BPSim Webinar
Presents
Cover 1
Business Process Simulation
Webinar:
Exploring the Temporal
& Control Perspectives
– Using Example 2 (Originating a Home Loan)
from the BPSim Implementation Guide –
Presenter: Lloyd Dugan
For BPSim Webinar Use Only
BPSim Webinar
• Learning Objectives
• Process Analysis Using Simulation (Temporal & Control Perspectives)
– Simulating Business Processes Modeled in BPMN
(Overview of Simulation and BPSim)
– Sample Process Walkthrough of Temporal & Control Perspectives
(Process Simulation, Diagnosis, and Redesign Example)
– Simulation Parameters in BPMN Models
(Loan Process Model Example)
– Simulation of Loan Process Model
(Demonstration of Temporal & Control Perspectives in the As-Is Analysis)
– Simulation Diagnostics & Process Redesign
(Demonstration of Temporal & Control Perspectives in the To-Be Redesign)
• Summary
• Questions & Answers
• Simulation Tools Showcased in this Webinar
• Presenter Bio
2
Outline
For BPSim Webinar Use Only
BPSim Webinar
• At the end of this webinar, you will know…
– Purposes of process analysis through simulation, relating the reasons
for simulating processes to specific aspects of the model
– Key concepts of simulation with BPMN models, focusing on the
temporal perspective, work queues, and processing times
• Note: Assumes basic understanding of core BPMN concepts
– Process model element simulation parameters (structural parameters)
and process performer simulation parameters (non-structural
parameters), connecting them to the behaviors of the model
– Simulation of a process model can be used to diagnose performance
problems, and lead to remediation of performance problems
– Recognizing patterns of performance problems and typical solutions
to those patterns as surfaced through process simulation
3
Learning Objectives
For BPSim Webinar Use Only
BPSim Webinar 4
Simulating Business Processes
Modeled in BPMN
(Overview of Simulation and BPSim)
For BPSim Webinar Use Only
BPSim Webinar
Analyze the business
process through simulation
of its corresponding model
to answer specific questions!
Analyze the business
process through simulation
of its corresponding model to
answer specific questions!
5
Process Analysis Using
Simulation
Analyze the business process
through simulation of its
corresponding model to
answer specific questions!
For BPSim Webinar Use Only
BPSim Webinar
• Business process model represents an abstract approximation of an
actual business process
– For example, one done in BPMN
– But: “All Models Are Wrong, Though Some Are Useful” – George Box (famous
mathematician and statistician)
• Business process is characterized by measurable performance
characteristics, such as those in the temporal perspective
– Time it takes to execute individual constituent activities (cycle time)
– Time it takes to execute through all constituent activities (time-in-system)
– Leftover work from inability to finish within allotted work time work-in-progress (WIP)
• Simulation provides the means by which to measure performance
characteristics of the process using the model instead of the real thing!
6
Simulation of a Business
Process
For BPSim Webinar Use Only
BPSim Webinar
Parameterization of a Business Process Model from different
perspectives for process analysis, simulation, and optimization purposes
7
Process Simulation Perspectives
Resource Cost
Time
Property
Process
Priority
- Graphic pprepared by Denis
Gagne, Founder of Trisotech and
the Business Process Incubator
The Business Process Simulation
(BPSim) Specification:
• Supports both inputs (parametric data)
into a simulation and outputs (result set)
of a simulation
• Maps to modeling notation concepts and
semantics, including schemas, for BPMN
2.0 (from OMG) and XPDL (from WfMC)
• Is consistent with core simulation
concepts and principles
• Provides consistent simulation model
interchange among tools
Control
Today’s
Focuses
For BPSim Webinar Use Only
BPSim Webinar
• (1) Confirmation of the Operational Behaviors of the Model:
– (1A) Compliance With the Semantics of the Modeling Language
• Does the simulation generate correct operational behaviors with respect to the
language used to model the business process?
– (1B) Fidelity With Respect To the Modeled Business Process
• Does the simulation yield performance results similar to what is actually
experienced for the business process?
• (2) Analysis of the Operational Behaviors of the Model:
– (2A) Identify Performance Problems of the Process
• Do the simulation results lead to the identification of the underlying sources of
performance problems of the as-is process?
– (2B) Facilitate Reengineering of the Process
• Does the simulation support what-if and sensitivity analyses through the design
and re-parameterization of the to-be process?
8
Purposes of Simulation
Color-Coding of Bullets Maps To Simulation Results Shown Later
For BPSim Webinar Use Only
BPSim Webinar
• Structural Aspects of a Model that Relate To
Simulation
– Process model structure channels the flow of a process
instance through one or more activities/events by way of one
or more routes via control flow and assignment flow
– Combination of performance characteristics for channel
routes and executed activities/events define and constrain the
overall operational performance of the process
9
Process Models and Simulations
• Non-structural Aspects of a Model that Relate
To Simulation
– Performers (as resources) are consumed when an activity
occurs, which can be constrained based on parameters
– Execution of activities/events, and therefore collectively for
a process, have costs that can be calculated
Arrival:
Receive Work Item
Work Item
Difficulty?
Activity #1A:
Analyze
Complex Item
Complex
Activity #1B:
Analyze
Simple Item
Simple
Activity #2:
Review Item
Analysis
End:
Complete Process
Arrival:
Receive Work Item
Work Item
Difficulty?
Activity #1A:
Analyze
Complex Item
Complex
Activity #1B:
Analyze
Simple Item
Simple
Activity #2:
Review Item
Analysis
End:
Complete Process
For BPSim Webinar Use Only
BPSim Webinar 10
Sample Process Walkthrough
of Temporal & Control Perspectives
(Process Simulation, Diagnosis, and Redesign Example)
For BPSim Webinar Use Only
BPSim Webinar
Work Item
Timing
Activity #1
(3 mins./item)
Activity #2
(2 mins./item)
Time
(:min.)
Arrival
Work Item #
Resource A
Work Item #
Resource B
Work Item #
Resource C
Work Item #
:00 - - - -
:01 1 1 - -
:02 - 1 - -
:03 2 1 2 -
:04 - - 2 1
:05 3 3 2 1
:06 - 3 - 2
:07 4 3 4 2
11
Process Walkthrough
– Baseline Configuration
Assumptions:
• Work day starts out with empty queues
• Work item arrives every other min.
• Each work item requires the same Activity #1 time
• Each work item requires the same Activity #2 time
• Resources are unconstrained (i.e., available as needed)
Arrival:
Receive Work Item
Activity #1:
Analyze Work
Item
Activity #2:
Review Item
Analysis
End:
Complete Process
Baseline
Configuration
+
No Work Item
Duration
Variation
Observations:
• Work item avgs. 5 mins. total (sum of durations)
• 2 work items were completed in first 7 mins.
• Only 1 work item is WIP in first 7 mins.
For BPSim Webinar Use Only
BPSim Webinar
Work Item
Timing
Activity #1
(3 mins. simple or 5 mins. complex/item)
Activity #2
(2 mins./item)
Time
(:min.)
Arrival Work
Item #
Resource A
Work Item #
Resource B
Work Item #
Resource C
Work Item #
:00 - - - -
:01 1 1 - -
:02 - 1 - -
:03 2 1 2 -
:04 - - 2 1
:05 3 3 2 1
:06 - 3 2 -
:07 4 3 2 -
12
Process Walkthrough
– Work Item Variation
Assumptions:
• Work day starts out with empty queues
• Work item arrives every other min.
• Each work item varies in the Activity #1 time
• Each work item requires the same Activity #2 time
• Resources are unconstrained (i.e., available as needed)
Arrival:
Receive Work Item
Activity #1:
Analyze Work
Item
Activity #2:
Review Item
Analysis
End:
Complete Process
Baseline
Configuration
+
Work Item
Duration
Variation
Observations:
• Work item avgs. >5 minutes total (sum of durations)
• Only 1 work item was completed in first 7 mins.
• 2 work items are WIP in first 7 mins.
For BPSim Webinar Use Only
BPSim Webinar
Timing Task 1A - Complex
(3 mins./item)
Task 1B - Simple
(3 mins./item)
Task 2 (2 mins./item)
Time
(:min.)
Arrival Work
Item #
Resource A
Work Item #
Resource B
Work Item #
Resource C
Work Item #
:00 - - - -
:01 1 - 1 -
:02 - - 1 -
:03 2 2 1 -
:04 - 2 1
:05 3 2 3 1
:06 - - 3 2
:07 4 4 3 2
13
Process Walkthrough
– Triage Configuration
Arrival:
Receive Work Item
Work Item
Difficulty?
Activity #1A:
Analyze
Complex Item
Complex
Activity #1B:
Analyze
Simple Item
Simple
Activity #2:
Review Item
Analysis
End:
Complete Process
Triage
Configuration
+
No Work Item
Duration
Variation
Assumptions:
• Work day starts out with empty queues
• Work item arrives every other min.
• Each work item requires the same Activity #1A/#1B time
• Each work item requires the same Activity #2 time
• Resources are unconstrained (i.e., available as needed)
Observations:
• Work item avgs. 5 mins. total (sum of durations)
• 2 work items were completed in first 7 mins.
• Only 1 work item is WIP in first 7 mins.
For BPSim Webinar Use Only
BPSim Webinar 14
Simulation Parameters in
BPMN Models
(Loan Process Model Example)
For BPSim Webinar Use Only
BPSim Webinar
Simulation Parameters Match
Behaviors of BPMN Elements
For BPSim Webinar Use Only 15
Boundary Event interrupts
execution of attached-to
activity if defined condition
is met (e.g., duration takes
more than 1 hour)
Start Event and Intermediate
Catching Event have an Inter-
trigger Timer that is the occurrence
rate (e.g., rate of arrivals)
End Events and
Intermediate Throwing
Events have no
parameters
Probability is assigned to
exclusive branching paths
that must sum to 1
Activities have
processing times only
with no constraints on
resources or implicit lag
times in execution of
instances
Loan Process Model Example
NOTE: Values used as
simulation parameters
can come from historical
data, time-and-motion
studies, and best guesses
BPSim Webinar
• Simulation parameters can incorporate uncertainty ... or not
– Probabilistic values are defined by a mean (or average) and distribution that has a
standard deviation from it
– Static values are fixed for the duration of the simulation
• Simulation parameters as probabilistic values
– Expected value = mean value that is expected to occur for a random instance from
a population of instances
– Distribution = defines the probability of a particular value for an instance occurring
within a population of instances
– Standard Deviation = a measure of the variation of possible values for an instance
away from the mean
• Simulation parameters must be correctly matched with the
appropriate elements within the model
16
Simulation Parameters
and Statistics
For BPSim Webinar Use Only
BPSim Webinar 17
Common Distributions
for Activities and Events
Normal (Gaussian) Distribution: Distribution used to reflect the
“normal” variation within a population of things being counted or
measured, which is typically the default distribution to be used due
to its suitability for use with most organic and mechanical activities
Probability
Distribution
Triangular Distribution: Distribution used to reflect the variation
between minimum and maximum values with a peak (mode) value
somewhere in between, all of which are easier to determine with a
population size that is too small for use with the Normal Distribution
For BPSim Webinar Use Only
Mean
(Average)
Probability
Distribution
Min Mode Max
Standard Deviations
BPSim Webinar 18
Simulation of Loan Process Model
(Demonstration of Temporal & Control Perspectives in the As-Is Analysis)
For BPSim Webinar Use Only
BPSim Webinar
Originate Home Loan Process
• Pre-condition: Beginning of a standard work week (5 business days at 8 hours per day) with no
WIP in the pipeline of the Originate Loan Process for the XYZ Bank
• Process Description (to be modeled in BPMN):
– A Loan Officer receives a completed loan application (from a borrower), and records the application
information.
– A Loan Officer then verifies provided employment information, recording the result of his/her investigation.
– The borrower’s credit score and report are requested of and received from the three credit bureaus in a
consolidated form.
– A Title Researcher searches the county title records for the property in question, and then determines whether
or not the property is correctly listed and free of liens.
– A Loan Officer assembles and reviews the case file (loan application with employment verification, credit
score and report, and title results) to approve or reject the application.
– If rejected, a Loan Officer sends a rejection notice to the borrower, and then closes out the rejected case file.
– If approved, a Loan Officer sends an approval notice to the borrower, and then forwards the case file to an
Underwriter.
– An Underwriter underwrites the loan based on the case file, returning it to the Loan Officer, but if this takes
more than an hour, then standard loan terms are assigned.
– The Loan Officer then closes out the approved case file.
• Post-condition: End of a standard work week with minimal WIP still in the pipeline
19
Simulation Use Case
For BPSim Webinar Use Only
BPSim Webinar
• Process Performance Goals and Measures (as
established by XYZ Bank Management):
– No problematic backlog at the end of a standard 5 business days week
(acceptable WIP only)
– QoS Targets:
• Minimum: Weighted average turn-around time for a loan (across all accepted and
rejected loans) should be no more than 2.5 hours (150 minutes)
• Stretch: No loan should take more than 3 hours (180 minutes) to process
• Reengineering Imperative Established By XYZ
Bank Management For the To-Be Redesign:
– Analyze process to identify any leverage points for achieving process
performance goals and measures
– Targeted change(s) to process to ensure process performance goals and
measures are achieved
Simulation Use Case – Goals
and Performance Measures
For BPSim Webinar Use Only 20
BPSim Webinar
• Parametric Data For Simulation (as determined by TPS Reports, Inc.):
– 30 applications arrive per day (on avg.) <for the Receive Loan Application Start Event (the process trigger)>
– 8 out of the 30 are approved (on avg.) and about a fifth of the rejections have very low credit scores <for control flow>
– Credit score receipt is within 4 to 6 minutes of request, but is usually 5 mins <for the Intermediate Catching Event>
– Average duration times for activities are listed below: <for parameterizing activities>
21
Simulation Use Case –
Parameters
Activity Name Approval Path Rejection Path
Record Loan Application 20
Verify Employment 30
Perform Title Search 60
Review Title Report 20
Review Loan Application 30
Send Rejection Letter 1 (system constant)
Close-Out Rejection 5
Send Approval Letter 1 (system constant)
Underwrite Loan With Terms 50 (max of 60)
Set With Default Terms (if applicable) 1 (system constant)
Close-Out Approval 10
TOTAL (Averages and Constants) 191 or 202 136
Totals 80
for the parallel
thread
Max is 80
for all
parallel
threads
Measured weighted
average of time-in-
system for approved
and rejected loans is
about 150 minutes
with a maximum of
well over 180 minutes
Measured incidence
of WIP is that it
occurs in modest
weekly increments
For BPSim Webinar Use Only
BPSim Webinar 22
Simulation Use Case –
Initial Model
What are the Counts for each pair
of outcomes, and is there backlog
or merely WIP in the pipeline?
What is the average and maximum
Time-in-System (weighted sum of
cycle times) for a Loan
Application?
Run the simulation to
answer these questions
For BPSim Webinar Use Only
BPSim Webinar 23
Simulation Use Case –
1st Result (Failed)
What are the Counts for each pair of
outcomes, and is there backlog or
merely WIP in the pipeline?
What is the average and maximum
Time-in-System (weighted sum of
cycle times) for a Loan Application?
Unable to answer these
questions because this
catching event was not
parameterized as needed
for its BPMN behavior,
preventing process
instances from advancing,
so fix and rerun simulation
5 minutes
(on
average)
Simulation Purpose (1A): Compliance With
the Semantics of the Modeling Language!!!
For BPSim Webinar Use Only
BPSim Webinar
Simulation Use Case –
2nd Result (Successful)
For BPSim Webinar Use Only 24
What are the Counts for each pair of
outcomes, and is there backlog or
merely WIP in the pipeline?
What is the average and maximum
Time-in-System (weighted sum of
cycle times) for a Loan Application?
WIP: Time-in-System Avg. Time-in-System
Max.
132 - (93+32) = 7 149.7 mins. 223.6 mins.
Consistent With Measured Historical Data
132
Received
93
Closed
32
Closed
Simulation Purpose (1B): Fidelity With
Respect To the Modeled Business Process!!!
BPSim Webinar 25
Simulation Diagnostics & Process Redesign
(Demonstration of Temporal & Control Perspectives in the To-Be Redesign)
For BPSim Webinar Use Only
BPSim Webinar
• Performance Problems Surfaced Through the
Temporal Perspective
– Long time-in-system => is this an internal QoS violation or an external service
level agreement (SLA) failure?
– Large backlog/WIP => is there a cause of backlog as new work not getting
done (e.g., a bottleneck) or is it just acceptable WIP in the pipeline?
26
What Can Simulation Show?
• Structural Changes Informed Through the Temporal
Perspective
– Revise the process structure (i.e., the sequence of activities) to streamline the
flow of work <see applicable reengineering patterns>
– Change the type of execution mode for activities (e.g., the task type) to reduce
cycle times <see applicable reengineering patterns>
For BPSim Webinar Use Only
BPSim Webinar
Simulation Use Case –
2nd Result (Reprised)
For BPSim Webinar Use Only 27
What are the Counts for each pair of
outcomes, and is there backlog or
merely WIP in the pipeline?
What is the average and maximum
Time-in-System (weighted sum of
cycle times) for a Loan Application?
WIP: Time-in-System Avg. Time-in-System
Max.
132 - (93+32) = 7 149.7 mins 223.6 mins
Consistent With Measured Historical Data
132
Received
93
Closed
32
Closed
Acceptable
WIP?
Simulation Purpose (2A): Identify
Performance Problems of the Process!!!
Room for
Improvement
BPSim Webinar
Diagnostic View
of Simulation Results
Process
Performance
Problem(s)
Sequence Flow Activity/Event
Cost Performer
Duration
Variability
Availability
Role/Selection
Quantity
Unit Cost
Fixed Cost
Arrivals
Work Latency
StructuralNon-structural
Simulation provides data about potential sources of measured performance
problems that relate to structural or non-structural aspects of the process model
28
Order of Work
Combination of
these factors may
be the root cause
of performance
problems!
Root Cause Analysis (Fishbone Diagram or Ishikawa Diagram)
For BPSim Webinar Use Only
BPSim Webinar
Data Capture
• Anti-Pattern: Performance Problem of
Split Data Capture Responsibility
– Capture of data that is input to a process is
captured throughout the process, delaying
the ability to address the data in the process
instance for purposes of routing work,
applying business rules, etc.
• Redesign Pattern: Performance Solution
of Early Data Capture Responsibility
– Capture of data is consolidated and moved
to the front of the process, enabling earlier
treatment of the data by process activities
• Potential Indicator Measures To
Examine:
– Cycle Time or Duration Time
– Time-in-System
– Backlog/WIP
Work Differentiation (Triage)
• Anti-Pattern: Performance Problem of
Undifferentiated Treatment of Work
– All work items move though the same
sequence regardless of the complexity of the
work or the amount of time work items may
require based on the work item
• Redesign Pattern: Performance Solution of
Triaged (Differentiated Treatment) of Work
– Work items are split into different threads for
different treatment by more appropriate sets
of activities and/or more appropriate
performers to streamline the process flow
• Potential Indicator Measures To
Examine:
– Cycle Time or Duration Time
– Time-in-System
– Backlog/WIP
29
Process Redesign – Using
Reengineering Patterns (Part I)
Try moving Request Credit Report and Receive Credit Report events upstream to
catch very low (unreviewable) credit scores before doing other work for the review.
For BPSim Webinar Use Only
BPSim Webinar
Simulation Use Case – Model
With Triage + Early Data
Capture
For BPSim Webinar Use Only 30
What are the Counts for each pair of
outcomes, and is there backlog or
merely WIP in the pipeline?
What is the average and maximum
Time-in-System (weighted sum of
cycle times) for a Loan Application?
WIP Time-in-System Avg. Time-in-System
Max.
132 - (95+30) = 7 141.63 mins. 229.08 mins.
Main Goals Realized But Stretch Goal Still Not Achieved
132
Received
95
Closed
30
Closed
Simulation Purpose (2B): Facilitate
Reengineering of the Process (Part I)!!!
NOTE: Probability parameters changed: 4 out of 30
can be rejected on credit score alone, 18 out of
remaining 26 will be rejected while 8 will be approved
BPSim Webinar
Automation
• Anti-Pattern: Performance Problem of Activity Is
Inefficient
– Typically is a manual or user-mediated activity that is seen
as taking too much time (especially with respect to peer or
contiguous activities), or is generally routine or repetitive
in a manner that is better realized through automation
• Redesign Pattern: Performance Solution of
Automating the Activity
– Offending activity is changed to be supported with
automation (e.g., manual task changed to user task with
user screen(s)) or abstracted out by way of service
invocation (e.g., manual or user task changed to a service
task provisioned through a system or service provider)
• Potential Indicator Measures To Examine:
– Cycle Time or Duration Time
– Time-in-System
– Backlog/WIP
31
Process Redesign – Using
Reengineering Patterns (Part II)
Try automating the Perform Title Search
activity by making it a user-mediated
online search (with user screens), thus
reducing its cycle time and bringing it into
alignment with the parallel activities.
For BPSim Webinar Use Only
BPSim Webinar
Simulation Use Case – Model
With (Automation)
For BPSim Webinar Use Only 32
Simulation Purpose (2B): Facilitate
Reengineering of the Process (Part II)!!!
What are the Counts for each pair of
outcomes, and is there backlog or
merely WIP in the pipeline?
What is the average and maximum
Time-in-System (weighted sum of
cycle times) for a Loan Application?
WIP Time-in-System Avg Time-in-System
Max
132 - (93+34) = 5 97.82 mins 179.24 mins
Stretch Goal Realized and Other Goals Realized or Exceeded
132
Received
93
Closed
34
Closed
BPSim Webinar
• To Summarize...
– Purposes of process simulation relate to specific reasons for
simulating business processes as part of process analysis
– Key concepts of simulation with BPMN models, focusing on the
temporal perspective, work queues, and processing times
– Process model element simulation parameters (structural parameters)
and process performer simulation parameters (non-structural
parameters) are connected to the behaviors in the model
– Simulation of a process model can be used to diagnose performance
problems and to remediate the process via a revised design
– As-is anti-patterns exist and can be addressed with redesign patterns
as processes are reengineered to address performance problems
unearthed through simulation as part of process analysis
33
Summary
For BPSim Webinar Use Only
BPSim Webinar
?
34
Questions & Answers
For BPSim Webinar Use Only
BPSim Webinar
Trisotech –
http://www.trisotech.com/en/index.php
Business Process Incubator –
http://www.businessprocessincubator.com/
Lanner –
http://www.lanner.com/
35
Simulation Tools
Showcased in this Webinar
Business
Process
Incubator
Both are Members of BPSim.org!!!
BPMN Web Modeler (with L-
SIM)
For BPSim Webinar Use Only
BPSim Webinar
• Chief Architect for Business
Process Management, Inc. (BPMI,
www.bpm.com); e-mail:
lloyd@bpm.com
• Senior BPMN SME/Trainer for the
DoD’s Deputy Chief Management
Office (DCMO); e-mail:
ldugan@bizmanagers.com
• Independent Contractor/Sole
Proprietor of LAB Derivations
(BPMN4SCA); e-mail:
ldugan.bpmn4sca@gmail.com
• Co-Founder of Semantic BPMN,
combining and leveraging BPMN
and Semantic Technologies; e-mail:
ldugan.bpmn4sca@gmail.com
• Senior BPMN SME/Chief
Architect for the Process
Modeling Design Center (PMDC)
of the VA’s Office of IT (OIT)
• Member of the Workflow
Management Coalition (WfMC,
www.wfmc.org); co-author
BPMN 2.0 Handbook
• Member of the WfMC’s Business
Process Simulation Working
Group (BPSim, www.bpsim.org)
• Member of the Object
Management Group (OMG)
BPMN Model Interchange
Working Group (MIWG)
• OMG-Certified Expert in
Business Process Management
(BPM) (OCEB) - Fundamental
Presenter Bio: Lloyd Dugan
You Can
Find Me On
For BPSim Webinar Use Only 36

Mais conteúdo relacionado

Mais procurados

Quality management interview questions
Quality management interview questionsQuality management interview questions
Quality management interview questionsselinasimpson2301
 
ARMA Denver Implementing An ECM System Final 6_21_2016
ARMA Denver Implementing An ECM System Final 6_21_2016ARMA Denver Implementing An ECM System Final 6_21_2016
ARMA Denver Implementing An ECM System Final 6_21_2016Craig Young
 
Practical_Business_Rules_Development_and_Use
Practical_Business_Rules_Development_and_UsePractical_Business_Rules_Development_and_Use
Practical_Business_Rules_Development_and_UseMichael Cook
 
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVO
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVODo iT : Failure - Root Cause analysis : Classical approach by C3VIVO
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVOKiran Vairagkar
 
Test case design techniques
Test case design techniquesTest case design techniques
Test case design techniquesAshutosh Garg
 
Software Project Management lecture 7
Software Project Management lecture 7Software Project Management lecture 7
Software Project Management lecture 7Syed Muhammad Hammad
 
Michael Roar Borlund & Christian Carlsen - Real Exploratory Testing, Now With...
Michael Roar Borlund & Christian Carlsen - Real Exploratory Testing, Now With...Michael Roar Borlund & Christian Carlsen - Real Exploratory Testing, Now With...
Michael Roar Borlund & Christian Carlsen - Real Exploratory Testing, Now With...TEST Huddle
 
WebSphere Business Process Simulationon
WebSphere Business Process SimulationonWebSphere Business Process Simulationon
WebSphere Business Process Simulationonrandikaucsc
 
Advancing Testing Using Axioms
Advancing Testing Using AxiomsAdvancing Testing Using Axioms
Advancing Testing Using AxiomsSQALab
 
6 sigma introduction
6 sigma introduction6 sigma introduction
6 sigma introductionGlobal Vision
 
My business processes are deviant! What should I do about it?
My business processes are deviant! What should I do about it?My business processes are deviant! What should I do about it?
My business processes are deviant! What should I do about it?Marlon Dumas
 
14 lessons for successful testing outsourcing
14 lessons for successful testing outsourcing14 lessons for successful testing outsourcing
14 lessons for successful testing outsourcingSQALab
 
Defining Test Competence
Defining Test CompetenceDefining Test Competence
Defining Test CompetenceJohan Hoberg
 
Using Stories to Test Requirements and Systems
Using Stories to Test Requirements and SystemsUsing Stories to Test Requirements and Systems
Using Stories to Test Requirements and SystemsPaul Gerrard
 
Hans-Henrik Olesen - What to Automate and What not to Automate
Hans-Henrik Olesen - What to Automate and What not to AutomateHans-Henrik Olesen - What to Automate and What not to Automate
Hans-Henrik Olesen - What to Automate and What not to AutomateTEST Huddle
 
Maelscrum / Business Story Manager Overview
Maelscrum / Business Story Manager OverviewMaelscrum / Business Story Manager Overview
Maelscrum / Business Story Manager OverviewPaul Gerrard
 

Mais procurados (20)

Quality management interview questions
Quality management interview questionsQuality management interview questions
Quality management interview questions
 
Root cause analysis by: ICG Team
Root cause analysis by: ICG TeamRoot cause analysis by: ICG Team
Root cause analysis by: ICG Team
 
ARMA Denver Implementing An ECM System Final 6_21_2016
ARMA Denver Implementing An ECM System Final 6_21_2016ARMA Denver Implementing An ECM System Final 6_21_2016
ARMA Denver Implementing An ECM System Final 6_21_2016
 
Practical_Business_Rules_Development_and_Use
Practical_Business_Rules_Development_and_UsePractical_Business_Rules_Development_and_Use
Practical_Business_Rules_Development_and_Use
 
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVO
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVODo iT : Failure - Root Cause analysis : Classical approach by C3VIVO
Do iT : Failure - Root Cause analysis : Classical approach by C3VIVO
 
new quality tools
 new quality tools new quality tools
new quality tools
 
Test case design techniques
Test case design techniquesTest case design techniques
Test case design techniques
 
Software Project Management lecture 7
Software Project Management lecture 7Software Project Management lecture 7
Software Project Management lecture 7
 
Michael Roar Borlund & Christian Carlsen - Real Exploratory Testing, Now With...
Michael Roar Borlund & Christian Carlsen - Real Exploratory Testing, Now With...Michael Roar Borlund & Christian Carlsen - Real Exploratory Testing, Now With...
Michael Roar Borlund & Christian Carlsen - Real Exploratory Testing, Now With...
 
WebSphere Business Process Simulationon
WebSphere Business Process SimulationonWebSphere Business Process Simulationon
WebSphere Business Process Simulationon
 
Advancing Testing Using Axioms
Advancing Testing Using AxiomsAdvancing Testing Using Axioms
Advancing Testing Using Axioms
 
6 sigma introduction
6 sigma introduction6 sigma introduction
6 sigma introduction
 
My business processes are deviant! What should I do about it?
My business processes are deviant! What should I do about it?My business processes are deviant! What should I do about it?
My business processes are deviant! What should I do about it?
 
14 lessons for successful testing outsourcing
14 lessons for successful testing outsourcing14 lessons for successful testing outsourcing
14 lessons for successful testing outsourcing
 
Defining Test Competence
Defining Test CompetenceDefining Test Competence
Defining Test Competence
 
Using Stories to Test Requirements and Systems
Using Stories to Test Requirements and SystemsUsing Stories to Test Requirements and Systems
Using Stories to Test Requirements and Systems
 
Root Cause Analysis Presentation
Root Cause Analysis PresentationRoot Cause Analysis Presentation
Root Cause Analysis Presentation
 
Hans-Henrik Olesen - What to Automate and What not to Automate
Hans-Henrik Olesen - What to Automate and What not to AutomateHans-Henrik Olesen - What to Automate and What not to Automate
Hans-Henrik Olesen - What to Automate and What not to Automate
 
Qc story
Qc storyQc story
Qc story
 
Maelscrum / Business Story Manager Overview
Maelscrum / Business Story Manager OverviewMaelscrum / Business Story Manager Overview
Maelscrum / Business Story Manager Overview
 

Semelhante a BPSim The Temporal and Control Perspectives

Business Process Simulation in jBPM
Business Process Simulation in jBPMBusiness Process Simulation in jBPM
Business Process Simulation in jBPMtsurdilovic
 
Business Process Simulation in jBPM
Business Process Simulation in jBPMBusiness Process Simulation in jBPM
Business Process Simulation in jBPMtsurdilovic
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
BPM for business analysts: modelling procedure
BPM for business analysts: modelling procedureBPM for business analysts: modelling procedure
BPM for business analysts: modelling procedureAlexander SAMARIN
 
Unified modeling language basics and slides
Unified modeling language basics and slidesUnified modeling language basics and slides
Unified modeling language basics and slidesvenkatasubramanianSr5
 
Complete guide to manual testing@uma
Complete guide to manual  testing@umaComplete guide to manual  testing@uma
Complete guide to manual testing@umaUma Sapireddy
 
Complete testing@uma
Complete testing@umaComplete testing@uma
Complete testing@umaUma Sapireddy
 
24-scrum.ppt
24-scrum.ppt24-scrum.ppt
24-scrum.pptSTEMEd1
 
Scrum and Agile Software Development
Scrum and Agile Software DevelopmentScrum and Agile Software Development
Scrum and Agile Software Developmentbanerjeerohit
 
Business processeffortestimation
Business processeffortestimationBusiness processeffortestimation
Business processeffortestimationDavut Çulha
 
Agile businessprocessdevelopmentmethodology
Agile businessprocessdevelopmentmethodologyAgile businessprocessdevelopmentmethodology
Agile businessprocessdevelopmentmethodologyDavut Çulha
 
Sequencing ofusecases
Sequencing ofusecasesSequencing ofusecases
Sequencing ofusecasesDavut Çulha
 

Semelhante a BPSim The Temporal and Control Perspectives (20)

Business Process Simulation in jBPM
Business Process Simulation in jBPMBusiness Process Simulation in jBPM
Business Process Simulation in jBPM
 
Business Process Simulation in jBPM
Business Process Simulation in jBPMBusiness Process Simulation in jBPM
Business Process Simulation in jBPM
 
Generic process model
Generic process modelGeneric process model
Generic process model
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
 
BPM for business analysts: modelling procedure
BPM for business analysts: modelling procedureBPM for business analysts: modelling procedure
BPM for business analysts: modelling procedure
 
Business workflow
Business workflowBusiness workflow
Business workflow
 
24 scrum
24 scrum24 scrum
24 scrum
 
Unified modeling language basics and slides
Unified modeling language basics and slidesUnified modeling language basics and slides
Unified modeling language basics and slides
 
Complete guide to manual testing@uma
Complete guide to manual  testing@umaComplete guide to manual  testing@uma
Complete guide to manual testing@uma
 
Complete testing@uma
Complete testing@umaComplete testing@uma
Complete testing@uma
 
24-scrum.ppt
24-scrum.ppt24-scrum.ppt
24-scrum.ppt
 
Scrum and Agile Software Development
Scrum and Agile Software DevelopmentScrum and Agile Software Development
Scrum and Agile Software Development
 
Culha methodology
Culha methodologyCulha methodology
Culha methodology
 
Agile bpm
Agile bpmAgile bpm
Agile bpm
 
Business processeffortestimation
Business processeffortestimationBusiness processeffortestimation
Business processeffortestimation
 
Agile bpsdm
Agile bpsdmAgile bpsdm
Agile bpsdm
 
Iteration base
Iteration baseIteration base
Iteration base
 
Agile bpsdm
Agile bpsdmAgile bpsdm
Agile bpsdm
 
Agile businessprocessdevelopmentmethodology
Agile businessprocessdevelopmentmethodologyAgile businessprocessdevelopmentmethodology
Agile businessprocessdevelopmentmethodology
 
Sequencing ofusecases
Sequencing ofusecasesSequencing ofusecases
Sequencing ofusecases
 

Mais de Denis Gagné

Generative AI and Regulatory Compliance
Generative AI and Regulatory ComplianceGenerative AI and Regulatory Compliance
Generative AI and Regulatory ComplianceDenis Gagné
 
Automating and Orchestrating Processes and Decisions Across the Enterprise
Automating and Orchestrating Processes and Decisions Across the EnterpriseAutomating and Orchestrating Processes and Decisions Across the Enterprise
Automating and Orchestrating Processes and Decisions Across the EnterpriseDenis Gagné
 
Low Code Neuro-Symbolic Agents.pdf
Low Code Neuro-Symbolic Agents.pdfLow Code Neuro-Symbolic Agents.pdf
Low Code Neuro-Symbolic Agents.pdfDenis Gagné
 
Data Validation in a Low-Code Environment
Data Validation in a Low-Code EnvironmentData Validation in a Low-Code Environment
Data Validation in a Low-Code EnvironmentDenis Gagné
 
From Laws and Regulations to Decision Automation
From Laws and Regulations to Decision AutomationFrom Laws and Regulations to Decision Automation
From Laws and Regulations to Decision AutomationDenis Gagné
 
Smart Drug Package Inserts using Clinical Workflows and Decisions
Smart Drug Package Inserts using Clinical Workflows and DecisionsSmart Drug Package Inserts using Clinical Workflows and Decisions
Smart Drug Package Inserts using Clinical Workflows and DecisionsDenis Gagné
 
Deployment, Performance, Agility and Flexibility using Trisotech Digital Dist...
Deployment, Performance, Agility and Flexibility using Trisotech Digital Dist...Deployment, Performance, Agility and Flexibility using Trisotech Digital Dist...
Deployment, Performance, Agility and Flexibility using Trisotech Digital Dist...Denis Gagné
 
Pharma, FHIR, Workflows and Decisions
Pharma, FHIR, Workflows and DecisionsPharma, FHIR, Workflows and Decisions
Pharma, FHIR, Workflows and DecisionsDenis Gagné
 
5 Mins Intro to CMMN
5 Mins Intro to CMMN5 Mins Intro to CMMN
5 Mins Intro to CMMNDenis Gagné
 
Modelling the Preoperative Surgical Journey
Modelling the Preoperative Surgical JourneyModelling the Preoperative Surgical Journey
Modelling the Preoperative Surgical JourneyDenis Gagné
 
BPM+ Health Virtual Coffee: 5 Mins Intro to DMN
BPM+ Health Virtual Coffee: 5 Mins Intro to DMNBPM+ Health Virtual Coffee: 5 Mins Intro to DMN
BPM+ Health Virtual Coffee: 5 Mins Intro to DMNDenis Gagné
 
Intelligent Assistance for Knowledge Workers.pptx
Intelligent Assistance for Knowledge Workers.pptxIntelligent Assistance for Knowledge Workers.pptx
Intelligent Assistance for Knowledge Workers.pptxDenis Gagné
 
How do you FEEL about Low Code .pptx
How do you FEEL about Low Code .pptxHow do you FEEL about Low Code .pptx
How do you FEEL about Low Code .pptxDenis Gagné
 
Enabling and Debugging Business Automation.pptx
Enabling and Debugging Business Automation.pptxEnabling and Debugging Business Automation.pptx
Enabling and Debugging Business Automation.pptxDenis Gagné
 
BPM+ Virtual Coffee: 5 Mins Intro to BPMN
BPM+ Virtual Coffee: 5 Mins Intro to BPMNBPM+ Virtual Coffee: 5 Mins Intro to BPMN
BPM+ Virtual Coffee: 5 Mins Intro to BPMNDenis Gagné
 
Integrating Clinical Workflows and Decisions with FHIR, CDS Hooks and SMART
Integrating Clinical Workflows and Decisions with FHIR, CDS Hooks and SMARTIntegrating Clinical Workflows and Decisions with FHIR, CDS Hooks and SMART
Integrating Clinical Workflows and Decisions with FHIR, CDS Hooks and SMARTDenis Gagné
 
Where to start from with BPM+ Health
Where to start from with BPM+ HealthWhere to start from with BPM+ Health
Where to start from with BPM+ HealthDenis Gagné
 
Where to start from with BPM+ Health.pptx
Where to start from with BPM+ Health.pptxWhere to start from with BPM+ Health.pptx
Where to start from with BPM+ Health.pptxDenis Gagné
 
Event-Driven Architecture Webinar.pptx
Event-Driven Architecture Webinar.pptxEvent-Driven Architecture Webinar.pptx
Event-Driven Architecture Webinar.pptxDenis Gagné
 
BPM+ Virtual Coffee: Overview of BPMN, CMMN and DMN.pptx
BPM+ Virtual Coffee: Overview of BPMN, CMMN and DMN.pptxBPM+ Virtual Coffee: Overview of BPMN, CMMN and DMN.pptx
BPM+ Virtual Coffee: Overview of BPMN, CMMN and DMN.pptxDenis Gagné
 

Mais de Denis Gagné (20)

Generative AI and Regulatory Compliance
Generative AI and Regulatory ComplianceGenerative AI and Regulatory Compliance
Generative AI and Regulatory Compliance
 
Automating and Orchestrating Processes and Decisions Across the Enterprise
Automating and Orchestrating Processes and Decisions Across the EnterpriseAutomating and Orchestrating Processes and Decisions Across the Enterprise
Automating and Orchestrating Processes and Decisions Across the Enterprise
 
Low Code Neuro-Symbolic Agents.pdf
Low Code Neuro-Symbolic Agents.pdfLow Code Neuro-Symbolic Agents.pdf
Low Code Neuro-Symbolic Agents.pdf
 
Data Validation in a Low-Code Environment
Data Validation in a Low-Code EnvironmentData Validation in a Low-Code Environment
Data Validation in a Low-Code Environment
 
From Laws and Regulations to Decision Automation
From Laws and Regulations to Decision AutomationFrom Laws and Regulations to Decision Automation
From Laws and Regulations to Decision Automation
 
Smart Drug Package Inserts using Clinical Workflows and Decisions
Smart Drug Package Inserts using Clinical Workflows and DecisionsSmart Drug Package Inserts using Clinical Workflows and Decisions
Smart Drug Package Inserts using Clinical Workflows and Decisions
 
Deployment, Performance, Agility and Flexibility using Trisotech Digital Dist...
Deployment, Performance, Agility and Flexibility using Trisotech Digital Dist...Deployment, Performance, Agility and Flexibility using Trisotech Digital Dist...
Deployment, Performance, Agility and Flexibility using Trisotech Digital Dist...
 
Pharma, FHIR, Workflows and Decisions
Pharma, FHIR, Workflows and DecisionsPharma, FHIR, Workflows and Decisions
Pharma, FHIR, Workflows and Decisions
 
5 Mins Intro to CMMN
5 Mins Intro to CMMN5 Mins Intro to CMMN
5 Mins Intro to CMMN
 
Modelling the Preoperative Surgical Journey
Modelling the Preoperative Surgical JourneyModelling the Preoperative Surgical Journey
Modelling the Preoperative Surgical Journey
 
BPM+ Health Virtual Coffee: 5 Mins Intro to DMN
BPM+ Health Virtual Coffee: 5 Mins Intro to DMNBPM+ Health Virtual Coffee: 5 Mins Intro to DMN
BPM+ Health Virtual Coffee: 5 Mins Intro to DMN
 
Intelligent Assistance for Knowledge Workers.pptx
Intelligent Assistance for Knowledge Workers.pptxIntelligent Assistance for Knowledge Workers.pptx
Intelligent Assistance for Knowledge Workers.pptx
 
How do you FEEL about Low Code .pptx
How do you FEEL about Low Code .pptxHow do you FEEL about Low Code .pptx
How do you FEEL about Low Code .pptx
 
Enabling and Debugging Business Automation.pptx
Enabling and Debugging Business Automation.pptxEnabling and Debugging Business Automation.pptx
Enabling and Debugging Business Automation.pptx
 
BPM+ Virtual Coffee: 5 Mins Intro to BPMN
BPM+ Virtual Coffee: 5 Mins Intro to BPMNBPM+ Virtual Coffee: 5 Mins Intro to BPMN
BPM+ Virtual Coffee: 5 Mins Intro to BPMN
 
Integrating Clinical Workflows and Decisions with FHIR, CDS Hooks and SMART
Integrating Clinical Workflows and Decisions with FHIR, CDS Hooks and SMARTIntegrating Clinical Workflows and Decisions with FHIR, CDS Hooks and SMART
Integrating Clinical Workflows and Decisions with FHIR, CDS Hooks and SMART
 
Where to start from with BPM+ Health
Where to start from with BPM+ HealthWhere to start from with BPM+ Health
Where to start from with BPM+ Health
 
Where to start from with BPM+ Health.pptx
Where to start from with BPM+ Health.pptxWhere to start from with BPM+ Health.pptx
Where to start from with BPM+ Health.pptx
 
Event-Driven Architecture Webinar.pptx
Event-Driven Architecture Webinar.pptxEvent-Driven Architecture Webinar.pptx
Event-Driven Architecture Webinar.pptx
 
BPM+ Virtual Coffee: Overview of BPMN, CMMN and DMN.pptx
BPM+ Virtual Coffee: Overview of BPMN, CMMN and DMN.pptxBPM+ Virtual Coffee: Overview of BPMN, CMMN and DMN.pptx
BPM+ Virtual Coffee: Overview of BPMN, CMMN and DMN.pptx
 

Último

Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 

Último (20)

Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 

BPSim The Temporal and Control Perspectives

  • 1. BPSim Webinar Presents Cover 1 Business Process Simulation Webinar: Exploring the Temporal & Control Perspectives – Using Example 2 (Originating a Home Loan) from the BPSim Implementation Guide – Presenter: Lloyd Dugan For BPSim Webinar Use Only
  • 2. BPSim Webinar • Learning Objectives • Process Analysis Using Simulation (Temporal & Control Perspectives) – Simulating Business Processes Modeled in BPMN (Overview of Simulation and BPSim) – Sample Process Walkthrough of Temporal & Control Perspectives (Process Simulation, Diagnosis, and Redesign Example) – Simulation Parameters in BPMN Models (Loan Process Model Example) – Simulation of Loan Process Model (Demonstration of Temporal & Control Perspectives in the As-Is Analysis) – Simulation Diagnostics & Process Redesign (Demonstration of Temporal & Control Perspectives in the To-Be Redesign) • Summary • Questions & Answers • Simulation Tools Showcased in this Webinar • Presenter Bio 2 Outline For BPSim Webinar Use Only
  • 3. BPSim Webinar • At the end of this webinar, you will know… – Purposes of process analysis through simulation, relating the reasons for simulating processes to specific aspects of the model – Key concepts of simulation with BPMN models, focusing on the temporal perspective, work queues, and processing times • Note: Assumes basic understanding of core BPMN concepts – Process model element simulation parameters (structural parameters) and process performer simulation parameters (non-structural parameters), connecting them to the behaviors of the model – Simulation of a process model can be used to diagnose performance problems, and lead to remediation of performance problems – Recognizing patterns of performance problems and typical solutions to those patterns as surfaced through process simulation 3 Learning Objectives For BPSim Webinar Use Only
  • 4. BPSim Webinar 4 Simulating Business Processes Modeled in BPMN (Overview of Simulation and BPSim) For BPSim Webinar Use Only
  • 5. BPSim Webinar Analyze the business process through simulation of its corresponding model to answer specific questions! Analyze the business process through simulation of its corresponding model to answer specific questions! 5 Process Analysis Using Simulation Analyze the business process through simulation of its corresponding model to answer specific questions! For BPSim Webinar Use Only
  • 6. BPSim Webinar • Business process model represents an abstract approximation of an actual business process – For example, one done in BPMN – But: “All Models Are Wrong, Though Some Are Useful” – George Box (famous mathematician and statistician) • Business process is characterized by measurable performance characteristics, such as those in the temporal perspective – Time it takes to execute individual constituent activities (cycle time) – Time it takes to execute through all constituent activities (time-in-system) – Leftover work from inability to finish within allotted work time work-in-progress (WIP) • Simulation provides the means by which to measure performance characteristics of the process using the model instead of the real thing! 6 Simulation of a Business Process For BPSim Webinar Use Only
  • 7. BPSim Webinar Parameterization of a Business Process Model from different perspectives for process analysis, simulation, and optimization purposes 7 Process Simulation Perspectives Resource Cost Time Property Process Priority - Graphic pprepared by Denis Gagne, Founder of Trisotech and the Business Process Incubator The Business Process Simulation (BPSim) Specification: • Supports both inputs (parametric data) into a simulation and outputs (result set) of a simulation • Maps to modeling notation concepts and semantics, including schemas, for BPMN 2.0 (from OMG) and XPDL (from WfMC) • Is consistent with core simulation concepts and principles • Provides consistent simulation model interchange among tools Control Today’s Focuses For BPSim Webinar Use Only
  • 8. BPSim Webinar • (1) Confirmation of the Operational Behaviors of the Model: – (1A) Compliance With the Semantics of the Modeling Language • Does the simulation generate correct operational behaviors with respect to the language used to model the business process? – (1B) Fidelity With Respect To the Modeled Business Process • Does the simulation yield performance results similar to what is actually experienced for the business process? • (2) Analysis of the Operational Behaviors of the Model: – (2A) Identify Performance Problems of the Process • Do the simulation results lead to the identification of the underlying sources of performance problems of the as-is process? – (2B) Facilitate Reengineering of the Process • Does the simulation support what-if and sensitivity analyses through the design and re-parameterization of the to-be process? 8 Purposes of Simulation Color-Coding of Bullets Maps To Simulation Results Shown Later For BPSim Webinar Use Only
  • 9. BPSim Webinar • Structural Aspects of a Model that Relate To Simulation – Process model structure channels the flow of a process instance through one or more activities/events by way of one or more routes via control flow and assignment flow – Combination of performance characteristics for channel routes and executed activities/events define and constrain the overall operational performance of the process 9 Process Models and Simulations • Non-structural Aspects of a Model that Relate To Simulation – Performers (as resources) are consumed when an activity occurs, which can be constrained based on parameters – Execution of activities/events, and therefore collectively for a process, have costs that can be calculated Arrival: Receive Work Item Work Item Difficulty? Activity #1A: Analyze Complex Item Complex Activity #1B: Analyze Simple Item Simple Activity #2: Review Item Analysis End: Complete Process Arrival: Receive Work Item Work Item Difficulty? Activity #1A: Analyze Complex Item Complex Activity #1B: Analyze Simple Item Simple Activity #2: Review Item Analysis End: Complete Process For BPSim Webinar Use Only
  • 10. BPSim Webinar 10 Sample Process Walkthrough of Temporal & Control Perspectives (Process Simulation, Diagnosis, and Redesign Example) For BPSim Webinar Use Only
  • 11. BPSim Webinar Work Item Timing Activity #1 (3 mins./item) Activity #2 (2 mins./item) Time (:min.) Arrival Work Item # Resource A Work Item # Resource B Work Item # Resource C Work Item # :00 - - - - :01 1 1 - - :02 - 1 - - :03 2 1 2 - :04 - - 2 1 :05 3 3 2 1 :06 - 3 - 2 :07 4 3 4 2 11 Process Walkthrough – Baseline Configuration Assumptions: • Work day starts out with empty queues • Work item arrives every other min. • Each work item requires the same Activity #1 time • Each work item requires the same Activity #2 time • Resources are unconstrained (i.e., available as needed) Arrival: Receive Work Item Activity #1: Analyze Work Item Activity #2: Review Item Analysis End: Complete Process Baseline Configuration + No Work Item Duration Variation Observations: • Work item avgs. 5 mins. total (sum of durations) • 2 work items were completed in first 7 mins. • Only 1 work item is WIP in first 7 mins. For BPSim Webinar Use Only
  • 12. BPSim Webinar Work Item Timing Activity #1 (3 mins. simple or 5 mins. complex/item) Activity #2 (2 mins./item) Time (:min.) Arrival Work Item # Resource A Work Item # Resource B Work Item # Resource C Work Item # :00 - - - - :01 1 1 - - :02 - 1 - - :03 2 1 2 - :04 - - 2 1 :05 3 3 2 1 :06 - 3 2 - :07 4 3 2 - 12 Process Walkthrough – Work Item Variation Assumptions: • Work day starts out with empty queues • Work item arrives every other min. • Each work item varies in the Activity #1 time • Each work item requires the same Activity #2 time • Resources are unconstrained (i.e., available as needed) Arrival: Receive Work Item Activity #1: Analyze Work Item Activity #2: Review Item Analysis End: Complete Process Baseline Configuration + Work Item Duration Variation Observations: • Work item avgs. >5 minutes total (sum of durations) • Only 1 work item was completed in first 7 mins. • 2 work items are WIP in first 7 mins. For BPSim Webinar Use Only
  • 13. BPSim Webinar Timing Task 1A - Complex (3 mins./item) Task 1B - Simple (3 mins./item) Task 2 (2 mins./item) Time (:min.) Arrival Work Item # Resource A Work Item # Resource B Work Item # Resource C Work Item # :00 - - - - :01 1 - 1 - :02 - - 1 - :03 2 2 1 - :04 - 2 1 :05 3 2 3 1 :06 - - 3 2 :07 4 4 3 2 13 Process Walkthrough – Triage Configuration Arrival: Receive Work Item Work Item Difficulty? Activity #1A: Analyze Complex Item Complex Activity #1B: Analyze Simple Item Simple Activity #2: Review Item Analysis End: Complete Process Triage Configuration + No Work Item Duration Variation Assumptions: • Work day starts out with empty queues • Work item arrives every other min. • Each work item requires the same Activity #1A/#1B time • Each work item requires the same Activity #2 time • Resources are unconstrained (i.e., available as needed) Observations: • Work item avgs. 5 mins. total (sum of durations) • 2 work items were completed in first 7 mins. • Only 1 work item is WIP in first 7 mins. For BPSim Webinar Use Only
  • 14. BPSim Webinar 14 Simulation Parameters in BPMN Models (Loan Process Model Example) For BPSim Webinar Use Only
  • 15. BPSim Webinar Simulation Parameters Match Behaviors of BPMN Elements For BPSim Webinar Use Only 15 Boundary Event interrupts execution of attached-to activity if defined condition is met (e.g., duration takes more than 1 hour) Start Event and Intermediate Catching Event have an Inter- trigger Timer that is the occurrence rate (e.g., rate of arrivals) End Events and Intermediate Throwing Events have no parameters Probability is assigned to exclusive branching paths that must sum to 1 Activities have processing times only with no constraints on resources or implicit lag times in execution of instances Loan Process Model Example NOTE: Values used as simulation parameters can come from historical data, time-and-motion studies, and best guesses
  • 16. BPSim Webinar • Simulation parameters can incorporate uncertainty ... or not – Probabilistic values are defined by a mean (or average) and distribution that has a standard deviation from it – Static values are fixed for the duration of the simulation • Simulation parameters as probabilistic values – Expected value = mean value that is expected to occur for a random instance from a population of instances – Distribution = defines the probability of a particular value for an instance occurring within a population of instances – Standard Deviation = a measure of the variation of possible values for an instance away from the mean • Simulation parameters must be correctly matched with the appropriate elements within the model 16 Simulation Parameters and Statistics For BPSim Webinar Use Only
  • 17. BPSim Webinar 17 Common Distributions for Activities and Events Normal (Gaussian) Distribution: Distribution used to reflect the “normal” variation within a population of things being counted or measured, which is typically the default distribution to be used due to its suitability for use with most organic and mechanical activities Probability Distribution Triangular Distribution: Distribution used to reflect the variation between minimum and maximum values with a peak (mode) value somewhere in between, all of which are easier to determine with a population size that is too small for use with the Normal Distribution For BPSim Webinar Use Only Mean (Average) Probability Distribution Min Mode Max Standard Deviations
  • 18. BPSim Webinar 18 Simulation of Loan Process Model (Demonstration of Temporal & Control Perspectives in the As-Is Analysis) For BPSim Webinar Use Only
  • 19. BPSim Webinar Originate Home Loan Process • Pre-condition: Beginning of a standard work week (5 business days at 8 hours per day) with no WIP in the pipeline of the Originate Loan Process for the XYZ Bank • Process Description (to be modeled in BPMN): – A Loan Officer receives a completed loan application (from a borrower), and records the application information. – A Loan Officer then verifies provided employment information, recording the result of his/her investigation. – The borrower’s credit score and report are requested of and received from the three credit bureaus in a consolidated form. – A Title Researcher searches the county title records for the property in question, and then determines whether or not the property is correctly listed and free of liens. – A Loan Officer assembles and reviews the case file (loan application with employment verification, credit score and report, and title results) to approve or reject the application. – If rejected, a Loan Officer sends a rejection notice to the borrower, and then closes out the rejected case file. – If approved, a Loan Officer sends an approval notice to the borrower, and then forwards the case file to an Underwriter. – An Underwriter underwrites the loan based on the case file, returning it to the Loan Officer, but if this takes more than an hour, then standard loan terms are assigned. – The Loan Officer then closes out the approved case file. • Post-condition: End of a standard work week with minimal WIP still in the pipeline 19 Simulation Use Case For BPSim Webinar Use Only
  • 20. BPSim Webinar • Process Performance Goals and Measures (as established by XYZ Bank Management): – No problematic backlog at the end of a standard 5 business days week (acceptable WIP only) – QoS Targets: • Minimum: Weighted average turn-around time for a loan (across all accepted and rejected loans) should be no more than 2.5 hours (150 minutes) • Stretch: No loan should take more than 3 hours (180 minutes) to process • Reengineering Imperative Established By XYZ Bank Management For the To-Be Redesign: – Analyze process to identify any leverage points for achieving process performance goals and measures – Targeted change(s) to process to ensure process performance goals and measures are achieved Simulation Use Case – Goals and Performance Measures For BPSim Webinar Use Only 20
  • 21. BPSim Webinar • Parametric Data For Simulation (as determined by TPS Reports, Inc.): – 30 applications arrive per day (on avg.) <for the Receive Loan Application Start Event (the process trigger)> – 8 out of the 30 are approved (on avg.) and about a fifth of the rejections have very low credit scores <for control flow> – Credit score receipt is within 4 to 6 minutes of request, but is usually 5 mins <for the Intermediate Catching Event> – Average duration times for activities are listed below: <for parameterizing activities> 21 Simulation Use Case – Parameters Activity Name Approval Path Rejection Path Record Loan Application 20 Verify Employment 30 Perform Title Search 60 Review Title Report 20 Review Loan Application 30 Send Rejection Letter 1 (system constant) Close-Out Rejection 5 Send Approval Letter 1 (system constant) Underwrite Loan With Terms 50 (max of 60) Set With Default Terms (if applicable) 1 (system constant) Close-Out Approval 10 TOTAL (Averages and Constants) 191 or 202 136 Totals 80 for the parallel thread Max is 80 for all parallel threads Measured weighted average of time-in- system for approved and rejected loans is about 150 minutes with a maximum of well over 180 minutes Measured incidence of WIP is that it occurs in modest weekly increments For BPSim Webinar Use Only
  • 22. BPSim Webinar 22 Simulation Use Case – Initial Model What are the Counts for each pair of outcomes, and is there backlog or merely WIP in the pipeline? What is the average and maximum Time-in-System (weighted sum of cycle times) for a Loan Application? Run the simulation to answer these questions For BPSim Webinar Use Only
  • 23. BPSim Webinar 23 Simulation Use Case – 1st Result (Failed) What are the Counts for each pair of outcomes, and is there backlog or merely WIP in the pipeline? What is the average and maximum Time-in-System (weighted sum of cycle times) for a Loan Application? Unable to answer these questions because this catching event was not parameterized as needed for its BPMN behavior, preventing process instances from advancing, so fix and rerun simulation 5 minutes (on average) Simulation Purpose (1A): Compliance With the Semantics of the Modeling Language!!! For BPSim Webinar Use Only
  • 24. BPSim Webinar Simulation Use Case – 2nd Result (Successful) For BPSim Webinar Use Only 24 What are the Counts for each pair of outcomes, and is there backlog or merely WIP in the pipeline? What is the average and maximum Time-in-System (weighted sum of cycle times) for a Loan Application? WIP: Time-in-System Avg. Time-in-System Max. 132 - (93+32) = 7 149.7 mins. 223.6 mins. Consistent With Measured Historical Data 132 Received 93 Closed 32 Closed Simulation Purpose (1B): Fidelity With Respect To the Modeled Business Process!!!
  • 25. BPSim Webinar 25 Simulation Diagnostics & Process Redesign (Demonstration of Temporal & Control Perspectives in the To-Be Redesign) For BPSim Webinar Use Only
  • 26. BPSim Webinar • Performance Problems Surfaced Through the Temporal Perspective – Long time-in-system => is this an internal QoS violation or an external service level agreement (SLA) failure? – Large backlog/WIP => is there a cause of backlog as new work not getting done (e.g., a bottleneck) or is it just acceptable WIP in the pipeline? 26 What Can Simulation Show? • Structural Changes Informed Through the Temporal Perspective – Revise the process structure (i.e., the sequence of activities) to streamline the flow of work <see applicable reengineering patterns> – Change the type of execution mode for activities (e.g., the task type) to reduce cycle times <see applicable reengineering patterns> For BPSim Webinar Use Only
  • 27. BPSim Webinar Simulation Use Case – 2nd Result (Reprised) For BPSim Webinar Use Only 27 What are the Counts for each pair of outcomes, and is there backlog or merely WIP in the pipeline? What is the average and maximum Time-in-System (weighted sum of cycle times) for a Loan Application? WIP: Time-in-System Avg. Time-in-System Max. 132 - (93+32) = 7 149.7 mins 223.6 mins Consistent With Measured Historical Data 132 Received 93 Closed 32 Closed Acceptable WIP? Simulation Purpose (2A): Identify Performance Problems of the Process!!! Room for Improvement
  • 28. BPSim Webinar Diagnostic View of Simulation Results Process Performance Problem(s) Sequence Flow Activity/Event Cost Performer Duration Variability Availability Role/Selection Quantity Unit Cost Fixed Cost Arrivals Work Latency StructuralNon-structural Simulation provides data about potential sources of measured performance problems that relate to structural or non-structural aspects of the process model 28 Order of Work Combination of these factors may be the root cause of performance problems! Root Cause Analysis (Fishbone Diagram or Ishikawa Diagram) For BPSim Webinar Use Only
  • 29. BPSim Webinar Data Capture • Anti-Pattern: Performance Problem of Split Data Capture Responsibility – Capture of data that is input to a process is captured throughout the process, delaying the ability to address the data in the process instance for purposes of routing work, applying business rules, etc. • Redesign Pattern: Performance Solution of Early Data Capture Responsibility – Capture of data is consolidated and moved to the front of the process, enabling earlier treatment of the data by process activities • Potential Indicator Measures To Examine: – Cycle Time or Duration Time – Time-in-System – Backlog/WIP Work Differentiation (Triage) • Anti-Pattern: Performance Problem of Undifferentiated Treatment of Work – All work items move though the same sequence regardless of the complexity of the work or the amount of time work items may require based on the work item • Redesign Pattern: Performance Solution of Triaged (Differentiated Treatment) of Work – Work items are split into different threads for different treatment by more appropriate sets of activities and/or more appropriate performers to streamline the process flow • Potential Indicator Measures To Examine: – Cycle Time or Duration Time – Time-in-System – Backlog/WIP 29 Process Redesign – Using Reengineering Patterns (Part I) Try moving Request Credit Report and Receive Credit Report events upstream to catch very low (unreviewable) credit scores before doing other work for the review. For BPSim Webinar Use Only
  • 30. BPSim Webinar Simulation Use Case – Model With Triage + Early Data Capture For BPSim Webinar Use Only 30 What are the Counts for each pair of outcomes, and is there backlog or merely WIP in the pipeline? What is the average and maximum Time-in-System (weighted sum of cycle times) for a Loan Application? WIP Time-in-System Avg. Time-in-System Max. 132 - (95+30) = 7 141.63 mins. 229.08 mins. Main Goals Realized But Stretch Goal Still Not Achieved 132 Received 95 Closed 30 Closed Simulation Purpose (2B): Facilitate Reengineering of the Process (Part I)!!! NOTE: Probability parameters changed: 4 out of 30 can be rejected on credit score alone, 18 out of remaining 26 will be rejected while 8 will be approved
  • 31. BPSim Webinar Automation • Anti-Pattern: Performance Problem of Activity Is Inefficient – Typically is a manual or user-mediated activity that is seen as taking too much time (especially with respect to peer or contiguous activities), or is generally routine or repetitive in a manner that is better realized through automation • Redesign Pattern: Performance Solution of Automating the Activity – Offending activity is changed to be supported with automation (e.g., manual task changed to user task with user screen(s)) or abstracted out by way of service invocation (e.g., manual or user task changed to a service task provisioned through a system or service provider) • Potential Indicator Measures To Examine: – Cycle Time or Duration Time – Time-in-System – Backlog/WIP 31 Process Redesign – Using Reengineering Patterns (Part II) Try automating the Perform Title Search activity by making it a user-mediated online search (with user screens), thus reducing its cycle time and bringing it into alignment with the parallel activities. For BPSim Webinar Use Only
  • 32. BPSim Webinar Simulation Use Case – Model With (Automation) For BPSim Webinar Use Only 32 Simulation Purpose (2B): Facilitate Reengineering of the Process (Part II)!!! What are the Counts for each pair of outcomes, and is there backlog or merely WIP in the pipeline? What is the average and maximum Time-in-System (weighted sum of cycle times) for a Loan Application? WIP Time-in-System Avg Time-in-System Max 132 - (93+34) = 5 97.82 mins 179.24 mins Stretch Goal Realized and Other Goals Realized or Exceeded 132 Received 93 Closed 34 Closed
  • 33. BPSim Webinar • To Summarize... – Purposes of process simulation relate to specific reasons for simulating business processes as part of process analysis – Key concepts of simulation with BPMN models, focusing on the temporal perspective, work queues, and processing times – Process model element simulation parameters (structural parameters) and process performer simulation parameters (non-structural parameters) are connected to the behaviors in the model – Simulation of a process model can be used to diagnose performance problems and to remediate the process via a revised design – As-is anti-patterns exist and can be addressed with redesign patterns as processes are reengineered to address performance problems unearthed through simulation as part of process analysis 33 Summary For BPSim Webinar Use Only
  • 34. BPSim Webinar ? 34 Questions & Answers For BPSim Webinar Use Only
  • 35. BPSim Webinar Trisotech – http://www.trisotech.com/en/index.php Business Process Incubator – http://www.businessprocessincubator.com/ Lanner – http://www.lanner.com/ 35 Simulation Tools Showcased in this Webinar Business Process Incubator Both are Members of BPSim.org!!! BPMN Web Modeler (with L- SIM) For BPSim Webinar Use Only
  • 36. BPSim Webinar • Chief Architect for Business Process Management, Inc. (BPMI, www.bpm.com); e-mail: lloyd@bpm.com • Senior BPMN SME/Trainer for the DoD’s Deputy Chief Management Office (DCMO); e-mail: ldugan@bizmanagers.com • Independent Contractor/Sole Proprietor of LAB Derivations (BPMN4SCA); e-mail: ldugan.bpmn4sca@gmail.com • Co-Founder of Semantic BPMN, combining and leveraging BPMN and Semantic Technologies; e-mail: ldugan.bpmn4sca@gmail.com • Senior BPMN SME/Chief Architect for the Process Modeling Design Center (PMDC) of the VA’s Office of IT (OIT) • Member of the Workflow Management Coalition (WfMC, www.wfmc.org); co-author BPMN 2.0 Handbook • Member of the WfMC’s Business Process Simulation Working Group (BPSim, www.bpsim.org) • Member of the Object Management Group (OMG) BPMN Model Interchange Working Group (MIWG) • OMG-Certified Expert in Business Process Management (BPM) (OCEB) - Fundamental Presenter Bio: Lloyd Dugan You Can Find Me On For BPSim Webinar Use Only 36