DBKL Brickfield Road Disbursement
1. Dialogue Session With Datuk Bandar KL
On Road Dispersal System in Bangsar & Brickfields
2. Dialogue Session with Datuk Bandar KL
CURRENT TRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS
3. Dialogue Session with Datuk Bandar KL
CURRENT TRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS
1) Traffic is heavy on the main roads in and around Bangsar & Brickfields i.e.
intersection of Jalan Travers/ Jalan Bangsar; Jalan Tun Sambanthan/ Jalan
i i f l / l l S b h / l
Travers; Jalan Tun Sambanthan/ Jalan Tun Sambanthan 4 and Jalan Tun
Sambanthan/ Jalan Robson.
Side roads in and around residential areas are also heavy.
CAUSES OF HEAVY TRAFFIC IN THE AREA
CAUSES OF HEAVY TRAFFIC IN THE AREA
i. Current roads are unable to cope with the surge in traffic volume due to the
fast‐paced development in and around Brickfields notably KL Sentral
ii. Illegal parking of vehicles (especially on the main roads in Brickfields)
g p g ( p y )
compound the situation due to insufficient parking areas
iii. Signalised junctions have already reached their optimum capacity
4. Dialogue Session with Datuk Bandar KL
CURRENT TRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS
5. Dialogue Session with Datuk Bandar KL
TRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS AFTER
IMPROVEMENT
6. Dialogue Session with Datuk Bandar KL
PROPOSED TRAFFIC SOLUTION FOR BANGSAR/BRICKFIELDS
from KL Sentral to Jalan
Intersection of Jalan Damansara and Lebuhraya
Travers/Jalan Bangsar
/ g Mahameru
Slip road from Jalan
Bangsar to Jalan
B t J l
Maarof
7. Dialogue Session with Datuk Bandar KL
PROPOSED TRAFFIC SOLUTION UNDER RM110 MILLION STIMULUS
PACKAGES
Package 1: Construction of Flyover at Jalan Travers/Jalan Bangsar Intersection
Package 2: Construction of Flyover from KL Sentral to Jalan Damansara &
g y
Lebuhraya Mahameru
Package 3: Upgrading of Jalan Tun Sambanthan and its vicinity
Package 4: Construction of Pedestrian Bridges & Linkages
Package 5: Upgrade and Repair Roads in KL Sentral
k d d i d i S l
Package 6: Construction of Elevated Road from Jalan Bangsar to Jalan Maarof
8. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 1:
CONSTRUCTION OF FLYOVER AT JALAN TRAVERS/JALAN BANGSAR INTERSECTION
Flyover at intersection of Jalan
Travers/Jalan Bangsar
9. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 1:
CONSTRUCTION OF FLYOVER AT JALAN TRAVERS/JALAN BANGSAR INTERSECTION
View of
Flyover
from Jalan
Bangsar
10. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 1:
CONSTRUCTION OF FLYOVER AT JALAN TRAVERS/JALAN BANGSAR INTERSECTION
View of Flyover from Jalan T
Vi f Fl f J l Travers
11. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 1:
CONSTRUCTION OF FLYOVER AT JALAN TRAVERS/JALAN BANGSAR INTERSECTION
View of flyover from 1 Sentral Building on Jalan Travers
y g
12. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 2:
CONSTRUCTION OF FLYOVER FROM KL SENTRAL TO JALAN DAMANSARA &
LEBUHRAYA MAHAMERU
Flyover from KL Sentral to Jalan Damansara/Lebuhraya
Mahameru
13. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 2:
CONSTRUCTION OF FLYOVER FROM
KL SENTRAL TO JALAN DAMANSARA
& LEBUHRAYA MAHAMERU
View of Flyover from KL Sentral to Jalan Mahameru and Jalan Damansara
14. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 3:
UPGRADING OF JALAN TUN SAMBANTHAN
The upgrading works include widening and beautification of roads in Brickfields as well as
The upgrading works include widening and beautification of roads in Brickfields as well as
conversion of roads to one‐way system
15. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 3
PROPOSED BEAUTIFICATION OF JALAN TUN SAMBANTHAN WITH THE UPGRADING &
CONVERSION TO ONE-WAY STREET
16. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 3
PROPOSED BEAUTIFICATION OF
JALAN TUN SAMBANTHAN
More artist impression of the new one‐way
p y
street system
17. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 3
PROPOSED BEAUTIFICATION OF JALAN TUN SAMBANTHAN
Artist impression of the new one‐way street system alongside Nu Sentral Mall by 2012
18. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 4:
CONSTRUCTION OF PEDESTRIAN BRIDGES & LINKAGES
19. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 4:
4
CONSTRUCTION OF PEDESTRIAN BRIDGES & LINKAGES
Artist impression of a pedestrian bridge linking KL Monorail to Nu Sentral Mall
20. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 4:
4
CONSTRUCTION OF PEDESTRIAN BRIDGES & LINKAGES
Artist impression of a pedestrian bridge near 348 Sentral
21. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 4:
CONSTRUCTION OF PEDESTRIAN BRIDGES & LINKAGES
Artist impression of a pedestrian bridge near 348 Sentral
22. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 5: UPGRADE AND REPAIR ROADS AT KL SENTRAL
23. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 5: UPGRADE AND REPAIR ROADS AT KL SENTRAL
Jalan Stesen Sentral, one of the roads in the KL Sentral would undergo upgrade
and repair
24. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 6:
CONSTRUCTION OF ELEVATED ROAD FROM JALAN BANGSAR TO JALAN MAAROF
Elevated road from Jalan
Bangsar to Jalan Maarof
25. Dialogue Session with Datuk Bandar KL
STIMULUS PACKAGE 6:
CONSTRUCTION OF ELEVATED ROAD FROM JALAN BANGSAR TO JALAN MAAROF
View of elevated road from Jalan Bangsar
26. Dialogue Session with Datuk Bandar KL
ONGOING IMPLEMENTATION OF A PROPOSED TRAFFIC SOLUTION
(currently in progress)
27. Dialogue Session with Datuk Bandar KL
PROPOSED TRAFFIC SOLUTION FOR BANGSAR/BRICKFIELDS
RM110 MILLION TRAFFIC DISPERSAL SCHEME HAS BEEN
LAUNCHED
PACKAGE 1 HAS COMMENCED WORK ON 1 OCTOBER 2009
SUBSEQUENT PACKAGES WILL BE IMPLEMENTED
ACCORDING TO SCHEDULE
THE WHOLE PROJECT IS EXPECTED TO BE COMPLETED BY
EARLY 2011
28. Dialogue Session with Datuk Bandar KL
PROPOSED TRAFFIC SOLUTION FOR BANGSAR/BRICKFIELDS
Based on the outcome of the dialogue on 9 October 2009, a one month
period has been given to the Bangsar/Brickfields/Federal Hills community
to comment & provide feedback on the matter. The agreed deadline was
for a month ending by 5pm on 8 November 2009.
Mohd Khi
M hd Khir,
Engineer,
Public Works Department
Dewan Bandaraya Kuala Lumpur