Presentation given on May 2nd, 2009 to the Mossy Creek Community in Jefferson County, TN. Basic overview of wind energy technologies and applications suitable for the county.
11. Construction Operation Gravel Access Road 14’-20’ wide Gravel Crane Pad and Turnaround ~40’ x 60’ Subsurface Concrete Foundation ~40’ - 50’ diameter Turbine Pedestal 16’ – 18’ diameter Each wind turbine requires 0.5 - 2 acres. A typical facility requires only about 1%-3% of the total land under lease. Land Use