36. PROJECT DESCRIPTION: The work consist of Clearing & Grubbing, Cutting & Uprooting of Trees, Roadway Excavation, Structure Excavation, Embankment, Sub-Grade Preparation, Aggregate Base Course, PCSD w/ Headwall, and other Concrete Works (Wingwall, Flooring, Cut-Off Wall).
55. PROJECT DESCRIPTION:road concreting composed of 180ln.m. with 6.7m wide. It include roadway excavation, embankment, sub-grade preparation, aggregate base course, PCCP w/ chaplan
56. AFTER POURING OF CONCRETE ON BOTH LANES & AFTER THE SHOULDERING
166. BRIEF DESCRIPTION:It includes clearing & grubbing, removal of structures & obstruction (concrete pav’t & chaplan ) structure excavation, embankment, aggregate base course, inst. of 600mmØRCCP(300 ln.m.), 10 units manhole, curb & gutter and other misc. items affected by the project.
167. START OF PROJECT STA. 0 + 000 AFTER END OF PROJECT STA. 0 + 300
181. PROJECT DESCRIPTION: Proposed Sidewalk with Streetlights at Gov’t Center, it includes removal of existing conc. structures, replacement of conc. Sidewalk into paver bricks, curb & gutter, planters, lamp posts, electrical fixtures and other misc. item affected by the project
182. Along Pendatun Ave. Along City Hall Drive Along DatuMatalam Road Along Roxas Ave
183. Infront of City Hall Metering Pole/Control Cabinet PNP Landmark
192. PROJECT DESCRIPTION:Road Concreting composed of 206.10 ln.m. with 5.0 meter wide. It include roadway excavation, embankment, subgrade preparation, item 201 & item 311.
224. PROJECT DESCRIPTION:Road Rehabilitation/Widening of Farm to Market Road with 8 meter width and 5,620 meter length, and Final Grade consist of Aggregate Base Course. Additional Works consists of Triple Barrel Culvert with PCCP, Concrete Works, and Stone Masonry protection.
244. PROJECT DESCRIPTION: Road concreting of 279.25 ln.m., Drainage Construction of 209 ln.m. with 2 units Crossdrains consisting of 20 ln.m., and 4 units Manhole.
257. PROJECT DESCRIPTION: consist of 715.8 ln.m PCCP includes Roadway Excavation,StructureExcavation,Embankment,Overhaul,Sub-grade Preparation,Aggregate Base Course,Pipe Culvert & Storm Drains,Manhole-Inlets & Catch Basin,RetrofittingWorks,Billboards and Construction Signages
405. PROJECT DESCRIPTION : the work consists of improvement of Covered Court approx. 45% of the total building which includes steel works, concrete, masonry and painting
466. PROJECT DESCRIPTION : work consist of concrete masonry works & steel works. Works consist of concrete work, masonry works, roofing works, steel works & electrical works.