2. For your consideration the budget for production and postproduction of the video "New Topic inn 2009" for the HR
department of Cemex.
Includes:
• Preproduction
• Technical Personnel
• Production
• HD equipment
• Direction
• Photo Direction
• Speech and Music Composition
• Editing and Post-Production
• Logo and map animation
• Photo Animation
Sunday, April 3, 2011
3. Production
HD recording formats RED Digital Cinema Camera in Austin Tx. (1 day)
Mobile lighting.
5000w, 2000w, 1000w, 650w, 300w, and 150w (2 of each)
2 Kino Flou 1.20m with 4 tubes.
Dolly with straight rails 6m ½ circle, boards, banners and textiles.
Director, assistant director, photographer, camera assistant, louder, Illuminator and staff, art director and Runners.
Postproduction
Capture HD material.
Editing and digital color correction.
Editing a video clip with approximately 3 to 4 minutes as required.
Sunday, April 3, 2011
4. Etapa Descripción| Duración
1 Preproduction 5-7 days
2 Production 1 day
3 Postproduction 8-12 days
4 Edit changes 2-3 days
5 Delivery materials 1 day
Delivery Times 6 Delivery of final project 1 day
• Estimated weekdays.
• These daily times do not include time for review and approval by the customer.
• Changes in creative direction or delays in the delivery of information by the client once the project begins, can lead to
adjustments in the delivery time and additional costs.
Changes
• The project has only one (1) session of change for video editing.
• The changes must be requested in writing and in a single document for each session.
• Once you have submitted the original proposal has 5 days to make comments or request changes, otherwise these proposals
will be considered as authorized by the customer.
• Requested changes from an earlier stage or after the authorization or delivery will be quoted separately.
Pay Terms
• This proposal is valid for 30 due days.
• Any other item not included in this proposal shall be quoted separately.
• The amounts are expressed in USA Dollars (USD) and do not include 16% (VAT) Value Added Tax.
• It requires a purchase order and this proposal signed on each page to begin the project.
• You need a deposit of 50% to start the project, 50% is required from the final delivery.
Sunday, April 3, 2011
5. Contact
For any doubts, or suggestion…
Austin, Texas, USA
5704 Abilene trail
Austin TX 78749
México DF
Av. 27 de Abril No. 56
Col Lomas Hipódromo
Naucalpan, Edo de México, CP 53910
Monterrey
Rio Guayalejo 106, Col. del Valle CP 66220
San Pedro Garza García, Nuevo León.
Tel. 01 800-000-BURÓ
+ 52 (81) 8356 64 75
52 (81) 1642-1195
Web. www.burocreativo.com
www.themarketingunited.com
Sunday, April 3, 2011