SlideShare uma empresa Scribd logo
1 de 21
Baixar para ler offline
Energy Performance Contracting (EPC)

Making energy savings work for your organisation
About Envido




               www.envido.co.uk
Agenda


 1.Introduction: what is and why choose an EPC, key benefits

 2.Financing options

 3.Q&A

 4.From feasibility to guaranteed savings – the process

 5.Select the right Energy Services Company (ESCo)

 6.Q&A
What have these buildings got in common?



  Empire State     Gwent Hospital     Strand Palace Hotel




   38% saving     54,000t CO2e p.a.     £125,000 p.a.
EPC can cover all projects
                                   Lighting replacement,                Roof Insulation
                                  control systems & LEDs
               Ventilation fans                                     Building
                                                               Management Systems                         Damper control
 Solar gain
minimization


                                                                                                                      Wall Insulation




             Zone
          temperature
             control                                                                                               Voltage
                                                                                                                   reduction
                  Chiller
          upgrade/replacement &
            absorption cooling
                                   Plug load                                              VSD motor control
                                  management        On-Site Technical Resource
                                                          Management
                                                                          High efficiency motors         Boiler upgrades, controls
                                                                                                         Combined Heat & Power
EPC market & drivers

 Origin - US 1990s federal bodies

 Exponential growth in North                                £m
                                                           160
 America, EU & UK following
                                                           140

                                                           120
 Drivers
                                                           100
       – Energy      price     forecasts
           +17% by 2020                                     80

       – CRC liability                                      60

       – Availability of internal capital                   40

         funding                                            20

                                                              0
                                                                   2006     2007     2008     2009     2010     2011     2012




  Source: BSRIA; Review of the European Performance Contracting Market; December 2006, Frost & Sullivan, Credo research and analysis
What is an EPC?


   Comprehensive set of energy efficiency
    measures

   Accompanied with a savings guarantee

   No up-front capital investment required

     Benefits
  •   Permanently lower energy costs
  •   Permanently lower GHG emissions costs
  •   Accelerated project implementation
  •   Shorter procurement timescales
  •   Lower risk
Standard EPC Model

                       Saving guaranteed – no repayment if target not met
£
                        Guaranteed
                          savings                         Guaranteed
                        Energy savings
                                                            savings
             Your     repay improvement
    Energy
      and    annual                         Your
     O&M     costs       Energy             annual          Energy          Your
     costs   today         and              costs             and           annual
                          O&M               during           O&M            costs
                          costs             EPC              costs          after
                                                                            EPC

    Before                During                             After
     EPC                   EPC                               EPC
How is this possible?

  Future energy savings finance upgrade

  Building improvements generate sufficient
   energy savings to finance project costs

  ESCo guaranteed energy and cost saving
   opportunities identified

  Up front technology and equipment cost
   borne by ESCo, then offset by future energy
   savings

 If your building wastes energy, you already have the
 budget for an EPC!!
EPC financing
About Envido

Illustration of shared savings structure

• Financial Solution - We structure a financing solution to address the up-front capital costs of installing the energy efficient systems and
  equipment. We take our returns out of the savings achieved through the project, therefore the risk sits with us, and not with the client.

• Shared Savings Mechanism - During the contract term, the client shares in the savings generated from the installation of the energy efficient
  systems and equipment, ensuring they are in a cash positive position from Day 1.

• Long Term Benefit - At the end of the contract term, the client benefits from 100% of the savings achieved.



  Example – A Public Sector Organisation

                                                                                Typical Impact on Energy Bills During and After Project

                                                                                             During Project     After Project



  • A public sector organisation with an annual energy bill of £1m
    reduces its electricity, water and gas bills by 25% by
    implementing a variety of energy efficiency interventions
    including lighting, insulation, plant upgrades, voltage
    optimisation and building management systems (BMS).

  • During the first 7 years, the public sector organisation benefits
    from positive cash flow of £50,000, even after the ESA
    payments are taken into account. In year 7 and beyond,
    £250,000 in annual savings go straight to the bottom line.




                                                                                                                                www.envido.co.uk
Commercial structure:
                                                                                    Energy Performance
                                                                                    Contract, including O&M                ESCO
                                                                                    and M&V and
                                                                                    Performance Guarantee
                                                                                    (See note 3)



                                           Shared Savings
                                           Payments                                                      Project Capex


                                                                            SPV

                                                                                                         Equity & Debt
                                                                                                         Investment
                    Building Owner         Energy Services
                                           Agreement


                                                                                              Return                     Investors



  Features:
  1. The Building Owner enters into an energy service agreement (ESA) with the Special Purpose Vehicle (SPV) under which the SPV funds and
     implements the energy efficiency project in return for a share of the resulting energy savings.
  2. The SPV sub-contracts the implementation to the ESCO through the energy performance contract (EPC) and its Investors provide debt and equity
     capital to fund the project capex and other costs.
  3. The EPC may incorporate the performance guarantee, on-going O&M and M&V services; alternatively some or all of these may be provided directly to
     the Building Owner. The other terms of the EPC are designed to be back-to-back with the ESA, leaving the SPV with only the obligation to fund the
     project and the ESCO with the obligation to deliver the project.
  4. The Building Owner has the right to terminate the ESA at any time after implementation, for the present value of the future cash flow streams. In such
     a case the O&M services contract and Performance Guarantee would survive such termination.
  5. SDCL has worked with its professional advisers to design its ESA to maximise the likelihood that such projects may qualify for off balance sheet
     treatment in the UK (for the Building Owner).
Case study – the strand palace hotel, the 6th largest hotel in london
                                           The Challenge

                                           •The Strand Palace hotel, situated in the heart of the West End, is the sixth largest hotel in London, with 784 rooms and an overall
                                           capacity of 330,000 square feet.
                                           •The hotel had received a Green Tourism award from ‘Green London’. However, the management team were keen to make a
                                           further commitment to reducing their carbon emissions while also reducing their operating costs.

                                           The Solution

                                           •SDCL and its technical partners worked with the Strand Palace Hotel management team to identify energy savings opportunities
                                           around the hotel, verify the opportunity, the costs and the benefits of the installations and design a programme of works.
 Overview                                  •A competitive tender process has been run for Energy Services Companies (ESCOs) to install and maintain the equipment and
                                           systems, ensuring energy savings are achieved at the lowest cost and to the highest performance standards.
 Programme   LED lighting installations,   •SDCL has designed a financial solution for the project whereby the up-front capital costs of installing the energy efficiency
 of works    voltage optimisation, the     equipment and systems could be financed out of the savings achieved. The project is expected to be able to generate a sufficient
             installation of a building    level of savings through reduced energy and maintenance costs and other benefits to cover the cost of implementing the project
             management system             within approximately 4 years. Once an energy performance contract has been awarded to the winning ESCO, SDCL will then be
             and boiler plant              in a position to arrange finance for the project in return for a share of the savings achieved.
             replacement.
                                           Results
 Savings     Overall, the project is
             expected to save in           •The programme of works is due to begin in Q1 2013, and will include LED lighting installations, voltage optimisation, the
             excess of 25% of the          installation of a building management system and boiler plant replacement.
             hotel’s current energy        •Overall, the project is expected to save in excess of 25% of the hotel’s current energy consumption, with estimated annual
             consumption, with             savings expected of £125,000 per year.
             estimated annual              •The project will enable the Strand Palace Hotel to reduce their energy costs and improve their environmental performance,
             savings expected of           without the investment risk.
             £125,000 per year.
                                           Other benefits for the Strand Palace Hotel include:
 Outcomes    The project will enable
             the Strand Palace Hotel
                                           •A turn-key solution based on in-depth knowledge of the whole process from project definition to delivery and finance; SDCL’s
             to reduce their energy
                                           expertise saves both operational and management time for the hotel
             costs and improve their
                                           •Access to a dedicated professional team focused exclusively on delivering energy efficiency opportunities
             environmental
                                           •Solution tailored to the specific needs of the building
             performance, without the
                                           •Reduced operating costs and improvements to the hotel’s asset value
             investment risk.
                                           •Frees up capital budget for the Strand Palace Hotel to use on refurbishing and upgrading facilities as part of their 5-year capital
                                           plan.
Advantages of EPC
   Risk Reduction
     – Guaranteed savings
     – Guaranteed min level of performance (and savings!!!)
     – Performance and financial risk borne by contractor
     – Single contractor
   Financial
     – Can be self-financing - no capital outlay
     – Long-term reduction to operating overhead
     – Can be off balance sheet
     – Low cash flow impact - repayment aligned to savings
   Environmental & reputation
     – Hit energy and carbon reduction targets met
   Deeper energy and carbon reduction possible
     – consider projects with longer payback

      An EPC guarantees predictable energy (and cost) savings
EPC challenges


   An EPC is a complex project
      – Multiple decision-makers:
        boards, facilities managers,
        “fiefdoms”
      – Strong Leadership Required –
        champion needed to drive project
      – Long, involved feasibility and
        assessment
      – Low awareness of EPC
      – Requires project management


 The same applies when managing
 multiple, smaller projects but less risk
 involved
Developing
 an EPC
What to look for when choosing an ESCo
  Can they capture the maximum level of savings
    • Guarantee, auditing, M&V, financing, project
      management, design, construction/installation,
      commissioning
    • Able to deliver a wide scope of measures (HVAC,
      lighting, renewables, controls, plant upgrades &
      specialty systems relating to your facility)


  Ensure measured, sustained savings
 • Rigorous measurement and verification process (with an
   up-front plan) to ensure ongoing savings
What to look for when choosing an ESCo
  Do they combine technical &
   practical expertise
    • Able to design and implement
    • Understand practicalities
    • Expertise/experience in similar
      building/sector using measures you
      anticipate
    • Review a sample audit


  In-house capability
    • Energy assessors - identify and verify
      projects
    • Engineers design, install, commission
      and provide ongoing maintenance
    • Project managers (PRINCE2 )
The importance of measurement and verification



  Evaluate performance of installed ECMs
  Verify the energy savings guarantee

 If guarantee is not met, M&V determines the
     energy savings shortfall. Envido repays the
     financial value to you.




                                                   IPMVP – the global energy
                                                   verification standard
When to establish M&V procedures
     Preliminary plan established at
      feasibility stage, then developed at IGP
     Establishes any need for baseline
      measurements to establish energy use
      profile of plant or systems.

    For example:
    IPMVP method B - single chiller – isolated
       retrofit requires pre and post
       measurement

    IPMVP method C – whole building
       measurement – with several ECMs &
       10% target, utility bill used for baseline      IPMVP – the global energy
                                                       verification standard
       period so only post retrofit values
       required
  Remember: If you don’t understand the M&V plan don’t sign it!!!
About Envido




 0207 199 0090 |  info@envido.co.uk |  www.envido.co.uk |   @envido




 Find out more about Energy Performance contracting




                                                               www.envido.co.uk

Mais conteúdo relacionado

Mais procurados

SCE rate update to KCTA 120209
SCE rate update to KCTA 120209SCE rate update to KCTA 120209
SCE rate update to KCTA 120209KernTax
 
Show Me the Data: Cannon Design Environmental Awareness Week 2012
Show Me the Data: Cannon Design Environmental Awareness Week 2012Show Me the Data: Cannon Design Environmental Awareness Week 2012
Show Me the Data: Cannon Design Environmental Awareness Week 2012Cliff Majersik
 
Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...
Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...
Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...Vlerick_Alumni
 
GC energy & environmental newsletter April 2012
GC energy & environmental newsletter   April 2012GC energy & environmental newsletter   April 2012
GC energy & environmental newsletter April 2012generalcarbon
 
Energy Efficiency / Alliance to Save Energy - EE Global Conference, Brussels,...
Energy Efficiency / Alliance to Save Energy - EE Global Conference, Brussels,...Energy Efficiency / Alliance to Save Energy - EE Global Conference, Brussels,...
Energy Efficiency / Alliance to Save Energy - EE Global Conference, Brussels,...lucamazzei
 
Alan Pears - slides - price on carbon forum Aug 2011
Alan Pears - slides - price on carbon forum Aug 2011Alan Pears - slides - price on carbon forum Aug 2011
Alan Pears - slides - price on carbon forum Aug 2011simon5678
 
Renewable Energy Implementations
Renewable Energy ImplementationsRenewable Energy Implementations
Renewable Energy ImplementationsRachmadi Gustrian
 
German Energy Transition Workshop-Raouf Al Dabbas
German Energy Transition Workshop-Raouf Al Dabbas German Energy Transition Workshop-Raouf Al Dabbas
German Energy Transition Workshop-Raouf Al Dabbas EDAMA
 
The power to change Peter Birkner
The power to change   Peter BirknerThe power to change   Peter Birkner
The power to change Peter BirknerInnovation Norway
 
Charles McGlashan: Marin Clean Energy
Charles McGlashan: Marin Clean EnergyCharles McGlashan: Marin Clean Energy
Charles McGlashan: Marin Clean EnergyClean Energy Action
 
Solar Energy Choices Magazine3
Solar Energy Choices Magazine3Solar Energy Choices Magazine3
Solar Energy Choices Magazine3comF5
 
D11 Energy Education Nexus
D11 Energy Education NexusD11 Energy Education Nexus
D11 Energy Education NexusJacob Anderson
 
Building Energy Rating & Disclosure: A Catalyst for Efficiency
Building Energy Rating & Disclosure: A Catalyst for EfficiencyBuilding Energy Rating & Disclosure: A Catalyst for Efficiency
Building Energy Rating & Disclosure: A Catalyst for EfficiencyCliff Majersik
 
Forum on Energy Savings with Senator Al Franken
Forum on Energy Savings with Senator Al FrankenForum on Energy Savings with Senator Al Franken
Forum on Energy Savings with Senator Al FrankenUniversity of Minnesota
 
AREVA, Business & strategy overview - November 2009
AREVA, Business & strategy overview - November 2009AREVA, Business & strategy overview - November 2009
AREVA, Business & strategy overview - November 2009AREVA
 
The Green Deal - an innovative energy efficient delivery structure for UK homes
The Green Deal - an innovative energy efficient delivery structure for UK homesThe Green Deal - an innovative energy efficient delivery structure for UK homes
The Green Deal - an innovative energy efficient delivery structure for UK homesGrant Thornton
 
Energy Conservation For Liu
Energy Conservation For LiuEnergy Conservation For Liu
Energy Conservation For Liurolewis1
 

Mais procurados (20)

SCE rate update to KCTA 120209
SCE rate update to KCTA 120209SCE rate update to KCTA 120209
SCE rate update to KCTA 120209
 
Show Me the Data: Cannon Design Environmental Awareness Week 2012
Show Me the Data: Cannon Design Environmental Awareness Week 2012Show Me the Data: Cannon Design Environmental Awareness Week 2012
Show Me the Data: Cannon Design Environmental Awareness Week 2012
 
Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...
Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...
Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...
 
CBI energy conference 2011 - Tony Quinlan
CBI energy conference 2011 - Tony QuinlanCBI energy conference 2011 - Tony Quinlan
CBI energy conference 2011 - Tony Quinlan
 
GC energy & environmental newsletter April 2012
GC energy & environmental newsletter   April 2012GC energy & environmental newsletter   April 2012
GC energy & environmental newsletter April 2012
 
Energy Efficiency / Alliance to Save Energy - EE Global Conference, Brussels,...
Energy Efficiency / Alliance to Save Energy - EE Global Conference, Brussels,...Energy Efficiency / Alliance to Save Energy - EE Global Conference, Brussels,...
Energy Efficiency / Alliance to Save Energy - EE Global Conference, Brussels,...
 
Alan Pears - slides - price on carbon forum Aug 2011
Alan Pears - slides - price on carbon forum Aug 2011Alan Pears - slides - price on carbon forum Aug 2011
Alan Pears - slides - price on carbon forum Aug 2011
 
Renewable Energy Implementations
Renewable Energy ImplementationsRenewable Energy Implementations
Renewable Energy Implementations
 
German Energy Transition Workshop-Raouf Al Dabbas
German Energy Transition Workshop-Raouf Al Dabbas German Energy Transition Workshop-Raouf Al Dabbas
German Energy Transition Workshop-Raouf Al Dabbas
 
The power to change Peter Birkner
The power to change   Peter BirknerThe power to change   Peter Birkner
The power to change Peter Birkner
 
Charles McGlashan: Marin Clean Energy
Charles McGlashan: Marin Clean EnergyCharles McGlashan: Marin Clean Energy
Charles McGlashan: Marin Clean Energy
 
Solar Energy Choices Magazine3
Solar Energy Choices Magazine3Solar Energy Choices Magazine3
Solar Energy Choices Magazine3
 
D11 Energy Education Nexus
D11 Energy Education NexusD11 Energy Education Nexus
D11 Energy Education Nexus
 
Building Energy Rating & Disclosure: A Catalyst for Efficiency
Building Energy Rating & Disclosure: A Catalyst for EfficiencyBuilding Energy Rating & Disclosure: A Catalyst for Efficiency
Building Energy Rating & Disclosure: A Catalyst for Efficiency
 
Forum on Energy Savings with Senator Al Franken
Forum on Energy Savings with Senator Al FrankenForum on Energy Savings with Senator Al Franken
Forum on Energy Savings with Senator Al Franken
 
AREVA, Business & strategy overview - November 2009
AREVA, Business & strategy overview - November 2009AREVA, Business & strategy overview - November 2009
AREVA, Business & strategy overview - November 2009
 
The Green Deal - an innovative energy efficient delivery structure for UK homes
The Green Deal - an innovative energy efficient delivery structure for UK homesThe Green Deal - an innovative energy efficient delivery structure for UK homes
The Green Deal - an innovative energy efficient delivery structure for UK homes
 
Sgcp12 crisp-decc
Sgcp12 crisp-deccSgcp12 crisp-decc
Sgcp12 crisp-decc
 
The Multiple Benefits of Efficiency Policies
The Multiple Benefits of Efficiency PoliciesThe Multiple Benefits of Efficiency Policies
The Multiple Benefits of Efficiency Policies
 
Energy Conservation For Liu
Energy Conservation For LiuEnergy Conservation For Liu
Energy Conservation For Liu
 

Destaque

More Secrets of JavaScript Libraries
More Secrets of JavaScript LibrariesMore Secrets of JavaScript Libraries
More Secrets of JavaScript Librariesjeresig
 
Using energy audits in energy efficiency programs NREL
Using energy audits in energy efficiency programs NRELUsing energy audits in energy efficiency programs NREL
Using energy audits in energy efficiency programs NRELConor Merrigan
 
Phoenix Energy Performance Contracting Presentation
Phoenix   Energy Performance Contracting PresentationPhoenix   Energy Performance Contracting Presentation
Phoenix Energy Performance Contracting PresentationICF_HCD
 
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...Steve Lojuntin
 
Introduction to Energy Performance Contracting
Introduction to Energy Performance ContractingIntroduction to Energy Performance Contracting
Introduction to Energy Performance ContractingZAINI ABDUL WAHAB
 
The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017LinkedIn
 

Destaque (7)

Panel 1: MAPC Presentation
Panel 1: MAPC PresentationPanel 1: MAPC Presentation
Panel 1: MAPC Presentation
 
More Secrets of JavaScript Libraries
More Secrets of JavaScript LibrariesMore Secrets of JavaScript Libraries
More Secrets of JavaScript Libraries
 
Using energy audits in energy efficiency programs NREL
Using energy audits in energy efficiency programs NRELUsing energy audits in energy efficiency programs NREL
Using energy audits in energy efficiency programs NREL
 
Phoenix Energy Performance Contracting Presentation
Phoenix   Energy Performance Contracting PresentationPhoenix   Energy Performance Contracting Presentation
Phoenix Energy Performance Contracting Presentation
 
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
Proposal to BSEEP to adopt GreenPASS Operation (CIS 20 - CIDB) as Energy Effi...
 
Introduction to Energy Performance Contracting
Introduction to Energy Performance ContractingIntroduction to Energy Performance Contracting
Introduction to Energy Performance Contracting
 
The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017
 

Semelhante a Energy finance for building retrofits: Energy Performance Contracting UK

Finance for renewable energy
Finance for renewable energyFinance for renewable energy
Finance for renewable energyRicardo- AEA
 
Apresentação da SelfEnergy
Apresentação da SelfEnergyApresentação da SelfEnergy
Apresentação da SelfEnergyGreen Campus
 
Warehouse energy efficiency opportunities
Warehouse energy efficiency opportunitiesWarehouse energy efficiency opportunities
Warehouse energy efficiency opportunitiesdrpaulfisher
 
Warehouse lighting and energy efficiency projects
Warehouse lighting and energy efficiency projectsWarehouse lighting and energy efficiency projects
Warehouse lighting and energy efficiency projectsdrpaulfisher
 
Energy Efficient White Paper
Energy Efficient White PaperEnergy Efficient White Paper
Energy Efficient White PaperNercon
 
How Economic Value Management can be Applied to Power Plant Management
How Economic Value Management can be Applied to Power Plant ManagementHow Economic Value Management can be Applied to Power Plant Management
How Economic Value Management can be Applied to Power Plant ManagementPar Sut
 
Who is GEM, Inc.
Who is GEM, Inc.Who is GEM, Inc.
Who is GEM, Inc.tstrait
 
Bringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the UserBringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the UserEMEX
 
Benefit illustration application of §179 d of ep-act for an auto dealers......
Benefit illustration   application of §179 d of ep-act for an auto dealers......Benefit illustration   application of §179 d of ep-act for an auto dealers......
Benefit illustration application of §179 d of ep-act for an auto dealers......Cindy May Marketing
 
Sim Energy Brochure Carbon Management
Sim Energy Brochure   Carbon ManagementSim Energy Brochure   Carbon Management
Sim Energy Brochure Carbon ManagementAndy_Watson_Sim
 
(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document email(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document emailsgraham007
 
W2 Group Capabilities Brochure Final
W2 Group Capabilities Brochure FinalW2 Group Capabilities Brochure Final
W2 Group Capabilities Brochure Finalatomic10dog
 
Operations & Maintenance Operator Forum brochure
Operations & Maintenance Operator Forum brochureOperations & Maintenance Operator Forum brochure
Operations & Maintenance Operator Forum brochurePolly Freeman
 
Energy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in MalaysiaEnergy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in MalaysiaZAINI ABDUL WAHAB
 
IBM smarter energy
IBM smarter energyIBM smarter energy
IBM smarter energybenhanley77
 
Finance workshop Session 1 - Project Financing and Project Opportunities
Finance workshop Session 1 - Project Financing and Project OpportunitiesFinance workshop Session 1 - Project Financing and Project Opportunities
Finance workshop Session 1 - Project Financing and Project OpportunitiesSeattle2030District
 
GRESB Greenbuild 2017 PACE Financing
GRESB Greenbuild 2017 PACE Financing GRESB Greenbuild 2017 PACE Financing
GRESB Greenbuild 2017 PACE Financing GRESB
 
Energy Smart: Saving Energy is Smart Business
Energy Smart: Saving Energy is Smart BusinessEnergy Smart: Saving Energy is Smart Business
Energy Smart: Saving Energy is Smart BusinessUniversity of Minnesota
 
SPB Infrastructure Presentation
SPB Infrastructure PresentationSPB Infrastructure Presentation
SPB Infrastructure Presentationjsmitley
 

Semelhante a Energy finance for building retrofits: Energy Performance Contracting UK (20)

Finance for renewable energy
Finance for renewable energyFinance for renewable energy
Finance for renewable energy
 
Apresentação da SelfEnergy
Apresentação da SelfEnergyApresentação da SelfEnergy
Apresentação da SelfEnergy
 
Warehouse energy efficiency opportunities
Warehouse energy efficiency opportunitiesWarehouse energy efficiency opportunities
Warehouse energy efficiency opportunities
 
Warehouse lighting and energy efficiency projects
Warehouse lighting and energy efficiency projectsWarehouse lighting and energy efficiency projects
Warehouse lighting and energy efficiency projects
 
Energy Efficient White Paper
Energy Efficient White PaperEnergy Efficient White Paper
Energy Efficient White Paper
 
How Economic Value Management can be Applied to Power Plant Management
How Economic Value Management can be Applied to Power Plant ManagementHow Economic Value Management can be Applied to Power Plant Management
How Economic Value Management can be Applied to Power Plant Management
 
Who is GEM, Inc.
Who is GEM, Inc.Who is GEM, Inc.
Who is GEM, Inc.
 
Bringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the UserBringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the User
 
Benefit illustration application of §179 d of ep-act for an auto dealers......
Benefit illustration   application of §179 d of ep-act for an auto dealers......Benefit illustration   application of §179 d of ep-act for an auto dealers......
Benefit illustration application of §179 d of ep-act for an auto dealers......
 
Sim Energy Brochure Carbon Management
Sim Energy Brochure   Carbon ManagementSim Energy Brochure   Carbon Management
Sim Energy Brochure Carbon Management
 
(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document email(B) pepco energy solutions overview document email
(B) pepco energy solutions overview document email
 
W2 Group Capabilities Brochure Final
W2 Group Capabilities Brochure FinalW2 Group Capabilities Brochure Final
W2 Group Capabilities Brochure Final
 
Operations & Maintenance Operator Forum brochure
Operations & Maintenance Operator Forum brochureOperations & Maintenance Operator Forum brochure
Operations & Maintenance Operator Forum brochure
 
Energy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in MalaysiaEnergy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in Malaysia
 
Miguel Matius - SELF ENERGY
Miguel Matius - SELF ENERGYMiguel Matius - SELF ENERGY
Miguel Matius - SELF ENERGY
 
IBM smarter energy
IBM smarter energyIBM smarter energy
IBM smarter energy
 
Finance workshop Session 1 - Project Financing and Project Opportunities
Finance workshop Session 1 - Project Financing and Project OpportunitiesFinance workshop Session 1 - Project Financing and Project Opportunities
Finance workshop Session 1 - Project Financing and Project Opportunities
 
GRESB Greenbuild 2017 PACE Financing
GRESB Greenbuild 2017 PACE Financing GRESB Greenbuild 2017 PACE Financing
GRESB Greenbuild 2017 PACE Financing
 
Energy Smart: Saving Energy is Smart Business
Energy Smart: Saving Energy is Smart BusinessEnergy Smart: Saving Energy is Smart Business
Energy Smart: Saving Energy is Smart Business
 
SPB Infrastructure Presentation
SPB Infrastructure PresentationSPB Infrastructure Presentation
SPB Infrastructure Presentation
 

Último

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 

Último (20)

Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 

Energy finance for building retrofits: Energy Performance Contracting UK

  • 1. Energy Performance Contracting (EPC) Making energy savings work for your organisation
  • 2. About Envido www.envido.co.uk
  • 3. Agenda 1.Introduction: what is and why choose an EPC, key benefits 2.Financing options 3.Q&A 4.From feasibility to guaranteed savings – the process 5.Select the right Energy Services Company (ESCo) 6.Q&A
  • 4. What have these buildings got in common? Empire State Gwent Hospital Strand Palace Hotel 38% saving 54,000t CO2e p.a. £125,000 p.a.
  • 5. EPC can cover all projects Lighting replacement, Roof Insulation control systems & LEDs Ventilation fans Building Management Systems Damper control Solar gain minimization Wall Insulation Zone temperature control Voltage reduction Chiller upgrade/replacement & absorption cooling Plug load VSD motor control management On-Site Technical Resource Management High efficiency motors Boiler upgrades, controls Combined Heat & Power
  • 6. EPC market & drivers Origin - US 1990s federal bodies Exponential growth in North £m 160 America, EU & UK following 140 120 Drivers 100 – Energy price forecasts +17% by 2020 80 – CRC liability 60 – Availability of internal capital 40 funding 20 0 2006 2007 2008 2009 2010 2011 2012 Source: BSRIA; Review of the European Performance Contracting Market; December 2006, Frost & Sullivan, Credo research and analysis
  • 7. What is an EPC?  Comprehensive set of energy efficiency measures  Accompanied with a savings guarantee  No up-front capital investment required  Benefits • Permanently lower energy costs • Permanently lower GHG emissions costs • Accelerated project implementation • Shorter procurement timescales • Lower risk
  • 8. Standard EPC Model Saving guaranteed – no repayment if target not met £ Guaranteed savings Guaranteed Energy savings savings Your repay improvement Energy and annual Your O&M costs Energy annual Energy Your costs today and costs and annual O&M during O&M costs costs EPC costs after EPC Before During After EPC EPC EPC
  • 9. How is this possible?  Future energy savings finance upgrade  Building improvements generate sufficient energy savings to finance project costs  ESCo guaranteed energy and cost saving opportunities identified  Up front technology and equipment cost borne by ESCo, then offset by future energy savings If your building wastes energy, you already have the budget for an EPC!!
  • 11. About Envido Illustration of shared savings structure • Financial Solution - We structure a financing solution to address the up-front capital costs of installing the energy efficient systems and equipment. We take our returns out of the savings achieved through the project, therefore the risk sits with us, and not with the client. • Shared Savings Mechanism - During the contract term, the client shares in the savings generated from the installation of the energy efficient systems and equipment, ensuring they are in a cash positive position from Day 1. • Long Term Benefit - At the end of the contract term, the client benefits from 100% of the savings achieved. Example – A Public Sector Organisation Typical Impact on Energy Bills During and After Project During Project After Project • A public sector organisation with an annual energy bill of £1m reduces its electricity, water and gas bills by 25% by implementing a variety of energy efficiency interventions including lighting, insulation, plant upgrades, voltage optimisation and building management systems (BMS). • During the first 7 years, the public sector organisation benefits from positive cash flow of £50,000, even after the ESA payments are taken into account. In year 7 and beyond, £250,000 in annual savings go straight to the bottom line. www.envido.co.uk
  • 12. Commercial structure: Energy Performance Contract, including O&M ESCO and M&V and Performance Guarantee (See note 3) Shared Savings Payments Project Capex SPV Equity & Debt Investment Building Owner Energy Services Agreement Return Investors Features: 1. The Building Owner enters into an energy service agreement (ESA) with the Special Purpose Vehicle (SPV) under which the SPV funds and implements the energy efficiency project in return for a share of the resulting energy savings. 2. The SPV sub-contracts the implementation to the ESCO through the energy performance contract (EPC) and its Investors provide debt and equity capital to fund the project capex and other costs. 3. The EPC may incorporate the performance guarantee, on-going O&M and M&V services; alternatively some or all of these may be provided directly to the Building Owner. The other terms of the EPC are designed to be back-to-back with the ESA, leaving the SPV with only the obligation to fund the project and the ESCO with the obligation to deliver the project. 4. The Building Owner has the right to terminate the ESA at any time after implementation, for the present value of the future cash flow streams. In such a case the O&M services contract and Performance Guarantee would survive such termination. 5. SDCL has worked with its professional advisers to design its ESA to maximise the likelihood that such projects may qualify for off balance sheet treatment in the UK (for the Building Owner).
  • 13. Case study – the strand palace hotel, the 6th largest hotel in london The Challenge •The Strand Palace hotel, situated in the heart of the West End, is the sixth largest hotel in London, with 784 rooms and an overall capacity of 330,000 square feet. •The hotel had received a Green Tourism award from ‘Green London’. However, the management team were keen to make a further commitment to reducing their carbon emissions while also reducing their operating costs. The Solution •SDCL and its technical partners worked with the Strand Palace Hotel management team to identify energy savings opportunities around the hotel, verify the opportunity, the costs and the benefits of the installations and design a programme of works. Overview •A competitive tender process has been run for Energy Services Companies (ESCOs) to install and maintain the equipment and systems, ensuring energy savings are achieved at the lowest cost and to the highest performance standards. Programme LED lighting installations, •SDCL has designed a financial solution for the project whereby the up-front capital costs of installing the energy efficiency of works voltage optimisation, the equipment and systems could be financed out of the savings achieved. The project is expected to be able to generate a sufficient installation of a building level of savings through reduced energy and maintenance costs and other benefits to cover the cost of implementing the project management system within approximately 4 years. Once an energy performance contract has been awarded to the winning ESCO, SDCL will then be and boiler plant in a position to arrange finance for the project in return for a share of the savings achieved. replacement. Results Savings Overall, the project is expected to save in •The programme of works is due to begin in Q1 2013, and will include LED lighting installations, voltage optimisation, the excess of 25% of the installation of a building management system and boiler plant replacement. hotel’s current energy •Overall, the project is expected to save in excess of 25% of the hotel’s current energy consumption, with estimated annual consumption, with savings expected of £125,000 per year. estimated annual •The project will enable the Strand Palace Hotel to reduce their energy costs and improve their environmental performance, savings expected of without the investment risk. £125,000 per year. Other benefits for the Strand Palace Hotel include: Outcomes The project will enable the Strand Palace Hotel •A turn-key solution based on in-depth knowledge of the whole process from project definition to delivery and finance; SDCL’s to reduce their energy expertise saves both operational and management time for the hotel costs and improve their •Access to a dedicated professional team focused exclusively on delivering energy efficiency opportunities environmental •Solution tailored to the specific needs of the building performance, without the •Reduced operating costs and improvements to the hotel’s asset value investment risk. •Frees up capital budget for the Strand Palace Hotel to use on refurbishing and upgrading facilities as part of their 5-year capital plan.
  • 14. Advantages of EPC  Risk Reduction – Guaranteed savings – Guaranteed min level of performance (and savings!!!) – Performance and financial risk borne by contractor – Single contractor  Financial – Can be self-financing - no capital outlay – Long-term reduction to operating overhead – Can be off balance sheet – Low cash flow impact - repayment aligned to savings  Environmental & reputation – Hit energy and carbon reduction targets met  Deeper energy and carbon reduction possible – consider projects with longer payback An EPC guarantees predictable energy (and cost) savings
  • 15. EPC challenges  An EPC is a complex project – Multiple decision-makers: boards, facilities managers, “fiefdoms” – Strong Leadership Required – champion needed to drive project – Long, involved feasibility and assessment – Low awareness of EPC – Requires project management The same applies when managing multiple, smaller projects but less risk involved
  • 17. What to look for when choosing an ESCo  Can they capture the maximum level of savings • Guarantee, auditing, M&V, financing, project management, design, construction/installation, commissioning • Able to deliver a wide scope of measures (HVAC, lighting, renewables, controls, plant upgrades & specialty systems relating to your facility)  Ensure measured, sustained savings • Rigorous measurement and verification process (with an up-front plan) to ensure ongoing savings
  • 18. What to look for when choosing an ESCo  Do they combine technical & practical expertise • Able to design and implement • Understand practicalities • Expertise/experience in similar building/sector using measures you anticipate • Review a sample audit  In-house capability • Energy assessors - identify and verify projects • Engineers design, install, commission and provide ongoing maintenance • Project managers (PRINCE2 )
  • 19. The importance of measurement and verification  Evaluate performance of installed ECMs  Verify the energy savings guarantee If guarantee is not met, M&V determines the energy savings shortfall. Envido repays the financial value to you. IPMVP – the global energy verification standard
  • 20. When to establish M&V procedures  Preliminary plan established at feasibility stage, then developed at IGP  Establishes any need for baseline measurements to establish energy use profile of plant or systems. For example: IPMVP method B - single chiller – isolated retrofit requires pre and post measurement IPMVP method C – whole building measurement – with several ECMs & 10% target, utility bill used for baseline IPMVP – the global energy verification standard period so only post retrofit values required Remember: If you don’t understand the M&V plan don’t sign it!!!
  • 21. About Envido  0207 199 0090 |  info@envido.co.uk |  www.envido.co.uk | @envido Find out more about Energy Performance contracting www.envido.co.uk