SlideShare uma empresa Scribd logo
1 de 2
Baixar para ler offline
 
 
 
 
 
 
 
 
 
 
 
 
 




                 RAVVA
    Celebrating 16 Years of Technical Excellence

     Innovating Development | Reservoir Simulation
Ravva | Innovating Development


Reservoir Simulation

Reservoir Simulation Studies have been a critical tool to understand the performance of the field and
devise methods for optimum development and exploitation of the reservoirs. Reservoir simulations help in
identifying any deviations from the predicted path of reservoir performance and help in fine tuning the
exploitation strategy to make mid-course adjustments to achieve the ultimate target of achieving the
projected recoveries from the oil fields.

                                                                          The first 3D simulation studies for
                                                                          Ravva were carried out in 1996
                                                                          soon after the PSC was signed and
                                                                          it was used for the initial
                                                                          development planning. This study
                                                                          was based on the limited data
                                                                          available at that point of time. With
                                                                          additional data being available,
                                                                          revised simulation studies were
                                                                          carried out in 1997, which
                                                                          recognised that the field could be
                                                                          produced at higher offtakes and
                                                                          recommended the increase in the
                                                                          oil production plateau rate from
                                                                          35,000 bopd to 50,000 bopd.
                                                                          Again, in 2004, based on revised
                                                                          geological modeling, reservoir
                                                                          simulation studies were conducted
                                                                          which formed the basis for infill and
                                                                          further appraisal drilling in the

Ravva field. The results from the infill drilling / workover programme of 2007 were as per expectations.

Based on the results of the last drilling campaign, the geological model for Ravva has been further revised
in 2008 and is currently being evaluated for identifying further infill and workover opportunities in the field.
The field has so far been performing as per expectations and predictions from the previous reservoir
simulation studies.

The performance review and monitoring are warranted due to the availability of additional data, possible
deviation from the recommended path of development, new set of exploitation conditions and advances in
technology. The critical element in creating a representative dynamic model of the reservoir is
representing the technical character of the field/ reservoir with a comprehensive geological model. This is
a pre-requisite for the formulation of a viable and effective exploitation strategy. The realisation of the
effective yield from the field would ultimately depend on the best design and timely execution of the
development plans. Ravva reservoir models are created using state-of–the-art modeling tools like
PETREL and ECLIPSE reservoir simulators.

Through repeated cycles of model building and reservoir simulation, the performance and the potential of
Ravva field is being continuous evaluated and appropriate steps taken to achieve the ultimate objectives.

Mais conteúdo relacionado

Mais de Cairn India Limited

Mais de Cairn India Limited (20)

Occupational Health & Safety in India - Framework and Challenges | Mr. Anup C...
Occupational Health & Safety in India - Framework and Challenges | Mr. Anup C...Occupational Health & Safety in India - Framework and Challenges | Mr. Anup C...
Occupational Health & Safety in India - Framework and Challenges | Mr. Anup C...
 
HEAT STRESS PREVENTION – A CASE STUDY | Dr. Divyang Shah, – Occupational Heal...
HEAT STRESS PREVENTION – A CASE STUDY | Dr. Divyang Shah, – Occupational Heal...HEAT STRESS PREVENTION – A CASE STUDY | Dr. Divyang Shah, – Occupational Heal...
HEAT STRESS PREVENTION – A CASE STUDY | Dr. Divyang Shah, – Occupational Heal...
 
North Sea Emergency Response Preparedness 25 Years On | Ms. Claire Forbes, Re...
North Sea Emergency Response Preparedness 25 Years On | Ms. Claire Forbes, Re...North Sea Emergency Response Preparedness 25 Years On | Ms. Claire Forbes, Re...
North Sea Emergency Response Preparedness 25 Years On | Ms. Claire Forbes, Re...
 
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...
 
Importance of Data Driven Decision Making in Enterprise Energy Management | D...
Importance of Data Driven Decision Making in Enterprise Energy Management | D...Importance of Data Driven Decision Making in Enterprise Energy Management | D...
Importance of Data Driven Decision Making in Enterprise Energy Management | D...
 
Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...
Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...
Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...
 
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
 
Health, Safety and Environment Aspects of Carbon dioxide Sequestration | By: ...
Health, Safety and Environment Aspects of Carbon dioxide Sequestration | By: ...Health, Safety and Environment Aspects of Carbon dioxide Sequestration | By: ...
Health, Safety and Environment Aspects of Carbon dioxide Sequestration | By: ...
 
Lessons from Texas City | Michael P. Broadribb, Baker Engineering & Risk Cons...
Lessons from Texas City | Michael P. Broadribb, Baker Engineering & Risk Cons...Lessons from Texas City | Michael P. Broadribb, Baker Engineering & Risk Cons...
Lessons from Texas City | Michael P. Broadribb, Baker Engineering & Risk Cons...
 
Process Safety Management in Design, Construction & Commissioning | Lalit K...
Process Safety Management in Design, Construction &  Commissioning | Lalit  K...Process Safety Management in Design, Construction &  Commissioning | Lalit  K...
Process Safety Management in Design, Construction & Commissioning | Lalit K...
 
Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...
Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...
Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...
 
The Continuing Challenges of Balancing Process Safety Management and Personal...
The Continuing Challenges of Balancing Process Safety Management and Personal...The Continuing Challenges of Balancing Process Safety Management and Personal...
The Continuing Challenges of Balancing Process Safety Management and Personal...
 
Competency Development – a paradigm shift | Alastair Shakeshaft, Director, B...
Competency Development  – a paradigm shift | Alastair Shakeshaft, Director, B...Competency Development  – a paradigm shift | Alastair Shakeshaft, Director, B...
Competency Development – a paradigm shift | Alastair Shakeshaft, Director, B...
 
Building the competence of your workforce | Teresa Budworth, Chief Executive,...
Building the competence of your workforce | Teresa Budworth, Chief Executive,...Building the competence of your workforce | Teresa Budworth, Chief Executive,...
Building the competence of your workforce | Teresa Budworth, Chief Executive,...
 
Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...
Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...
Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...
 
Inclusive Growth – Is Sustainability the Answer ? | Dr. Yogendra Saxena, Tata...
Inclusive Growth – Is Sustainability the Answer ? | Dr. Yogendra Saxena, Tata...Inclusive Growth – Is Sustainability the Answer ? | Dr. Yogendra Saxena, Tata...
Inclusive Growth – Is Sustainability the Answer ? | Dr. Yogendra Saxena, Tata...
 
Shared Prosperity through Strategic Community Investment: An IFC perspective ...
Shared Prosperity through Strategic Community Investment: An IFC perspective ...Shared Prosperity through Strategic Community Investment: An IFC perspective ...
Shared Prosperity through Strategic Community Investment: An IFC perspective ...
 
Global perspective on sustainability initiatives in the mining industry | Mar...
Global perspective on sustainability initiatives in the mining industry | Mar...Global perspective on sustainability initiatives in the mining industry | Mar...
Global perspective on sustainability initiatives in the mining industry | Mar...
 
Human Factors – How to take the first steps? | Neil Clark – IHF Ltd
Human Factors –  How to take the first steps? | Neil Clark – IHF LtdHuman Factors –  How to take the first steps? | Neil Clark – IHF Ltd
Human Factors – How to take the first steps? | Neil Clark – IHF Ltd
 
Climate Change - Role of Industry - Mr. Rambabu
Climate Change - Role of Industry - Mr. RambabuClimate Change - Role of Industry - Mr. Rambabu
Climate Change - Role of Industry - Mr. Rambabu
 

Último

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 

Último (20)

CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 

Ravva Reservoir Simulation

  • 1.                           RAVVA Celebrating 16 Years of Technical Excellence Innovating Development | Reservoir Simulation
  • 2. Ravva | Innovating Development Reservoir Simulation Reservoir Simulation Studies have been a critical tool to understand the performance of the field and devise methods for optimum development and exploitation of the reservoirs. Reservoir simulations help in identifying any deviations from the predicted path of reservoir performance and help in fine tuning the exploitation strategy to make mid-course adjustments to achieve the ultimate target of achieving the projected recoveries from the oil fields. The first 3D simulation studies for Ravva were carried out in 1996 soon after the PSC was signed and it was used for the initial development planning. This study was based on the limited data available at that point of time. With additional data being available, revised simulation studies were carried out in 1997, which recognised that the field could be produced at higher offtakes and recommended the increase in the oil production plateau rate from 35,000 bopd to 50,000 bopd. Again, in 2004, based on revised geological modeling, reservoir simulation studies were conducted which formed the basis for infill and further appraisal drilling in the Ravva field. The results from the infill drilling / workover programme of 2007 were as per expectations. Based on the results of the last drilling campaign, the geological model for Ravva has been further revised in 2008 and is currently being evaluated for identifying further infill and workover opportunities in the field. The field has so far been performing as per expectations and predictions from the previous reservoir simulation studies. The performance review and monitoring are warranted due to the availability of additional data, possible deviation from the recommended path of development, new set of exploitation conditions and advances in technology. The critical element in creating a representative dynamic model of the reservoir is representing the technical character of the field/ reservoir with a comprehensive geological model. This is a pre-requisite for the formulation of a viable and effective exploitation strategy. The realisation of the effective yield from the field would ultimately depend on the best design and timely execution of the development plans. Ravva reservoir models are created using state-of–the-art modeling tools like PETREL and ECLIPSE reservoir simulators. Through repeated cycles of model building and reservoir simulation, the performance and the potential of Ravva field is being continuous evaluated and appropriate steps taken to achieve the ultimate objectives.