpg   3
Anatomy of High Electricity Prices1
            1.     Lack of sufficient domestic fuel reserves – generation
                   companies forced to import fuel
            2.     Higher cost in transmission infrastructure due to
                   country’s topography, required resilience against
                   tropical storms & earthquakes
            3.     “Relatively peaky” electricity demand curve – little
                   baseload demand on a 24-hour basis due to lack of
                   strong industrial base
            4.     Most inputs sourced overseas – purchased at
                   international prices, subject to significant foreign
                   exchange risk

1 The   IPP Experience in the Philippines: http://iis-db.stanford.edu/pubs/20816/PhilippinesIPP.pdf   4
Nine Years After: A Review of EPIRA
                                                                                                 State-owned

  EPIRA restructured1
  the electric power
  industry from…



             to…




 For privatization and/or
 driven by private sector

1 ERC: http://www.erc.or.th/ERCWeb/Upload/Document/10.30-12.30%203Rauf%20A.%20Tan(Philippines).pdf             5
Privatization, Rent Seeking, and the
           Power Oligarchy
                  EPIRA bars cross-ownership between generation/distribution
                   and transmission, but not between generation, distribution
                   and supply (Sec. 45)
                  Capacity share limits: 30% (regional), 25% (national)
                  Two families1 – Lopez & Aboitiz – have horizontal and
                   vertical market power; acquired 10 out of 20 privatized NPC
                   generation plants to date
                       Generation                        Luzon                    Visayas                  Mindanao     National
                       Lopez                              19.8%                       53%                        5.6%     15%
                       Aboitiz                            12.3%                     6.53%                        35%      14%
                       Distribution
                       Lopez                Meralco – largest distribution utility, serves Luzon
                                            VECO and Davao Light & Power Co – 2nd and 3rd
                       Aboitiz
                                            largest, serve Visayas and Mindanao, respectively
1   From state monopoly to de factor electricity oligarchy, People Against Immoral Debt Vol. 13 No. 1 pp. 7-27
                                                                                                                                   6
WESM, Open Access and Retail
        Competition




•  WESM – trading place between electricity buyers and sellers via auctions that
   match bids for demand and supply
•  Must be established within 1 year from effectivity of EPIRA (Sec. 30)
•  Launched in June 2006 and only for Luzon1
Figure from ERC
1 Why WESM Won’t Work, People Against Immoral Debt Vol. 13 No. 1 pp. 43-54         7
Gaming the WESM




   •  Mechanism is prone to gaming, in theory1 and in practice2
   •  Electricity sourced through WESM was more expensive3
   •  Distributors obtain electricity largely through bilateral4 contracts,
      EPIRA allows them to source up to 90% bilaterally and up to 50% from
      their affiliates (Sec. 45b and 45c)
Figure from: WESM Overview – http://asianenergyadvisors.pbworks.com/f/WESM-Overview.pdf
1 Rethinking Electricity Deregulation, Elsevier The Electricity Journal Vol. 17 No. 8 pp. 11-26
2 Lessons from the Failure of U.S. Electricity Restructuring: http://repository.cmu.edu/cgi/viewcontent.cgi?article=1236&context=tepper
3 Why WESM Won’t Work
4 14th EPIRA Status Report: http://www.doe.gov.ph/EP/14th%20EPIRA%20Status%20Report.pdf                                                   8
An Ineffectual ERC
                ERC tasked1 to “ensure adequate promotion of
                 consumer interests”, and “promote competition,
                 encourage market development, ensure customer
                 choice and penalize abuse of market power”
                Has the authority to approve rate hikes and act on
                 complaints regarding anti-competitive behavior
                Dismissed complaints from PEMC (WESM operator)
                 due to “lack of evidence”:
                 1.  PSALM trading teams simultaneously2 raised MCP for 3 plants
                 2.  Meralco3 bought more from WESM when its IPPs were price
                     setters next to 2 other NPC plants
                Arguably a case of regulatory capture
1 Sec. 41
       and 43 of EPIRA
2A commission of power: http://pcij.org/stories/a-commission-of-power
3 Why WESM Won’t Work                                                              9
Necessary Amendments to EPIRA
         1.    Total ban on cross-ownership in transmission,
               generation, distribution and supply
         2.    Restriction on firms with vertical market power from
               further acquisition of NPC generation assets
         3.    Clearer guidelines on the regional generation capacity
               share limits to curb horizontal market power
         4.    A lower limit on the amount of supply that may be
               sourced through bilateral contracts by a distribution
               utility from its affiliate generation firm



                                                                                     10
Image from: http://cdn.wn.com/ph/img/bb/49/1099a26a93557b0e8c74dbd1a62b-grande.jpg
Reevaluate the Practicability of WESM
              Pay-as-bid pricing will not solve gaming issue1
              An administered2 market will not be sustainable
              Free and competitive market requires numerous
               companies that do not have horizontal market power;
               needed investments are prohibitive
              If WESM cannot be made competitive, limit amount of
               electricity sourced from the spot market
              Enforce better regulation of bilateral contracts – place
               generation as close to average cost as possible, allow
               agreements to span life of generation plants3

1Rethinking Electricity Deregulation
2Lessons from the Failure of U.S. Electricity Restructuring
Image from: http://thinkgeoenergy.com/wp-content/uploads/2010/03/Tongonan_plant_Philippines.jpg
                                                                                                  11
Securing a Sustainable Energy Future
                 Reforming the electric power industry both a technical
                  and adaptive challenge
                 Renewable Energy Act – addresses technology gaps of
                  EPIRA, encourages broader market participation1 in
                  renewables sector; must fast track implementation
                 Overhaul the ERC – ensure appointment of
                  commissioners based on competence and integrity,
                  remove2 power to grant provisional authority to firms
                 Decisive and strong leadership from Congress,
                  Department of Energy and ERC


1 Energy  [R]Evolution, A Sustainable Philippine Energy Outlook: http://www.greenpeace.org/raw/content/seasia/en/press/reports/energy-r-evolution-a-sustain.pdf
2   A Dozen Ways to Reduce Electricity Rates Towards Sustainable and Pro-Consumer Electric Power Industry, People Against Immoral Debt Vol. 13 No. 1 pp. 58-59    12

Mais conteúdo relacionado

Mais procurados

Project on STATCOM
Project on STATCOMProject on STATCOM
Project on STATCOM
Sutirtha Das
 
Load curve
Load curveLoad curve
Load curve
boromama
 
Concept Of Grid Code Anilpatil Session Iii
Concept Of Grid Code Anilpatil Session  IiiConcept Of Grid Code Anilpatil Session  Iii
Concept Of Grid Code Anilpatil Session Iii
Anil Patil
 
What are Ancillary Services In Power System ?
What are Ancillary Services In Power System ?What are Ancillary Services In Power System ?
What are Ancillary Services In Power System ?
Power System Operation
 
SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1
Murugappa Group
 

Mais procurados (20)

Power System Stability Issues
Power System Stability IssuesPower System Stability Issues
Power System Stability Issues
 
Mechanical design of overhead lines
Mechanical design of overhead linesMechanical design of overhead lines
Mechanical design of overhead lines
 
Ppt power grid design
Ppt power grid designPpt power grid design
Ppt power grid design
 
Project on STATCOM
Project on STATCOMProject on STATCOM
Project on STATCOM
 
Load curve
Load curveLoad curve
Load curve
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power Sector
 
Concept Of Grid Code Anilpatil Session Iii
Concept Of Grid Code Anilpatil Session  IiiConcept Of Grid Code Anilpatil Session  Iii
Concept Of Grid Code Anilpatil Session Iii
 
Pv system sizing
Pv system sizingPv system sizing
Pv system sizing
 
DISTRIBUTED GENERATION TECHNOLOGIES
DISTRIBUTED GENERATION TECHNOLOGIESDISTRIBUTED GENERATION TECHNOLOGIES
DISTRIBUTED GENERATION TECHNOLOGIES
 
What are Ancillary Services In Power System ?
What are Ancillary Services In Power System ?What are Ancillary Services In Power System ?
What are Ancillary Services In Power System ?
 
SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1
 
Vehicle to Grid Technology
Vehicle to Grid TechnologyVehicle to Grid Technology
Vehicle to Grid Technology
 
EDS Unit 6.pptx
EDS Unit 6.pptxEDS Unit 6.pptx
EDS Unit 6.pptx
 
Feasibility study of setting of solar plant in Philippines
Feasibility study of setting of solar plant in Philippines Feasibility study of setting of solar plant in Philippines
Feasibility study of setting of solar plant in Philippines
 
Voltage and Frequency Control of the Grid
Voltage and Frequency Control of the GridVoltage and Frequency Control of the Grid
Voltage and Frequency Control of the Grid
 
National electrical code.pptx
National electrical code.pptxNational electrical code.pptx
National electrical code.pptx
 
Line to Line & Double Line to Ground Fault On Power System
Line to Line & Double Line to Ground Fault On Power SystemLine to Line & Double Line to Ground Fault On Power System
Line to Line & Double Line to Ground Fault On Power System
 
Ampacity.pptx
Ampacity.pptxAmpacity.pptx
Ampacity.pptx
 
Saudi Arabian Power Grid Code 2020
Saudi Arabian Power Grid Code 2020Saudi Arabian Power Grid Code 2020
Saudi Arabian Power Grid Code 2020
 
Power station
Power stationPower station
Power station
 

Semelhante a Reforming the Philippine Electric Power Industry Reform Act (EPIRA)

FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
FEF Philippines
 
Power Market Report - Application
Power Market Report - ApplicationPower Market Report - Application
Power Market Report - Application
Karol Semczuk
 
Power Purchase Agreement Workshop
Power Purchase Agreement WorkshopPower Purchase Agreement Workshop
Power Purchase Agreement Workshop
Raluca Dirjan
 
Solar PV Curtailment in Changing Grid and Technological Contexts
Solar PV Curtailment in Changing Grid and Technological ContextsSolar PV Curtailment in Changing Grid and Technological Contexts
Solar PV Curtailment in Changing Grid and Technological Contexts
Power System Operation
 
Indian power market design
Indian power market designIndian power market design
Indian power market design
Navajyoti Martha
 
Electricity Restructuringand Competition.docx
Electricity Restructuringand Competition.docxElectricity Restructuringand Competition.docx
Electricity Restructuringand Competition.docx
toltonkendal
 
Electricity Restructuringand Competition.docx
Electricity Restructuringand Competition.docxElectricity Restructuringand Competition.docx
Electricity Restructuringand Competition.docx
gidmanmary
 

Semelhante a Reforming the Philippine Electric Power Industry Reform Act (EPIRA) (20)

power systems.pdf
power systems.pdfpower systems.pdf
power systems.pdf
 
Deregulation in power industry
Deregulation in power industryDeregulation in power industry
Deregulation in power industry
 
Wind Energy Business Case PowerGenz
Wind Energy Business Case PowerGenzWind Energy Business Case PowerGenz
Wind Energy Business Case PowerGenz
 
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
 
Pcci energy committe twg on power
Pcci energy committe   twg on powerPcci energy committe   twg on power
Pcci energy committe twg on power
 
Power Market Report - Application
Power Market Report - ApplicationPower Market Report - Application
Power Market Report - Application
 
Text
TextText
Text
 
Power Purchase Agreement Workshop
Power Purchase Agreement WorkshopPower Purchase Agreement Workshop
Power Purchase Agreement Workshop
 
Solar & Grid Stability: A Primer for Local Governments
Solar & Grid Stability: A Primer for Local GovernmentsSolar & Grid Stability: A Primer for Local Governments
Solar & Grid Stability: A Primer for Local Governments
 
Chapter 5 Smart electrical grid , Smart City Summer Course, AUST, 2015
Chapter 5 Smart electrical grid , Smart City Summer Course, AUST, 2015Chapter 5 Smart electrical grid , Smart City Summer Course, AUST, 2015
Chapter 5 Smart electrical grid , Smart City Summer Course, AUST, 2015
 
Power distribution system fault monitoring device for supply networks in Nigeria
Power distribution system fault monitoring device for supply networks in NigeriaPower distribution system fault monitoring device for supply networks in Nigeria
Power distribution system fault monitoring device for supply networks in Nigeria
 
Solar PV Curtailment in Changing Grid and Technological Contexts
Solar PV Curtailment in Changing Grid and Technological ContextsSolar PV Curtailment in Changing Grid and Technological Contexts
Solar PV Curtailment in Changing Grid and Technological Contexts
 
Indian power market design
Indian power market designIndian power market design
Indian power market design
 
Electricity Restructuringand Competition.docx
Electricity Restructuringand Competition.docxElectricity Restructuringand Competition.docx
Electricity Restructuringand Competition.docx
 
Electricity Restructuringand Competition.docx
Electricity Restructuringand Competition.docxElectricity Restructuringand Competition.docx
Electricity Restructuringand Competition.docx
 
Indian wind energy status
Indian wind energy statusIndian wind energy status
Indian wind energy status
 
Reaction to presentations on PH Energy Outlook
Reaction to presentations on PH Energy OutlookReaction to presentations on PH Energy Outlook
Reaction to presentations on PH Energy Outlook
 
Deregulation of electricity-background
Deregulation of electricity-backgroundDeregulation of electricity-background
Deregulation of electricity-background
 
01012010 demand response
01012010 demand response 01012010 demand response
01012010 demand response
 
The Benefits of Smart Grid Technology for Buildings, Cities, and Sustainability
The Benefits of Smart Grid Technology for Buildings, Cities, and SustainabilityThe Benefits of Smart Grid Technology for Buildings, Cities, and Sustainability
The Benefits of Smart Grid Technology for Buildings, Cities, and Sustainability
 

Último

9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
lunadelior
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf04052024_First India Newspaper Jaipur.pdf
04052024_First India Newspaper Jaipur.pdf
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In DubaiDubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
 
Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf
 
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 

Reforming the Philippine Electric Power Industry Reform Act (EPIRA)

  • 1. Genuine & Sustainable Reforms in the Philippine Electric Power Industry Elvin Ivan Uy Emerging Policies Forum II 22 May 2010
  • 2. Executive Summary   Electricity rates in the Philippines is 3rd highest in Asia1   The Electric Power Industry Reform Act of 2001 (EPIRA) aims to bring down power rates and improve delivery of supply through greater competition and efficiency in the industry. It has failed to achieve both.   3 necessary amendments to EPIRA: 1.  Strengthen safeguards against cross-ownership and abuse of market power 2.  Reevaluate the practicability of the Wholesale Electricity Spot Market (WESM) 3.  Overhaul the Energy Regulatory Commission (ERC)   Beyond EPIRA: fast track implementation of Renewable Energy Act of 2008 1 RP Power 3rd most costly in Asia: http://newsinfo.inquirer.net/breakingnews/regions/view/20100404-262343/RP-power-3rd-most-costly-in-Asia 2
  • 3. Presentation Overview 1.  Anatomy of High Electricity Rates 2.  Nine Years After: A Review of EPIRA ◦  Privatization, Rent Seeking and the Power Oligarchy ◦  Gaming the WESM, Delays in Implementation of Open Access and Retail Competition ◦  An Ineffectual ERC 3.  Reforming EPIRA and the Power Industry 4.  Securing a Sustainable Energy Future Image from: http://rfestin.files.wordpress.com/2008/12/transco31aug07-0061.jpg 3
  • 4. Anatomy of High Electricity Prices1 1.  Lack of sufficient domestic fuel reserves – generation companies forced to import fuel 2.  Higher cost in transmission infrastructure due to country’s topography, required resilience against tropical storms & earthquakes 3.  “Relatively peaky” electricity demand curve – little baseload demand on a 24-hour basis due to lack of strong industrial base 4.  Most inputs sourced overseas – purchased at international prices, subject to significant foreign exchange risk 1 The IPP Experience in the Philippines: http://iis-db.stanford.edu/pubs/20816/PhilippinesIPP.pdf 4
  • 5. Nine Years After: A Review of EPIRA State-owned EPIRA restructured1 the electric power industry from… to… For privatization and/or driven by private sector 1 ERC: http://www.erc.or.th/ERCWeb/Upload/Document/10.30-12.30%203Rauf%20A.%20Tan(Philippines).pdf 5
  • 6. Privatization, Rent Seeking, and the Power Oligarchy   EPIRA bars cross-ownership between generation/distribution and transmission, but not between generation, distribution and supply (Sec. 45)   Capacity share limits: 30% (regional), 25% (national)   Two families1 – Lopez & Aboitiz – have horizontal and vertical market power; acquired 10 out of 20 privatized NPC generation plants to date Generation Luzon Visayas Mindanao National Lopez 19.8% 53% 5.6% 15% Aboitiz 12.3% 6.53% 35% 14% Distribution Lopez Meralco – largest distribution utility, serves Luzon VECO and Davao Light & Power Co – 2nd and 3rd Aboitiz largest, serve Visayas and Mindanao, respectively 1 From state monopoly to de factor electricity oligarchy, People Against Immoral Debt Vol. 13 No. 1 pp. 7-27 6
  • 7. WESM, Open Access and Retail Competition •  WESM – trading place between electricity buyers and sellers via auctions that match bids for demand and supply •  Must be established within 1 year from effectivity of EPIRA (Sec. 30) •  Launched in June 2006 and only for Luzon1 Figure from ERC 1 Why WESM Won’t Work, People Against Immoral Debt Vol. 13 No. 1 pp. 43-54 7
  • 8. Gaming the WESM •  Mechanism is prone to gaming, in theory1 and in practice2 •  Electricity sourced through WESM was more expensive3 •  Distributors obtain electricity largely through bilateral4 contracts, EPIRA allows them to source up to 90% bilaterally and up to 50% from their affiliates (Sec. 45b and 45c) Figure from: WESM Overview – http://asianenergyadvisors.pbworks.com/f/WESM-Overview.pdf 1 Rethinking Electricity Deregulation, Elsevier The Electricity Journal Vol. 17 No. 8 pp. 11-26 2 Lessons from the Failure of U.S. Electricity Restructuring: http://repository.cmu.edu/cgi/viewcontent.cgi?article=1236&context=tepper 3 Why WESM Won’t Work 4 14th EPIRA Status Report: http://www.doe.gov.ph/EP/14th%20EPIRA%20Status%20Report.pdf 8
  • 9. An Ineffectual ERC   ERC tasked1 to “ensure adequate promotion of consumer interests”, and “promote competition, encourage market development, ensure customer choice and penalize abuse of market power”   Has the authority to approve rate hikes and act on complaints regarding anti-competitive behavior   Dismissed complaints from PEMC (WESM operator) due to “lack of evidence”: 1.  PSALM trading teams simultaneously2 raised MCP for 3 plants 2.  Meralco3 bought more from WESM when its IPPs were price setters next to 2 other NPC plants   Arguably a case of regulatory capture 1 Sec. 41 and 43 of EPIRA 2A commission of power: http://pcij.org/stories/a-commission-of-power 3 Why WESM Won’t Work 9
  • 10. Necessary Amendments to EPIRA 1.  Total ban on cross-ownership in transmission, generation, distribution and supply 2.  Restriction on firms with vertical market power from further acquisition of NPC generation assets 3.  Clearer guidelines on the regional generation capacity share limits to curb horizontal market power 4.  A lower limit on the amount of supply that may be sourced through bilateral contracts by a distribution utility from its affiliate generation firm 10 Image from: http://cdn.wn.com/ph/img/bb/49/1099a26a93557b0e8c74dbd1a62b-grande.jpg
  • 11. Reevaluate the Practicability of WESM   Pay-as-bid pricing will not solve gaming issue1   An administered2 market will not be sustainable   Free and competitive market requires numerous companies that do not have horizontal market power; needed investments are prohibitive   If WESM cannot be made competitive, limit amount of electricity sourced from the spot market   Enforce better regulation of bilateral contracts – place generation as close to average cost as possible, allow agreements to span life of generation plants3 1Rethinking Electricity Deregulation 2Lessons from the Failure of U.S. Electricity Restructuring Image from: http://thinkgeoenergy.com/wp-content/uploads/2010/03/Tongonan_plant_Philippines.jpg 11
  • 12. Securing a Sustainable Energy Future   Reforming the electric power industry both a technical and adaptive challenge   Renewable Energy Act – addresses technology gaps of EPIRA, encourages broader market participation1 in renewables sector; must fast track implementation   Overhaul the ERC – ensure appointment of commissioners based on competence and integrity, remove2 power to grant provisional authority to firms   Decisive and strong leadership from Congress, Department of Energy and ERC 1 Energy [R]Evolution, A Sustainable Philippine Energy Outlook: http://www.greenpeace.org/raw/content/seasia/en/press/reports/energy-r-evolution-a-sustain.pdf 2 A Dozen Ways to Reduce Electricity Rates Towards Sustainable and Pro-Consumer Electric Power Industry, People Against Immoral Debt Vol. 13 No. 1 pp. 58-59 12

Notas do Editor

  1. 3. Little baseload demand to help defray cost of installing facilities to cover peak demand
  2. TRANSCO privatized in 2008, now NGCP81% of NPC generation assets in Luzon & Visayas have been privatized
  3. VECO – Visayan Electric CompanyERC rules on generation capacity and market share limits coupled with ownership structure of companies prevent any corrective action. Both Lopez & Aboitiz continue to acquire and consolidate market power.
  4. cost-efficient dispatch of power through economic merit orderReliable price signals for players to weigh investment optionsFair and level playing field for suppliers and buyers of electricityMO is PEMC, SO is NGCPLaunched behind schedule due to delays in privatization of NPC assets; trial operations for Visayas began in March 2009, no specific date for commercial launch
  5. Hourly auctions, 24 trading periods daily for next day’s requirementsMCP – where last supply bid meets last demand requirementLowest bid dispatched firstSettlements through WESMMore expensive – data from January 2007 to March 2008, comparing NPC, IPPs and WESMTheory: SaroshTalukdar (CMU Electrical & Computer Engineering) simulation with 10 firms, each having 10% of system capacity. Firms not as smart as human traders and learn slowly. Even when capacity is twice the amount of electricity needed, suppliers managed to raise price to monopoly levelsPractice: hourly spot market auctions in US fostered tacit collusion among participating generators. Pivotal supplier problem (firm has enough capacity and withholding it can cause blackout) – single firm or group of firms colluding explicitly or implicitly. Lopez-owned IPPs routinely bid zero to ensure dispatch.
  6. ERC investigated the wrong parties, disregarded evidence from PEMCIPPs were the pivotal supplier, able to set price
  7. Strengthen safeguards against cross-ownership and abuse of market power
  8. Pay-as-bid done in UK and failed. Generators still able to game spot market, tacit collusion and pivotal supplier problem persistAdministered market is what we tried to reform 9 years ago
  9. Luzon – natural gas, Visayas – geothermal, Mindanao – hydro, nationwide – natural gas, coal, geothermal, hydroRenewable Energy Act – market participation enabled through feed-in tariff system, implemented in 42 countries/states/regions, responsible for uptake in renewable electricity capacity and generation