SlideShare uma empresa Scribd logo
1 de 10
Baixar para ler offline
Pavement Design Construction and Materials
         Michigan Technological University
PDCM Overview
Pavement Design Construction and Materials
Group Member | Spring 2006 through Spring 2008

The goal of the Enterprise program is to get students involved and
working with industry on real industry projects. This Enterprise was
formed by a generous donation from Bob Thompson in 2000. Visit
www.pavementscholars.mtu.edu for more information.

The Enterprise two year project based curriculum compensates for
the Senior Design project. Each year PDCM also hosts in-house
versions of the national level Bidding and Asphalt Design
competitions that the Enterprise has seen strong success in winning
regional and national first place finishes.
Leadership
Executive Board
Treasurer | Fall 2007
Class Representative | Several Terms

Awards
Scholarship Recipient | Spring 2008
Scholarship Recipient | Spring 2007
Scholarship Recipient | Fall 2006
Member of the Month| Two Times
  -Scholarship availability varied from year to year


Adopt-A-Highway Volunteer | Two Times
Project Team
Pavement Management Business Plan
Team Member | Spring 2008

Objective:
To develop a profitable business plan for the Enterprise based on
Asphalt Pavement Management using PASER rating methodology and
to identify associated startup costs, overhead and labor expenses, and
related client fees related to a venture of this sort.

Outcome:
A recommendation report was submitted to the PDCM Advisory
Board. The project was later eliminated due to complexities not
desired by the Enterprise at this time.
Project Team
Real Time Quality Control Roadbed Assessment Transmitter
Project Manager | Spring 2007 Project Manager| Fall 2007

Objective:
To develop a wireless concrete maturity meter in collaboration with
the Integrated Microsystems Enterprise. The PDCM commitment was
to develop a casing that would protect the electronics from the
corrosive environment of concrete while helping it fit into the
aggregate matrix.

Outcome:
A dodecahedron shape casing molding process using epoxy was
developed and the electronic was cased and successfully transmitted
test signals from within a small batch of concrete.
Project Team
Real Time Quality Control Roadbed Assessment Transmitter
Project Manager | Spring 2007 Project Manager| Fall 2007

Images of Casing:
Project Team
City of Houghton Capital Improvement Plan
Team Member| Fall 2006

Objective:
To PASER rate the City of Houghton road network and input the data
into RoadSoft GIS for analysis to develop a pavement asset
management plan.

Outcome:
Fall 2006 was the third year of data points where a deterioration
curve was starting to present itself. A report and pavement
management recommendations were submitted to the PDCM
Advisory Board
Project Team
City of Houghton Capital Improvement Plan
Team Member| Fall 2006

Images:
Project Team
Madeline Island Capital Improvement Plan
Team Member| Spring 2006

Objective:
To PASER rate the Madeline Island road network and input the data
into RoadSoft GIS for analysis to develop a pavement asset
management plan for specific roads.

Outcome:
The data was collected and analyzed. A recommendation for the
requested roads was formed and submitted to the PDCM Advisory
Board.
In Closing
Overall the time I spent in PDCM was very educational. I was exposed to asphalt
pavement design, asphalt pavement management, estimating, and to electronics
and concrete maturity meters during the interdisciplinary work with the Integrated
Microsystems Enterprise.

I am willing to share more information on the program at your request. If you
have work that the Enterprise may be able to conduct of just want to learn more,
their contact information can be found at www.pavementscholars.mtu.edu or I can
refer you to a contact in the organization.

Mais conteúdo relacionado

Semelhante a PDCM Enterprise

Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2 Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee
 
Mike_Kuenkel_Complete Resume_20150422
Mike_Kuenkel_Complete Resume_20150422Mike_Kuenkel_Complete Resume_20150422
Mike_Kuenkel_Complete Resume_20150422
Mike Kuenkel
 
JAAResume112016Rev.5
JAAResume112016Rev.5JAAResume112016Rev.5
JAAResume112016Rev.5
Josh Alamo
 
Thomas Redznak Resume fall 2015
Thomas Redznak Resume fall 2015Thomas Redznak Resume fall 2015
Thomas Redznak Resume fall 2015
Thomas Redznak
 
GRE PM - proposal for MDDA
GRE PM - proposal for MDDAGRE PM - proposal for MDDA
GRE PM - proposal for MDDA
Tarit Mohan
 

Semelhante a PDCM Enterprise (20)

Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2 Simin Rasolee Resume 4-17-2015 version 2
Simin Rasolee Resume 4-17-2015 version 2
 
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
 
Mike_Kuenkel_Complete Resume_20150422
Mike_Kuenkel_Complete Resume_20150422Mike_Kuenkel_Complete Resume_20150422
Mike_Kuenkel_Complete Resume_20150422
 
JAAResume112016Rev.5
JAAResume112016Rev.5JAAResume112016Rev.5
JAAResume112016Rev.5
 
Resume for Akaii Lineberger
Resume for Akaii LinebergerResume for Akaii Lineberger
Resume for Akaii Lineberger
 
Saurav_CV
Saurav_CVSaurav_CV
Saurav_CV
 
apidays LIVE Singapore - Using data to track plastic waste and recovery globa...
apidays LIVE Singapore - Using data to track plastic waste and recovery globa...apidays LIVE Singapore - Using data to track plastic waste and recovery globa...
apidays LIVE Singapore - Using data to track plastic waste and recovery globa...
 
Kjf16d1 chron
Kjf16d1 chronKjf16d1 chron
Kjf16d1 chron
 
Kjf16d1 chron
Kjf16d1 chronKjf16d1 chron
Kjf16d1 chron
 
Kjf16d1 chron
Kjf16d1 chronKjf16d1 chron
Kjf16d1 chron
 
01 bim project_execution_planning_guide_v2.1
01 bim project_execution_planning_guide_v2.101 bim project_execution_planning_guide_v2.1
01 bim project_execution_planning_guide_v2.1
 
Car and Road Test.pdf
Car and Road Test.pdfCar and Road Test.pdf
Car and Road Test.pdf
 
Douglas Carlesco Resume
Douglas Carlesco ResumeDouglas Carlesco Resume
Douglas Carlesco Resume
 
Thomas Redznak Resume fall 2015
Thomas Redznak Resume fall 2015Thomas Redznak Resume fall 2015
Thomas Redznak Resume fall 2015
 
Dinesh Bhatt
Dinesh BhattDinesh Bhatt
Dinesh Bhatt
 
Saikat Basu-CV
Saikat Basu-CVSaikat Basu-CV
Saikat Basu-CV
 
Scheduling_09.pptx
Scheduling_09.pptxScheduling_09.pptx
Scheduling_09.pptx
 
Manoj_Jawale_CV
Manoj_Jawale_CVManoj_Jawale_CV
Manoj_Jawale_CV
 
GRE PM - proposal for MDDA
GRE PM - proposal for MDDAGRE PM - proposal for MDDA
GRE PM - proposal for MDDA
 
Surender Reddy
Surender ReddySurender Reddy
Surender Reddy
 

Último

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Último (20)

Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 

PDCM Enterprise

  • 1. Pavement Design Construction and Materials Michigan Technological University
  • 2. PDCM Overview Pavement Design Construction and Materials Group Member | Spring 2006 through Spring 2008 The goal of the Enterprise program is to get students involved and working with industry on real industry projects. This Enterprise was formed by a generous donation from Bob Thompson in 2000. Visit www.pavementscholars.mtu.edu for more information. The Enterprise two year project based curriculum compensates for the Senior Design project. Each year PDCM also hosts in-house versions of the national level Bidding and Asphalt Design competitions that the Enterprise has seen strong success in winning regional and national first place finishes.
  • 3. Leadership Executive Board Treasurer | Fall 2007 Class Representative | Several Terms Awards Scholarship Recipient | Spring 2008 Scholarship Recipient | Spring 2007 Scholarship Recipient | Fall 2006 Member of the Month| Two Times -Scholarship availability varied from year to year Adopt-A-Highway Volunteer | Two Times
  • 4. Project Team Pavement Management Business Plan Team Member | Spring 2008 Objective: To develop a profitable business plan for the Enterprise based on Asphalt Pavement Management using PASER rating methodology and to identify associated startup costs, overhead and labor expenses, and related client fees related to a venture of this sort. Outcome: A recommendation report was submitted to the PDCM Advisory Board. The project was later eliminated due to complexities not desired by the Enterprise at this time.
  • 5. Project Team Real Time Quality Control Roadbed Assessment Transmitter Project Manager | Spring 2007 Project Manager| Fall 2007 Objective: To develop a wireless concrete maturity meter in collaboration with the Integrated Microsystems Enterprise. The PDCM commitment was to develop a casing that would protect the electronics from the corrosive environment of concrete while helping it fit into the aggregate matrix. Outcome: A dodecahedron shape casing molding process using epoxy was developed and the electronic was cased and successfully transmitted test signals from within a small batch of concrete.
  • 6. Project Team Real Time Quality Control Roadbed Assessment Transmitter Project Manager | Spring 2007 Project Manager| Fall 2007 Images of Casing:
  • 7. Project Team City of Houghton Capital Improvement Plan Team Member| Fall 2006 Objective: To PASER rate the City of Houghton road network and input the data into RoadSoft GIS for analysis to develop a pavement asset management plan. Outcome: Fall 2006 was the third year of data points where a deterioration curve was starting to present itself. A report and pavement management recommendations were submitted to the PDCM Advisory Board
  • 8. Project Team City of Houghton Capital Improvement Plan Team Member| Fall 2006 Images:
  • 9. Project Team Madeline Island Capital Improvement Plan Team Member| Spring 2006 Objective: To PASER rate the Madeline Island road network and input the data into RoadSoft GIS for analysis to develop a pavement asset management plan for specific roads. Outcome: The data was collected and analyzed. A recommendation for the requested roads was formed and submitted to the PDCM Advisory Board.
  • 10. In Closing Overall the time I spent in PDCM was very educational. I was exposed to asphalt pavement design, asphalt pavement management, estimating, and to electronics and concrete maturity meters during the interdisciplinary work with the Integrated Microsystems Enterprise. I am willing to share more information on the program at your request. If you have work that the Enterprise may be able to conduct of just want to learn more, their contact information can be found at www.pavementscholars.mtu.edu or I can refer you to a contact in the organization.