Emergency Power System Selective Coordination What is Selective Coordination?
N.E.C. Definition: Localization of an overcurrent condition to restrict outages to the circuit or equipment affected, accomplished by the choice of overcurrent protective devices and their ratings or settings. Emergency Power System Selective Coordination What is Selective Coordination? The Goal: To isolate the faulted portion of the electrical system quickly while at the same time maintaining power to the remainder of the electrical system . ,[object Object],[object Object]
Emergency Power System Selective Coordination What is Selective Coordination? Without  Selective Coordination  With  Selective Coordination OPENS NOT AFFECTED UNNECESSARY POWER LOSS OPENS NOT  AFFECTED Fault Fault
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Emergency Power System Selective Coordination Why is Selective Coordination Important?
Emergency Power System Selective Coordination A Brief History Lesson ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],Emergency Power System Selective Coordination Why is Selective Coordination Important? ,[object Object],[object Object]
System Protection vs. Selectivity An Overcurrent Protective Device Coordination Study evaluates the selection of devices and determines proper settings and ratings for protection AND selectivity Emergency Power System Selective Coordination What are some of the challenges? Protection :  To disconnect faulted equipment from the system BEFORE damage occurs [requires FAST and SENSITIVE tripping] Selectivity :  Requires some devices employ TIME DELAY tripping or HIGHER activation (pickup) levels [Time delays are dependent on location in system] Can be contradicting objectives
[object Object],[object Object],[object Object],Emergency Power System Selective Coordination What are some of the challenges?
Overload vs. Fault Emergency Power System Selective Coordination What are some of the challenges? Overload  –  operation of equip in excess of normal, full load rating, or ampacity of conductor causing damage or dangerous overheating Typical range:  101% < I < 250% full load rating Fault  –  an unintentional and undesirable conducting path in an electrical power system.  Can take many forms; 3L, 3i0, LL, LL-G, L-G Typical range:  I > 250% full load rating
Phase vs. Ground Fault Emergency Power System Selective Coordination What are some of the challenges? Phase Protection :  OL or OC, LL faults, 3ph faults, usually of higher current levels GF Protection :  L-G faults, LL-G, 3ph-G faults GFP:  (Art. 100) – system intended to provide protection of equipment from damaging L-G fault currents by disconnecting all ungrounded conductors of faulted circuit A B C SLG L-L 3ph
Emergency Power System Selective Coordination What are some of the challenges? ,[object Object],[object Object],[object Object],[object Object],[object Object]
Emergency Power System Selective Coordination What are some of the challenges? ATS Emergency Source N E Normal Source Panel ATS Emergency Source N E Normal Source Panel
Emergency Power System Selective Coordination Example 1 ,[object Object],[object Object],OCPD Opens OCPD not affected ATS Emergency Source N E Normal Source Panel Fault ,[object Object],[object Object]
Emergency Power System Selective Coordination ATS Emergency Source N E Normal Source ,[object Object],[object Object],OCPD Opens OCPD not affected Panel Fault ,[object Object],[object Object],[object Object],[object Object],Example 2
Emergency Power System Selective Coordination The Two Exceptions Exception 2: Two devices of same amp rating in series Exception 1 : Transformer primary and secondary Same Circuit  Neither exception reduced life-safety because no additional parts of the electrical system would be shut down unnecessarily  Hashed OCPDs do not have to be selectively coordinated Same Circuit  400A OCPD 400A OCPD
Emergency Power System Selective Coordination Coordination Methods ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Emergency Power System Selective Coordination Coordination Methods No plotting required Line Side Fuse Load Side Fuse
Emergency Power System Selective Coordination Coordination Methods ,[object Object],[object Object],[object Object],[object Object]
Emergency Power System Selective Coordination Coordination Methods ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Emergency Power System Selective Coordination Coordination Methods ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Emergency Power System Selective Coordination Coordination Methods Up to where the circuit breakers cross, it is interpreted to be coordinated. See  800A 200A 30A Up to  7600A Up to  1500A X X 1500A 7600A 30A 0.01s 0.1s 800A IT = 10X 200A IT = 10X Circuit Breakers
Emergency Power System Selective Coordination Coordination Methods Illustrates two instantaneous trip MCCBs: Lineside:  400A (7X IT) Loadside: 100A (Fixed IT) Where they intersect is point of non-coordination 0.01 seconds typically lowest time on TCCs CB IT unlatching times are less than 0.01s Circuit Breakers 0.1s 0.01s 0.001s
Emergency Power System Selective Coordination Coordination Methods Interpret CB curves:  800A CB does not coordinate with the 200A CB above 5400A, even though the curves do not cross on the plot.  2250A 5400A 800A 30A 200A 0.01s 0.1s 800A 200A 30A Up to  5400A Up to  2250A X X Circuit Breakers
Emergency Power System Selective Coordination Coordination Methods Circuit Breakers
Emergency Power System Selective Coordination Coordination Methods Circuit Breakers 1500A Crossing Point Interpreting Curves Max. 2700A: CB Mfg. Coordination Testing CB Manufacturer’s Coordination Tables can help show coordination for higher fault current than simply plotting curves Example:   30A & 200A MCCBs 800A 30A 200A 0.01s 0.1s
Emergency Power System Selective Coordination Coordination Methods Circuit Breakers Selective coordination for all overcurrents up to the interrupting rating for each circuit breaker Still need to plot curves to ensure there is no crossing of circuit breaker curves.  Must have time settings with enough separation. 800A 30A 200A 0.01s 0.1s
Emergency Power System Selective Coordination Coordination Methods Circuit Breakers - ZSI 1 2 3 X Fault Here 3 2 1 1200A 175A 400A 0.01s 0.1s CB3 Trips  Instantaneously Restraint signal Restraint signal
Fault Here Emergency Power System Selective Coordination Coordination Methods Circuit Breakers - ZSI 1 2 3 X No signal Restraint signal CB2 Trips  Instantaneously 3 2 1 1200A 175A 400A 0.01s 0.1s
Emergency Power System Selective Coordination Coordination Methods ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Circuit Breakers - Summary
Emergency Power System Selective Coordination Coordination Methods Parallel Generators ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Emergency Power System Selective Coordination Coordination Methods Parallel Generators
Overload protection  only.  Coordinates with overload characteristics of downstream OCPDs Emergency Power System Selective Coordination Coordination Methods Parallel Generators Normal Source N E N E N E G 87B G Bus differential relaying provides short-circuit protection for bus & generators for bus fault (between CTs) Fuses or CBs selectively coordinated with downstream OCPDs for all overcurrents Emergency Source Bus Differential Relay
Emergency Power System Selective Coordination ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Emergency Power System Selective Coordination ,[object Object],[object Object],[object Object],[object Object],[object Object]
Thank you! www.sandsengineering.com Contact : Douglas R. Strang, Jr., P.E. PO Box 345 Batavia, NY 14021-0345 585-235-3530 [email_address] [email_address] Emergency Power System Selective Coordination

More Related Content

What's hot

APFC project presentation
APFC project presentationAPFC project presentation
APFC project presentationkartickmp613
 
Regeneration in Variable Frequency Drives and Energy Saving Methods
Regeneration in Variable Frequency Drives and Energy Saving MethodsRegeneration in Variable Frequency Drives and Energy Saving Methods
Regeneration in Variable Frequency Drives and Energy Saving MethodsIRJET Journal
 
Micro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System ReportMicro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System ReportTheory to Practical
 
Automatic power factor correction
Automatic power factor correction Automatic power factor correction
Automatic power factor correction VIKAS KUMAR MANJHI
 
Automatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.PptxAutomatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.PptxSveris COE Pandharpur
 
Automatic Power Factor Improvement by Using PLC & SCADA
Automatic Power Factor Improvement by Using PLC & SCADAAutomatic Power Factor Improvement by Using PLC & SCADA
Automatic Power Factor Improvement by Using PLC & SCADAferozpatowary
 
Automatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using ArduinoAutomatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using ArduinoSouvik Dutta
 
Power Quality Systems and Power Factor Correction Presentation
Power Quality Systems and Power Factor Correction PresentationPower Quality Systems and Power Factor Correction Presentation
Power Quality Systems and Power Factor Correction PresentationMircea Gingu
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...ARC Advisory Group
 
Minimizing losses in power distribution system
Minimizing losses in power distribution systemMinimizing losses in power distribution system
Minimizing losses in power distribution systemharshal567
 
IRENA_The Role of Grid Codes v2
IRENA_The Role of Grid Codes v2IRENA_The Role of Grid Codes v2
IRENA_The Role of Grid Codes v2fboshell
 
IRJET- Automated Energy Monitering System and Power Factor Improvement
IRJET-  	  Automated Energy Monitering System and Power Factor ImprovementIRJET-  	  Automated Energy Monitering System and Power Factor Improvement
IRJET- Automated Energy Monitering System and Power Factor ImprovementIRJET Journal
 
IRJET- Total Harmonic Distortion (THD) Compensation Via UPQC using PID Contro...
IRJET- Total Harmonic Distortion (THD) Compensation Via UPQC using PID Contro...IRJET- Total Harmonic Distortion (THD) Compensation Via UPQC using PID Contro...
IRJET- Total Harmonic Distortion (THD) Compensation Via UPQC using PID Contro...IRJET Journal
 
Non-conventional Energy Operated ECG System
Non-conventional Energy Operated ECG SystemNon-conventional Energy Operated ECG System
Non-conventional Energy Operated ECG SystemIRJET Journal
 
Amit new report
Amit new reportAmit new report
Amit new reportyadav amit
 
Practical Power System Harmonics, Earthing and Power Quality - Problems and S...
Practical Power System Harmonics, Earthing and Power Quality - Problems and S...Practical Power System Harmonics, Earthing and Power Quality - Problems and S...
Practical Power System Harmonics, Earthing and Power Quality - Problems and S...Living Online
 
Automatic power factor controller by microcontroller
Automatic power factor controller by microcontrollerAutomatic power factor controller by microcontroller
Automatic power factor controller by microcontrollerSanket Shitole
 
power factor correction soham+niraj
power factor correction soham+nirajpower factor correction soham+niraj
power factor correction soham+nirajsoham patel
 

What's hot (20)

APFC project presentation
APFC project presentationAPFC project presentation
APFC project presentation
 
Regeneration in Variable Frequency Drives and Energy Saving Methods
Regeneration in Variable Frequency Drives and Energy Saving MethodsRegeneration in Variable Frequency Drives and Energy Saving Methods
Regeneration in Variable Frequency Drives and Energy Saving Methods
 
Micro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System ReportMicro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System Report
 
Apfc final seminar
Apfc final seminarApfc final seminar
Apfc final seminar
 
Automatic power factor correction
Automatic power factor correction Automatic power factor correction
Automatic power factor correction
 
Automatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.PptxAutomatic Power Factor Improvement.Pptx
Automatic Power Factor Improvement.Pptx
 
Automatic Power Factor Improvement by Using PLC & SCADA
Automatic Power Factor Improvement by Using PLC & SCADAAutomatic Power Factor Improvement by Using PLC & SCADA
Automatic Power Factor Improvement by Using PLC & SCADA
 
Automatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using ArduinoAutomatic Power Factor Detection And Correction using Arduino
Automatic Power Factor Detection And Correction using Arduino
 
Power Quality Systems and Power Factor Correction Presentation
Power Quality Systems and Power Factor Correction PresentationPower Quality Systems and Power Factor Correction Presentation
Power Quality Systems and Power Factor Correction Presentation
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
 
Minimizing losses in power distribution system
Minimizing losses in power distribution systemMinimizing losses in power distribution system
Minimizing losses in power distribution system
 
IRENA_The Role of Grid Codes v2
IRENA_The Role of Grid Codes v2IRENA_The Role of Grid Codes v2
IRENA_The Role of Grid Codes v2
 
IRJET- Automated Energy Monitering System and Power Factor Improvement
IRJET-  	  Automated Energy Monitering System and Power Factor ImprovementIRJET-  	  Automated Energy Monitering System and Power Factor Improvement
IRJET- Automated Energy Monitering System and Power Factor Improvement
 
IRJET- Total Harmonic Distortion (THD) Compensation Via UPQC using PID Contro...
IRJET- Total Harmonic Distortion (THD) Compensation Via UPQC using PID Contro...IRJET- Total Harmonic Distortion (THD) Compensation Via UPQC using PID Contro...
IRJET- Total Harmonic Distortion (THD) Compensation Via UPQC using PID Contro...
 
Power Quality
Power QualityPower Quality
Power Quality
 
Non-conventional Energy Operated ECG System
Non-conventional Energy Operated ECG SystemNon-conventional Energy Operated ECG System
Non-conventional Energy Operated ECG System
 
Amit new report
Amit new reportAmit new report
Amit new report
 
Practical Power System Harmonics, Earthing and Power Quality - Problems and S...
Practical Power System Harmonics, Earthing and Power Quality - Problems and S...Practical Power System Harmonics, Earthing and Power Quality - Problems and S...
Practical Power System Harmonics, Earthing and Power Quality - Problems and S...
 
Automatic power factor controller by microcontroller
Automatic power factor controller by microcontrollerAutomatic power factor controller by microcontroller
Automatic power factor controller by microcontroller
 
power factor correction soham+niraj
power factor correction soham+nirajpower factor correction soham+niraj
power factor correction soham+niraj
 

Similar to Nfpa Wsc&amp;E 080602

Selective Coordination
Selective CoordinationSelective Coordination
Selective Coordinationmichaeljmack
 
Selective Coodination
Selective CoodinationSelective Coodination
Selective Coodinationmichaeljmack
 
Short Circuit, Protective Device Coordination
Short Circuit, Protective Device CoordinationShort Circuit, Protective Device Coordination
Short Circuit, Protective Device Coordinationmichaeljmack
 
Lecture 1. INTRODUCTION TO BASIC PROTECTION AND RELAYING SCHEMES.pptx
Lecture 1. INTRODUCTION TO BASIC PROTECTION AND RELAYING SCHEMES.pptxLecture 1. INTRODUCTION TO BASIC PROTECTION AND RELAYING SCHEMES.pptx
Lecture 1. INTRODUCTION TO BASIC PROTECTION AND RELAYING SCHEMES.pptxssuserb444c3
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.pptbasicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.pptThien Phan Bản
 
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.pptbasicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.pptThien Phan Bản
 
Short-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisShort-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisPower System Operation
 
EDS Unit 4 (Protection and Coordination).pptx
EDS Unit 4 (Protection and Coordination).pptxEDS Unit 4 (Protection and Coordination).pptx
EDS Unit 4 (Protection and Coordination).pptxDr. Rohit Babu
 
Power quality-disturbances and monitoring Seminar
Power quality-disturbances and monitoring  SeminarPower quality-disturbances and monitoring  Seminar
Power quality-disturbances and monitoring SeminarSurabhi Vasudev
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
Tecnical aplicacion1 abb
Tecnical aplicacion1 abbTecnical aplicacion1 abb
Tecnical aplicacion1 abbisaac diaz said
 
Power system protection seminar report
Power system protection seminar reportPower system protection seminar report
Power system protection seminar reportRahul Aman
 
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...IRJET Journal
 
Power_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdfPower_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdfYogeshGairola2
 
Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"michaeljmack
 
ECE4762011_Lect22.ppt
ECE4762011_Lect22.pptECE4762011_Lect22.ppt
ECE4762011_Lect22.pptSekar80689
 
lecture1423723756.pdf
lecture1423723756.pdflecture1423723756.pdf
lecture1423723756.pdfssuser564db8
 

Similar to Nfpa Wsc&amp;E 080602 (20)

Selective Coordination
Selective CoordinationSelective Coordination
Selective Coordination
 
Selective Coodination
Selective CoodinationSelective Coodination
Selective Coodination
 
Short Circuit, Protective Device Coordination
Short Circuit, Protective Device CoordinationShort Circuit, Protective Device Coordination
Short Circuit, Protective Device Coordination
 
Lecture 1. INTRODUCTION TO BASIC PROTECTION AND RELAYING SCHEMES.pptx
Lecture 1. INTRODUCTION TO BASIC PROTECTION AND RELAYING SCHEMES.pptxLecture 1. INTRODUCTION TO BASIC PROTECTION AND RELAYING SCHEMES.pptx
Lecture 1. INTRODUCTION TO BASIC PROTECTION AND RELAYING SCHEMES.pptx
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.pptbasicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
 
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.pptbasicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
basicprotectionandrelayingbysomaliajaldas-121126030037-phpapp01.ppt
 
Short-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisShort-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash Analysis
 
EDS Unit 4 (Protection and Coordination).pptx
EDS Unit 4 (Protection and Coordination).pptxEDS Unit 4 (Protection and Coordination).pptx
EDS Unit 4 (Protection and Coordination).pptx
 
Power quality-disturbances and monitoring Seminar
Power quality-disturbances and monitoring  SeminarPower quality-disturbances and monitoring  Seminar
Power quality-disturbances and monitoring Seminar
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
Tecnical aplicacion1 abb
Tecnical aplicacion1 abbTecnical aplicacion1 abb
Tecnical aplicacion1 abb
 
Power system protection seminar report
Power system protection seminar reportPower system protection seminar report
Power system protection seminar report
 
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
 
Power quality
Power qualityPower quality
Power quality
 
Power_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdfPower_System_Protection Lecture-1.pdf
Power_System_Protection Lecture-1.pdf
 
Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"Selective Coordination "The Rest of the Story"
Selective Coordination "The Rest of the Story"
 
ECE4762011_Lect22.ppt
ECE4762011_Lect22.pptECE4762011_Lect22.ppt
ECE4762011_Lect22.ppt
 
lecture1423723756.pdf
lecture1423723756.pdflecture1423723756.pdf
lecture1423723756.pdf
 
5010566.ppt
5010566.ppt5010566.ppt
5010566.ppt
 

Nfpa Wsc&amp;E 080602

  • 1. Emergency Power System Selective Coordination NFPA 2008 World Safety Conference & Exposition Monday, June 2, 2008
  • 2.
  • 3.
  • 4. Emergency Power System Selective Coordination What is Selective Coordination?
  • 5.
  • 6. Emergency Power System Selective Coordination What is Selective Coordination? Without Selective Coordination With Selective Coordination OPENS NOT AFFECTED UNNECESSARY POWER LOSS OPENS NOT AFFECTED Fault Fault
  • 7.
  • 8.
  • 9.
  • 10. System Protection vs. Selectivity An Overcurrent Protective Device Coordination Study evaluates the selection of devices and determines proper settings and ratings for protection AND selectivity Emergency Power System Selective Coordination What are some of the challenges? Protection : To disconnect faulted equipment from the system BEFORE damage occurs [requires FAST and SENSITIVE tripping] Selectivity : Requires some devices employ TIME DELAY tripping or HIGHER activation (pickup) levels [Time delays are dependent on location in system] Can be contradicting objectives
  • 11.
  • 12. Overload vs. Fault Emergency Power System Selective Coordination What are some of the challenges? Overload – operation of equip in excess of normal, full load rating, or ampacity of conductor causing damage or dangerous overheating Typical range: 101% < I < 250% full load rating Fault – an unintentional and undesirable conducting path in an electrical power system. Can take many forms; 3L, 3i0, LL, LL-G, L-G Typical range: I > 250% full load rating
  • 13. Phase vs. Ground Fault Emergency Power System Selective Coordination What are some of the challenges? Phase Protection : OL or OC, LL faults, 3ph faults, usually of higher current levels GF Protection : L-G faults, LL-G, 3ph-G faults GFP: (Art. 100) – system intended to provide protection of equipment from damaging L-G fault currents by disconnecting all ungrounded conductors of faulted circuit A B C SLG L-L 3ph
  • 14.
  • 15. Emergency Power System Selective Coordination What are some of the challenges? ATS Emergency Source N E Normal Source Panel ATS Emergency Source N E Normal Source Panel
  • 16.
  • 17.
  • 18. Emergency Power System Selective Coordination The Two Exceptions Exception 2: Two devices of same amp rating in series Exception 1 : Transformer primary and secondary Same Circuit Neither exception reduced life-safety because no additional parts of the electrical system would be shut down unnecessarily Hashed OCPDs do not have to be selectively coordinated Same Circuit 400A OCPD 400A OCPD
  • 19.
  • 20. Emergency Power System Selective Coordination Coordination Methods No plotting required Line Side Fuse Load Side Fuse
  • 21.
  • 22.
  • 23.
  • 24. Emergency Power System Selective Coordination Coordination Methods Up to where the circuit breakers cross, it is interpreted to be coordinated. See 800A 200A 30A Up to 7600A Up to 1500A X X 1500A 7600A 30A 0.01s 0.1s 800A IT = 10X 200A IT = 10X Circuit Breakers
  • 25. Emergency Power System Selective Coordination Coordination Methods Illustrates two instantaneous trip MCCBs: Lineside: 400A (7X IT) Loadside: 100A (Fixed IT) Where they intersect is point of non-coordination 0.01 seconds typically lowest time on TCCs CB IT unlatching times are less than 0.01s Circuit Breakers 0.1s 0.01s 0.001s
  • 26. Emergency Power System Selective Coordination Coordination Methods Interpret CB curves: 800A CB does not coordinate with the 200A CB above 5400A, even though the curves do not cross on the plot. 2250A 5400A 800A 30A 200A 0.01s 0.1s 800A 200A 30A Up to 5400A Up to 2250A X X Circuit Breakers
  • 27. Emergency Power System Selective Coordination Coordination Methods Circuit Breakers
  • 28. Emergency Power System Selective Coordination Coordination Methods Circuit Breakers 1500A Crossing Point Interpreting Curves Max. 2700A: CB Mfg. Coordination Testing CB Manufacturer’s Coordination Tables can help show coordination for higher fault current than simply plotting curves Example: 30A & 200A MCCBs 800A 30A 200A 0.01s 0.1s
  • 29. Emergency Power System Selective Coordination Coordination Methods Circuit Breakers Selective coordination for all overcurrents up to the interrupting rating for each circuit breaker Still need to plot curves to ensure there is no crossing of circuit breaker curves. Must have time settings with enough separation. 800A 30A 200A 0.01s 0.1s
  • 30. Emergency Power System Selective Coordination Coordination Methods Circuit Breakers - ZSI 1 2 3 X Fault Here 3 2 1 1200A 175A 400A 0.01s 0.1s CB3 Trips Instantaneously Restraint signal Restraint signal
  • 31. Fault Here Emergency Power System Selective Coordination Coordination Methods Circuit Breakers - ZSI 1 2 3 X No signal Restraint signal CB2 Trips Instantaneously 3 2 1 1200A 175A 400A 0.01s 0.1s
  • 32.
  • 33.
  • 34. Emergency Power System Selective Coordination Coordination Methods Parallel Generators
  • 35. Overload protection only. Coordinates with overload characteristics of downstream OCPDs Emergency Power System Selective Coordination Coordination Methods Parallel Generators Normal Source N E N E N E G 87B G Bus differential relaying provides short-circuit protection for bus & generators for bus fault (between CTs) Fuses or CBs selectively coordinated with downstream OCPDs for all overcurrents Emergency Source Bus Differential Relay
  • 36.
  • 37.
  • 38. Thank you! www.sandsengineering.com Contact : Douglas R. Strang, Jr., P.E. PO Box 345 Batavia, NY 14021-0345 585-235-3530 [email_address] [email_address] Emergency Power System Selective Coordination