TURKEY THICKET /BROOKLAND MIDDLE SCHOOL
                      FREQUENTLY ASKED QUESTIONS
The DC Department of General Services (DGS), Department of Parks and Recreation (DPR), and DC Public
Schools (DCPS) have held two (2) community meetings to discuss design concepts and community
requests for the construction of a new Brookland Middle School and upgrades to Turkey Thicket Park.
The concepts resulted from collaborative meetings between the relevant DC agencies, a School
Improvement Team, and community input.

Below are answers to many of the community’s questions related to the projects:

DESIGN AND CONSTRUCTION
1. Will the new school definitely be built adjacent to the Rec Center? If not, when will a decision be
   made on where the school gets built?
   The ultimate goal is to build the school in a manner that best utilizes both facilities on District-
   owned land. At this time, the design concepts are being developed by the architects, which will be
   shared with the community.

2. What led to the decision to explore a co-located design concept?
   The initial concept designs for the middle school displayed several challenges with building a new
   modern-day middle school at the site. Examples include: proximity to nearby one-story houses,
   achieving safe student drop-off, limited available space for school parking, direct abutment with
   tennis courts which limit access to the park, and a somewhat awkward relationship with the
   recreation center. After reviewing several ways the land could be used for both recreation and a
   school, an approach that placed both buildings along 10th St NE appeared to be the best option. This
   approach maintains the existing outdoor recreation spaces and their relationships, while also
   providing opportunities for the school and recreation center to potentially share spaces such as
   gymnasium, an auditorium, and dining space. The other options explored can be seen at:
   http://www.slideshare.net/dgscomm/brookand-tt-community-meeting-slides-2013-0314

3. Why was Brookland chosen as the site for a new middle school instead of another property?
   After several years working with the Ward 5 Council on Education and establishing a need for an
   arts-focused middle school in Ward 5, DCPS initially vetted three DCPS locations: Hamilton,
   Brookland and Backus. Backus was eliminated when UDC confirmed their intent to continue using
   it. Brookland was preferred over Hamilton because of its northern location within the ward, as there
   are ample middle school seats in the southern portion at McKinley MS, Wheatley EC and Brown EC.
   Taft was never considered, as it has been leased to a charter school. Community input also
   indicated a desire for Brookland due to the central location, Metro accessibility and potential Turkey
   Thicket proximity.

4. We value green space. How much will be lost with the new school?
   Depending on the site selected, loss of green space ranges between zero and one acre.




                                                   1
5. Placing a school entrance on 10th Street NE could be problematic due to Metro bus routes. Has a
   traffic study been performed in this process?
   A traffic study of all streets surrounding the park/school site is currently being performed by the
   design team and will be incorporated into the decision on where to place the school and how to
   best incorporate parking and drop-off/pickup into the site layout.

6. Is underground parking being considered for the projects?
   Yes. As the site continues being studied for space available to meet all needs of the school and rec
   center, underground parking is being considered if there is not enough space for surface parking to
   support both facilities.

7. Who is the architect selected for the school project?
   The architect team of Hartman-Cox/Grimm+Parker was selected utilizing DGS’s standard
   procurement evaluation criteria for architects on major modernization projects. Factors include
   experience on similar projects, project personnel, project-specific design approach, experience with
   fast-track project delivery, and compliance with DC local hiring and local business inclusion policies.

8. Has a building program been developed for the school to be incorporated into the design?
   Yes. A set of Education Specifications has been developed by DCPS. A copy can be seen here:
   http://dcps.dc.gov/DCPS/Parents+and+Community/Community+Initiatives/Ward+5+Great+Schools+
   Initiative

9. A RFP went out for design build contractor. Who won the bid and for how much?
   Bids have been received and will be evaluated to determine the winning bid.

TURKEY THICKET PLAYGROUND PROJECT

10. What is happening with the Turkey Thicket modernization design that was to be implemented this
    summer?
    Should the agencies decide to keep the school near its current location, the Turkey Thicket
    modernization will move forward.

11. Will the budget for the playground project be affected?
    The budget for playground will not be affected.

12. What is the budget for the playground?
    The playground budget for Turkey Thicket will be determined based on the final concept and the
    selection of the contractor.

BUDGET

13. How much of the $50M budget for Brookland MS is for construction costs?
    At this time the design team has been tasked with designing a building that can be constructed for
    approximately $38M. The remaining costs are used to cover project “soft costs” such as furnishings,
    equipment, design and professional fees, permits, utility fees and project contingency for currently
    unknown site conditions.


                                                    2
14. Is $50M enough to build the school without being co-located?
    Yes, based on early estimates.

OPERATIONAL

15. Co-location or not, how do DCPS and DPR foresee their individual users interacting during the
    school day? How will proper security be maintained?
    We are in the early stages of these discussions. Additionally, any school location within the site
    needs to address how students would have safe, direct access from the school to the park fields for
    occasional daytime use. DCPS and DPR will work out a Memorandum of Understanding (MOU) will
    be created. Once the details are finalized we will share with the community.

16. What impact will this have on toddlers and their parents who use the outdoor park during the
    day?
    As stated above, the agencies are working with the designers to ensure whichever design chosen
    ensures students occasionally walking from the school to the playing fields can do so in a manner
    that maintains secure use of the playground. More details on these design approaches will be
    shared once a school location has been finalized and the site plans develop.

17. What impact will this have on charter schools that use the recreation center during the day?
    The recreation center and park are DC-owned public properties available to all District residents and
    charter schools who file proper permits and/or MOU to use such facilities. The arrival of the middle
    school onsite will not change that, but will likely require more coordination and schedule planning to
    ensure all who want to use the park have the opportunity to do so.

18. What happens to the walking groups that utilize Turkey Thicket field during the day? Will it be
    restricted because kids are on the site?
    The goal is not to affect use of the walking exercise trail during the day. This will be further explored
    in the development of the MOU between DPR and DCPS regarding usage.

19. Why do we need eight (8) tennis courts? Can we have four (4) courts and use additional space for
    green space?
    Maintaining the eight (8) tennis courts is a requirement of DPR.

COMMUNITY ENGAGEMENT

20. What is the actual role of the School Improvement Team (SIT) and are they required to do any
    community outreach?
    School Improvement Teams (SITs) are established for each school renovation/modernization
    project. The SITs’ main focus is to provide input and feedback on the Educational Specifications (Ed
    Specs) and the project’s schematic design. The SIT is not required to do any community outreach.

21. What community input has gone into the designs thus far? Where can the community see
    presentations made to the School Improvement Team (SIT)?
    For the Turkey Thicket modernizations, DPR held two community meetings in Winter 2012 to gather
    initial input on desired upgrades and then shared a concept design by Studio 39 Architects before it


                                                     3
went into implementation. In addition, online surveys were used to gather initial input and then
    feedback on the design concept developed.

    Community involvement on the Ward 5 Great Schools Initiative, tasked with improving Ward 5
    middle grades DCPS education options, formally began in the summer of 2011. This initiative was a
    response to community concerns, especially as shared by the Ward 5 Council on Education. As part
    of the Ward 5 Great Schools Initiative, DCPS announced plans to locate a new middle school at the
    Brookland site in March 2012. After DCPS decided to move forward with Brookland MS, an initial SIT
    of 15-20 community members and DCPS personnel was formed in September 2012 and met twice to
    provide feedback on the program/Educational Specifications before an architect was engaged to
    begin design in December 2012. Initial site layout concepts were presented in January 2012. The co-
    location design approach was shared with the SIT for the first time at the community-wide meeting
    on February 26, 2013. Copies of previous Brookland SIT presentations and more information on the
    Ward 5 Great Schools Initiative can be found on the DCPS website at:
    http://dcps.dc.gov/DCPS/Parents+and+Community/Community+Initiatives/Ward+5+Great+Schools+
    Initiative

22. How will the community be further engaged in this design and decision process?
    The next community meeting will occur in 2-3 weeks to share which site design has been selected
    for implementation. Conversations will then focus on developing that site plan to best
    accommodate both the school and the park. Use of the recreation amenities will also be an area
    requiring community feedback.

23. Are there any environmental concerns with demolishing the existing school building?
    As with many DCPS modernizations, all hazardous materials (i.e. asbestos, lead paint) will be
    identified, documented, and then abated per federal regulations under the supervision of an
    industrial hygienist so that no hazardous materials get released during demolition work.

24. Does this project require review from DC State Historic Preservation Office (SHPO)?
    Because the building (built in 1975) is less than 50 years old, and it is not in a DC Historic District, DC
    SHPO does not anticipate having any concerns with respect to the built environment on this project
    and thus will not require a Determination of Eligibility or Historical Resources Survey. However,
    SHPO is still required to review the project during the permitting process for things like archaeology.




                                                      4

More Related Content

More from DC Department of General Services

Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)DC Department of General Services
 
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...DC Department of General Services
 
Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)DC Department of General Services
 
Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)DC Department of General Services
 
Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)DC Department of General Services
 
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)DC Department of General Services
 
Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)DC Department of General Services
 
Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)DC Department of General Services
 
Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)DC Department of General Services
 
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)DC Department of General Services
 
Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)DC Department of General Services
 
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...DC Department of General Services
 
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)DC Department of General Services
 
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)DC Department of General Services
 
Friendship Recreation Center Meeting Presentation (July 26, 2016)
Friendship Recreation Center Meeting Presentation (July 26, 2016)Friendship Recreation Center Meeting Presentation (July 26, 2016)
Friendship Recreation Center Meeting Presentation (July 26, 2016)DC Department of General Services
 

More from DC Department of General Services (20)

Marie Reed Construction Project Update (May 5, 2017)
Marie Reed Construction Project Update (May 5, 2017)Marie Reed Construction Project Update (May 5, 2017)
Marie Reed Construction Project Update (May 5, 2017)
 
Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)
 
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
 
Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)
 
Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)
 
Marie Reed Project Update (February 24, 2017)
Marie Reed Project Update (February 24, 2017)Marie Reed Project Update (February 24, 2017)
Marie Reed Project Update (February 24, 2017)
 
Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)
 
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
 
Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)
 
Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)
 
Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)
 
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
 
Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)
 
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
 
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
 
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
 
Lafayette School - SIT Meeting Presentation (July 27, 2016)
Lafayette School - SIT Meeting Presentation (July 27, 2016)Lafayette School - SIT Meeting Presentation (July 27, 2016)
Lafayette School - SIT Meeting Presentation (July 27, 2016)
 
Benning Park Meeting Presentation (July 28, 2016)
Benning Park Meeting Presentation (July 28, 2016)Benning Park Meeting Presentation (July 28, 2016)
Benning Park Meeting Presentation (July 28, 2016)
 
Friendship Recreation Center Meeting Presentation (July 26, 2016)
Friendship Recreation Center Meeting Presentation (July 26, 2016)Friendship Recreation Center Meeting Presentation (July 26, 2016)
Friendship Recreation Center Meeting Presentation (July 26, 2016)
 
Lafayette School SIT Meeting Presentation (June 1, 2016)
Lafayette School SIT Meeting Presentation (June 1, 2016)Lafayette School SIT Meeting Presentation (June 1, 2016)
Lafayette School SIT Meeting Presentation (June 1, 2016)
 

Recently uploaded

26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct CommiteemenRoberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemenkfjstone13
 
25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxjohnandrewcarlos
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...Diya Sharma
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadershipanjanibaddipudi1
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfLorenzo Lemes
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docxkfjstone13
 
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership AwardN. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership Awardsrinuseo15
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docxkfjstone13
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfFahimUddin61
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书Fi L
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceDelhi Call girls
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceDelhi Call girls
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackPsychicRuben LoveSpells
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...Axel Bruns
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Pooja Nehwal
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKISHAN REDDY OFFICE
 

Recently uploaded (20)

26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf26042024_First India Newspaper Jaipur.pdf
26042024_First India Newspaper Jaipur.pdf
 
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct CommiteemenRoberts Rules Cheat Sheet for LD4 Precinct Commiteemen
Roberts Rules Cheat Sheet for LD4 Precinct Commiteemen
 
25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf25042024_First India Newspaper Jaipur.pdf
25042024_First India Newspaper Jaipur.pdf
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
How Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdfHow Europe Underdeveloped Africa_walter.pdf
How Europe Underdeveloped Africa_walter.pdf
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership AwardN. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
N. Chandrababu Naidu Receives Global Agriculture Policy Leadership Award
 
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdf
 
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
如何办理(BU学位证书)美国贝翰文大学毕业证学位证书
 
29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf29042024_First India Newspaper Jaipur.pdf
29042024_First India Newspaper Jaipur.pdf
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
 
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Iffco Chowk Gurgaon >༒8448380779 Escort Service
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
Call Girls in Mira Road Mumbai ( Neha 09892124323 ) College Escorts Service i...
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 

Brookland & Turkey Thicket Community Meeting FAQ Sheet (03 23-2013)

  • 1. TURKEY THICKET /BROOKLAND MIDDLE SCHOOL FREQUENTLY ASKED QUESTIONS The DC Department of General Services (DGS), Department of Parks and Recreation (DPR), and DC Public Schools (DCPS) have held two (2) community meetings to discuss design concepts and community requests for the construction of a new Brookland Middle School and upgrades to Turkey Thicket Park. The concepts resulted from collaborative meetings between the relevant DC agencies, a School Improvement Team, and community input. Below are answers to many of the community’s questions related to the projects: DESIGN AND CONSTRUCTION 1. Will the new school definitely be built adjacent to the Rec Center? If not, when will a decision be made on where the school gets built? The ultimate goal is to build the school in a manner that best utilizes both facilities on District- owned land. At this time, the design concepts are being developed by the architects, which will be shared with the community. 2. What led to the decision to explore a co-located design concept? The initial concept designs for the middle school displayed several challenges with building a new modern-day middle school at the site. Examples include: proximity to nearby one-story houses, achieving safe student drop-off, limited available space for school parking, direct abutment with tennis courts which limit access to the park, and a somewhat awkward relationship with the recreation center. After reviewing several ways the land could be used for both recreation and a school, an approach that placed both buildings along 10th St NE appeared to be the best option. This approach maintains the existing outdoor recreation spaces and their relationships, while also providing opportunities for the school and recreation center to potentially share spaces such as gymnasium, an auditorium, and dining space. The other options explored can be seen at: http://www.slideshare.net/dgscomm/brookand-tt-community-meeting-slides-2013-0314 3. Why was Brookland chosen as the site for a new middle school instead of another property? After several years working with the Ward 5 Council on Education and establishing a need for an arts-focused middle school in Ward 5, DCPS initially vetted three DCPS locations: Hamilton, Brookland and Backus. Backus was eliminated when UDC confirmed their intent to continue using it. Brookland was preferred over Hamilton because of its northern location within the ward, as there are ample middle school seats in the southern portion at McKinley MS, Wheatley EC and Brown EC. Taft was never considered, as it has been leased to a charter school. Community input also indicated a desire for Brookland due to the central location, Metro accessibility and potential Turkey Thicket proximity. 4. We value green space. How much will be lost with the new school? Depending on the site selected, loss of green space ranges between zero and one acre. 1
  • 2. 5. Placing a school entrance on 10th Street NE could be problematic due to Metro bus routes. Has a traffic study been performed in this process? A traffic study of all streets surrounding the park/school site is currently being performed by the design team and will be incorporated into the decision on where to place the school and how to best incorporate parking and drop-off/pickup into the site layout. 6. Is underground parking being considered for the projects? Yes. As the site continues being studied for space available to meet all needs of the school and rec center, underground parking is being considered if there is not enough space for surface parking to support both facilities. 7. Who is the architect selected for the school project? The architect team of Hartman-Cox/Grimm+Parker was selected utilizing DGS’s standard procurement evaluation criteria for architects on major modernization projects. Factors include experience on similar projects, project personnel, project-specific design approach, experience with fast-track project delivery, and compliance with DC local hiring and local business inclusion policies. 8. Has a building program been developed for the school to be incorporated into the design? Yes. A set of Education Specifications has been developed by DCPS. A copy can be seen here: http://dcps.dc.gov/DCPS/Parents+and+Community/Community+Initiatives/Ward+5+Great+Schools+ Initiative 9. A RFP went out for design build contractor. Who won the bid and for how much? Bids have been received and will be evaluated to determine the winning bid. TURKEY THICKET PLAYGROUND PROJECT 10. What is happening with the Turkey Thicket modernization design that was to be implemented this summer? Should the agencies decide to keep the school near its current location, the Turkey Thicket modernization will move forward. 11. Will the budget for the playground project be affected? The budget for playground will not be affected. 12. What is the budget for the playground? The playground budget for Turkey Thicket will be determined based on the final concept and the selection of the contractor. BUDGET 13. How much of the $50M budget for Brookland MS is for construction costs? At this time the design team has been tasked with designing a building that can be constructed for approximately $38M. The remaining costs are used to cover project “soft costs” such as furnishings, equipment, design and professional fees, permits, utility fees and project contingency for currently unknown site conditions. 2
  • 3. 14. Is $50M enough to build the school without being co-located? Yes, based on early estimates. OPERATIONAL 15. Co-location or not, how do DCPS and DPR foresee their individual users interacting during the school day? How will proper security be maintained? We are in the early stages of these discussions. Additionally, any school location within the site needs to address how students would have safe, direct access from the school to the park fields for occasional daytime use. DCPS and DPR will work out a Memorandum of Understanding (MOU) will be created. Once the details are finalized we will share with the community. 16. What impact will this have on toddlers and their parents who use the outdoor park during the day? As stated above, the agencies are working with the designers to ensure whichever design chosen ensures students occasionally walking from the school to the playing fields can do so in a manner that maintains secure use of the playground. More details on these design approaches will be shared once a school location has been finalized and the site plans develop. 17. What impact will this have on charter schools that use the recreation center during the day? The recreation center and park are DC-owned public properties available to all District residents and charter schools who file proper permits and/or MOU to use such facilities. The arrival of the middle school onsite will not change that, but will likely require more coordination and schedule planning to ensure all who want to use the park have the opportunity to do so. 18. What happens to the walking groups that utilize Turkey Thicket field during the day? Will it be restricted because kids are on the site? The goal is not to affect use of the walking exercise trail during the day. This will be further explored in the development of the MOU between DPR and DCPS regarding usage. 19. Why do we need eight (8) tennis courts? Can we have four (4) courts and use additional space for green space? Maintaining the eight (8) tennis courts is a requirement of DPR. COMMUNITY ENGAGEMENT 20. What is the actual role of the School Improvement Team (SIT) and are they required to do any community outreach? School Improvement Teams (SITs) are established for each school renovation/modernization project. The SITs’ main focus is to provide input and feedback on the Educational Specifications (Ed Specs) and the project’s schematic design. The SIT is not required to do any community outreach. 21. What community input has gone into the designs thus far? Where can the community see presentations made to the School Improvement Team (SIT)? For the Turkey Thicket modernizations, DPR held two community meetings in Winter 2012 to gather initial input on desired upgrades and then shared a concept design by Studio 39 Architects before it 3
  • 4. went into implementation. In addition, online surveys were used to gather initial input and then feedback on the design concept developed. Community involvement on the Ward 5 Great Schools Initiative, tasked with improving Ward 5 middle grades DCPS education options, formally began in the summer of 2011. This initiative was a response to community concerns, especially as shared by the Ward 5 Council on Education. As part of the Ward 5 Great Schools Initiative, DCPS announced plans to locate a new middle school at the Brookland site in March 2012. After DCPS decided to move forward with Brookland MS, an initial SIT of 15-20 community members and DCPS personnel was formed in September 2012 and met twice to provide feedback on the program/Educational Specifications before an architect was engaged to begin design in December 2012. Initial site layout concepts were presented in January 2012. The co- location design approach was shared with the SIT for the first time at the community-wide meeting on February 26, 2013. Copies of previous Brookland SIT presentations and more information on the Ward 5 Great Schools Initiative can be found on the DCPS website at: http://dcps.dc.gov/DCPS/Parents+and+Community/Community+Initiatives/Ward+5+Great+Schools+ Initiative 22. How will the community be further engaged in this design and decision process? The next community meeting will occur in 2-3 weeks to share which site design has been selected for implementation. Conversations will then focus on developing that site plan to best accommodate both the school and the park. Use of the recreation amenities will also be an area requiring community feedback. 23. Are there any environmental concerns with demolishing the existing school building? As with many DCPS modernizations, all hazardous materials (i.e. asbestos, lead paint) will be identified, documented, and then abated per federal regulations under the supervision of an industrial hygienist so that no hazardous materials get released during demolition work. 24. Does this project require review from DC State Historic Preservation Office (SHPO)? Because the building (built in 1975) is less than 50 years old, and it is not in a DC Historic District, DC SHPO does not anticipate having any concerns with respect to the built environment on this project and thus will not require a Determination of Eligibility or Historical Resources Survey. However, SHPO is still required to review the project during the permitting process for things like archaeology. 4