1S:6532- 1972
Indian Standard
CODE OF PRACTICE FOR
DESIGN, INSTALLATION, OBSERVATION AND
MAINTENANCE OF UPLIFT PRESSURE PIPES
FOR HYDRAULIC STRUCTURES ON
PERMEABLE FOUNDATIONS
( Third Reprint JUNE 1988 )
IJDC 621.643.%986:626/627
BUREAU OF INDIAN STANDARDS
MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG
NEW DELHI 110002
I6 : 6!532- 1972
Indian Standard
CODE OF PRACTICE FOR
DESIGN, INSTALLATION, OBSERVATION AND
MAINTENANCE OF UPLIFT PRESSURE PIPES
FOR HYDRAULIC STRUCTURES ON
PERMEABLE FOUNDATIONS
Instrumentation Sectional Committee, BDC 60
Chairman Rcpressnling
SHRI B. S. KAPRE* Maharashtra Engineering Research Institute, Nasik
Members
RESEARCH OFFICER ( AfIcrnate to
Shri B. S. Kapre )
DRB. K. A~ARWALA National Physical Laboratory ( CSIR ), New Delhi
SHRI B. S. BHALLA Beas Designs Organization, Nangal Township
DR G. P. MALHOTRA( Alkrnde )
SI-IRIN. M. CHA~CRABORTY Damodar Valley Corporation, Dhanbad
CHIEFENGINEERt IRRIGATION) Public Works Department, Government of Tamil
Nadu
SHRI P. KUMARASWAMY( Alkrnutc)
SHRIP. P. DW~VEDI Central Scientific Instruments Organization ( CSIR ),
Chandigarh
SHRXP. GOS~AMI Philips India Limited, Bombay
&RI K. Brrsu( Alternate)
SIiRII. P. KAPILA Central Board of Irrigation and Power, New Delhi
SHRIR. RAJARAXAN( Alkrnarc)
SHRI Z. M. KARACHIWALA
KUMARIA. MANI
Vasi Shumg & Co Pvt Ltd, Bombay
Metyzo#;;: Department, Government of India,
SHRIV. N. NAGARAJA Ministry of Irrigation & Power, New Delhi
SI-XRIR. G. PATEL Public Works Department, Government of Gujarat
SHRIJ. R~~ULINGAM
SHRIK. S. RAO
Central Water & Power Commission! New Delhi
Electroniw Corporation of India Limited, Hyderabad
S~nr H. C. VERMA Associated Instruments Manufacturers ( India ) Pvt
Ltd, New D$bi
SHRIK. G. PURANG ( Akrnutc )
SHRI D. AJITHAS~~HA, Director General, BIS ( Ex&i& Member )
Director ( Civ Engg )
Sccrcta~
SHRI G. RAMAN
Deputy Director ( Civ Engg ), BIS
lSti B. S. i(opre was the chairmanfor the meeting in which this -standard was fmsliaed.
BUREAU OF INDIAN STANDARDS
MANAK BHAVAN. 9 BAHADUR SHAH ZAFAR MARC3
NEW DEL31 110002
c
I6: 6532- 1972
hdian Standard
CODE OF PRACTICE FOR
DESIGN, INSTALLATION, OBSERVATION AND
MAINTENANCE OF UPLIFT PRESiXJRE PIPES
FOR HYDRAULIC STRUCTURES ON
PERMEABLE FOUNDATIONS
0. FOREWORD
0.1 This Indian Standard was adopted by the Indian Standards Institution
on 25 February 1972, after the draft finalized by the Instrumentation
Sectional Committee had been approved by the Civil Engineering
Division Council.
6.2 In hydraulic structures on permeable foundations water stored
percolates below the foundation of the structure thereby causing uplift
pressures. The pressure gradient acting along the direction of flow is a
critical design parameter at the exit end of the structure. Design of tbe
structure involves calculation of these pressures and gradients on the -basis
of certain assumptions. In these cases, therefore, actual observations of
these pressures during actual operation become important. This standard
has, therefore, been prepared to cover installation of instruments for
observation of uplift pressures at the contacts of the structures and the
foundation soils. Pressure measurements at depths in .-the foundation soil
and pore pressure measurements in earth and masonry dams using
piezometers are being covered in a separate standard which is under
preparation.
A3 The theory of ground water movement is based on Darcy’s law for
laminar flow which postulates that flow velocity is linearly proportional to
the energy gradient and that the flow may be characterized by a potmtial
function satisfying the following equation:
c
where
4 = velocity potential
= k (z +p/W) + a constant
where
k = permeability of the medium,
z = height of the point tinder consideration above a datum,
2
nst6532-1972
P = residual pressure of water at the point, and
w = unit weight of water.
0.3.1 With a number. of simplifying assumptions far ease of matbe-
matical analysis, the residual pressure at any point in the medium may be
computed analytically for mathematically elementary boundary geometries,
utilizing potential flow theory and suitable conformal transformations.
0.3.2 The assumptions generally made for facilitating theoretical
calculations are the following:
a) The sub-soil medium is uniform, homogeneous and isotrouic and
b)
cl
4
4
f>
there are no layers of differing ~ermeabkies within ttie medium;
The soil medium is completely saturated;
The flow is laminar throughout, enabling application of Darcy’s
law and potential flow theory;
The temperature of the soil medium and the flowing water is
constant;
Seepage flow along the bottom profile by passing the soil medium
does not occur anywhere; and
Only two dimensional analysis is to be made ignoring all end-
effects.
0.4 But the assumptions mentioned in 0.3.2 are generally not valid for
practical structures. Sometimes values of residual pressures and exit
gradient are obtainable from electrical analogs of the structure and the
medium which may include effects of non-homogeneity, non-isotropicity,
stratification and end-effects. However, even these experimentally
obtained values may not be realistic enough, due to the hydraulic proper-
ties of the soi: medium with its variations from point to point which
can never be accurately assessed in its totality and simulated in the analog.
The analog could at best be only a gross approximation of the prototype
built usually with meagre data.
0.5 Therefore, it becomes essential to install pressure pipes on the structure
itself with two objects in view; firstly to act as tell-tales watching the
stability of the structure, and to predict any undesirable developments, and
secondly, to investigate if the actual pressures at various points on the
structure are in conformity with those assumed for purposes of design. A
systematic record of their observations, apart from its scientific value, will
be as necessary for the maintenance of structures as a record of usual sub-
surface soundings and probings.
0.6 IO the formulation of this standard due weightage has been given to
international co-ordination among the standards and practices prevailing in
different countries in addition to relating it to the practices in the field in
this country.
3
ls:6532-1972
0.7 For the purpose of deciding whether a particular re uirement
?
of this
standard is complied with, the final value, observed or ca culated, express-
irig the result of a test or analysis, shall be rounded off in accordance with
IS : 2-MO*. The number of significant places retained in the rounded ,off
value should be the same as that of the specified value in this standard.
1. SCOPE
1.1 This standard covers design, installation, observation and maintenance
of uplift pressure pipes provided for hydraulic structures resting on perme-
able foundations. This is ~essentially a system for measurement of uplift
pressures at the contacts of the structures and the foundationsoils.
1.1.1 The principles, however, may also be applied to other structures
(such as spillway aprons, head regulators, pump houses on lift channels
and other appurtenant structures ) resting on permeable foundations,
where uplift pressures and excessive exit gradients are likely to develop.
2. G-L
2.1 In hydraulic structures on permeable foundations, water stored
upstream of the structure percolates below the foundations of the structure
due to the difference of head, H, between the upstream and downstream
water levels ( see Fig. 1 >. Consequently at intermediate points, such as at
A on the foundation bottom profile, residual pressures P develop, and they
act upwards tending to lift the structure, thereby reducing its stability. In
order to design the structure safe against such uplift pressures, it becomes
necessary to compute the residual pressure at a number of salient points,
and provide sufficient dead weight of the structure itself to counteract the
same.
22 The pressure gradient or the force of water acting along the direction
of flow is a critical design parameter at the exit end of the hydraulic
structure indicated as point B in Fig. 1. If at this end, the upward force
of water due to the-exit gradient is in excess of the effective weight, the
surface soil twill be lifted up followed by progressive dislodgement of soil
particles, and may result in the undermining of the foundation soil called
‘ piping ‘, and ultimate failure of the structure itself. This exit gradient
should be within design limits dependent on the foundation soil at the exit
end of the structure.
3. LOCATION OF PRESSURE-TAPPING POINTS
3.1 The location of the pressure-tapping points in any structure shall be
planned with great care and thought. The stratigraphy of the sub-soil,
*R&a for roUndiXl~oft numcricpl vaha ( raised).
4
especially the presence of clay
feat&es, shall be duly considered
t.he structure.
Is:653211972
beds and other geological and design
together with the foundation profile of
ROCK
Fm. 1 H'YBRA~LIC STRUCTURE ON PERMEABLE FOUNDATION
3.2 The pressure points may be divided into three groups:
a) along and immediately beneath the horizontal or sloping floors,
b) at different points along the deep vertical cut-offs, and
c) at different depths in the sub-soil.
3.2.1 A comprehensive arrangement of pressure-tapping points under a
typical structure is indicated in Fig. 2.
3.2.2 Tapping points suitable under the horizontal floor are the upstream
and downstream ends, immediately upstream and downstream of each
vertical cut-off and other intermediate points at regular intervals. These
will give uplift pressures at the selected points beneath the floor, a
knowledge of which is helpful for watching the safety of the work.
3.2.3 Along the faces of the deep vertical cut-offs the tapping~pointa shall
be placed or driven, as found feasible, close against the upstream and
downstream faces at suitable depths. The tapping points so located enable
5
‘IS : 6532- 1972
a correct determination of the effect of the depth and spacing of vertical
cut-offs and of the stratification of~the sub-soil on uplift pressures.
3.2.4 In the sub-soil’ the tapping. points shall be located at suitable
depths and intervals under the perv~us as well as impervious floors with
due regard to stratification. The pressures at these points will give the
normal distribution of pressure,
vertical cut-offs of the structure,
away from the zone of distortion due to
3.2.5 In order to compute the exit gradient, there shall be pressure
tappings at the bottom of the vertical cut-off at the downstream end of the
structures as indicated in Fig. 2.
TAPPING POINTS
TAPPINGS FOR
MEASURING EXIT GRADIENT
Fro. 2 LOCATIONOF P~~~~RB-TA~PIII~Poxma
3.2.6 Pressure-tapping points shall be locatedalong theabutmentsof the
structure and at a number of intermediate sections between the abutments
at suitable intervals dependent upon the importance of the structure. A
minimum of three intermediate sections of pressure-tapping shall be
provided.
4. DESIGN OF PILTER POINTS AND PRJ3SSURB PIPES
4.1 Brass-filter points of 50.mm inner diameter and of 100~cm length each
shall be placed at suitable selected points ( See Fig. 2 ) and they shall Ibe
connected by 40-mm G. I. pipes to suitable stand pipes located on the
superstructure for measurement of water level. All connections shall be
leak proof. The filter point shall be fitted with a driving point at one end
6
ISr6!532-1972
and a threaded blind pipe of 50-mm diameter and 75.mm length at the
other. In between and around the filter point shall be a 100 cm long,
500”micron wire gauze strainer to serve as the filter (see Fig. 3 ).
BRASS FILTER
POINT WlTH
500 MICRON
WIRE GAUZE’
DRIVING POINT +
All dimensions in millimetres.
FIG. 3 FILTER POINT
4.2 These filter points shall be laid horizontal where excavation permits.
Otherwise they shall be driven down to proper level. Where the depth is
too great or when the soil is hard and liable to cause damage to the filter
points in driving, the filter ~point and the connecting blind pipe may be
inserted in a bore hole of loo-mm diameter.
49 It may not always be necessary to provide graded filter material
around the filter points, as required for relief wells, since no flows through
the filter points are expected, except during the short periods when change
of water level occurs, and during washing operations to remove any
choking-up. If graded filters are desired from the point of view of very
fine sub-soil material or of the existence of a high probability of choking-up
7
c
x8:6532-1972
of the pressure pipes, graded filter material may be provided around the
filter points, as for relief wells, in accordance with IS : 5050-i 968*.
4.3.1 If graded filters become necessary but the provision of such graded
filters becomes costly, as ,an alternative, porous tube piezometers in which
a porous ceramic tube acts as a filter trp may be provided.
NOTE -Details regarding porous tube piezometcrs will be covered in a separate
standard.
5. PRECAUTIONS FOR PRESSURE PIPE
5.1 During the installation of pressure pipes the properties of soil around
the tip, should be observed, particularly when the tips are located in soil
with different properties and permeabilities recorded. This may be of
help in subsequent analysis and interpretation of observations.
5.2 A damaged filter point shall not be used. If one is damaged during
driving it shall be replaced with a good one.
5.3 Where necessary, especially in bored installations, a clay seal of mini-
mum 1’5 m may be provided immediately above the filter point to provide
effective closing around the periphery of the connecting pipe.
5.4 When more than one pipe are driven at the same place to different
depths, they shall be spaced not closer than 30 cm. This will avoid any
direct connection between any two filter points that may occur during
driving or extraction operations.
5.5 The -horizontal piping between the filter point and the observation
point on the superstructure shall be slightly inclined downwards in the
direction of the filter point to avoid any possible air lock.
~5.6 During erection, the ends of all pipes shall be kept closed by caps to
avoid foreign matter findings its way into the pipes making observation of
water level unreliable, if r-rotimpossible.
5.7 All vertical pipes shall be kept dead vertical and no kink of any sort
shall be allowed. Failure in this requirement may make it impossible to
lower the bell sounder or the thermometer to the right place for obser-
vations,
5.8 Each pressure-tapping point shall be given a distinct number and that
number shall be marked on the filter point and on each length of connect-
ing pipe. These distinctive numbers shall be stamped on the caps at the
end of the stand pipes and on the masonry or concrete platform where
they are located.
*Code of practice for the design, construction and maintenance of relief wells.
8
IS : 6532 - 1972
5.9 Pipes from the filter points shall be led to piers or abutment walls to
enable water level readings to be taken throughout the year. Points
directly under a pier or abutment wall shall be connected to the observa-
tion platform by a single vertical length of piping. But those away from
piers and abutment walls shall be connected by horizontal lengths of
piping. These latter shall be placed well below the lowest pressure level
that is likely to occur at the respective points. Otherwise no observations
will be possible during certain water level conditions, when the observa-
tions stand pipe will be dry.
5.10 Each pipe shall be tested to see that the filter point is not choked.
If any choking has occured anywhere in the pipe line, it’ shall be removed
by using compressed air or pressure water under pressure by jetting
through the pipe, flowing out through the filter point.
5.11 Each vertical stand pipe shall be provided with a screw cap to avoid
bird nests and tampering.
5.12 All the piping including the stand pipes shall be coated with a good
quality anti-corrosive paint.
6. OBSERVATIONS
6.1 The observations given in 6.1.1 to 6.1.6 for pressure data shall be made
simultaneously.
6.1.1 Upstream and downstream water levels shall be read from water
level gauges suitably fixed.
.
6.1.2 Shade temperature shall be read by means of an accurate maxi-
mum-minimum thermometer.
6.13 The temperature of river water at a suitable depth below water
surface where temperature is approximately constant shall be read. The
surface temperature of river water is influenced by atmospheric tempera-
ture, and only at a depth of l-5 to 2-O m below the water surface, the
temperature appears to remain approximately constant. This is the tern--
perature to be observed, only by a maximum-minimum thermometer, and
not by an ordinary thermometer, since its readings will be affected by the
varying temperature in the upper two metrcs of water during its with.
drawal after reading.
6.1.4 The temperature of sub-soil water shall be read in a few selected
observation pipes. These temperatures may be read by long distance
recording electrical thermometers, preferably of the automatic recording
type.
6.1.5 The water levels in all the stand pipes shall be read by means of a
bell sounder lowered into the pipe by a steel tape or by electrical devices.
The bell sounder is an accurate, reliable, simple and cheap device. It
9
c
IS t 6532 - 1972
consists of a solid brass rod about 90 mm long and 20 mm in diameter
ending in an inverted cup of 30 mm diameter ( set Fig. 4 ). A swivel is
screwed on to the upper end to which the steel tape ii attached. The length
of the sounder below the zero of the tape shali be measured carefully and
added to each reading of the tape to get the true depth from the top of
the stand pipe to the water level within the pipe. The moment the cup
of the sounder~hits the water surface within the pipe, a definite ‘ plop ’ can
be heard, a sound which cannot be mistaken or drowned even in the roar of
any discharging water through the hydraulic structure. For exact reading,
the cup is moved up and down and the precise position where the ( plop ’
occurs is read to an accuracy ~of2 mm. From the previously known reduced
levels of the tops of the stand pipes, the reduced levels of the water within
the stand pipes are obtained by subtracting the measured depths.
6.1.6 The depths of sediment on the upstream and downstream floors
and if possible the soil characteristics of the sediment shall be observed.
Depths of sediment may be measured by sounding,
6.2 For purposes of interpretation, it is recommended that for a filter, laid
horizontal, the centre of the filter length will be the position of the pressure
point to which the reading in the connecting stand pipe relates. If there
is a drop of pressure along the length of the filter the pressure point should
be at the farthest position along the direction of flow. Similarly in a
vertical filter the pipe reading should refer to the top or bottom end of
the filter, whichever is fi rthest downstream along the direction of flow and
has the lowest pressure. Thus, at the upstream end of the structure, the
reading should refer to the botrom of the filter and at the downstream
end to the top.
6.3 The frequency of observations will depend on local requirements. For
investigation of a particular problem, the observations will have to be
rather frequent, but for watching the stability of a structure, once a week
for the key-pomts and once a fortnight for other points shall be enough.
Daily observations shall be made during periods when daily water level
changes are equal to more than 10 cm.
7. TIME LAG
7.1 When there are large fluctuatiqns in upstream and downstream water
levels, for instance during rising or falhng floods or when the river supply
is bemgponded up to feed supplies into the canals, the results are likely
to be influenced by time lag. A rise in the upstream level will give rela-
tively lower readings and vice versa. When water levels are taken at regu-
lar intervals, due allowance shall be made for such time lag.
NATE - The time lag of the pressure point should be assessed for each uplift prusurc
pipe after initial saturation of the sub-soil and at periodical intervals. This can be
done by filling the stand pipe with waterand measuring the time for the water level to
drop down to a constant level. The time lag for this purpose may be defined as the
10
IS : 6532- 1972
time taken for the water level in the pipe to drop down by 50 percent of the increase
obtained by filling the pipe with water. This test shall be performed when water levels
on the upstream and the downstream are almost steady. The time lag should be
measured as an average of three such trials.
7.2 A sudden rise in downstream level will give relatively lower pipe
readings and vice versa.
7.3 .In a rising flood, when both upstream and downstream levels are
rising, the pressure pipes will read relatively low. In a falling flood, when
both the upstream and downstream levels are falling, they will read high.
rBRASS BODV
CUP
All dimensions. in millimetres.
FIG. 4 BELL SOIJI'JDER
Ii
69 : 6532~91972
7.4 The response to any variation in head due to change in the upstream
or downstream levels is almost instantaneous throughout the structure, but
as the rate of movement of sub-soil water is very slow, the water in the
pressure pipes takes some time to deplete or recuperate corresponding fall
or rise in the pressures. Systematic and comprehensive tests shall be done
during the course of operation of the hydraulic structure to enable fixing
of the actual amount of time lag.
8. RECO+D OF OBSERVATIONS
8.1 The observations shall be recorded suitably in registers or forms.
8.2 The record of observations shall consist of the following:
a) Date of observation;
b) Upstream water level ( metres ) ;
c) Downstream water level ( metres );
d) Total head, H, that is, difference between upstream and down-
stream levels ( metres ) ;
e) Maximum and minimum shade temperatures ( “C );
f ) Temperature of river water ( “C );
g) Temperature of water in selected pipes ( “C );
h) Depths of sediment on upstream and downstream floon ( metrea );
j) Water levels in all pipes ( metres ) ;
k) Residual pressure in each pipe, P, that is, difference between
water level in stand pipe and downstream river water level
( metres ); and
m) Velocity potential percentage, 4 = (P/H) x 100.
8.2.1 The form shown in Appendix A should be used for recording
observations.
8.3 For purposes of analysing the observations, pipes are grouped by
‘ lines ‘, that is, pipes on a single section from upstream to downstream of L
the hydraulic structures.
8.4 Record in Registers
8;4.1 One page of the register shall be earmarked for one line. Sufficient
pages shall be reserved consecutively for each line to admit of all observa-
tions for that line being recorded consecutively for a period of, say, one
year.
8.4.2 The registers shall be maintained in duplicate, one for permanent
record in the office of origin and the other for periodical despatch to any
central organization where these data are scrutinized and analysed. These
12
Is:653211972
registers shall be printed on standard forms and made available to the
,various observation stations for uniformity of record.
8.5 Record in Farms - When forms are used for recording observa-
tions, separate forms shall be used for each line of uplift pressure pipes.
These forms may be bound in pads of 50 or 100 sheets. Observations
shall be recorded in duplicate on these forms at site. These forms with
recorded data may bc dctachcd from the pad; one copy of the form shall
be filed suitably in the onice and the other sent as expeditiously as possible
to the agency analysing the data.
8.6 For the purposes of ready reference, the data collected and recorded as
explained in 8.2 to 8.5 shall be plotted as graphs. properly plotted graphs
will give a quick visual idea of the behaviour of different pipes at any time
of the year and wiJ1 bring to light any special features or abnormalities.
For a given pressure point, 4 ( P/H) remains constant for any structure
provided the temperature of the flowing water and the nature and depth
of sediment or scour on the upstream or downstream pervious floors do not
alter. The function (b should, therefore, form the basis for plotting, as
any variation in this value from the normal will connote damage unless
this variation can be explained by temperature and sedimentation. The
dates of observation should be plotted on the X-axis and the variable
factors on the Y-axis. The variable factors are 4, river temperature,
sub-soil temperature, H, downstream water level, depths of sediment or
scour at the pervious floors, upstream and downstream. These graphs
shall be kept plotted up to date for all the key points, so that any un-
favourable developments in the sub-soil can be discovered as soon as they
occur.
9. MAINTENANCE OF PRESSURE PIPES
9.1 Each year before the onset of monsoon, each pressure pipe shall he
tested for any choking-up and cleared, if necessary, by water jetting. The
time lag shall be measured for each pipe at required intervals and com-
pared with the initial time lag (see Note under 7.1 ).
9.2 All missing screw caps on the top
with their original numbers stamped.
s of stand pipes shah he replaced
9.3 The top levels of the stand pipes shall be checked up by an accurate
levelling instrument, if any subsidence of levels is suspected to have
occured.
9.4 The stand pipes shall be annually painted with good quality anticor-
rosive paint, taking care to see that the original pipe numbers are not
obliterated.
15
1S : 6532 - 1972
APPENDIX A
( Clause 8.2.1 )
REGISTER OF UPLIFT PRESSURE PIPE OBSERVATIONS
Name of river:
Name of hydraulic structure:
the line of pipes, of the structure
( as illustrated in Fig. 2 ) showing
details indicated in Note overleaf.
Name of observer:
Date of observation:
Approximate time of observation ... ....., ...h to a........... h
Upstream water level: (m)
Downstream water level: (m)
Head, H = Cm)
Shade temperature, maximum: “C minimum: “C
River water temperature: “C
Depth of sediment on upstream pervious floor: (m)
Depth of sediment on downstream pervious floor: (m)
Line No. Total width of pucca floor: +
Pipe No. Distance from
Upstream End of
Puma Floor
Reduced Levei of
Bottom of Pipe
Reduced Level of
Bend 6f Pipes, if
Any
-~
(1) (2) (3) i4)
14
PS: 6532- 1972
Reduced i
Level of ZEr
Depth
Top of Tempera- W:er
Pipe, m ture, “C in
Pipe
m
(2) (3) (4)
R;duu;; P
Water in [ sZS.2
Pipe, m ( k ) 1
(5) (6)
-. ---
$=(Pjff) x 100
.-- 4Designed Observed g
!&
--
X7) (8) (9)
-_
,
NoTe -Following features may be shown on the sketch:
a) Foundation profile;
b) uplift pipes with their number (reduced levels of bottoms and tops
pip”. beds, I[ any, dlatance from upstream end of puccafloor; and
of
c) Strati&cation of the substrata.
BUREAU OF INDIAN STANDARDS
tfeadquarters :
Manak Bhavan, 9 Bahadur Shah Zafar Marg, NEW DELHI 110002
Telephones : 3 31 01 31, 3 31 13 75 Telegrams : Manaksanstrg
( Common to all Offices 1
Regipnal Offices : Telephone
*West&n ; Manakalaya, E9 MIDC, Marol. Andheri ( East :, 6 33.~92 95
BOMBAY 400093
tEastern : l/14 C. I. T. Scheme VI1 M, V. I. P. Road,
Maniktola, CALCUTTA 700054
Noithern : SC0 445-446, Sector 35-C
CHANDIGARH 160036
Southern : C. I. T. Campus, MADRAS 600113
Branch Offices :
Pushpak,’ Nurmohamed Shaikh Marg;Khsnpur.
AHMADABAD 380001
‘F’ Block. Unity Bldg. Narasimharaja Scu.~re,
BANGALORE 560002
36 24 99
{
21843
3 1641
(41 24 42
{ 41 25 13
141 29 16
C
2 63 48
2 63 49
22 48 05
Gangotri Complex. 5th Floor, Bhadhhada lica~~ 7 ; p:,?g:+r, 6 27 16
BHOPAL 462003
Plot No. 82/83. Lewis Road, BHUBANESHWAR 751902 5 36 27
5315 Ward No. 29, R. G. Barua Road,
5th Byelane, GUWAHATI 781003
-
58-56C L. N. Gupta Xiarg, (Nampally Station Road),
HYDERABAD 500001
22 10 83
R14 Yudhister Marg, C Scheme, JAIPUR 302005
117/418B Sarvodaya Nagar, KANPUR 208005
c
Patliputra Industrial Estate, PATNA 800013
Hantex Bldg ( 2nd Floor ), Rly Station Road,
TRIVANDRUM 695001
6 23 05
52 27
Inspection Office ( With Sale Point ):
Institution of Engineers ( India) Building, 1332 Shivaji Nagar, 5 24 35
PUNE 410005
*Sales Office in Bombay is at Novelty Chambers. Grant Hoad, 89 65
Bombay 400007
28
tSales Office in Calcutta is at 5 Chowringhee Approach. P. 0. Princep 27 68
Street. Calcutta
00
700072
Reprography Unit, BIS, New Delhi, India

Mais conteúdo relacionado

Mais procurados

Diversion Systems and Spillways (22 Nov 2013)
Diversion Systems and Spillways (22 Nov 2013)Diversion Systems and Spillways (22 Nov 2013)
Diversion Systems and Spillways (22 Nov 2013)Todd Lewis
 
Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...
Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...
Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...Dr. Amarjeet Singh
 
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...Yury Lyapichev
 
Hydraulic characteristics of flow and energy dissipation over stepped spillway
Hydraulic characteristics of flow and energy dissipation over stepped spillwayHydraulic characteristics of flow and energy dissipation over stepped spillway
Hydraulic characteristics of flow and energy dissipation over stepped spillwayIAEME Publication
 
Q921 de2 lec4 v1
Q921 de2 lec4 v1Q921 de2 lec4 v1
Q921 de2 lec4 v1AFATous
 
Review on seismic analysis of elevated water tank 2
Review on seismic analysis of elevated water tank 2Review on seismic analysis of elevated water tank 2
Review on seismic analysis of elevated water tank 2IAEME Publication
 
Effect of flow coefficient and loading coefficient on
Effect of flow coefficient and loading coefficient onEffect of flow coefficient and loading coefficient on
Effect of flow coefficient and loading coefficient oneSAT Publishing House
 
Elevated water tank
Elevated water tankElevated water tank
Elevated water tankAamir Patni
 
Q922+de2+l07 v1
Q922+de2+l07 v1Q922+de2+l07 v1
Q922+de2+l07 v1AFATous
 
Detection of Abnormal Formation Pressures using Drilling Parameters
Detection of Abnormal Formation Pressures using Drilling ParametersDetection of Abnormal Formation Pressures using Drilling Parameters
Detection of Abnormal Formation Pressures using Drilling ParametersIRJET Journal
 
Design and Development of Transonic Axial Flow Compressor Rotor Blade
Design and Development of Transonic Axial Flow Compressor Rotor BladeDesign and Development of Transonic Axial Flow Compressor Rotor Blade
Design and Development of Transonic Axial Flow Compressor Rotor BladeIJERDJOURNAL
 
Analysis of dual bell rocket nozzle using
Analysis of dual bell rocket nozzle usingAnalysis of dual bell rocket nozzle using
Analysis of dual bell rocket nozzle usingeSAT Publishing House
 
Static analysis of c s short cylindrical shell under internal liquid pressure...
Static analysis of c s short cylindrical shell under internal liquid pressure...Static analysis of c s short cylindrical shell under internal liquid pressure...
Static analysis of c s short cylindrical shell under internal liquid pressure...eSAT Publishing House
 
Static analysis of c s short cylindrical shell under internal liquid pressure...
Static analysis of c s short cylindrical shell under internal liquid pressure...Static analysis of c s short cylindrical shell under internal liquid pressure...
Static analysis of c s short cylindrical shell under internal liquid pressure...eSAT Journals
 
Seismic analysis of water tank considering effect on time period
Seismic analysis of water tank considering effect on time periodSeismic analysis of water tank considering effect on time period
Seismic analysis of water tank considering effect on time periodeSAT Journals
 
Seismic Analysis of Elevated Water Tank
Seismic Analysis of Elevated Water TankSeismic Analysis of Elevated Water Tank
Seismic Analysis of Elevated Water TankKalaivanan Murthy
 

Mais procurados (20)

Diversion Systems and Spillways (22 Nov 2013)
Diversion Systems and Spillways (22 Nov 2013)Diversion Systems and Spillways (22 Nov 2013)
Diversion Systems and Spillways (22 Nov 2013)
 
Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...
Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...
Time History Analysis of Circular and Rectangular Elevated Water Storage Tank...
 
Seismic design of_elevated_tanks
Seismic design of_elevated_tanksSeismic design of_elevated_tanks
Seismic design of_elevated_tanks
 
English ayur
English ayurEnglish ayur
English ayur
 
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
 
Hydraulic characteristics of flow and energy dissipation over stepped spillway
Hydraulic characteristics of flow and energy dissipation over stepped spillwayHydraulic characteristics of flow and energy dissipation over stepped spillway
Hydraulic characteristics of flow and energy dissipation over stepped spillway
 
Q921 de2 lec4 v1
Q921 de2 lec4 v1Q921 de2 lec4 v1
Q921 de2 lec4 v1
 
4880 4
4880 44880 4
4880 4
 
4880 5
4880 54880 5
4880 5
 
Review on seismic analysis of elevated water tank 2
Review on seismic analysis of elevated water tank 2Review on seismic analysis of elevated water tank 2
Review on seismic analysis of elevated water tank 2
 
Effect of flow coefficient and loading coefficient on
Effect of flow coefficient and loading coefficient onEffect of flow coefficient and loading coefficient on
Effect of flow coefficient and loading coefficient on
 
Elevated water tank
Elevated water tankElevated water tank
Elevated water tank
 
Q922+de2+l07 v1
Q922+de2+l07 v1Q922+de2+l07 v1
Q922+de2+l07 v1
 
Detection of Abnormal Formation Pressures using Drilling Parameters
Detection of Abnormal Formation Pressures using Drilling ParametersDetection of Abnormal Formation Pressures using Drilling Parameters
Detection of Abnormal Formation Pressures using Drilling Parameters
 
Design and Development of Transonic Axial Flow Compressor Rotor Blade
Design and Development of Transonic Axial Flow Compressor Rotor BladeDesign and Development of Transonic Axial Flow Compressor Rotor Blade
Design and Development of Transonic Axial Flow Compressor Rotor Blade
 
Analysis of dual bell rocket nozzle using
Analysis of dual bell rocket nozzle usingAnalysis of dual bell rocket nozzle using
Analysis of dual bell rocket nozzle using
 
Static analysis of c s short cylindrical shell under internal liquid pressure...
Static analysis of c s short cylindrical shell under internal liquid pressure...Static analysis of c s short cylindrical shell under internal liquid pressure...
Static analysis of c s short cylindrical shell under internal liquid pressure...
 
Static analysis of c s short cylindrical shell under internal liquid pressure...
Static analysis of c s short cylindrical shell under internal liquid pressure...Static analysis of c s short cylindrical shell under internal liquid pressure...
Static analysis of c s short cylindrical shell under internal liquid pressure...
 
Seismic analysis of water tank considering effect on time period
Seismic analysis of water tank considering effect on time periodSeismic analysis of water tank considering effect on time period
Seismic analysis of water tank considering effect on time period
 
Seismic Analysis of Elevated Water Tank
Seismic Analysis of Elevated Water TankSeismic Analysis of Elevated Water Tank
Seismic Analysis of Elevated Water Tank
 

Destaque

15 05-05 wind uplift - the next big lift - roof tech presentation
15 05-05 wind uplift - the next big lift - roof tech presentation15 05-05 wind uplift - the next big lift - roof tech presentation
15 05-05 wind uplift - the next big lift - roof tech presentationJRS Engineering
 
Dam & Pressure acts on dam
Dam & Pressure acts on damDam & Pressure acts on dam
Dam & Pressure acts on damPravin Patil
 
Drop structure lecture 3
Drop structure lecture 3Drop structure lecture 3
Drop structure lecture 3Vidhi Khokhani
 
Concrete dam lecture 2
Concrete dam lecture 2Concrete dam lecture 2
Concrete dam lecture 2Vidhi Khokhani
 

Destaque (8)

15 05-05 wind uplift - the next big lift - roof tech presentation
15 05-05 wind uplift - the next big lift - roof tech presentation15 05-05 wind uplift - the next big lift - roof tech presentation
15 05-05 wind uplift - the next big lift - roof tech presentation
 
Dam & Pressure acts on dam
Dam & Pressure acts on damDam & Pressure acts on dam
Dam & Pressure acts on dam
 
Drop structure lecture 3
Drop structure lecture 3Drop structure lecture 3
Drop structure lecture 3
 
Concrete dam lecture 2
Concrete dam lecture 2Concrete dam lecture 2
Concrete dam lecture 2
 
Arch and Buttress Dams
Arch and Buttress DamsArch and Buttress Dams
Arch and Buttress Dams
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Cross Drainage Works
Cross Drainage WorksCross Drainage Works
Cross Drainage Works
 
Gravity dam
Gravity damGravity dam
Gravity dam
 

Semelhante a 6532

The Design of Hydraulic Distribution Module of Subsea Distribut ion Unit
The Design of Hydraulic Distribution Module of Subsea Distribut ion UnitThe Design of Hydraulic Distribution Module of Subsea Distribut ion Unit
The Design of Hydraulic Distribution Module of Subsea Distribut ion UnitIJRES Journal
 
Management of hydrogeological risks in underground constructions
Management of hydrogeological risks in underground constructionsManagement of hydrogeological risks in underground constructions
Management of hydrogeological risks in underground constructionsIRJET Journal
 
Management of hydrogeological risks in underground constructions
Management of hydrogeological risks in underground constructionsManagement of hydrogeological risks in underground constructions
Management of hydrogeological risks in underground constructionsIRJET Journal
 
Piping For Cooling Water Circulation between Cooling Tower and Condenser
Piping For Cooling Water Circulation between Cooling Tower and CondenserPiping For Cooling Water Circulation between Cooling Tower and Condenser
Piping For Cooling Water Circulation between Cooling Tower and CondenserIJSRD
 
Comparative Study of Pre-Engineered Building and Truss Arrangement Building f...
Comparative Study of Pre-Engineered Building and Truss Arrangement Building f...Comparative Study of Pre-Engineered Building and Truss Arrangement Building f...
Comparative Study of Pre-Engineered Building and Truss Arrangement Building f...Roshni Ramakrishnan
 
PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...
PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...
PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...Ijripublishers Ijri
 
Performance Study of Elevated Water Tanks under Seismic Forces
Performance Study of Elevated Water Tanks under Seismic ForcesPerformance Study of Elevated Water Tanks under Seismic Forces
Performance Study of Elevated Water Tanks under Seismic ForcesIRJET Journal
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16Leo Youngman
 
IRJET- Comparative Study on Conventional Slab and Flat Slabs RCC Structure us...
IRJET- Comparative Study on Conventional Slab and Flat Slabs RCC Structure us...IRJET- Comparative Study on Conventional Slab and Flat Slabs RCC Structure us...
IRJET- Comparative Study on Conventional Slab and Flat Slabs RCC Structure us...IRJET Journal
 
REVIEW PAPER ON “HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
REVIEW PAPER ON “HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”REVIEW PAPER ON “HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
REVIEW PAPER ON “HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”IRJET Journal
 
Design analysis & comparsion of intze type water tank for different wind ...
Design analysis & comparsion of intze type water tank for different wind ...Design analysis & comparsion of intze type water tank for different wind ...
Design analysis & comparsion of intze type water tank for different wind ...eSAT Journals
 
CFD BASED ANALYSIS OF VORTEX SHEDDING IN NEAR WAKE OF HEXAGONAL CYLINDER
CFD BASED ANALYSIS OF VORTEX SHEDDING IN NEAR WAKE OF HEXAGONAL CYLINDERCFD BASED ANALYSIS OF VORTEX SHEDDING IN NEAR WAKE OF HEXAGONAL CYLINDER
CFD BASED ANALYSIS OF VORTEX SHEDDING IN NEAR WAKE OF HEXAGONAL CYLINDERIRJET Journal
 
ANALYSIS AND EVALUATION OF COEFFICIENT OF DISCHARGE ON ORIFICE PLATE AND FLOW...
ANALYSIS AND EVALUATION OF COEFFICIENT OF DISCHARGE ON ORIFICE PLATE AND FLOW...ANALYSIS AND EVALUATION OF COEFFICIENT OF DISCHARGE ON ORIFICE PLATE AND FLOW...
ANALYSIS AND EVALUATION OF COEFFICIENT OF DISCHARGE ON ORIFICE PLATE AND FLOW...IRJET Journal
 
Performance of an rcc frame building subjected to hydrodynamic force at each ...
Performance of an rcc frame building subjected to hydrodynamic force at each ...Performance of an rcc frame building subjected to hydrodynamic force at each ...
Performance of an rcc frame building subjected to hydrodynamic force at each ...eSAT Journals
 
IRJET- Design and Analysis of Anchor Block and Penstock Pipe of a Hydroelectr...
IRJET- Design and Analysis of Anchor Block and Penstock Pipe of a Hydroelectr...IRJET- Design and Analysis of Anchor Block and Penstock Pipe of a Hydroelectr...
IRJET- Design and Analysis of Anchor Block and Penstock Pipe of a Hydroelectr...IRJET Journal
 

Semelhante a 6532 (20)

7436 2
7436 27436 2
7436 2
 
7436 1
7436 17436 1
7436 1
 
The Design of Hydraulic Distribution Module of Subsea Distribut ion Unit
The Design of Hydraulic Distribution Module of Subsea Distribut ion UnitThe Design of Hydraulic Distribution Module of Subsea Distribut ion Unit
The Design of Hydraulic Distribution Module of Subsea Distribut ion Unit
 
Management of hydrogeological risks in underground constructions
Management of hydrogeological risks in underground constructionsManagement of hydrogeological risks in underground constructions
Management of hydrogeological risks in underground constructions
 
Management of hydrogeological risks in underground constructions
Management of hydrogeological risks in underground constructionsManagement of hydrogeological risks in underground constructions
Management of hydrogeological risks in underground constructions
 
Piping For Cooling Water Circulation between Cooling Tower and Condenser
Piping For Cooling Water Circulation between Cooling Tower and CondenserPiping For Cooling Water Circulation between Cooling Tower and Condenser
Piping For Cooling Water Circulation between Cooling Tower and Condenser
 
Hr2413591363
Hr2413591363Hr2413591363
Hr2413591363
 
Comparative Study of Pre-Engineered Building and Truss Arrangement Building f...
Comparative Study of Pre-Engineered Building and Truss Arrangement Building f...Comparative Study of Pre-Engineered Building and Truss Arrangement Building f...
Comparative Study of Pre-Engineered Building and Truss Arrangement Building f...
 
PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...
PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...
PERFORMANCE BASED ANALYSIS OF VERTICALLY IRREGULAR STRUCTURE UNDER VARIOUS SE...
 
Performance Study of Elevated Water Tanks under Seismic Forces
Performance Study of Elevated Water Tanks under Seismic ForcesPerformance Study of Elevated Water Tanks under Seismic Forces
Performance Study of Elevated Water Tanks under Seismic Forces
 
6512
65126512
6512
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
IRJET- Comparative Study on Conventional Slab and Flat Slabs RCC Structure us...
IRJET- Comparative Study on Conventional Slab and Flat Slabs RCC Structure us...IRJET- Comparative Study on Conventional Slab and Flat Slabs RCC Structure us...
IRJET- Comparative Study on Conventional Slab and Flat Slabs RCC Structure us...
 
REVIEW PAPER ON “HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
REVIEW PAPER ON “HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”REVIEW PAPER ON “HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
REVIEW PAPER ON “HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
 
Design analysis & comparsion of intze type water tank for different wind ...
Design analysis & comparsion of intze type water tank for different wind ...Design analysis & comparsion of intze type water tank for different wind ...
Design analysis & comparsion of intze type water tank for different wind ...
 
CFD BASED ANALYSIS OF VORTEX SHEDDING IN NEAR WAKE OF HEXAGONAL CYLINDER
CFD BASED ANALYSIS OF VORTEX SHEDDING IN NEAR WAKE OF HEXAGONAL CYLINDERCFD BASED ANALYSIS OF VORTEX SHEDDING IN NEAR WAKE OF HEXAGONAL CYLINDER
CFD BASED ANALYSIS OF VORTEX SHEDDING IN NEAR WAKE OF HEXAGONAL CYLINDER
 
3370 4
3370 43370 4
3370 4
 
ANALYSIS AND EVALUATION OF COEFFICIENT OF DISCHARGE ON ORIFICE PLATE AND FLOW...
ANALYSIS AND EVALUATION OF COEFFICIENT OF DISCHARGE ON ORIFICE PLATE AND FLOW...ANALYSIS AND EVALUATION OF COEFFICIENT OF DISCHARGE ON ORIFICE PLATE AND FLOW...
ANALYSIS AND EVALUATION OF COEFFICIENT OF DISCHARGE ON ORIFICE PLATE AND FLOW...
 
Performance of an rcc frame building subjected to hydrodynamic force at each ...
Performance of an rcc frame building subjected to hydrodynamic force at each ...Performance of an rcc frame building subjected to hydrodynamic force at each ...
Performance of an rcc frame building subjected to hydrodynamic force at each ...
 
IRJET- Design and Analysis of Anchor Block and Penstock Pipe of a Hydroelectr...
IRJET- Design and Analysis of Anchor Block and Penstock Pipe of a Hydroelectr...IRJET- Design and Analysis of Anchor Block and Penstock Pipe of a Hydroelectr...
IRJET- Design and Analysis of Anchor Block and Penstock Pipe of a Hydroelectr...
 

Mais de Boopathi Yoganathan (20)

28-5.21 Company Profile of Pyrmaid structural consultant.pptx
28-5.21 Company Profile of Pyrmaid structural consultant.pptx28-5.21 Company Profile of Pyrmaid structural consultant.pptx
28-5.21 Company Profile of Pyrmaid structural consultant.pptx
 
Front page upto content new
Front page upto content newFront page upto content new
Front page upto content new
 
Book report new
Book report newBook report new
Book report new
 
Fem
FemFem
Fem
 
Exopy injection
Exopy injectionExopy injection
Exopy injection
 
Embedded
EmbeddedEmbedded
Embedded
 
Earthquakes seminar
Earthquakes seminarEarthquakes seminar
Earthquakes seminar
 
10334
1033410334
10334
 
10302
1030210302
10302
 
10297
1029710297
10297
 
9527 1
9527 19527 1
9527 1
 
9459
94599459
9459
 
9456
94569456
9456
 
9429
94299429
9429
 
9417
94179417
9417
 
7873
78737873
7873
 
7500
75007500
7500
 
7251
72517251
7251
 
7246
72467246
7246
 
7245
72457245
7245
 

Último

Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 

Último (20)

Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 

6532

  • 1. 1S:6532- 1972 Indian Standard CODE OF PRACTICE FOR DESIGN, INSTALLATION, OBSERVATION AND MAINTENANCE OF UPLIFT PRESSURE PIPES FOR HYDRAULIC STRUCTURES ON PERMEABLE FOUNDATIONS ( Third Reprint JUNE 1988 ) IJDC 621.643.%986:626/627 BUREAU OF INDIAN STANDARDS MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG NEW DELHI 110002
  • 2. I6 : 6!532- 1972 Indian Standard CODE OF PRACTICE FOR DESIGN, INSTALLATION, OBSERVATION AND MAINTENANCE OF UPLIFT PRESSURE PIPES FOR HYDRAULIC STRUCTURES ON PERMEABLE FOUNDATIONS Instrumentation Sectional Committee, BDC 60 Chairman Rcpressnling SHRI B. S. KAPRE* Maharashtra Engineering Research Institute, Nasik Members RESEARCH OFFICER ( AfIcrnate to Shri B. S. Kapre ) DRB. K. A~ARWALA National Physical Laboratory ( CSIR ), New Delhi SHRI B. S. BHALLA Beas Designs Organization, Nangal Township DR G. P. MALHOTRA( Alkrnde ) SI-IRIN. M. CHA~CRABORTY Damodar Valley Corporation, Dhanbad CHIEFENGINEERt IRRIGATION) Public Works Department, Government of Tamil Nadu SHRI P. KUMARASWAMY( Alkrnutc) SHRIP. P. DW~VEDI Central Scientific Instruments Organization ( CSIR ), Chandigarh SHRXP. GOS~AMI Philips India Limited, Bombay &RI K. Brrsu( Alternate) SIiRII. P. KAPILA Central Board of Irrigation and Power, New Delhi SHRIR. RAJARAXAN( Alkrnarc) SHRI Z. M. KARACHIWALA KUMARIA. MANI Vasi Shumg & Co Pvt Ltd, Bombay Metyzo#;;: Department, Government of India, SHRIV. N. NAGARAJA Ministry of Irrigation & Power, New Delhi SI-XRIR. G. PATEL Public Works Department, Government of Gujarat SHRIJ. R~~ULINGAM SHRIK. S. RAO Central Water & Power Commission! New Delhi Electroniw Corporation of India Limited, Hyderabad S~nr H. C. VERMA Associated Instruments Manufacturers ( India ) Pvt Ltd, New D$bi SHRIK. G. PURANG ( Akrnutc ) SHRI D. AJITHAS~~HA, Director General, BIS ( Ex&i& Member ) Director ( Civ Engg ) Sccrcta~ SHRI G. RAMAN Deputy Director ( Civ Engg ), BIS lSti B. S. i(opre was the chairmanfor the meeting in which this -standard was fmsliaed. BUREAU OF INDIAN STANDARDS MANAK BHAVAN. 9 BAHADUR SHAH ZAFAR MARC3 NEW DEL31 110002 c
  • 3. I6: 6532- 1972 hdian Standard CODE OF PRACTICE FOR DESIGN, INSTALLATION, OBSERVATION AND MAINTENANCE OF UPLIFT PRESiXJRE PIPES FOR HYDRAULIC STRUCTURES ON PERMEABLE FOUNDATIONS 0. FOREWORD 0.1 This Indian Standard was adopted by the Indian Standards Institution on 25 February 1972, after the draft finalized by the Instrumentation Sectional Committee had been approved by the Civil Engineering Division Council. 6.2 In hydraulic structures on permeable foundations water stored percolates below the foundation of the structure thereby causing uplift pressures. The pressure gradient acting along the direction of flow is a critical design parameter at the exit end of the structure. Design of tbe structure involves calculation of these pressures and gradients on the -basis of certain assumptions. In these cases, therefore, actual observations of these pressures during actual operation become important. This standard has, therefore, been prepared to cover installation of instruments for observation of uplift pressures at the contacts of the structures and the foundation soils. Pressure measurements at depths in .-the foundation soil and pore pressure measurements in earth and masonry dams using piezometers are being covered in a separate standard which is under preparation. A3 The theory of ground water movement is based on Darcy’s law for laminar flow which postulates that flow velocity is linearly proportional to the energy gradient and that the flow may be characterized by a potmtial function satisfying the following equation: c where 4 = velocity potential = k (z +p/W) + a constant where k = permeability of the medium, z = height of the point tinder consideration above a datum, 2
  • 4. nst6532-1972 P = residual pressure of water at the point, and w = unit weight of water. 0.3.1 With a number. of simplifying assumptions far ease of matbe- matical analysis, the residual pressure at any point in the medium may be computed analytically for mathematically elementary boundary geometries, utilizing potential flow theory and suitable conformal transformations. 0.3.2 The assumptions generally made for facilitating theoretical calculations are the following: a) The sub-soil medium is uniform, homogeneous and isotrouic and b) cl 4 4 f> there are no layers of differing ~ermeabkies within ttie medium; The soil medium is completely saturated; The flow is laminar throughout, enabling application of Darcy’s law and potential flow theory; The temperature of the soil medium and the flowing water is constant; Seepage flow along the bottom profile by passing the soil medium does not occur anywhere; and Only two dimensional analysis is to be made ignoring all end- effects. 0.4 But the assumptions mentioned in 0.3.2 are generally not valid for practical structures. Sometimes values of residual pressures and exit gradient are obtainable from electrical analogs of the structure and the medium which may include effects of non-homogeneity, non-isotropicity, stratification and end-effects. However, even these experimentally obtained values may not be realistic enough, due to the hydraulic proper- ties of the soi: medium with its variations from point to point which can never be accurately assessed in its totality and simulated in the analog. The analog could at best be only a gross approximation of the prototype built usually with meagre data. 0.5 Therefore, it becomes essential to install pressure pipes on the structure itself with two objects in view; firstly to act as tell-tales watching the stability of the structure, and to predict any undesirable developments, and secondly, to investigate if the actual pressures at various points on the structure are in conformity with those assumed for purposes of design. A systematic record of their observations, apart from its scientific value, will be as necessary for the maintenance of structures as a record of usual sub- surface soundings and probings. 0.6 IO the formulation of this standard due weightage has been given to international co-ordination among the standards and practices prevailing in different countries in addition to relating it to the practices in the field in this country. 3
  • 5. ls:6532-1972 0.7 For the purpose of deciding whether a particular re uirement ? of this standard is complied with, the final value, observed or ca culated, express- irig the result of a test or analysis, shall be rounded off in accordance with IS : 2-MO*. The number of significant places retained in the rounded ,off value should be the same as that of the specified value in this standard. 1. SCOPE 1.1 This standard covers design, installation, observation and maintenance of uplift pressure pipes provided for hydraulic structures resting on perme- able foundations. This is ~essentially a system for measurement of uplift pressures at the contacts of the structures and the foundationsoils. 1.1.1 The principles, however, may also be applied to other structures (such as spillway aprons, head regulators, pump houses on lift channels and other appurtenant structures ) resting on permeable foundations, where uplift pressures and excessive exit gradients are likely to develop. 2. G-L 2.1 In hydraulic structures on permeable foundations, water stored upstream of the structure percolates below the foundations of the structure due to the difference of head, H, between the upstream and downstream water levels ( see Fig. 1 >. Consequently at intermediate points, such as at A on the foundation bottom profile, residual pressures P develop, and they act upwards tending to lift the structure, thereby reducing its stability. In order to design the structure safe against such uplift pressures, it becomes necessary to compute the residual pressure at a number of salient points, and provide sufficient dead weight of the structure itself to counteract the same. 22 The pressure gradient or the force of water acting along the direction of flow is a critical design parameter at the exit end of the hydraulic structure indicated as point B in Fig. 1. If at this end, the upward force of water due to the-exit gradient is in excess of the effective weight, the surface soil twill be lifted up followed by progressive dislodgement of soil particles, and may result in the undermining of the foundation soil called ‘ piping ‘, and ultimate failure of the structure itself. This exit gradient should be within design limits dependent on the foundation soil at the exit end of the structure. 3. LOCATION OF PRESSURE-TAPPING POINTS 3.1 The location of the pressure-tapping points in any structure shall be planned with great care and thought. The stratigraphy of the sub-soil, *R&a for roUndiXl~oft numcricpl vaha ( raised). 4
  • 6. especially the presence of clay feat&es, shall be duly considered t.he structure. Is:653211972 beds and other geological and design together with the foundation profile of ROCK Fm. 1 H'YBRA~LIC STRUCTURE ON PERMEABLE FOUNDATION 3.2 The pressure points may be divided into three groups: a) along and immediately beneath the horizontal or sloping floors, b) at different points along the deep vertical cut-offs, and c) at different depths in the sub-soil. 3.2.1 A comprehensive arrangement of pressure-tapping points under a typical structure is indicated in Fig. 2. 3.2.2 Tapping points suitable under the horizontal floor are the upstream and downstream ends, immediately upstream and downstream of each vertical cut-off and other intermediate points at regular intervals. These will give uplift pressures at the selected points beneath the floor, a knowledge of which is helpful for watching the safety of the work. 3.2.3 Along the faces of the deep vertical cut-offs the tapping~pointa shall be placed or driven, as found feasible, close against the upstream and downstream faces at suitable depths. The tapping points so located enable 5
  • 7. ‘IS : 6532- 1972 a correct determination of the effect of the depth and spacing of vertical cut-offs and of the stratification of~the sub-soil on uplift pressures. 3.2.4 In the sub-soil’ the tapping. points shall be located at suitable depths and intervals under the perv~us as well as impervious floors with due regard to stratification. The pressures at these points will give the normal distribution of pressure, vertical cut-offs of the structure, away from the zone of distortion due to 3.2.5 In order to compute the exit gradient, there shall be pressure tappings at the bottom of the vertical cut-off at the downstream end of the structures as indicated in Fig. 2. TAPPING POINTS TAPPINGS FOR MEASURING EXIT GRADIENT Fro. 2 LOCATIONOF P~~~~RB-TA~PIII~Poxma 3.2.6 Pressure-tapping points shall be locatedalong theabutmentsof the structure and at a number of intermediate sections between the abutments at suitable intervals dependent upon the importance of the structure. A minimum of three intermediate sections of pressure-tapping shall be provided. 4. DESIGN OF PILTER POINTS AND PRJ3SSURB PIPES 4.1 Brass-filter points of 50.mm inner diameter and of 100~cm length each shall be placed at suitable selected points ( See Fig. 2 ) and they shall Ibe connected by 40-mm G. I. pipes to suitable stand pipes located on the superstructure for measurement of water level. All connections shall be leak proof. The filter point shall be fitted with a driving point at one end 6
  • 8. ISr6!532-1972 and a threaded blind pipe of 50-mm diameter and 75.mm length at the other. In between and around the filter point shall be a 100 cm long, 500”micron wire gauze strainer to serve as the filter (see Fig. 3 ). BRASS FILTER POINT WlTH 500 MICRON WIRE GAUZE’ DRIVING POINT + All dimensions in millimetres. FIG. 3 FILTER POINT 4.2 These filter points shall be laid horizontal where excavation permits. Otherwise they shall be driven down to proper level. Where the depth is too great or when the soil is hard and liable to cause damage to the filter points in driving, the filter ~point and the connecting blind pipe may be inserted in a bore hole of loo-mm diameter. 49 It may not always be necessary to provide graded filter material around the filter points, as required for relief wells, since no flows through the filter points are expected, except during the short periods when change of water level occurs, and during washing operations to remove any choking-up. If graded filters are desired from the point of view of very fine sub-soil material or of the existence of a high probability of choking-up 7 c
  • 9. x8:6532-1972 of the pressure pipes, graded filter material may be provided around the filter points, as for relief wells, in accordance with IS : 5050-i 968*. 4.3.1 If graded filters become necessary but the provision of such graded filters becomes costly, as ,an alternative, porous tube piezometers in which a porous ceramic tube acts as a filter trp may be provided. NOTE -Details regarding porous tube piezometcrs will be covered in a separate standard. 5. PRECAUTIONS FOR PRESSURE PIPE 5.1 During the installation of pressure pipes the properties of soil around the tip, should be observed, particularly when the tips are located in soil with different properties and permeabilities recorded. This may be of help in subsequent analysis and interpretation of observations. 5.2 A damaged filter point shall not be used. If one is damaged during driving it shall be replaced with a good one. 5.3 Where necessary, especially in bored installations, a clay seal of mini- mum 1’5 m may be provided immediately above the filter point to provide effective closing around the periphery of the connecting pipe. 5.4 When more than one pipe are driven at the same place to different depths, they shall be spaced not closer than 30 cm. This will avoid any direct connection between any two filter points that may occur during driving or extraction operations. 5.5 The -horizontal piping between the filter point and the observation point on the superstructure shall be slightly inclined downwards in the direction of the filter point to avoid any possible air lock. ~5.6 During erection, the ends of all pipes shall be kept closed by caps to avoid foreign matter findings its way into the pipes making observation of water level unreliable, if r-rotimpossible. 5.7 All vertical pipes shall be kept dead vertical and no kink of any sort shall be allowed. Failure in this requirement may make it impossible to lower the bell sounder or the thermometer to the right place for obser- vations, 5.8 Each pressure-tapping point shall be given a distinct number and that number shall be marked on the filter point and on each length of connect- ing pipe. These distinctive numbers shall be stamped on the caps at the end of the stand pipes and on the masonry or concrete platform where they are located. *Code of practice for the design, construction and maintenance of relief wells. 8
  • 10. IS : 6532 - 1972 5.9 Pipes from the filter points shall be led to piers or abutment walls to enable water level readings to be taken throughout the year. Points directly under a pier or abutment wall shall be connected to the observa- tion platform by a single vertical length of piping. But those away from piers and abutment walls shall be connected by horizontal lengths of piping. These latter shall be placed well below the lowest pressure level that is likely to occur at the respective points. Otherwise no observations will be possible during certain water level conditions, when the observa- tions stand pipe will be dry. 5.10 Each pipe shall be tested to see that the filter point is not choked. If any choking has occured anywhere in the pipe line, it’ shall be removed by using compressed air or pressure water under pressure by jetting through the pipe, flowing out through the filter point. 5.11 Each vertical stand pipe shall be provided with a screw cap to avoid bird nests and tampering. 5.12 All the piping including the stand pipes shall be coated with a good quality anti-corrosive paint. 6. OBSERVATIONS 6.1 The observations given in 6.1.1 to 6.1.6 for pressure data shall be made simultaneously. 6.1.1 Upstream and downstream water levels shall be read from water level gauges suitably fixed. . 6.1.2 Shade temperature shall be read by means of an accurate maxi- mum-minimum thermometer. 6.13 The temperature of river water at a suitable depth below water surface where temperature is approximately constant shall be read. The surface temperature of river water is influenced by atmospheric tempera- ture, and only at a depth of l-5 to 2-O m below the water surface, the temperature appears to remain approximately constant. This is the tern-- perature to be observed, only by a maximum-minimum thermometer, and not by an ordinary thermometer, since its readings will be affected by the varying temperature in the upper two metrcs of water during its with. drawal after reading. 6.1.4 The temperature of sub-soil water shall be read in a few selected observation pipes. These temperatures may be read by long distance recording electrical thermometers, preferably of the automatic recording type. 6.1.5 The water levels in all the stand pipes shall be read by means of a bell sounder lowered into the pipe by a steel tape or by electrical devices. The bell sounder is an accurate, reliable, simple and cheap device. It 9 c
  • 11. IS t 6532 - 1972 consists of a solid brass rod about 90 mm long and 20 mm in diameter ending in an inverted cup of 30 mm diameter ( set Fig. 4 ). A swivel is screwed on to the upper end to which the steel tape ii attached. The length of the sounder below the zero of the tape shali be measured carefully and added to each reading of the tape to get the true depth from the top of the stand pipe to the water level within the pipe. The moment the cup of the sounder~hits the water surface within the pipe, a definite ‘ plop ’ can be heard, a sound which cannot be mistaken or drowned even in the roar of any discharging water through the hydraulic structure. For exact reading, the cup is moved up and down and the precise position where the ( plop ’ occurs is read to an accuracy ~of2 mm. From the previously known reduced levels of the tops of the stand pipes, the reduced levels of the water within the stand pipes are obtained by subtracting the measured depths. 6.1.6 The depths of sediment on the upstream and downstream floors and if possible the soil characteristics of the sediment shall be observed. Depths of sediment may be measured by sounding, 6.2 For purposes of interpretation, it is recommended that for a filter, laid horizontal, the centre of the filter length will be the position of the pressure point to which the reading in the connecting stand pipe relates. If there is a drop of pressure along the length of the filter the pressure point should be at the farthest position along the direction of flow. Similarly in a vertical filter the pipe reading should refer to the top or bottom end of the filter, whichever is fi rthest downstream along the direction of flow and has the lowest pressure. Thus, at the upstream end of the structure, the reading should refer to the botrom of the filter and at the downstream end to the top. 6.3 The frequency of observations will depend on local requirements. For investigation of a particular problem, the observations will have to be rather frequent, but for watching the stability of a structure, once a week for the key-pomts and once a fortnight for other points shall be enough. Daily observations shall be made during periods when daily water level changes are equal to more than 10 cm. 7. TIME LAG 7.1 When there are large fluctuatiqns in upstream and downstream water levels, for instance during rising or falhng floods or when the river supply is bemgponded up to feed supplies into the canals, the results are likely to be influenced by time lag. A rise in the upstream level will give rela- tively lower readings and vice versa. When water levels are taken at regu- lar intervals, due allowance shall be made for such time lag. NATE - The time lag of the pressure point should be assessed for each uplift prusurc pipe after initial saturation of the sub-soil and at periodical intervals. This can be done by filling the stand pipe with waterand measuring the time for the water level to drop down to a constant level. The time lag for this purpose may be defined as the 10
  • 12. IS : 6532- 1972 time taken for the water level in the pipe to drop down by 50 percent of the increase obtained by filling the pipe with water. This test shall be performed when water levels on the upstream and the downstream are almost steady. The time lag should be measured as an average of three such trials. 7.2 A sudden rise in downstream level will give relatively lower pipe readings and vice versa. 7.3 .In a rising flood, when both upstream and downstream levels are rising, the pressure pipes will read relatively low. In a falling flood, when both the upstream and downstream levels are falling, they will read high. rBRASS BODV CUP All dimensions. in millimetres. FIG. 4 BELL SOIJI'JDER Ii
  • 13. 69 : 6532~91972 7.4 The response to any variation in head due to change in the upstream or downstream levels is almost instantaneous throughout the structure, but as the rate of movement of sub-soil water is very slow, the water in the pressure pipes takes some time to deplete or recuperate corresponding fall or rise in the pressures. Systematic and comprehensive tests shall be done during the course of operation of the hydraulic structure to enable fixing of the actual amount of time lag. 8. RECO+D OF OBSERVATIONS 8.1 The observations shall be recorded suitably in registers or forms. 8.2 The record of observations shall consist of the following: a) Date of observation; b) Upstream water level ( metres ) ; c) Downstream water level ( metres ); d) Total head, H, that is, difference between upstream and down- stream levels ( metres ) ; e) Maximum and minimum shade temperatures ( “C ); f ) Temperature of river water ( “C ); g) Temperature of water in selected pipes ( “C ); h) Depths of sediment on upstream and downstream floon ( metrea ); j) Water levels in all pipes ( metres ) ; k) Residual pressure in each pipe, P, that is, difference between water level in stand pipe and downstream river water level ( metres ); and m) Velocity potential percentage, 4 = (P/H) x 100. 8.2.1 The form shown in Appendix A should be used for recording observations. 8.3 For purposes of analysing the observations, pipes are grouped by ‘ lines ‘, that is, pipes on a single section from upstream to downstream of L the hydraulic structures. 8.4 Record in Registers 8;4.1 One page of the register shall be earmarked for one line. Sufficient pages shall be reserved consecutively for each line to admit of all observa- tions for that line being recorded consecutively for a period of, say, one year. 8.4.2 The registers shall be maintained in duplicate, one for permanent record in the office of origin and the other for periodical despatch to any central organization where these data are scrutinized and analysed. These 12
  • 14. Is:653211972 registers shall be printed on standard forms and made available to the ,various observation stations for uniformity of record. 8.5 Record in Farms - When forms are used for recording observa- tions, separate forms shall be used for each line of uplift pressure pipes. These forms may be bound in pads of 50 or 100 sheets. Observations shall be recorded in duplicate on these forms at site. These forms with recorded data may bc dctachcd from the pad; one copy of the form shall be filed suitably in the onice and the other sent as expeditiously as possible to the agency analysing the data. 8.6 For the purposes of ready reference, the data collected and recorded as explained in 8.2 to 8.5 shall be plotted as graphs. properly plotted graphs will give a quick visual idea of the behaviour of different pipes at any time of the year and wiJ1 bring to light any special features or abnormalities. For a given pressure point, 4 ( P/H) remains constant for any structure provided the temperature of the flowing water and the nature and depth of sediment or scour on the upstream or downstream pervious floors do not alter. The function (b should, therefore, form the basis for plotting, as any variation in this value from the normal will connote damage unless this variation can be explained by temperature and sedimentation. The dates of observation should be plotted on the X-axis and the variable factors on the Y-axis. The variable factors are 4, river temperature, sub-soil temperature, H, downstream water level, depths of sediment or scour at the pervious floors, upstream and downstream. These graphs shall be kept plotted up to date for all the key points, so that any un- favourable developments in the sub-soil can be discovered as soon as they occur. 9. MAINTENANCE OF PRESSURE PIPES 9.1 Each year before the onset of monsoon, each pressure pipe shall he tested for any choking-up and cleared, if necessary, by water jetting. The time lag shall be measured for each pipe at required intervals and com- pared with the initial time lag (see Note under 7.1 ). 9.2 All missing screw caps on the top with their original numbers stamped. s of stand pipes shah he replaced 9.3 The top levels of the stand pipes shall be checked up by an accurate levelling instrument, if any subsidence of levels is suspected to have occured. 9.4 The stand pipes shall be annually painted with good quality anticor- rosive paint, taking care to see that the original pipe numbers are not obliterated. 15
  • 15. 1S : 6532 - 1972 APPENDIX A ( Clause 8.2.1 ) REGISTER OF UPLIFT PRESSURE PIPE OBSERVATIONS Name of river: Name of hydraulic structure: the line of pipes, of the structure ( as illustrated in Fig. 2 ) showing details indicated in Note overleaf. Name of observer: Date of observation: Approximate time of observation ... ....., ...h to a........... h Upstream water level: (m) Downstream water level: (m) Head, H = Cm) Shade temperature, maximum: “C minimum: “C River water temperature: “C Depth of sediment on upstream pervious floor: (m) Depth of sediment on downstream pervious floor: (m) Line No. Total width of pucca floor: + Pipe No. Distance from Upstream End of Puma Floor Reduced Levei of Bottom of Pipe Reduced Level of Bend 6f Pipes, if Any -~ (1) (2) (3) i4) 14
  • 16. PS: 6532- 1972 Reduced i Level of ZEr Depth Top of Tempera- W:er Pipe, m ture, “C in Pipe m (2) (3) (4) R;duu;; P Water in [ sZS.2 Pipe, m ( k ) 1 (5) (6) -. --- $=(Pjff) x 100 .-- 4Designed Observed g !& -- X7) (8) (9) -_ , NoTe -Following features may be shown on the sketch: a) Foundation profile; b) uplift pipes with their number (reduced levels of bottoms and tops pip”. beds, I[ any, dlatance from upstream end of puccafloor; and of c) Strati&cation of the substrata.
  • 17. BUREAU OF INDIAN STANDARDS tfeadquarters : Manak Bhavan, 9 Bahadur Shah Zafar Marg, NEW DELHI 110002 Telephones : 3 31 01 31, 3 31 13 75 Telegrams : Manaksanstrg ( Common to all Offices 1 Regipnal Offices : Telephone *West&n ; Manakalaya, E9 MIDC, Marol. Andheri ( East :, 6 33.~92 95 BOMBAY 400093 tEastern : l/14 C. I. T. Scheme VI1 M, V. I. P. Road, Maniktola, CALCUTTA 700054 Noithern : SC0 445-446, Sector 35-C CHANDIGARH 160036 Southern : C. I. T. Campus, MADRAS 600113 Branch Offices : Pushpak,’ Nurmohamed Shaikh Marg;Khsnpur. AHMADABAD 380001 ‘F’ Block. Unity Bldg. Narasimharaja Scu.~re, BANGALORE 560002 36 24 99 { 21843 3 1641 (41 24 42 { 41 25 13 141 29 16 C 2 63 48 2 63 49 22 48 05 Gangotri Complex. 5th Floor, Bhadhhada lica~~ 7 ; p:,?g:+r, 6 27 16 BHOPAL 462003 Plot No. 82/83. Lewis Road, BHUBANESHWAR 751902 5 36 27 5315 Ward No. 29, R. G. Barua Road, 5th Byelane, GUWAHATI 781003 - 58-56C L. N. Gupta Xiarg, (Nampally Station Road), HYDERABAD 500001 22 10 83 R14 Yudhister Marg, C Scheme, JAIPUR 302005 117/418B Sarvodaya Nagar, KANPUR 208005 c Patliputra Industrial Estate, PATNA 800013 Hantex Bldg ( 2nd Floor ), Rly Station Road, TRIVANDRUM 695001 6 23 05 52 27 Inspection Office ( With Sale Point ): Institution of Engineers ( India) Building, 1332 Shivaji Nagar, 5 24 35 PUNE 410005 *Sales Office in Bombay is at Novelty Chambers. Grant Hoad, 89 65 Bombay 400007 28 tSales Office in Calcutta is at 5 Chowringhee Approach. P. 0. Princep 27 68 Street. Calcutta 00 700072 Reprography Unit, BIS, New Delhi, India