            Dantherm Power


        Nordic Green II - April 2010
Common questions


Answers that might surprise you
• Can I buy one today?              
• Will it save me money?            
• Anybody important using them?     
• Can they power my IT network?     

• Should I have one at home?        
• Is yours like the Bloom box?     


                        Why not?
10 years away or just around the
corner?

How do you measure success?
• Deployed on every continent             
• Meet every performance metric           
• Exceed reliability & durability needs   
• Preferred choice for most advanced
  networks in the world                   

• Dominant technology for Backup          


                         Why not?
The integrated communication solution




                                                                Optional
                                                                climate
                                                                control
                                                                solution for
Hydrogen storage                                                cabinets
using compressed                                                and
hydrogen in                                                     shelters
cylinders including
hydrogen monitoring
equipment




                      Power Supply module with integrated UPS
                      or power backup and reformer integrated
                      when running on methanol
Reference Network
                             2 million hours with
                              100% availability
• Nationwide TETRA
  (emergency/military) network
• Dantherm supplied integrated
  cabinet solution including cooling,
  power, and radios:
  – 330 sites with battery back up (4 hours all that
    is required)
  – 125 critical sites with hydrogen based power
    back up (168 hours)
• Eliminate batteries at critical sites to
  ensure power available for 15 years
  with annual service only
Sample Deployments

•   15 Temporary Power sites in Canada
        –    Cheaper and friendlier than diesels until grid is connected
•   GSM-R station in Norway Indoor
        –    Reduced energy consumption for heat/cooling
        –    Increased maintenance to 2 year cycle from 6 month
•   Extreme Climate Indoor/Outdoor site
        –    Complete battery replacement for remote telecom site
•   High power Indoor Backup Power system
        –    Emergency power for critical communications and healthcare
•   Large operator sites in Canada
        –    Low maintenance, battery and genset replacement
•   Mobile Network expansion with standalone equipment
        –    Easy deployment of new network plus high value Backup
•   Data, VoIP, and pharmaceutical power quality & reliability
        –    Keep patients, doctors, clinicians and medicine safe and available
Temp. Power sites for new Canadian operator


Continuous use for 3-6 Months till mains grid is connected from utility
1,7 kW UPS system in rack

Battery free configuration eliminates
extra heating/cooling system.
Zero millisecond transfer from grid
to Backup.
Standard 1,7 kW module in custom
indoor cabinet, 16 hours outdoor.

GSM-R station subjected to
extensive vibration from trains.
Extreme climate Northern remote
critical
Battery free configuration reduces cost
and complexity.
Eliminates need for air conditioners.
Reduces energy consumption and
improves power quality.
0 ms bridge from grid power to full fuel
cell backup.
13,4 kW backup power system in racks

•   Battery hybrid backup power
    system for big Chinese network
    operator
•   2 racks with each 4 modules of
    1,7 kW standard units
•   DC power source for large
    telecom and data sites

•   External storage can provide
    extended power for emergency
    power
5 kW backup power system in rack

Battery free backup power system for use in big
telecom shelters for top operator in Canada.
1 rack with 3 x 1,7 kW standard units
16 hours on-site with 6 hr. response
Economizer replacement – pulls heat out
Wireless Outdoor Cabinet
Complete system 6kWe for 12 hours

Battery free Backup power system for large OEM
Single 36U rack with:
      • 3 x 2 kW standard units or
      • 2 x 2 kW plus LTE radios
12 hour Backup from standard H2 cylinders for
critical and remote sites




Easy way to
overlay LTE
plus long-
run Backup
Data Indoor Cabinets - UPS


Stand-alone 4 hours 2 kWe
UPS for critical individual
loads.

                              5kWe Backup extenders use front-
                              end of UPS eases integration,
                              requires no unplugging.



     Easy way to add or
     extend data backup with
     limited building
     modifications.
Sample Economics

TempPower      1 kW DC, urban setting, 25% less $$ than diesel

Backup fibre   2.7 kW DC, 16hours, 30% savings over battery/generator

Backup data    5 kW AC, 16 hours, 5 times per year, -20% over bat/gen

Remote PV      1.6 kW DC, 400 hours per year, -15% CapEx and -25% OpEx

Backup BTS     1.5 kW DC, 24hours onsite, 20% savings over batt/gen
Why not?


• I won’t be here in 10 years.

• That is a different budget.

• Somebody said they are dangerous.

• Who will fuel and fix it

Mais conteúdo relacionado

Mais procurados

How to Reduce Total Cost of Ownership of 4G-LTE Networks - an Eltek White Paper
How to Reduce Total Cost of Ownership of 4G-LTE Networks - an Eltek White PaperHow to Reduce Total Cost of Ownership of 4G-LTE Networks - an Eltek White Paper
How to Reduce Total Cost of Ownership of 4G-LTE Networks - an Eltek White Paper
Eltek
 
Renewable energy for bts (2)
Renewable energy for bts (2)Renewable energy for bts (2)
Renewable energy for bts (2)
nasir12345678900
 
Applicability of Smart Metering Technology in Sri Lanka
Applicability of Smart Metering Technology in Sri LankaApplicability of Smart Metering Technology in Sri Lanka
Applicability of Smart Metering Technology in Sri Lanka
JLanka Technologies (Pvt) Limited
 

Mais procurados (20)

Cost Saving and Excellent Payback for US Exchange Carrier - an Eltek Case S...
Cost Saving and Excellent Payback for US Exchange Carrier   - an Eltek Case S...Cost Saving and Excellent Payback for US Exchange Carrier   - an Eltek Case S...
Cost Saving and Excellent Payback for US Exchange Carrier - an Eltek Case S...
 
Nachman Shelef - Grid Scale Energy Storage
Nachman Shelef - Grid Scale Energy StorageNachman Shelef - Grid Scale Energy Storage
Nachman Shelef - Grid Scale Energy Storage
 
How HE Results In Cost Saving - an Eltek Case Study
How HE Results In Cost Saving - an Eltek Case StudyHow HE Results In Cost Saving - an Eltek Case Study
How HE Results In Cost Saving - an Eltek Case Study
 
NetSure ITM 48V DC UPS
NetSure ITM 48V DC UPSNetSure ITM 48V DC UPS
NetSure ITM 48V DC UPS
 
3 8 12 Overview Of New Products Pat
3 8 12 Overview Of New Products Pat3 8 12 Overview Of New Products Pat
3 8 12 Overview Of New Products Pat
 
How to Reduce Total Cost of Ownership of 4G-LTE Networks - an Eltek White Paper
How to Reduce Total Cost of Ownership of 4G-LTE Networks - an Eltek White PaperHow to Reduce Total Cost of Ownership of 4G-LTE Networks - an Eltek White Paper
How to Reduce Total Cost of Ownership of 4G-LTE Networks - an Eltek White Paper
 
Renewable energy for bts (2)
Renewable energy for bts (2)Renewable energy for bts (2)
Renewable energy for bts (2)
 
Integrating Multiple Microgrids into an Active Network Management System
Integrating Multiple Microgrids into an Active Network Management SystemIntegrating Multiple Microgrids into an Active Network Management System
Integrating Multiple Microgrids into an Active Network Management System
 
Issues faced by developer for net metering
Issues faced by developer for net meteringIssues faced by developer for net metering
Issues faced by developer for net metering
 
Energy Grid Tie: Smart Technology, Cooling, Modularity, Monitoring | Parker H...
Energy Grid Tie: Smart Technology, Cooling, Modularity, Monitoring | Parker H...Energy Grid Tie: Smart Technology, Cooling, Modularity, Monitoring | Parker H...
Energy Grid Tie: Smart Technology, Cooling, Modularity, Monitoring | Parker H...
 
A residential roof top solar system
A residential roof top solar systemA residential roof top solar system
A residential roof top solar system
 
Hybrid and sustainable energy management
Hybrid and sustainable energy managementHybrid and sustainable energy management
Hybrid and sustainable energy management
 
Applicability of Smart Metering Technology in Sri Lanka
Applicability of Smart Metering Technology in Sri LankaApplicability of Smart Metering Technology in Sri Lanka
Applicability of Smart Metering Technology in Sri Lanka
 
Multi string PV array
Multi string PV arrayMulti string PV array
Multi string PV array
 
Solar Cold Storage Solution
Solar Cold Storage SolutionSolar Cold Storage Solution
Solar Cold Storage Solution
 
Integration of Renewable Energy Sources
Integration of Renewable Energy SourcesIntegration of Renewable Energy Sources
Integration of Renewable Energy Sources
 
Distributed Generation Operation for Distribution System Volt/Var Control
Distributed Generation Operation for Distribution System Volt/Var ControlDistributed Generation Operation for Distribution System Volt/Var Control
Distributed Generation Operation for Distribution System Volt/Var Control
 
Back page
Back pageBack page
Back page
 
Energy efficient solar solutions for developing countries
Energy efficient solar solutions for developing countriesEnergy efficient solar solutions for developing countries
Energy efficient solar solutions for developing countries
 
Genius Energy - Steel Energy - Flywheel Energy Storage (Kinetic Storage)
Genius Energy - Steel Energy - Flywheel Energy Storage (Kinetic Storage)Genius Energy - Steel Energy - Flywheel Energy Storage (Kinetic Storage)
Genius Energy - Steel Energy - Flywheel Energy Storage (Kinetic Storage)
 

Semelhante a Backup Powersystems - David Martin - Dantherm Power - April 2010

Naps telecom references
Naps telecom referencesNaps telecom references
Naps telecom references
NapsSolar
 
schneider-electric-storage.pptx
schneider-electric-storage.pptxschneider-electric-storage.pptx
schneider-electric-storage.pptx
Poooi2
 
Global General Presentation 2011
Global General Presentation 2011Global General Presentation 2011
Global General Presentation 2011
vikings28
 
Energy Storage - Hatch Innovative approach to cost reduction
Energy Storage - Hatch Innovative approach to cost reductionEnergy Storage - Hatch Innovative approach to cost reduction
Energy Storage - Hatch Innovative approach to cost reduction
Michel Carreau
 
RF Battery Solar PPT
RF Battery Solar PPTRF Battery Solar PPT
RF Battery Solar PPT
Geof Moser
 

Semelhante a Backup Powersystems - David Martin - Dantherm Power - April 2010 (20)

998-21963451_GalaxyVS208-480V_GMA_brochure_final.pdf
998-21963451_GalaxyVS208-480V_GMA_brochure_final.pdf998-21963451_GalaxyVS208-480V_GMA_brochure_final.pdf
998-21963451_GalaxyVS208-480V_GMA_brochure_final.pdf
 
Cocr 9 jmlef-r0_en_2
Cocr 9 jmlef-r0_en_2Cocr 9 jmlef-r0_en_2
Cocr 9 jmlef-r0_en_2
 
Naps telecom references
Naps telecom referencesNaps telecom references
Naps telecom references
 
How to enhance hyperconvergence with infrastructure management
How to enhance hyperconvergence with infrastructure managementHow to enhance hyperconvergence with infrastructure management
How to enhance hyperconvergence with infrastructure management
 
Solving Energy Storage Challenges Offshore | Offshore Europe 2017
Solving Energy Storage Challenges Offshore | Offshore Europe 2017Solving Energy Storage Challenges Offshore | Offshore Europe 2017
Solving Energy Storage Challenges Offshore | Offshore Europe 2017
 
vergnet-wind-diesel
vergnet-wind-dieselvergnet-wind-diesel
vergnet-wind-diesel
 
Applications of flow batteries in Africa
Applications of flow batteries in AfricaApplications of flow batteries in Africa
Applications of flow batteries in Africa
 
Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power - High Reliability Australian Technology Innovative, Customise...Magellan Power - High Reliability Australian Technology Innovative, Customise...
Magellan Power - High Reliability Australian Technology Innovative, Customise...
 
Energy Efficiency and Sustainability: Safaricom Perspective
Energy Efficiency and Sustainability: Safaricom PerspectiveEnergy Efficiency and Sustainability: Safaricom Perspective
Energy Efficiency and Sustainability: Safaricom Perspective
 
schneider-electric-storage.pptx
schneider-electric-storage.pptxschneider-electric-storage.pptx
schneider-electric-storage.pptx
 
Vacon NXP Liquid Cooled
Vacon NXP Liquid CooledVacon NXP Liquid Cooled
Vacon NXP Liquid Cooled
 
Global General Presentation 2011
Global General Presentation 2011Global General Presentation 2011
Global General Presentation 2011
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
 
Energy storage fauzan kurnia
Energy storage fauzan kurniaEnergy storage fauzan kurnia
Energy storage fauzan kurnia
 
Utah Data Center Project
Utah Data Center ProjectUtah Data Center Project
Utah Data Center Project
 
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRESCOMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
COMMON PROBLEMS AND CHALLENGES IN DATA CENTRES
 
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
Australian Energy Storage Conference and Exhibition 2017 - 14-15 Jun 2017 in ...
 
Energy Storage - Hatch Innovative approach to cost reduction
Energy Storage - Hatch Innovative approach to cost reductionEnergy Storage - Hatch Innovative approach to cost reduction
Energy Storage - Hatch Innovative approach to cost reduction
 
RF Battery Solar PPT
RF Battery Solar PPTRF Battery Solar PPT
RF Battery Solar PPT
 
Narada power solutions
Narada power solutionsNarada power solutions
Narada power solutions
 

Mais de Burton Lee

Zarko Maletin - Plug n Play Tech Center - Stanford Engineering - Mar 12 2012
Zarko Maletin - Plug n Play Tech Center - Stanford Engineering - Mar 12 2012Zarko Maletin - Plug n Play Tech Center - Stanford Engineering - Mar 12 2012
Zarko Maletin - Plug n Play Tech Center - Stanford Engineering - Mar 12 2012
Burton Lee
 
Duncan Logan - Rocketspace - Stanford Engineering - Mar 12 2012
Duncan Logan - Rocketspace - Stanford Engineering - Mar 12 2012Duncan Logan - Rocketspace - Stanford Engineering - Mar 12 2012
Duncan Logan - Rocketspace - Stanford Engineering - Mar 12 2012
Burton Lee
 
Alfredo Coppola - US MAC - Stanford Engineering - Mar 12 2012
Alfredo Coppola - US MAC - Stanford Engineering - Mar 12 2012Alfredo Coppola - US MAC - Stanford Engineering - Mar 12 2012
Alfredo Coppola - US MAC - Stanford Engineering - Mar 12 2012
Burton Lee
 
Adeo Ressi - Founder Institute - Stanford Engineering - Mar 12 2012
Adeo Ressi - Founder Institute - Stanford Engineering - Mar 12 2012Adeo Ressi - Founder Institute - Stanford Engineering - Mar 12 2012
Adeo Ressi - Founder Institute - Stanford Engineering - Mar 12 2012
Burton Lee
 
Aydin Senkut - Felicis Ventures - Stanford Engineering - Mar 12 2012
Aydin Senkut - Felicis Ventures - Stanford Engineering - Mar 12 2012Aydin Senkut - Felicis Ventures - Stanford Engineering - Mar 12 2012
Aydin Senkut - Felicis Ventures - Stanford Engineering - Mar 12 2012
Burton Lee
 
Michel Wendell - Nexit Ventures - Finland - Stanford Engineering - Mar 5 2012
Michel Wendell - Nexit Ventures - Finland - Stanford Engineering - Mar 5 2012Michel Wendell - Nexit Ventures - Finland - Stanford Engineering - Mar 5 2012
Michel Wendell - Nexit Ventures - Finland - Stanford Engineering - Mar 5 2012
Burton Lee
 
Reshma Sohoni - Seedcamp - UK - Stanford Engineering - Mar 5 2012
Reshma Sohoni - Seedcamp - UK - Stanford Engineering - Mar 5 2012Reshma Sohoni - Seedcamp - UK - Stanford Engineering - Mar 5 2012
Reshma Sohoni - Seedcamp - UK - Stanford Engineering - Mar 5 2012
Burton Lee
 
Jan Rezab - Socialbakers - Czech Republic - Stanford Engineering - Feb 27 2012
Jan Rezab - Socialbakers - Czech Republic - Stanford Engineering - Feb 27 2012Jan Rezab - Socialbakers - Czech Republic - Stanford Engineering - Feb 27 2012
Jan Rezab - Socialbakers - Czech Republic - Stanford Engineering - Feb 27 2012
Burton Lee
 
Eirikur Hrafnsson - GreenQloud - Iceland - Stanford Engineering - Feb 27 2012
Eirikur Hrafnsson - GreenQloud - Iceland - Stanford Engineering - Feb 27 2012Eirikur Hrafnsson - GreenQloud - Iceland - Stanford Engineering - Feb 27 2012
Eirikur Hrafnsson - GreenQloud - Iceland - Stanford Engineering - Feb 27 2012
Burton Lee
 
Ville Miettinen - Microtask - Finland - Stanford Engineering - Feb 13 2012
Ville Miettinen - Microtask - Finland - Stanford Engineering - Feb 13 2012Ville Miettinen - Microtask - Finland - Stanford Engineering - Feb 13 2012
Ville Miettinen - Microtask - Finland - Stanford Engineering - Feb 13 2012
Burton Lee
 
Ilja Laurs - GetJar - Lithuania - Stanford Engineering - Feb 13 2012 v2
Ilja Laurs - GetJar - Lithuania - Stanford Engineering - Feb 13 2012 v2Ilja Laurs - GetJar - Lithuania - Stanford Engineering - Feb 13 2012 v2
Ilja Laurs - GetJar - Lithuania - Stanford Engineering - Feb 13 2012 v2
Burton Lee
 
Dietmar Harhoff - UniMunich LMU - GSVA - Stanford Engineering - Feb 6 2012 - ...
Dietmar Harhoff - UniMunich LMU - GSVA - Stanford Engineering - Feb 6 2012 - ...Dietmar Harhoff - UniMunich LMU - GSVA - Stanford Engineering - Feb 6 2012 - ...
Dietmar Harhoff - UniMunich LMU - GSVA - Stanford Engineering - Feb 6 2012 - ...
Burton Lee
 
Stephan Gutzeit - Stiftung Charite - Stanford Engineering - Feb 6 2012 - V2
Stephan Gutzeit - Stiftung Charite - Stanford Engineering - Feb 6 2012 - V2Stephan Gutzeit - Stiftung Charite - Stanford Engineering - Feb 6 2012 - V2
Stephan Gutzeit - Stiftung Charite - Stanford Engineering - Feb 6 2012 - V2
Burton Lee
 
Claus Fuglsang - Novozymes - Denmark - Stanford Engineering - Jan 30 2012
Claus Fuglsang - Novozymes - Denmark - Stanford Engineering - Jan 30 2012Claus Fuglsang - Novozymes - Denmark - Stanford Engineering - Jan 30 2012
Claus Fuglsang - Novozymes - Denmark - Stanford Engineering - Jan 30 2012
Burton Lee
 
Frederic Maire - Renault Innovation Silicon Valley - Stanford - Jan 30 2012 v2
Frederic Maire - Renault Innovation Silicon Valley - Stanford - Jan 30 2012 v2Frederic Maire - Renault Innovation Silicon Valley - Stanford - Jan 30 2012 v2
Frederic Maire - Renault Innovation Silicon Valley - Stanford - Jan 30 2012 v2
Burton Lee
 
Arkady Borkovsky - Yandex Labs - Stanford Engineering - Jan 30 2012
Arkady Borkovsky - Yandex Labs - Stanford Engineering - Jan 30 2012Arkady Borkovsky - Yandex Labs - Stanford Engineering - Jan 30 2012
Arkady Borkovsky - Yandex Labs - Stanford Engineering - Jan 30 2012
Burton Lee
 
Hushpreet Dhaliwal - NACUE UK - Stanford Engineering - Jan 23 2012
Hushpreet Dhaliwal - NACUE UK - Stanford Engineering - Jan 23 2012Hushpreet Dhaliwal - NACUE UK - Stanford Engineering - Jan 23 2012
Hushpreet Dhaliwal - NACUE UK - Stanford Engineering - Jan 23 2012
Burton Lee
 
Hardi Meybaum - GrabCAD - Estonia - Stanford Engineering - Jan 23 2012
Hardi Meybaum - GrabCAD - Estonia - Stanford Engineering - Jan 23 2012Hardi Meybaum - GrabCAD - Estonia - Stanford Engineering - Jan 23 2012
Hardi Meybaum - GrabCAD - Estonia - Stanford Engineering - Jan 23 2012
Burton Lee
 
Andrus Viirg - Enterprise Estonia - Stanford - Jan 23 2012
Andrus Viirg - Enterprise Estonia - Stanford - Jan 23 2012Andrus Viirg - Enterprise Estonia - Stanford - Jan 23 2012
Andrus Viirg - Enterprise Estonia - Stanford - Jan 23 2012
Burton Lee
 
Lorenzo Thione - Powerset - Stanford Engineering - Jan 9 2012
Lorenzo Thione - Powerset - Stanford Engineering - Jan 9 2012Lorenzo Thione - Powerset - Stanford Engineering - Jan 9 2012
Lorenzo Thione - Powerset - Stanford Engineering - Jan 9 2012
Burton Lee
 

Mais de Burton Lee (20)

Zarko Maletin - Plug n Play Tech Center - Stanford Engineering - Mar 12 2012
Zarko Maletin - Plug n Play Tech Center - Stanford Engineering - Mar 12 2012Zarko Maletin - Plug n Play Tech Center - Stanford Engineering - Mar 12 2012
Zarko Maletin - Plug n Play Tech Center - Stanford Engineering - Mar 12 2012
 
Duncan Logan - Rocketspace - Stanford Engineering - Mar 12 2012
Duncan Logan - Rocketspace - Stanford Engineering - Mar 12 2012Duncan Logan - Rocketspace - Stanford Engineering - Mar 12 2012
Duncan Logan - Rocketspace - Stanford Engineering - Mar 12 2012
 
Alfredo Coppola - US MAC - Stanford Engineering - Mar 12 2012
Alfredo Coppola - US MAC - Stanford Engineering - Mar 12 2012Alfredo Coppola - US MAC - Stanford Engineering - Mar 12 2012
Alfredo Coppola - US MAC - Stanford Engineering - Mar 12 2012
 
Adeo Ressi - Founder Institute - Stanford Engineering - Mar 12 2012
Adeo Ressi - Founder Institute - Stanford Engineering - Mar 12 2012Adeo Ressi - Founder Institute - Stanford Engineering - Mar 12 2012
Adeo Ressi - Founder Institute - Stanford Engineering - Mar 12 2012
 
Aydin Senkut - Felicis Ventures - Stanford Engineering - Mar 12 2012
Aydin Senkut - Felicis Ventures - Stanford Engineering - Mar 12 2012Aydin Senkut - Felicis Ventures - Stanford Engineering - Mar 12 2012
Aydin Senkut - Felicis Ventures - Stanford Engineering - Mar 12 2012
 
Michel Wendell - Nexit Ventures - Finland - Stanford Engineering - Mar 5 2012
Michel Wendell - Nexit Ventures - Finland - Stanford Engineering - Mar 5 2012Michel Wendell - Nexit Ventures - Finland - Stanford Engineering - Mar 5 2012
Michel Wendell - Nexit Ventures - Finland - Stanford Engineering - Mar 5 2012
 
Reshma Sohoni - Seedcamp - UK - Stanford Engineering - Mar 5 2012
Reshma Sohoni - Seedcamp - UK - Stanford Engineering - Mar 5 2012Reshma Sohoni - Seedcamp - UK - Stanford Engineering - Mar 5 2012
Reshma Sohoni - Seedcamp - UK - Stanford Engineering - Mar 5 2012
 
Jan Rezab - Socialbakers - Czech Republic - Stanford Engineering - Feb 27 2012
Jan Rezab - Socialbakers - Czech Republic - Stanford Engineering - Feb 27 2012Jan Rezab - Socialbakers - Czech Republic - Stanford Engineering - Feb 27 2012
Jan Rezab - Socialbakers - Czech Republic - Stanford Engineering - Feb 27 2012
 
Eirikur Hrafnsson - GreenQloud - Iceland - Stanford Engineering - Feb 27 2012
Eirikur Hrafnsson - GreenQloud - Iceland - Stanford Engineering - Feb 27 2012Eirikur Hrafnsson - GreenQloud - Iceland - Stanford Engineering - Feb 27 2012
Eirikur Hrafnsson - GreenQloud - Iceland - Stanford Engineering - Feb 27 2012
 
Ville Miettinen - Microtask - Finland - Stanford Engineering - Feb 13 2012
Ville Miettinen - Microtask - Finland - Stanford Engineering - Feb 13 2012Ville Miettinen - Microtask - Finland - Stanford Engineering - Feb 13 2012
Ville Miettinen - Microtask - Finland - Stanford Engineering - Feb 13 2012
 
Ilja Laurs - GetJar - Lithuania - Stanford Engineering - Feb 13 2012 v2
Ilja Laurs - GetJar - Lithuania - Stanford Engineering - Feb 13 2012 v2Ilja Laurs - GetJar - Lithuania - Stanford Engineering - Feb 13 2012 v2
Ilja Laurs - GetJar - Lithuania - Stanford Engineering - Feb 13 2012 v2
 
Dietmar Harhoff - UniMunich LMU - GSVA - Stanford Engineering - Feb 6 2012 - ...
Dietmar Harhoff - UniMunich LMU - GSVA - Stanford Engineering - Feb 6 2012 - ...Dietmar Harhoff - UniMunich LMU - GSVA - Stanford Engineering - Feb 6 2012 - ...
Dietmar Harhoff - UniMunich LMU - GSVA - Stanford Engineering - Feb 6 2012 - ...
 
Stephan Gutzeit - Stiftung Charite - Stanford Engineering - Feb 6 2012 - V2
Stephan Gutzeit - Stiftung Charite - Stanford Engineering - Feb 6 2012 - V2Stephan Gutzeit - Stiftung Charite - Stanford Engineering - Feb 6 2012 - V2
Stephan Gutzeit - Stiftung Charite - Stanford Engineering - Feb 6 2012 - V2
 
Claus Fuglsang - Novozymes - Denmark - Stanford Engineering - Jan 30 2012
Claus Fuglsang - Novozymes - Denmark - Stanford Engineering - Jan 30 2012Claus Fuglsang - Novozymes - Denmark - Stanford Engineering - Jan 30 2012
Claus Fuglsang - Novozymes - Denmark - Stanford Engineering - Jan 30 2012
 
Frederic Maire - Renault Innovation Silicon Valley - Stanford - Jan 30 2012 v2
Frederic Maire - Renault Innovation Silicon Valley - Stanford - Jan 30 2012 v2Frederic Maire - Renault Innovation Silicon Valley - Stanford - Jan 30 2012 v2
Frederic Maire - Renault Innovation Silicon Valley - Stanford - Jan 30 2012 v2
 
Arkady Borkovsky - Yandex Labs - Stanford Engineering - Jan 30 2012
Arkady Borkovsky - Yandex Labs - Stanford Engineering - Jan 30 2012Arkady Borkovsky - Yandex Labs - Stanford Engineering - Jan 30 2012
Arkady Borkovsky - Yandex Labs - Stanford Engineering - Jan 30 2012
 
Hushpreet Dhaliwal - NACUE UK - Stanford Engineering - Jan 23 2012
Hushpreet Dhaliwal - NACUE UK - Stanford Engineering - Jan 23 2012Hushpreet Dhaliwal - NACUE UK - Stanford Engineering - Jan 23 2012
Hushpreet Dhaliwal - NACUE UK - Stanford Engineering - Jan 23 2012
 
Hardi Meybaum - GrabCAD - Estonia - Stanford Engineering - Jan 23 2012
Hardi Meybaum - GrabCAD - Estonia - Stanford Engineering - Jan 23 2012Hardi Meybaum - GrabCAD - Estonia - Stanford Engineering - Jan 23 2012
Hardi Meybaum - GrabCAD - Estonia - Stanford Engineering - Jan 23 2012
 
Andrus Viirg - Enterprise Estonia - Stanford - Jan 23 2012
Andrus Viirg - Enterprise Estonia - Stanford - Jan 23 2012Andrus Viirg - Enterprise Estonia - Stanford - Jan 23 2012
Andrus Viirg - Enterprise Estonia - Stanford - Jan 23 2012
 
Lorenzo Thione - Powerset - Stanford Engineering - Jan 9 2012
Lorenzo Thione - Powerset - Stanford Engineering - Jan 9 2012Lorenzo Thione - Powerset - Stanford Engineering - Jan 9 2012
Lorenzo Thione - Powerset - Stanford Engineering - Jan 9 2012
 

Último

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 

Último (20)

Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 

Backup Powersystems - David Martin - Dantherm Power - April 2010

  • 1. Focus. Trust. Initiative. Dantherm Power Nordic Green II - April 2010
  • 2. Common questions Answers that might surprise you • Can I buy one today?  • Will it save me money?  • Anybody important using them?  • Can they power my IT network?  • Should I have one at home?  • Is yours like the Bloom box?  Why not?
  • 3. 10 years away or just around the corner? How do you measure success? • Deployed on every continent  • Meet every performance metric  • Exceed reliability & durability needs  • Preferred choice for most advanced networks in the world  • Dominant technology for Backup  Why not?
  • 4. The integrated communication solution Optional climate control solution for Hydrogen storage cabinets using compressed and hydrogen in shelters cylinders including hydrogen monitoring equipment Power Supply module with integrated UPS or power backup and reformer integrated when running on methanol
  • 5. Reference Network 2 million hours with 100% availability • Nationwide TETRA (emergency/military) network • Dantherm supplied integrated cabinet solution including cooling, power, and radios: – 330 sites with battery back up (4 hours all that is required) – 125 critical sites with hydrogen based power back up (168 hours) • Eliminate batteries at critical sites to ensure power available for 15 years with annual service only
  • 6. Sample Deployments • 15 Temporary Power sites in Canada – Cheaper and friendlier than diesels until grid is connected • GSM-R station in Norway Indoor – Reduced energy consumption for heat/cooling – Increased maintenance to 2 year cycle from 6 month • Extreme Climate Indoor/Outdoor site – Complete battery replacement for remote telecom site • High power Indoor Backup Power system – Emergency power for critical communications and healthcare • Large operator sites in Canada – Low maintenance, battery and genset replacement • Mobile Network expansion with standalone equipment – Easy deployment of new network plus high value Backup • Data, VoIP, and pharmaceutical power quality & reliability – Keep patients, doctors, clinicians and medicine safe and available
  • 7. Temp. Power sites for new Canadian operator Continuous use for 3-6 Months till mains grid is connected from utility
  • 8. 1,7 kW UPS system in rack Battery free configuration eliminates extra heating/cooling system. Zero millisecond transfer from grid to Backup. Standard 1,7 kW module in custom indoor cabinet, 16 hours outdoor. GSM-R station subjected to extensive vibration from trains.
  • 9. Extreme climate Northern remote critical Battery free configuration reduces cost and complexity. Eliminates need for air conditioners. Reduces energy consumption and improves power quality. 0 ms bridge from grid power to full fuel cell backup.
  • 10. 13,4 kW backup power system in racks • Battery hybrid backup power system for big Chinese network operator • 2 racks with each 4 modules of 1,7 kW standard units • DC power source for large telecom and data sites • External storage can provide extended power for emergency power
  • 11. 5 kW backup power system in rack Battery free backup power system for use in big telecom shelters for top operator in Canada. 1 rack with 3 x 1,7 kW standard units 16 hours on-site with 6 hr. response Economizer replacement – pulls heat out
  • 12. Wireless Outdoor Cabinet Complete system 6kWe for 12 hours Battery free Backup power system for large OEM Single 36U rack with: • 3 x 2 kW standard units or • 2 x 2 kW plus LTE radios 12 hour Backup from standard H2 cylinders for critical and remote sites Easy way to overlay LTE plus long- run Backup
  • 13. Data Indoor Cabinets - UPS Stand-alone 4 hours 2 kWe UPS for critical individual loads. 5kWe Backup extenders use front- end of UPS eases integration, requires no unplugging. Easy way to add or extend data backup with limited building modifications.
  • 14. Sample Economics TempPower 1 kW DC, urban setting, 25% less $$ than diesel Backup fibre 2.7 kW DC, 16hours, 30% savings over battery/generator Backup data 5 kW AC, 16 hours, 5 times per year, -20% over bat/gen Remote PV 1.6 kW DC, 400 hours per year, -15% CapEx and -25% OpEx Backup BTS 1.5 kW DC, 24hours onsite, 20% savings over batt/gen
  • 15. Why not? • I won’t be here in 10 years. • That is a different budget. • Somebody said they are dangerous. • Who will fuel and fix it