EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
Simplified Guideline for All New Buildings in the Seismic Zone V of India
Introduction:
As usual new construction of buildings under IAY, Prime Minister Rojgar Yojana and buildings
under various other National and State schemes get started in the month of May. The Ministry of Home
Affairs is keen that All New Buildings should be made earthquake resistant in the first instant so that we do
not add to the stock of existing unsafe buildings. Since most of the buildings are constructed using brickwork
or, solid hollow concrete blocks with flat roofs, very simple illustrated guidance is provided in the attached
brochure for incorporating the earthquake resistant features suitable for seismic zone V.
Essential Elements for Earthquake Safety1
:
The essential elements required to make a building earthquake safe are as given in Figure 1. Some
additional requirements are detailed in the following paragraphs.
1. GOOD CEMENT MORTAR:
The cement mortar should be used in the ratio of 1 part of cement with 4 parts of sand (1 sack of
cement mixed with 4 equal sacks of sand).
2. HORIZONTAL SEISMIC BANDS:
A seismic band consists of reinforced concrete flat runner through all external and internal
masonry walls at the following levels in the building.
a. at the plinth level of the building
b. at the levels of lintels of doors and windows
c. at the ceiling level of roofs consisting of wooden joists or, prefabricated reinforced concrete beams
or, planks. (Such band will not be necessary if the roof consists of Reinforced Concrete or,
Reinforced Brick slabs cast on the walls covering a minimum of 2/3 of the thickness of the wall.)
The dimensions of the band and the reinforcement inside depend upon the length of the walls
between the perpendicular cross walls. The table below (Table-1) shows the dimensions to be adopted for
the seismic bands and the internal reinforcement details to be provided. The reinforcement and bending
details of seismic bands are given in the Figure-2. Reinforcing bars will be of Fe 415 type [TOR or, High
Yield Strength Deformed, i.e. HYSD bars]
1
The details given here are extracted from IS: 4326-1993 Code of Practice as applicable to buildings with Brick/ Concrete
block walls and R.C. flat slab roofs. Details not given here may be seen in the Code.
1. Lintel Band
2. Roof/ Floor Band
3. Vertical reinforcing bar at corner
4. Door
5. Window
6. Plinth Band
7. Window Sill Bands
Figure – 1: Essential Internal
Elements in Buildings
for Earthquake Safety
Zone V
2
1
2
1
5
4
3
6
7
2
1
7
b1
b
1
2
2
2
2
1
33
b
b2
30 40
75
6@150
1
2
30
40
150
6@1501 2
bb
(a) (b)
40
30
(c) (d)
(e) (f)
(a) Section of the Band with 2 longitudinal steel bars
(b) Section of the Band with 4 longitudinal steel bars
(c) Structural Plan at L- type wall junction
(d) Structural Plan at T- type wall junction
(e) 3 Dimensional view of the L - type wall junction
(f) 3 Dimensional view of the T - type wall junction
1. Longitudinal reinforcements
2. Lateral Ties
3. Vertical reinforcement at corners
b, b1, b2 Wall thickness
Figure-2: Reinforcement and Bending Details of Seismic Bands
Table-1: Recommended size and longitudinal steel in Seismic Bands (Zone V)
Buildings of all types i.e., Residential buildings & Public Buildings (Schools, Hospitals,
Meeting Halls, Anganwadis, etc.)
Internal
length of
wall Size of the band No. of Bars Dia (mm)
5 m or, less 10 cm x wall width 2 10
6 m 10 cm x wall width 2 12
7 m 15 cm x wall width 4 10
8 m 15 cm x wall width 4 12
3. VERTICAL REINFORCEMENT IN THE BRICK WALLS:
For earthquake safety in seismic zone V reinforcing bars have to be embedded in brick masonry at
the corners of all the rooms and the side of the door openings. Window openings larger than 60 cm in
width will also need such reinforcing bars (Figure – 4). The diameter of the bar depends upon the
number of storeys in the building. The recommendations are given in Table-2.
Providing the vertical bars in the brickwork and concrete blocks requires special techniques which
could be easily learnt by the supervising engineers and masons will need to be trained.
31
2
3
1
2
These vertical bars have to be started from the foundation concrete, will pass through all seismic
bands where they will be tied to the band reinforcements using binding wire and embedded to the ceiling
band/roof slab as the case may be using a 300 mm 90° bend. Sometimes the vertical bars will not be
made in one full length. In that case the extension of the vertical reinforcement bars are required, an
overlap of minimum of 50 times the bar diameter should be provided. The two overlapped reinforcement
bars should be tied together by using the binding wires.
1
1
1
1/2
1/2
1/2
1/2
3/4
1/2
3/4
1/2
1/21/21/21/21/2
1/2
1/2
1/2
1/4
1/4
11 1/21/2
(a) (b)
33
3 3
3/4
3/4
a & b : Alternate courses in one brick wall
1 : One brick length
½ : Half brick length
¼ : Quarter of a brick length
¾ : Three quarters of a brick length
3 : Vertical reinforcement bars with Concrete/ mortar filling in
pocket of M20 grade (1:1½:3 nominal mix)
Figure-3: Typical Details of Providing Vertical Steel
Bars in Brick Masonry
Table-2: Recommended size of vertical
steel in Seismic Bands (Zone V)
Buildings of all types i.e., Residential
buildings & Public Buildings * (Schools,
Hospitals, Meeting Halls, Anganwadis, etc.)
No. of
storeys
Floor Dia of Single
HYSD(TOR) Bar at
corners of room (mm)
One - 12
Top 12
Two
Bottom 16
Top 12
Middle 16Three
Bottom 16
* Building of four storey not permitted in Zone V.
Table-3: Recommended joint details with the vertical reinforcement at corner for masonry walls
using different kind of materials
Type of
Joint
Corner reinforcement in
case of Brick Masonry
Corner reinforcement in
case of Solid Concrete Block
Masonry
Corner reinforcement in case of
Hollow Concrete Block Masonry
(see the hole and slit made)
L- Joint
T- Joint
B
WELL COMPACTED SOIL
2 T
P.C.C 1:4:8
2 TOR 12
125
150
<125
1.5 T
T
100Plinth Band
Floor Finish
<
Ground Level
T - 230 for Brick Work
200 for Block Work
Plinth Level
150
Well compacted Sand
Masonry in C.M.1:6
Masonry in C.M.1:4
6mm DIA. @150 c/c
(a) Sectional Elevation of Door
(b) Sectional Elevation of Window
(c) Section 2-2
Figure-4: Typical Details of Providing Vertical Steel Bars around doors/windows
4. VERTICAL REINFORCEMENT AT JAMBS OF OPENINGS:
All door and window openings wider than 600 mm will have vertical reinforcement in jambs as
shown in Figure-4.
5. FOUNDATION
Foundation width 'B' should
be decided by the load coming
on the foundation and the
bearing capacity. Masonry width
may be reduced by ½ times T in
every step of 150 mm height.
NOTE:
In sandy soils with high water
table within 8 m depth below
ground level, which may get
liquefied during earthquake of
MSK intensity VIII to IX, pile
foundation need to be used in
consultation with the Structural/
Geotechnical Engineer.
National Disaster Management Division,
Ministry of Home Affairs, North Block, New Delhi, India
Tel: 91 11 2309 3178; Tel/Fax: 2309 4019; Fax: 91 11 2309 3750;E-mail: ndmindia@nic.in; dsdm@nic.in; Website: www.ndmindia.nic.in
P r e p a r e d b y :
Professor Anand S. Arya and Jnananjan Panda
Tel: 91 11 5539 6386; Email: anand.s.arya@undp.org, jnananjan.panda@undp.org
Figure-5: Foundation Detail with
Plinth Band in Brick or,
Concrete Block Masonry
Prepared under the GoI – UNDP Disaster Risk Management Programme

Mais conteúdo relacionado

Mais procurados

pile foundation of burj khalifa
pile foundation of burj khalifapile foundation of burj khalifa
pile foundation of burj khalifaSUNILPRASAD68
 
W 1 single-storey steel-frames_structures
W 1  single-storey steel-frames_structuresW 1  single-storey steel-frames_structures
W 1 single-storey steel-frames_structuresMihai Pancu
 
Composite structure of concrete and steel.
Composite structure of concrete and steel.Composite structure of concrete and steel.
Composite structure of concrete and steel.Suhailkhan204
 
Bcon Bus Shelter Booklet
Bcon Bus Shelter BookletBcon Bus Shelter Booklet
Bcon Bus Shelter Bookletleejanett3
 
Portal frame 1
Portal  frame 1Portal  frame 1
Portal frame 1Est
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete constructionMadan Mohan Jana
 
Types of isolated footing and design
Types of isolated footing and design Types of isolated footing and design
Types of isolated footing and design Sukhvinder Singh
 
Raft foundations
Raft foundationsRaft foundations
Raft foundationshatim ahmed
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildingsAnas Adel
 
Raft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiaRaft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiakamal bhatia
 

Mais procurados (20)

pile foundation of burj khalifa
pile foundation of burj khalifapile foundation of burj khalifa
pile foundation of burj khalifa
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
W 1 single-storey steel-frames_structures
W 1  single-storey steel-frames_structuresW 1  single-storey steel-frames_structures
W 1 single-storey steel-frames_structures
 
Composite structure of concrete and steel.
Composite structure of concrete and steel.Composite structure of concrete and steel.
Composite structure of concrete and steel.
 
Bcon Bus Shelter Booklet
Bcon Bus Shelter BookletBcon Bus Shelter Booklet
Bcon Bus Shelter Booklet
 
Lecture 8 raft foundation
Lecture 8 raft foundationLecture 8 raft foundation
Lecture 8 raft foundation
 
Portal frame 1
Portal  frame 1Portal  frame 1
Portal frame 1
 
Shear wall ppt
Shear wall ppt Shear wall ppt
Shear wall ppt
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Jacketing (RR&S)
Jacketing (RR&S)Jacketing (RR&S)
Jacketing (RR&S)
 
Types of isolated footing and design
Types of isolated footing and design Types of isolated footing and design
Types of isolated footing and design
 
Load bearing elements part5
Load bearing elements part5Load bearing elements part5
Load bearing elements part5
 
Jacketing
JacketingJacketing
Jacketing
 
Rigid frame systems
Rigid frame systemsRigid frame systems
Rigid frame systems
 
High Performance Concrete
High Performance ConcreteHigh Performance Concrete
High Performance Concrete
 
Retaining Walls
Retaining WallsRetaining Walls
Retaining Walls
 
Raft foundations
Raft foundationsRaft foundations
Raft foundations
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
Pre-stressed Concrete
Pre-stressed ConcretePre-stressed Concrete
Pre-stressed Concrete
 
Raft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatiaRaft foundation ppt by kamal bhatia
Raft foundation ppt by kamal bhatia
 

Destaque

Shock Test Report 04
Shock Test Report 04Shock Test Report 04
Shock Test Report 04Franco Pezza
 
SEISMIC PERFORMANCE OF RC BUILDINGS WITH SHEAR WALL
SEISMIC PERFORMANCE OF RC BUILDINGS WITH SHEAR WALLSEISMIC PERFORMANCE OF RC BUILDINGS WITH SHEAR WALL
SEISMIC PERFORMANCE OF RC BUILDINGS WITH SHEAR WALLMohd Danish
 
Chapter11 Masonry
Chapter11 MasonryChapter11 Masonry
Chapter11 MasonryTeja Ande
 
Is 2185 1 1979(2003)
Is 2185 1  1979(2003)Is 2185 1  1979(2003)
Is 2185 1 1979(2003)Mohd Danish
 
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGSEARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGSMohd Danish
 
Rapid visual screening of critical facilities in the Kingston Metropolit
Rapid visual screening of critical facilities in the Kingston MetropolitRapid visual screening of critical facilities in the Kingston Metropolit
Rapid visual screening of critical facilities in the Kingston MetropolitChristopher Gayle M.Eng
 
EFFECT OF STAIRCASE ON RC FRAME STRUCTURES UNDER SEISMIC LOAD
EFFECT OF STAIRCASE ON RC FRAME STRUCTURES UNDER SEISMIC LOADEFFECT OF STAIRCASE ON RC FRAME STRUCTURES UNDER SEISMIC LOAD
EFFECT OF STAIRCASE ON RC FRAME STRUCTURES UNDER SEISMIC LOADMohd Danish
 
RVS: Lecture ppt
RVS: Lecture pptRVS: Lecture ppt
RVS: Lecture pptMohd Danish
 
Earthquake Engineering
Earthquake EngineeringEarthquake Engineering
Earthquake EngineeringHardeep Rai
 
Sp34 str detailing
Sp34     str detailingSp34     str detailing
Sp34 str detailingMohd Danish
 
Sp20 masonry design_and_construction
Sp20 masonry design_and_constructionSp20 masonry design_and_construction
Sp20 masonry design_and_constructionMohd Danish
 

Destaque (20)

Shock Test Report 04
Shock Test Report 04Shock Test Report 04
Shock Test Report 04
 
20110816230617
2011081623061720110816230617
20110816230617
 
Fema 240
Fema 240Fema 240
Fema 240
 
875 1
875 1875 1
875 1
 
875 4
875 4875 4
875 4
 
875 2
875 2875 2
875 2
 
IS 875 5
IS 875 5IS 875 5
IS 875 5
 
SEISMIC PERFORMANCE OF RC BUILDINGS WITH SHEAR WALL
SEISMIC PERFORMANCE OF RC BUILDINGS WITH SHEAR WALLSEISMIC PERFORMANCE OF RC BUILDINGS WITH SHEAR WALL
SEISMIC PERFORMANCE OF RC BUILDINGS WITH SHEAR WALL
 
Chapter11 Masonry
Chapter11 MasonryChapter11 Masonry
Chapter11 Masonry
 
Is 2185 1 1979(2003)
Is 2185 1  1979(2003)Is 2185 1  1979(2003)
Is 2185 1 1979(2003)
 
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGSEARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS
 
IS 875 3
IS 875 3IS 875 3
IS 875 3
 
Rapid visual screening of critical facilities in the Kingston Metropolit
Rapid visual screening of critical facilities in the Kingston MetropolitRapid visual screening of critical facilities in the Kingston Metropolit
Rapid visual screening of critical facilities in the Kingston Metropolit
 
EFFECT OF STAIRCASE ON RC FRAME STRUCTURES UNDER SEISMIC LOAD
EFFECT OF STAIRCASE ON RC FRAME STRUCTURES UNDER SEISMIC LOADEFFECT OF STAIRCASE ON RC FRAME STRUCTURES UNDER SEISMIC LOAD
EFFECT OF STAIRCASE ON RC FRAME STRUCTURES UNDER SEISMIC LOAD
 
RVS: Lecture ppt
RVS: Lecture pptRVS: Lecture ppt
RVS: Lecture ppt
 
The Earthquake Tips to make Safe Built Environment
The Earthquake Tips to make Safe Built EnvironmentThe Earthquake Tips to make Safe Built Environment
The Earthquake Tips to make Safe Built Environment
 
Earthquake Engineering
Earthquake EngineeringEarthquake Engineering
Earthquake Engineering
 
1893 1
1893 11893 1
1893 1
 
Sp34 str detailing
Sp34     str detailingSp34     str detailing
Sp34 str detailing
 
Sp20 masonry design_and_construction
Sp20 masonry design_and_constructionSp20 masonry design_and_construction
Sp20 masonry design_and_construction
 

Semelhante a EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS

Masonry structures confined with concrete beams an dcolumns
Masonry structures confined with concrete beams an dcolumnsMasonry structures confined with concrete beams an dcolumns
Masonry structures confined with concrete beams an dcolumnshsaam hsaam
 
Repair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationRepair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationIshwar Chauhan
 
36405231_seismic_design_steps_153.ppt
36405231_seismic_design_steps_153.ppt36405231_seismic_design_steps_153.ppt
36405231_seismic_design_steps_153.pptIrshadKhan97473
 
SEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.pptSEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.pptAteeqRahman26
 
Indian Standard
Indian StandardIndian Standard
Indian Standardaman kumar
 
Design guide for walls containing bond beams
Design guide for walls containing bond beamsDesign guide for walls containing bond beams
Design guide for walls containing bond beamshsaam hsaam
 
261909-C-ConstructionIssues-Fanella.pdf
261909-C-ConstructionIssues-Fanella.pdf261909-C-ConstructionIssues-Fanella.pdf
261909-C-ConstructionIssues-Fanella.pdfShamim Zubery
 
Principles and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil wallsPrinciples and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil wallsPrakash Ravindran
 
Influence of Modeling Masonry Infill on Seismic Performance of Multi-Storeyed...
Influence of Modeling Masonry Infill on Seismic Performance of Multi-Storeyed...Influence of Modeling Masonry Infill on Seismic Performance of Multi-Storeyed...
Influence of Modeling Masonry Infill on Seismic Performance of Multi-Storeyed...ijsrd.com
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartmentJy Chong
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology IOng Shi Hui
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor planDanny Chiverton
 

Semelhante a EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS (20)

IS 13828
IS 13828IS 13828
IS 13828
 
IS 4326
IS 4326IS 4326
IS 4326
 
Masonry structures confined with concrete beams an dcolumns
Masonry structures confined with concrete beams an dcolumnsMasonry structures confined with concrete beams an dcolumns
Masonry structures confined with concrete beams an dcolumns
 
IS 13827
IS 13827IS 13827
IS 13827
 
5th batch.pptx
5th batch.pptx5th batch.pptx
5th batch.pptx
 
Repair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationRepair,Retrofitting and Rehabilitation
Repair,Retrofitting and Rehabilitation
 
36405231_seismic_design_steps_153.ppt
36405231_seismic_design_steps_153.ppt36405231_seismic_design_steps_153.ppt
36405231_seismic_design_steps_153.ppt
 
SEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.pptSEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.ppt
 
Seismic design steps
Seismic design stepsSeismic design steps
Seismic design steps
 
Indian Standard
Indian StandardIndian Standard
Indian Standard
 
Design guide for walls containing bond beams
Design guide for walls containing bond beamsDesign guide for walls containing bond beams
Design guide for walls containing bond beams
 
261909-C-ConstructionIssues-Fanella.pdf
261909-C-ConstructionIssues-Fanella.pdf261909-C-ConstructionIssues-Fanella.pdf
261909-C-ConstructionIssues-Fanella.pdf
 
Principles and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil wallsPrinciples and design concepts of reinforced soil walls
Principles and design concepts of reinforced soil walls
 
Civil drawing detail
Civil drawing detailCivil drawing detail
Civil drawing detail
 
2327
23272327
2327
 
Boq sample
Boq sampleBoq sample
Boq sample
 
Influence of Modeling Masonry Infill on Seismic Performance of Multi-Storeyed...
Influence of Modeling Masonry Infill on Seismic Performance of Multi-Storeyed...Influence of Modeling Masonry Infill on Seismic Performance of Multi-Storeyed...
Influence of Modeling Masonry Infill on Seismic Performance of Multi-Storeyed...
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology I
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan
 

Mais de Mohd Danish

APPLICATION OF GENE EXPRESSION PROGRAMMING IN FLOOD FREQUENCY ANALYSIS
APPLICATION OF GENE EXPRESSION PROGRAMMING IN FLOOD FREQUENCY ANALYSISAPPLICATION OF GENE EXPRESSION PROGRAMMING IN FLOOD FREQUENCY ANALYSIS
APPLICATION OF GENE EXPRESSION PROGRAMMING IN FLOOD FREQUENCY ANALYSISMohd Danish
 
Prediction of scour depth at bridge abutments in cohesive bed using gene expr...
Prediction of scour depth at bridge abutments in cohesive bed using gene expr...Prediction of scour depth at bridge abutments in cohesive bed using gene expr...
Prediction of scour depth at bridge abutments in cohesive bed using gene expr...Mohd Danish
 
Scour prediction at bridge piers in cohesive bed using gene expression progra...
Scour prediction at bridge piers in cohesive bed using gene expression progra...Scour prediction at bridge piers in cohesive bed using gene expression progra...
Scour prediction at bridge piers in cohesive bed using gene expression progra...Mohd Danish
 
Seismic Conceptual Design of Buildings
Seismic Conceptual Design of BuildingsSeismic Conceptual Design of Buildings
Seismic Conceptual Design of BuildingsMohd Danish
 
Earth+and+rock+fill+dams
Earth+and+rock+fill+damsEarth+and+rock+fill+dams
Earth+and+rock+fill+damsMohd Danish
 
Is 3370 part 2 latest
Is 3370 part 2 latestIs 3370 part 2 latest
Is 3370 part 2 latestMohd Danish
 
Is 3370 part 1 latest
Is 3370 part 1 latestIs 3370 part 1 latest
Is 3370 part 1 latestMohd Danish
 

Mais de Mohd Danish (16)

IS 1893:1984
IS 1893:1984IS 1893:1984
IS 1893:1984
 
APPLICATION OF GENE EXPRESSION PROGRAMMING IN FLOOD FREQUENCY ANALYSIS
APPLICATION OF GENE EXPRESSION PROGRAMMING IN FLOOD FREQUENCY ANALYSISAPPLICATION OF GENE EXPRESSION PROGRAMMING IN FLOOD FREQUENCY ANALYSIS
APPLICATION OF GENE EXPRESSION PROGRAMMING IN FLOOD FREQUENCY ANALYSIS
 
Prediction of scour depth at bridge abutments in cohesive bed using gene expr...
Prediction of scour depth at bridge abutments in cohesive bed using gene expr...Prediction of scour depth at bridge abutments in cohesive bed using gene expr...
Prediction of scour depth at bridge abutments in cohesive bed using gene expr...
 
Scour prediction at bridge piers in cohesive bed using gene expression progra...
Scour prediction at bridge piers in cohesive bed using gene expression progra...Scour prediction at bridge piers in cohesive bed using gene expression progra...
Scour prediction at bridge piers in cohesive bed using gene expression progra...
 
Sp22
Sp22Sp22
Sp22
 
Seismic Conceptual Design of Buildings
Seismic Conceptual Design of BuildingsSeismic Conceptual Design of Buildings
Seismic Conceptual Design of Buildings
 
Fema 254
Fema 254Fema 254
Fema 254
 
Fema 253
Fema 253Fema 253
Fema 253
 
Fema 266
Fema 266Fema 266
Fema 266
 
Plates
PlatesPlates
Plates
 
Earth+and+rock+fill+dams
Earth+and+rock+fill+damsEarth+and+rock+fill+dams
Earth+and+rock+fill+dams
 
Sp16 latest
Sp16 latestSp16 latest
Sp16 latest
 
Is 3370 part 2 latest
Is 3370 part 2 latestIs 3370 part 2 latest
Is 3370 part 2 latest
 
Is 3370 part 1 latest
Is 3370 part 1 latestIs 3370 part 1 latest
Is 3370 part 1 latest
 
13920
1392013920
13920
 
13828
1382813828
13828
 

Último

Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 

Último (20)

Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 

EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS

  • 1. EARTHQUAKE SAFE CONSTRUCTION OF MASONRY BUILDINGS Simplified Guideline for All New Buildings in the Seismic Zone V of India Introduction: As usual new construction of buildings under IAY, Prime Minister Rojgar Yojana and buildings under various other National and State schemes get started in the month of May. The Ministry of Home Affairs is keen that All New Buildings should be made earthquake resistant in the first instant so that we do not add to the stock of existing unsafe buildings. Since most of the buildings are constructed using brickwork or, solid hollow concrete blocks with flat roofs, very simple illustrated guidance is provided in the attached brochure for incorporating the earthquake resistant features suitable for seismic zone V. Essential Elements for Earthquake Safety1 : The essential elements required to make a building earthquake safe are as given in Figure 1. Some additional requirements are detailed in the following paragraphs. 1. GOOD CEMENT MORTAR: The cement mortar should be used in the ratio of 1 part of cement with 4 parts of sand (1 sack of cement mixed with 4 equal sacks of sand). 2. HORIZONTAL SEISMIC BANDS: A seismic band consists of reinforced concrete flat runner through all external and internal masonry walls at the following levels in the building. a. at the plinth level of the building b. at the levels of lintels of doors and windows c. at the ceiling level of roofs consisting of wooden joists or, prefabricated reinforced concrete beams or, planks. (Such band will not be necessary if the roof consists of Reinforced Concrete or, Reinforced Brick slabs cast on the walls covering a minimum of 2/3 of the thickness of the wall.) The dimensions of the band and the reinforcement inside depend upon the length of the walls between the perpendicular cross walls. The table below (Table-1) shows the dimensions to be adopted for the seismic bands and the internal reinforcement details to be provided. The reinforcement and bending details of seismic bands are given in the Figure-2. Reinforcing bars will be of Fe 415 type [TOR or, High Yield Strength Deformed, i.e. HYSD bars] 1 The details given here are extracted from IS: 4326-1993 Code of Practice as applicable to buildings with Brick/ Concrete block walls and R.C. flat slab roofs. Details not given here may be seen in the Code. 1. Lintel Band 2. Roof/ Floor Band 3. Vertical reinforcing bar at corner 4. Door 5. Window 6. Plinth Band 7. Window Sill Bands Figure – 1: Essential Internal Elements in Buildings for Earthquake Safety Zone V 2 1 2 1 5 4 3 6 7 2 1 7
  • 2. b1 b 1 2 2 2 2 1 33 b b2 30 40 75 6@150 1 2 30 40 150 6@1501 2 bb (a) (b) 40 30 (c) (d) (e) (f) (a) Section of the Band with 2 longitudinal steel bars (b) Section of the Band with 4 longitudinal steel bars (c) Structural Plan at L- type wall junction (d) Structural Plan at T- type wall junction (e) 3 Dimensional view of the L - type wall junction (f) 3 Dimensional view of the T - type wall junction 1. Longitudinal reinforcements 2. Lateral Ties 3. Vertical reinforcement at corners b, b1, b2 Wall thickness Figure-2: Reinforcement and Bending Details of Seismic Bands Table-1: Recommended size and longitudinal steel in Seismic Bands (Zone V) Buildings of all types i.e., Residential buildings & Public Buildings (Schools, Hospitals, Meeting Halls, Anganwadis, etc.) Internal length of wall Size of the band No. of Bars Dia (mm) 5 m or, less 10 cm x wall width 2 10 6 m 10 cm x wall width 2 12 7 m 15 cm x wall width 4 10 8 m 15 cm x wall width 4 12 3. VERTICAL REINFORCEMENT IN THE BRICK WALLS: For earthquake safety in seismic zone V reinforcing bars have to be embedded in brick masonry at the corners of all the rooms and the side of the door openings. Window openings larger than 60 cm in width will also need such reinforcing bars (Figure – 4). The diameter of the bar depends upon the number of storeys in the building. The recommendations are given in Table-2. Providing the vertical bars in the brickwork and concrete blocks requires special techniques which could be easily learnt by the supervising engineers and masons will need to be trained. 31 2 3 1 2
  • 3. These vertical bars have to be started from the foundation concrete, will pass through all seismic bands where they will be tied to the band reinforcements using binding wire and embedded to the ceiling band/roof slab as the case may be using a 300 mm 90° bend. Sometimes the vertical bars will not be made in one full length. In that case the extension of the vertical reinforcement bars are required, an overlap of minimum of 50 times the bar diameter should be provided. The two overlapped reinforcement bars should be tied together by using the binding wires. 1 1 1 1/2 1/2 1/2 1/2 3/4 1/2 3/4 1/2 1/21/21/21/21/2 1/2 1/2 1/2 1/4 1/4 11 1/21/2 (a) (b) 33 3 3 3/4 3/4 a & b : Alternate courses in one brick wall 1 : One brick length ½ : Half brick length ¼ : Quarter of a brick length ¾ : Three quarters of a brick length 3 : Vertical reinforcement bars with Concrete/ mortar filling in pocket of M20 grade (1:1½:3 nominal mix) Figure-3: Typical Details of Providing Vertical Steel Bars in Brick Masonry Table-2: Recommended size of vertical steel in Seismic Bands (Zone V) Buildings of all types i.e., Residential buildings & Public Buildings * (Schools, Hospitals, Meeting Halls, Anganwadis, etc.) No. of storeys Floor Dia of Single HYSD(TOR) Bar at corners of room (mm) One - 12 Top 12 Two Bottom 16 Top 12 Middle 16Three Bottom 16 * Building of four storey not permitted in Zone V. Table-3: Recommended joint details with the vertical reinforcement at corner for masonry walls using different kind of materials Type of Joint Corner reinforcement in case of Brick Masonry Corner reinforcement in case of Solid Concrete Block Masonry Corner reinforcement in case of Hollow Concrete Block Masonry (see the hole and slit made) L- Joint T- Joint
  • 4. B WELL COMPACTED SOIL 2 T P.C.C 1:4:8 2 TOR 12 125 150 <125 1.5 T T 100Plinth Band Floor Finish < Ground Level T - 230 for Brick Work 200 for Block Work Plinth Level 150 Well compacted Sand Masonry in C.M.1:6 Masonry in C.M.1:4 6mm DIA. @150 c/c (a) Sectional Elevation of Door (b) Sectional Elevation of Window (c) Section 2-2 Figure-4: Typical Details of Providing Vertical Steel Bars around doors/windows 4. VERTICAL REINFORCEMENT AT JAMBS OF OPENINGS: All door and window openings wider than 600 mm will have vertical reinforcement in jambs as shown in Figure-4. 5. FOUNDATION Foundation width 'B' should be decided by the load coming on the foundation and the bearing capacity. Masonry width may be reduced by ½ times T in every step of 150 mm height. NOTE: In sandy soils with high water table within 8 m depth below ground level, which may get liquefied during earthquake of MSK intensity VIII to IX, pile foundation need to be used in consultation with the Structural/ Geotechnical Engineer. National Disaster Management Division, Ministry of Home Affairs, North Block, New Delhi, India Tel: 91 11 2309 3178; Tel/Fax: 2309 4019; Fax: 91 11 2309 3750;E-mail: ndmindia@nic.in; dsdm@nic.in; Website: www.ndmindia.nic.in P r e p a r e d b y : Professor Anand S. Arya and Jnananjan Panda Tel: 91 11 5539 6386; Email: anand.s.arya@undp.org, jnananjan.panda@undp.org Figure-5: Foundation Detail with Plinth Band in Brick or, Concrete Block Masonry Prepared under the GoI – UNDP Disaster Risk Management Programme