The document discusses best practices for flexible pavement structure widening projects from the Atlanta District's experience. It describes that widening construction should move quickly without pavement drop-offs each day. Compaction and settling issues can occur at longitudinal construction joints that may require patching before final surfacing. Widening design typically involves 10 inches of unstabilized flexbase and a seal coat covering the entire roadway. If widening more than 4 feet, 6-8 inches of cement stabilized subgrade is helpful. The Atlanta district has completed 95-98% of planned widening projects so few remain, and their projects differ from neighboring districts due to fewer asphalt plants and wetter conditions.