Chapter 5 Activity-Based Costing and Management
Learning  Objective 1
Traditional, Volume-Based Product-Costing System ,[object Object],[object Object]
Traditional, Volume-Based Product-Costing System ,[object Object],Manufacturing overhead is determined as follows
Traditional, Volume-Based Product-Costing System Budgeted manufacturing overhead  $3,894,000  Budgeted direct-labor hours  118,000 =  $33 per hour
Traditional, Volume-Based Product-Costing System ,[object Object],209.00  x  1.25
Learning  Objective 2
Activity Based Costing System  (ABC) ,[object Object],Stage One Identify significant activities and assign overhead costs to each activity in proportion to resources used. Stage Two Identify cost drivers appropriate to each activity and allocate overhead to the products.
Learning  Objective 3
Overhead Costs Total budgeted cost = $3,894,000 Activity Cost Pools Machinery cost pool $1,212,600 Setup cost pool $3,000 Engineering cost pool $700,000 Facility cost pool $507,400 Unit Level Batch Level Product- Sustaining Level Facility Level Identification of Activity Cost Pools Activity must be done on each unit produced. Activity performed on each batch produced. Activities needed to support an entire product line Activity required in order for the production process to occur.
Receiving/Inspection cost pool  $200,000 Material-Handling cost pool  $600,000 Quality-Assurance cost pool  $421,000 Packaging/Shipping cost pool  $250,000 Machinery cost pool $1,212,600 Setup cost pool $3,000 Engineering cost pool $700,000 Facility cost pool $507,400 Unit Level Batch Level Product- Sustaining Level Facility Level
Learning  Objectives 3 & 4
Machinery Cost Pool Total budgeted cost = $1,212,600 Activity cost pool STAGE ONE Various overhead costs related to  machinery Maintenance Depreciation Computer Support Lubrication Electricity Calibration
Calculate the pool rate Budgeted Machinery Costs   $1,212,600 Budgeted Machine Hours  43,000 $28.20/hour Cost Assignment STAGE TWO = =
Calculation of total  setup cost Setup Cost Pool Total budgeted cost = $3,000 Activity cost pool STAGE ONE
Calculate the pool rate Budgeted Setup Costs  $3,000 Planned Production Runs  15 runs $200 per run Cost Assignment STAGE TWO = =
Various overhead costs related to  engineering Engineering salaries Engineering supplies Engineering software Depreciation Engineering Cost Pool Total budgeted cost = $700,000 Activity cost pool STAGE ONE
Allocate based on  engineering transactions Cost Assignment STAGE TWO Engineering Cost Pool Total budgeted cost = $700,000
Various overhead costs related to  general operations Plant depr. Plant mgmt. Plant maint. Property taxes Insurance Security Facility Cost Pool Total budgeted cost = $507,400 Activity cost pool STAGE ONE
Budgeted Facilities Cost  $507,400 Budgeted Direct-Labor Hours  118,000 $4.30/hour Cost Assignment STAGE TWO = = Calculate the pool rate
Other Overhead Costs
Other Overhead Costs $14.82
Product Cost from ABC ,[object Object]
Learning  Objective 5
Distorted Product Costs ,[object Object],[$209.00 × 1.25] [$183.44 ×  1.25] The selling price of Mode I and II are reduced and the selling price for Mode III is increased.
[object Object],Traditional costing understates the cost of complex, low volume products. Distorted Product Costs
Two Key Points ,[object Object],[object Object],[object Object],[object Object]
Learning  Objective 6
Cost Drivers ,[object Object],Degree of Correlation Cost of Measurement Behavioral Effects
Learning  Objective 7
COLLECTING ABC DATA INTERVIEWS AND PAPER TRAILS -  The information for ABC systems initially comes from interviews with employees in the support departments and a review of each department’s records. STORYBOARDING -   A procedure used to develop a detailed process flow chart, which visually represents activities and the relationships among activities. MULTIDISCIPLINARY ABC PROJECT TEAMS  –   To gather information from all facets of an organizations operations, it is essential to involve personnel from a variety of functional areas.  A typical ABC project team includes  ACCOUNTING, FINANCE, PRODUCTION, OPERATIONS, ENGINEERS, MARKETING  etc.
Learning  Objective 8
Activity-Based Management The use of ABC costing  information to help management make decisions
Activity-Based Management Activity-based costing   establishes relationships between overhead costs and activities so that we can better allocate overhead costs. Activity-based management   focuses  on managing activities to reduce costs.
Two-Dimensional ABC and Activity-Based Management Activities
Two-Dimensional ABC and Activity-Based Management Cost Objects Activities Resource costs Cost Assignment View
Two-Dimensional ABC and Activity-Based Management Activity Triggers Cost Objects Activities Root Causes Process View Activity Analysis Resource costs Cost Assignment View Performance Measures Activity Evaluation
Elimination of Non-Value-Added Costs Nonvalue-added activities Necessary Unnecessary Activities Reduce or Eliminate Continually Evaluate  and Improve
Using ABM to Eliminate Non-Value-Added Activities and Costs ,[object Object],[object Object],[object Object],[object Object],[object Object],Specify parts Select vendor Receive parts Produce goods Inspect finished goods Rework defective products
Using ABM to Eliminate Non-Value-Added Activities and Costs Inspection time Process time Storage time Move time Waiting time
Learning  Objective 9
Customer Profitability Analysis Customer profitability analysis uses activity-based costing to determine the activities, costs, and profit associated  with serving particular customers.
Customer Profitability Analysis Orders small quantities. Orders frequently. Often changes orders. Required special packaging. Demand fast service. A costly customer
Customer Profitability Analysis A company may use these customer related costs to help determine the profitability of each customer.
Customer Profitability Analysis 75% of actual operating income 50% of actual operating income 25% of actual operating income
Learning  Objective 10
Activity-Based Management in the Service Industry Activity  Analysis Customer Profitability Analysis
Learning  Objective 11
Just-in-Time Inventory and Production Management ,[object Object],The primary goal of a JIT production system is to reduce or eliminate inventories at every stage of production.
Key Features of the JIT Approach Smooth, uniform production rate Pull method of production Purchase is small lot sizes Quick, inexpensive setups High quality materials Effective preventive maintenance Teamwork Multiskilled workers
JIT Purchasing Long-term contracts with suppliers. Only a few suppliers. Parts delivered in small lots. Minimal inspection of materials. Grouped payments to vendor.
End of Chapter 5 This is my kind of cost pool!

Mais conteúdo relacionado

Mais procurados

Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based CostingVikas Gupta
 
Lecture 1 of cost accounting..21 10-14
Lecture 1 of cost accounting..21 10-14Lecture 1 of cost accounting..21 10-14
Lecture 1 of cost accounting..21 10-14Zeeshan Bashir
 
Inventories and the Cost of Goods Sold
Inventories and the Cost of Goods SoldInventories and the Cost of Goods Sold
Inventories and the Cost of Goods SoldMuhammad Unaib Aslam
 
Capital budgeting and estimating cash flows
Capital budgeting and estimating cash flowsCapital budgeting and estimating cash flows
Capital budgeting and estimating cash flowsIan Isabel
 
Chapter 4 Activity Based Product Costing
Chapter 4 Activity Based Product CostingChapter 4 Activity Based Product Costing
Chapter 4 Activity Based Product CostingYesica Adicondro
 
Activity based costing
Activity based costingActivity based costing
Activity based costingsachdevkkapil
 
Standard costs and variance analysis
Standard costs and variance analysisStandard costs and variance analysis
Standard costs and variance analysisSumit Malhotra
 
Absorption costing vs variable costing
Absorption costing  vs variable costingAbsorption costing  vs variable costing
Absorption costing vs variable costingShankar Jyoti Doley
 
Cost volume-profit analysis
Cost volume-profit analysisCost volume-profit analysis
Cost volume-profit analysisBabasab Patil
 
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control Yesica Adicondro
 
Activity Based Costing.pptx
Activity Based Costing.pptxActivity Based Costing.pptx
Activity Based Costing.pptx1986anu
 
Chapter 6 Job Order and Process Costing
Chapter 6 Job Order and Process CostingChapter 6 Job Order and Process Costing
Chapter 6 Job Order and Process CostingYesica Adicondro
 
Job Order Costing
Job Order CostingJob Order Costing
Job Order Costingnarman1402
 
Chapter 6 Cost-Volume-Profit Relationships
Chapter 6 Cost-Volume-Profit RelationshipsChapter 6 Cost-Volume-Profit Relationships
Chapter 6 Cost-Volume-Profit RelationshipsViệt Hoàng Dương
 

Mais procurados (20)

Target costing
Target costingTarget costing
Target costing
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
Lecture 1 of cost accounting..21 10-14
Lecture 1 of cost accounting..21 10-14Lecture 1 of cost accounting..21 10-14
Lecture 1 of cost accounting..21 10-14
 
Inventories and the Cost of Goods Sold
Inventories and the Cost of Goods SoldInventories and the Cost of Goods Sold
Inventories and the Cost of Goods Sold
 
Capital budgeting and estimating cash flows
Capital budgeting and estimating cash flowsCapital budgeting and estimating cash flows
Capital budgeting and estimating cash flows
 
Chapter 4 Activity Based Product Costing
Chapter 4 Activity Based Product CostingChapter 4 Activity Based Product Costing
Chapter 4 Activity Based Product Costing
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Job costing and batch costing
Job costing and batch costingJob costing and batch costing
Job costing and batch costing
 
Relevant+cost
Relevant+costRelevant+cost
Relevant+cost
 
Basics of cost accounting
Basics of cost accountingBasics of cost accounting
Basics of cost accounting
 
Cost accounting - Ch2
Cost accounting - Ch2Cost accounting - Ch2
Cost accounting - Ch2
 
Standard costs and variance analysis
Standard costs and variance analysisStandard costs and variance analysis
Standard costs and variance analysis
 
Absorption costing vs variable costing
Absorption costing  vs variable costingAbsorption costing  vs variable costing
Absorption costing vs variable costing
 
Cost volume-profit analysis
Cost volume-profit analysisCost volume-profit analysis
Cost volume-profit analysis
 
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control
Chapter 15 Quality Costs and Productivity : Measurement, Reporting, and Control
 
Job costing
Job costingJob costing
Job costing
 
Activity Based Costing.pptx
Activity Based Costing.pptxActivity Based Costing.pptx
Activity Based Costing.pptx
 
Chapter 6 Job Order and Process Costing
Chapter 6 Job Order and Process CostingChapter 6 Job Order and Process Costing
Chapter 6 Job Order and Process Costing
 
Job Order Costing
Job Order CostingJob Order Costing
Job Order Costing
 
Chapter 6 Cost-Volume-Profit Relationships
Chapter 6 Cost-Volume-Profit RelationshipsChapter 6 Cost-Volume-Profit Relationships
Chapter 6 Cost-Volume-Profit Relationships
 

Destaque

Activity based costing
Activity based costingActivity based costing
Activity based costingJessy Chong
 
Activity based costing ppt @ mba finace
Activity based costing ppt @ mba finaceActivity based costing ppt @ mba finace
Activity based costing ppt @ mba finaceBabasab Patil
 
Activity based costing
Activity based costingActivity based costing
Activity based costingyogie pribadi
 
Activity based costing
Activity based costingActivity based costing
Activity based costingAnkur Verma
 
Activity Based Costing System
Activity Based Costing SystemActivity Based Costing System
Activity Based Costing SystemAsma Yasmin
 
Jaiden and archie final
Jaiden and archie finalJaiden and archie final
Jaiden and archie finalbcsengage
 
Abc parker and youssef final
Abc parker and youssef finalAbc parker and youssef final
Abc parker and youssef finalbcsengage
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based CostingMulyono Joyo
 
Activity Based Costing: A Case of Plastim Corporation
Activity Based Costing: A Case of Plastim CorporationActivity Based Costing: A Case of Plastim Corporation
Activity Based Costing: A Case of Plastim CorporationRahul Dhiman
 
Jiambalvo text book solutions (3)
Jiambalvo text book solutions (3)Jiambalvo text book solutions (3)
Jiambalvo text book solutions (3)Mvs Krishna
 
Cost volume-profit (cvp)
Cost volume-profit (cvp)Cost volume-profit (cvp)
Cost volume-profit (cvp)Jessy Chong
 
Prima Plastics Ltd (Bse Code 530589) - Jan16 katalyst wealth alpha report
Prima Plastics Ltd (Bse Code 530589) - Jan16 katalyst wealth alpha reportPrima Plastics Ltd (Bse Code 530589) - Jan16 katalyst wealth alpha report
Prima Plastics Ltd (Bse Code 530589) - Jan16 katalyst wealth alpha reportKatalyst Wealth
 
Wilkerson Company Case
Wilkerson Company CaseWilkerson Company Case
Wilkerson Company CaseElla Shen
 

Destaque (20)

Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Activity based costing ppt @ mba finace
Activity based costing ppt @ mba finaceActivity based costing ppt @ mba finace
Activity based costing ppt @ mba finace
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
新呈介紹與 Abc & abm
新呈介紹與 Abc & abm新呈介紹與 Abc & abm
新呈介紹與 Abc & abm
 
Abc ho
Abc hoAbc ho
Abc ho
 
Activity Based Costing System
Activity Based Costing SystemActivity Based Costing System
Activity Based Costing System
 
Jaiden and archie final
Jaiden and archie finalJaiden and archie final
Jaiden and archie final
 
Abc parker and youssef final
Abc parker and youssef finalAbc parker and youssef final
Abc parker and youssef final
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
Activity Based Costing: A Case of Plastim Corporation
Activity Based Costing: A Case of Plastim CorporationActivity Based Costing: A Case of Plastim Corporation
Activity Based Costing: A Case of Plastim Corporation
 
Jiambalvo text book solutions (3)
Jiambalvo text book solutions (3)Jiambalvo text book solutions (3)
Jiambalvo text book solutions (3)
 
Abc costing
Abc costingAbc costing
Abc costing
 
Cost volume-profit (cvp)
Cost volume-profit (cvp)Cost volume-profit (cvp)
Cost volume-profit (cvp)
 
Cvp
CvpCvp
Cvp
 
Prima Plastics Ltd (Bse Code 530589) - Jan16 katalyst wealth alpha report
Prima Plastics Ltd (Bse Code 530589) - Jan16 katalyst wealth alpha reportPrima Plastics Ltd (Bse Code 530589) - Jan16 katalyst wealth alpha report
Prima Plastics Ltd (Bse Code 530589) - Jan16 katalyst wealth alpha report
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
Wilkerson Company Case
Wilkerson Company CaseWilkerson Company Case
Wilkerson Company Case
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 

Semelhante a Activity-Based Costing for Complex Circuit Board Manufacturer

0324663854 151818
0324663854 1518180324663854 151818
0324663854 151818Nhu Le
 
Job Costing & ABC costing
Job Costing & ABC costingJob Costing & ABC costing
Job Costing & ABC costingRakesh Singh
 
Activity Based costing
Activity Based costingActivity Based costing
Activity Based costingJoseph Mary
 
Activity-Based Costing (ABC
Activity-Based Costing (ABCActivity-Based Costing (ABC
Activity-Based Costing (ABCAngie Miller
 
Acc mgt noreen03 systems design activity based costing
Acc mgt noreen03 systems design activity based costingAcc mgt noreen03 systems design activity based costing
Acc mgt noreen03 systems design activity based costingJudianto Nugroho
 
Activity Based Costing From The Perspective Of Competitive...
Activity Based Costing From The Perspective Of Competitive...Activity Based Costing From The Perspective Of Competitive...
Activity Based Costing From The Perspective Of Competitive...Katherine Alexander
 
Activity based costing
Activity based costingActivity based costing
Activity based costingRahul Kumar
 
ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...
ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...
ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...Sonu Sah
 
ACT202 Chapter 7.ppt
ACT202 Chapter 7.pptACT202 Chapter 7.ppt
ACT202 Chapter 7.pptssuserbea996
 

Semelhante a Activity-Based Costing for Complex Circuit Board Manufacturer (20)

PPT on PM_Unit 1 .pptx.
PPT                  on PM_Unit 1 .pptx.PPT                  on PM_Unit 1 .pptx.
PPT on PM_Unit 1 .pptx.
 
0324663854 151818
0324663854 1518180324663854 151818
0324663854 151818
 
APC costing
APC costingAPC costing
APC costing
 
A b c
A b cA b c
A b c
 
CA NOTES ON COSTING
CA NOTES ON COSTINGCA NOTES ON COSTING
CA NOTES ON COSTING
 
Job Costing & ABC costing
Job Costing & ABC costingJob Costing & ABC costing
Job Costing & ABC costing
 
Traditional & Abc
Traditional & AbcTraditional & Abc
Traditional & Abc
 
7594572.ppt
7594572.ppt7594572.ppt
7594572.ppt
 
7594572.ppt
7594572.ppt7594572.ppt
7594572.ppt
 
Acc 349 Preview Full Course
Acc 349 Preview Full Course Acc 349 Preview Full Course
Acc 349 Preview Full Course
 
Activity Based costing
Activity Based costingActivity Based costing
Activity Based costing
 
Activity-Based Costing (ABC
Activity-Based Costing (ABCActivity-Based Costing (ABC
Activity-Based Costing (ABC
 
Acc mgt noreen03 systems design activity based costing
Acc mgt noreen03 systems design activity based costingAcc mgt noreen03 systems design activity based costing
Acc mgt noreen03 systems design activity based costing
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Cost allocation
Cost allocationCost allocation
Cost allocation
 
Presentation on Activity-Based Costing.pptx
Presentation on Activity-Based Costing.pptxPresentation on Activity-Based Costing.pptx
Presentation on Activity-Based Costing.pptx
 
Activity Based Costing From The Perspective Of Competitive...
Activity Based Costing From The Perspective Of Competitive...Activity Based Costing From The Perspective Of Competitive...
Activity Based Costing From The Perspective Of Competitive...
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...
ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...
ACtivItY BaSeD CostinG, Value ChAin AnalysiS, TargeT cosTing & Life Cycle Cos...
 
ACT202 Chapter 7.ppt
ACT202 Chapter 7.pptACT202 Chapter 7.ppt
ACT202 Chapter 7.ppt
 

Último

Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 

Último (20)

Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 

Activity-Based Costing for Complex Circuit Board Manufacturer

  • 1. Chapter 5 Activity-Based Costing and Management
  • 3.
  • 4.
  • 5. Traditional, Volume-Based Product-Costing System Budgeted manufacturing overhead $3,894,000 Budgeted direct-labor hours 118,000 = $33 per hour
  • 6.
  • 8.
  • 10. Overhead Costs Total budgeted cost = $3,894,000 Activity Cost Pools Machinery cost pool $1,212,600 Setup cost pool $3,000 Engineering cost pool $700,000 Facility cost pool $507,400 Unit Level Batch Level Product- Sustaining Level Facility Level Identification of Activity Cost Pools Activity must be done on each unit produced. Activity performed on each batch produced. Activities needed to support an entire product line Activity required in order for the production process to occur.
  • 11. Receiving/Inspection cost pool $200,000 Material-Handling cost pool $600,000 Quality-Assurance cost pool $421,000 Packaging/Shipping cost pool $250,000 Machinery cost pool $1,212,600 Setup cost pool $3,000 Engineering cost pool $700,000 Facility cost pool $507,400 Unit Level Batch Level Product- Sustaining Level Facility Level
  • 13. Machinery Cost Pool Total budgeted cost = $1,212,600 Activity cost pool STAGE ONE Various overhead costs related to machinery Maintenance Depreciation Computer Support Lubrication Electricity Calibration
  • 14. Calculate the pool rate Budgeted Machinery Costs $1,212,600 Budgeted Machine Hours 43,000 $28.20/hour Cost Assignment STAGE TWO = =
  • 15. Calculation of total setup cost Setup Cost Pool Total budgeted cost = $3,000 Activity cost pool STAGE ONE
  • 16. Calculate the pool rate Budgeted Setup Costs $3,000 Planned Production Runs 15 runs $200 per run Cost Assignment STAGE TWO = =
  • 17. Various overhead costs related to engineering Engineering salaries Engineering supplies Engineering software Depreciation Engineering Cost Pool Total budgeted cost = $700,000 Activity cost pool STAGE ONE
  • 18. Allocate based on engineering transactions Cost Assignment STAGE TWO Engineering Cost Pool Total budgeted cost = $700,000
  • 19. Various overhead costs related to general operations Plant depr. Plant mgmt. Plant maint. Property taxes Insurance Security Facility Cost Pool Total budgeted cost = $507,400 Activity cost pool STAGE ONE
  • 20. Budgeted Facilities Cost $507,400 Budgeted Direct-Labor Hours 118,000 $4.30/hour Cost Assignment STAGE TWO = = Calculate the pool rate
  • 23.
  • 25.
  • 26.
  • 27.
  • 29.
  • 31. COLLECTING ABC DATA INTERVIEWS AND PAPER TRAILS - The information for ABC systems initially comes from interviews with employees in the support departments and a review of each department’s records. STORYBOARDING - A procedure used to develop a detailed process flow chart, which visually represents activities and the relationships among activities. MULTIDISCIPLINARY ABC PROJECT TEAMS – To gather information from all facets of an organizations operations, it is essential to involve personnel from a variety of functional areas. A typical ABC project team includes ACCOUNTING, FINANCE, PRODUCTION, OPERATIONS, ENGINEERS, MARKETING etc.
  • 33. Activity-Based Management The use of ABC costing information to help management make decisions
  • 34. Activity-Based Management Activity-based costing establishes relationships between overhead costs and activities so that we can better allocate overhead costs. Activity-based management focuses on managing activities to reduce costs.
  • 35. Two-Dimensional ABC and Activity-Based Management Activities
  • 36. Two-Dimensional ABC and Activity-Based Management Cost Objects Activities Resource costs Cost Assignment View
  • 37. Two-Dimensional ABC and Activity-Based Management Activity Triggers Cost Objects Activities Root Causes Process View Activity Analysis Resource costs Cost Assignment View Performance Measures Activity Evaluation
  • 38. Elimination of Non-Value-Added Costs Nonvalue-added activities Necessary Unnecessary Activities Reduce or Eliminate Continually Evaluate and Improve
  • 39.
  • 40. Using ABM to Eliminate Non-Value-Added Activities and Costs Inspection time Process time Storage time Move time Waiting time
  • 42. Customer Profitability Analysis Customer profitability analysis uses activity-based costing to determine the activities, costs, and profit associated with serving particular customers.
  • 43. Customer Profitability Analysis Orders small quantities. Orders frequently. Often changes orders. Required special packaging. Demand fast service. A costly customer
  • 44. Customer Profitability Analysis A company may use these customer related costs to help determine the profitability of each customer.
  • 45. Customer Profitability Analysis 75% of actual operating income 50% of actual operating income 25% of actual operating income
  • 47. Activity-Based Management in the Service Industry Activity Analysis Customer Profitability Analysis
  • 49.
  • 50. Key Features of the JIT Approach Smooth, uniform production rate Pull method of production Purchase is small lot sizes Quick, inexpensive setups High quality materials Effective preventive maintenance Teamwork Multiskilled workers
  • 51. JIT Purchasing Long-term contracts with suppliers. Only a few suppliers. Parts delivered in small lots. Minimal inspection of materials. Grouped payments to vendor.
  • 52. End of Chapter 5 This is my kind of cost pool!