 Ash resistivity
. Particle size distribution
. Number of ESP per boiler
. Minimum No. of fields required
. Minimum specific collecting area
. Maximum gas velocity
. Minimum aspect ratio
. Maximum area connected to one
TR set
. Collecting electrode spacing
. Recovery of material for economic reasons
Pulp and paper Industries (sodium sulphate )
. Removal of abrasive material in the dust to
reduce wear and tear of the Fan components
. Removal of objectionable matter in the dust
-NO2 and SO2
Specific Collecting Area
Amount of collecting area required to be provided to
collect dust in gas flow rate of 1 m3 /s.
Flue gas Velocity, m/s = Flue gas flow in
m3
ESP effective cross section m2
Aspect ratio = Effective Length of
ESP
Collecting electrode height
Treatment Time, sec =Effective Length of ESP in
m
Flue gas Velocity in m/s
Gas Velocity.
. Velocity is decided by the gas flow and
collection efficiency required
. Higher the gas velocity,higher the carryover of
dust particles without Collection - Re –
entertainment
. Very poor velocity alters the flow distribution
and effects settling of Dust particles
. Optimum velocity depends upon the
application will improve the Performance.
Aspect Ratio.
. During the rapping, the falling of dust particle
take a trajectory form
. Lower the aspect ratio, the trajectory dust
travel along with gas flow
 Without falling in to hoppers – Leads to re-
entrainment loss.
. Higher the ratio, performance will be good
. Optimum aspect ratio depends on allowable
velocity, required collection
 Efficiency and available space.
Treatment Time.
. Time available for capturing the dust particle
. More treatment time at reasonable velocity
improves the collection efficiency
. Probability of capturing the re-entrained
particles improves with time.
RECOVERY ELECTOSTATIC
PRECIPITATOR
The Paper mills are often located in a sensitive
environment with strict requirements of emission of
dust particles and gaseous pollutants to the
atmosphere. The dust particles are very fine and
sticky in nature. The gases are also highly corrosive.
Dedusting by means of Electrostatic Precipitators are
the preferred technology in Paper mills. Black liquor
recovery boilers are de-dusted by a multi chamber
ElectrostatiC Precipitator often with a casing made of
concrete
The casing of the precipitator for recovery boiler
applications are preferred to be made of
REINFORCED CEMENT CONCRETE. As the gas is
rich in moisture and highly corrosive due to the
presence of sulphur compounds ( sodium sulphate
and sodium sulphide used in the pulp digesters ), the
concrete casing is preferred to withstand corrosion.
For the same reason, the collecting electrode
( the thinnest part in the electrode system ) is made of
corrosion resistant steels – CORTEN - A or CORTEN –
B or equivalent. The thickness can be 1.5 mm to
provide for an enhanced life of the collecting system.
The emitting electrode shall be of austenitic
stainless steel having excellent corrosion resistant
properties (conforming to UHB 904L or AISI 316L or
equivalent)
The load of the collecting and emitting systems are
transferred to the casing through load bearing
members called ‘casing inserts’. These are small parts
made of steel and embedded in the concrete casing at
the time of casting the same. This is done in-site.
The hopper system for these precipitators shall be of
flat bottom. No pyramidal nor trapezoidal type of
hoppers are used for such applications. The bottom
floor of the casing itself serves as the hopper and the
dust from the collecting / emitting and the gas
distribution screens are allowed to fall on to this floor.
The collected dust on the floor is scrapped by means
of ‘SCRAPPER CONVEYOR’ which runs between the
inlet of the precipitator and the outlet. Structural
members are mounted at desired locations on two
end-less chains and scrap the collected dust to bring
it to the inlet end of the precipitator casing. The
conveyor is electrically driven by motors mounted on
the outside of the casing
In addition to the scrapper conveyor, a CHAIN
CONVEYOR is also employed to transfer the dust to a
ROTARY FEEDER mounted external to the
precipitator casing. The chain conveyor runs across
the precipitator at the inlet end of the casing and is
located inside the precipitator casing. The chain
conveyor is also electric driven by a motor mounted
external to the precipitator casing.
The dust discharged from the chain conveyor
into the rotary feeder is further conveyed to the
mixing chamber where it is mixed with the spent
liquor and recycled
The drives of the scrap per conveyor, chain conveyor and
the rotary feeder are to be interlocked in a particular
sequence by monitoring their operation through speed
monitoring devices mounted on the drive shafts
of these conveyors. This is essential to avoid
overloading of the conveyors / their drives. The
operation of the scrapper conveyor shall be
interlocked with the Transformer – Rectifier set
so that the fields are de-energized automatically
when the scrapper conveyor is NOT in
operation.
As the dust is sticky in nature due to the
high moisture content, the gas distributor
screens at the inlet of the precipitator will be
rapped at the same frequency as that of the
As the flue gas is highly corrosive and rich in
moisture content, special care has to be taken to
ensure that the flue gas temperature at the inlet of
the precipitator is sufficiently above the acid /
moisture dew point to avoid any condensation on
the precipitator surfaces and cause corrosion.
Temperature monitors are required to be installed
at the inlet duct. Some customers may prefer to
have a bye-pass duct when the gas temperature is
NOT sufficiently above the dew points. In such
cases, diverter dampers may be required at the
inlet and outlet of the precipitator casing to
prevent gas flow through the precipitator. This
will add to the cost of the precipitator system.
. Gas tight dampers are required to be installed at
the inlet and outlet of the precipitator casing for
purposes of maintenance.
The ingress / leakage of atmospheric air into the
precipitator casing has to be completely avoided
from the point of eliminating the possibility of any
local corrosion. The inspection doors on the casing
have to be therefore of double construction. One
inspection door located very close ( on the concrete
casing ) and the other one mounted over the inner
door.
The concrete casing also requires thermal
insulation on the outside. Light Resin Bonded (LRB)
mattresses of adequate thickness can be used.
CONSTRUCTION OF ELECTROSTATIC
PRECIPITATOR
This consists of Supporting structure and support
Bearing , these are the rigid structure supporting the
entire load of the ESP. The bearings are provided
between the casing colume and supporting structure to
act freely for thermal expansion.
CASING.
 The casing is known as IB casing, the side walls are
made of horizontal panels, it is a leak proof arrangement
with roof beams of Longitudinal and Transverse to
support the internals of Collecting and Emitting
systems.
HOPPER.
Pyramidal and flat bottom hoppers are provided under
the casing to collect the ashes. It should not be treated
as storage bunker.
EMITTING SYSTEM.
Emitting system consists of rigid emitting frame suspended
from four points on the top. The four suspension points are
supported on support Insulators to give electrical
insulation to the emitting frame.
EMITTING ELECTRODES.
The Discharge electrodes consist of hard drawn spiral
wires. The coil spring form emitting electrodes are self
tensioning, this stabilized
positioning permits the highest possible operating voltage.
The self tensioning spiral discharge electrodes allow for
better transmission of the rapping force. The spiral wire
electrode provides a uniform current distribution and the
corona discharge occurs around the entire surface of the
wire.
Rapping mechanism for Discharge electrode.
A Traction of the dust will be collected on the
discharge electrode and the corona will be suppressed
as the dust layer grows. Frequent rapping is required
to keep the electrode clean always.
COLLECTING SYSTEM.
The collecting system is of dimensional stability. The
upper edges of the collecting plate are hung on hooks
provided on the roof and the bottom is fixed with the
shock bar. The collecting electrodes are made of cold
rolled carbon steel or corton steel material of the
order of 1.5mm thickness with G profile at the end
RAPPING MECHANISM
FOR GOLLECTING
ELECTRODE.
The system employs tumbling hammers which are mounted on
a horizontal shaft in a staggered fashion with one hammer for
each shock bar. The shock bar transmits the blow
simultaneously to all of the collecting plates in one row because
of their direct contact with the shock bar.
ELECTRICS .
Rectifier Transformers are provided on top of ESP, the control
panels are located in ESP control room situated in the ground.
Auxiliary control panels are housed in the ESP control room to
control the auxiliary equipments of ESP like Heaters, Rapping
motors, conveyers etc.LT distribution board also housed in
control room.
OPERATION AND MAINTENANCE OF
RECOVERY ESP.
ESP’s are constant efficient equipment, if the input
parameters are maintained to the design value then the out
put efficiency (emission) will be maintained, Provided the
ESP fields should be healthy.
We have to ensure the healthiness of each and every
equipment independently.
The HVR and EC controllers should be tuned to the
optimum level
Depending upon the load in the steam unit.
Monitor the optimum operation of the boiler by periodical
check of O2 levels in different point in the flue gas circuit.
The controllers should be kept at just below spark level
Always monitor the conveyors to work smooth to avoid any
Jamming.
MAINTENANCE.
Check all the Heaters are in service with
thermostat control in operation.
Check all the rapping motors are working as per
the program set.
Check the conveyors are running smooth
Check the current and voltage are to the set level
in the controllers.
Check the boiler is operated with optimum design
condition without any excess flue gas
Any pluggage problem in the entire flue gas path
from boiler outlet to chimney Inlet.
To monitor the maximum solid content in the
liquor to be fired.
 Maintain history of firing proportion to emission
with parameter recording
The gas distribution to be studied for better
correction.
 Optimization of rapping to avoid offset in the system.
Repair and replacement of rapping mechanism by
suitably replacing the worn-out components.
 Field alignment to be checked perfectly to attain
max. current and voltage
Corona quenching problems to be studied and
attended.
The ESP rapping system should impart as high
acceleration to the precipitator internals as possible
to increase the intensity of rapping by increasing the
size.
Poor ESP power input
Dust build-ups
Gas flow issues
Over load
. Poor ESP power input : Due to mechanical alignment
deficiency, that reduces the gap between +ve and –ve
electrodes, sparks controls the current build up and
reduce the collection efficiency.
Dust build- up : The formation of accumulation is due to
the reaction between solid sodium sulfate and gaseous
So2, which results in the formation of acid sulfate,NaHso4
and thus corona quenching.
Gas Flow : Gas distribution, if it is not even then
current distribution will be uneven, In leakage of air
increases the flow rate , sneakage of gases flowing in
untreated levels carry the dust.
Over load : Due to higher production in the mill, Poor
boiler operation with high amount of excess air,
leakages in the flue gas path.
Leakages in the flue gas path to be controlled
Internal alignment to be checked and corrected,
Gas distribution to be checked for uniform
distribution,
Gas sneakage points to be arrested for efficiency
improvement,
Rapping mechanism to be checked for effective
dislodging of dust particles,
Cleaning of internals either by air lashing or water
washing.
Power supply sources to the ESP to be checked.
Electrical migration
Electrical mobility
Corona discharge
ESP theory
Charging mechanisms
Ash resistivity
Flue gas conditioning
Power consumption
Reading: Chap. 5
Positive Negative
Republican Democrat
Love Hate
Ying Yang
Man Woman
Hell Heaven
Cation Anion
War Peace
Attraction Repel
Coulomb’s law
Statcoulomb (stC): the charge that causes a repulsive force of 1
dyne when 2 equal charges are separated by 1 cm (3.33×10-10
C)
Unit charge: 4.8 ×10-10
stC (1.6×10-19
C)
2
21
r
qq
KF EE = E
F
q
E
= (q=ne)
Electric Field
(Robert
Millikan, US,
1868-1953;
Nobel Prize
Laureate, 1923)
Hinds, Aerosol Technology, 1999
http://nobelprize.org/nobel_prizes/physics/laureates/1923/millikan-bio.html
Terminal velocity in an electrical field
(electrical migration velocity/drift velocity)
c
TEp
C
Vd
qE
πµ3
=
( ) qEB
d
qEC
wV
p
c
TE ===⇒
πµ3
qB
d
qC
E
V
Z
p
cTE
===⇒
πµ3
(force balance)
DE FF =
(for Re < 1)
Q: What is the physical meaning of electrical mobility?
Q: When does a particle have a higher mobility?
May the force be with the
particles!
Q: Difference between
cyclone and ESP in terms
of forces acting on the
system? What’s the
effect?
Positive Corona Negative Corona
+ -
+ -
+
+ -
+
+
+
-
-
+
- +
- +
-
-
-
+
+
Corona Discharge
Step 1
Step 2
Step 3
Step 4
Collection Plate Collection Plate
Electron
Molecule
Particle
Electrode Electrode
Q: How can we generate charges?
Ozone generation - http://www.mtcnet.net/~jdhogg/ozone/ozonation.html
1 2 3
1 2 3
(20) (12) (8)
Turbulent Flow with Lateral Mixing Model
Electrostatic Precipitator
Deutsch-Anderson
Equation
R
dtV
R
dtRV
N
dN TETE 22
2
−=−=
π
π
)
2
exp(
)(
0 R
tV
N
tN TE
−=⇒






−−=−=η⇒
Q
AV
P cTE
exp11 Ac/Q: Specific Collection Area (SCA)
• Turbulent flow: uniformly mixing
• Perfect Collection
•The fraction of the particles removed in
unit time = the ratio of the area traveled by
drift velocity in unit time to the total cross-
section
Q: How to increase the efficiency?
Q: An ESP that treats 10,000 m3
/min of air is expected to
be 98% efficient. The effective drift velocity of the
particles is 6.0 m/min. (a) What is the total collection
area? (b) Assuming the plates are 6 m high and 3 m
long, what is the number of plates required?
6 m
3 m
Internal Configuration: self-review
Random collisions between ions
and particles








+=
kT
tNecd
e
kTd
n
iipp
2
1ln
2
2
2
π
Q: Does q depend on time?
Does q depend on dp?
The total number of charges on a particle
(ci ~ 2.4×104
cm/s)
neq =
The total charges on a particle
Use esu, not SI units.
Bombardment of ions in the presence of a strong
field
eZ1
eZ
42
3
i
i
2






+













+
=
tN
tN
e
Ed
n
i
ip
π
π
ε
ε
Total number of charges by field charging
Q: Is the charging rate dependent on
particle size? On field strength? On
time? On material?
Aerosol Technology, Hinds, W. C., John Wiley & Sons, 1999.














+
=
e
Ed
n
p
s
42
3
2
ε
ε
Saturation charge (Zi ~ 450 cm2
/stV•s)
Comparison of Diffusion & Field Charging
Q: Does collection efficiency increase
as particle size increase (because of a
higher number of charges)?
dp (um) ndiff nfield ntotal Zdiff ZField Z (stC•s/g)
0.01 0.10 0.02 0.12 0.66 0.10 0.76
0.02 0.30 0.06 0.36 0.49 0.11 0.60
0.05 1.1 0.40 1.50 0.31 0.12 0.43
0.1 2.8 1.6 4.38 0.23 0.13 0.36
0.2 7 6.5 13.2 0.18 0.17 0.35
0.5 21 40 61.2 0.15 0.30 0.45
1 48 161 209 0.16 0.52 0.68
2 108 646 754 0.16 0.98 1.14
5 311 4035 4346 0.18 2.34 2.52
10 683 16140 16824 0.20 4.61 4.80
20 1490 64562 66052 0.21 9.16 9.37
50 4134 403510 407644 0.23 22.78 23.0
Nit = 107
s/cm3
ε= 5.1
E = 5 KV/cm
T = 298 K
Typical fly ash
size distribution
Q: If the ESP is used to collect the fly ash,
how will the particle size distribution at
ESP outlet look like?
Impact of particles’ resistivity on ESP’s
performance:
Factors: temperature, composition
Flue gas conditioning
109
- 1010
ohm-cm is desired
Q: How does resistivity affect an ESP’s performance?
Effects of sulfur content and temperature on resistivity
Q: Is S in coal good or bad?
Water spray for cement kiln dust
Flue Gas Conditioning
Effective drift velocity as a function of resistivity by
measurement
Use the same Deutsch-Anderson Equation with new we.
Q: Estimate the total collection area required for a 95% efficient fly-ash
ESP that treats 8000 m3
/min. The ash resistivity is 1.6×1010
ohm-cm.
Good for moderate collection
efficiency (90% ~ 95%)
High Efficiency ESP (>95%)
Matts-Ohnfeldt Equation














−−=
k
e
C
w
Q
A
exp1η
Use k = 1 for fly ash
k = 0.5 or 0.6 for
industrial category
Rule of Thumb
• Below 95%, use Deutsch-Anderson Equation
• Above 99%, use Matts-Ohnfeldt Equation
• Between them, use an average
Q: In designing a high
efficiency ESP, a smaller
drift velocity is to be
used. Why?
avgCC VIP =
C
C
e
A
kP
w =
Power density ~ 1-2 W/ft2





 −
−=
Q
kPC
exp1η
Corona power
Drift velocity
Efficiency vs. Corona Power
k = 0.55 for Pc/Q in W/cfs up to 98.5%
20/04/13 56
20/04/13 57
20/04/13 58
Positive Corona Negative Corona
+ - -
- +
-
-
-
+
+
+
- +
electron molecule particle
Collection Plate Collection PlateElectrode Electrode
Step 1
+ -
+Step 2
+ -
+
Step 3
+
+
-
Step 4
20/04/13 59
Electrostatic Precipitator (ESP)
҉ Drift velocity of particles between the ESP
plates
20/04/13 60
Types of ESPs in terms of shape
҉ Cylindrical type
҉ Plate type
Types of ESPs in terms of flow
direction
҉ Vertical gas-flow
҉ Horizontal gas-flow
Types of ESPs in terms
performance
҉ One stage or two stages
҉ Dry or wet
Plate type, horizontal gas-flow, one stage
and dry ESPs are the most common ESP
type in industrial application.
20/04/13 61
Electrostatic Precipitator (ESP)
One-stage ESP Two-stage ESP
Discharge
electrodes
Collecting
electrodes
The observed
minimum is because
of Cunningham
factor in calculation
of drift velocity.
20/04/13 62
20/04/13 63
20/04/13 64
20/04/13 65
20/04/13 66
20/04/13 67

More Related Content

What's hot

Electrostatic precipitator's ESP Project MiniProject EEE Electrical
Electrostatic precipitator's ESP Project MiniProject EEE ElectricalElectrostatic precipitator's ESP Project MiniProject EEE Electrical
Electrostatic precipitator's ESP Project MiniProject EEE Electricalshiva kumar
 
Electrostatic precipitator (esp) - working function
Electrostatic precipitator (esp) - working functionElectrostatic precipitator (esp) - working function
Electrostatic precipitator (esp) - working functionYokesh Mech
 
27.ESP Presentation.ppt
27.ESP Presentation.ppt27.ESP Presentation.ppt
27.ESP Presentation.pptchandra607701
 
Ash Handling in powerplants.ppt
Ash Handling in powerplants.pptAsh Handling in powerplants.ppt
Ash Handling in powerplants.pptWearyCase
 
Particulate technology (electrostatic precipitator)
Particulate technology (electrostatic precipitator)Particulate technology (electrostatic precipitator)
Particulate technology (electrostatic precipitator)Usman Shah
 
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdownCfbc boiler startup and shutdown
Cfbc boiler startup and shutdownAshvani Shukla
 
Boiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plantBoiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plantBoben Anto Chemmannoor
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plantSHIVAJI CHOUDHURY
 
ASH HANDLING PLANT
ASH HANDLING PLANTASH HANDLING PLANT
ASH HANDLING PLANTAditya Anand
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedureABVSAI
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesBoben Anto Chemmannoor
 
Combustion in a CFBC Boiler
Combustion in a CFBC BoilerCombustion in a CFBC Boiler
Combustion in a CFBC BoilerTapash Nag
 
Air & flue gas system
Air & flue gas system Air & flue gas system
Air & flue gas system Kushjani1
 

What's hot (20)

Electrostatic precipitator's ESP Project MiniProject EEE Electrical
Electrostatic precipitator's ESP Project MiniProject EEE ElectricalElectrostatic precipitator's ESP Project MiniProject EEE Electrical
Electrostatic precipitator's ESP Project MiniProject EEE Electrical
 
Electrostatic precipitator (esp) - working function
Electrostatic precipitator (esp) - working functionElectrostatic precipitator (esp) - working function
Electrostatic precipitator (esp) - working function
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
 
27.ESP Presentation.ppt
27.ESP Presentation.ppt27.ESP Presentation.ppt
27.ESP Presentation.ppt
 
Ash Handling in powerplants.ppt
Ash Handling in powerplants.pptAsh Handling in powerplants.ppt
Ash Handling in powerplants.ppt
 
Boiler safety protection
Boiler  safety protectionBoiler  safety protection
Boiler safety protection
 
Particulate technology (electrostatic precipitator)
Particulate technology (electrostatic precipitator)Particulate technology (electrostatic precipitator)
Particulate technology (electrostatic precipitator)
 
Cfbc boiler startup and shutdown
Cfbc boiler startup and shutdownCfbc boiler startup and shutdown
Cfbc boiler startup and shutdown
 
Boiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plantBoiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plant
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plant
 
ASH HANDLING PLANT
ASH HANDLING PLANTASH HANDLING PLANT
ASH HANDLING PLANT
 
Boiler Operation
Boiler OperationBoiler Operation
Boiler Operation
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedure
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 
Ash handling
Ash handlingAsh handling
Ash handling
 
Combustion in a CFBC Boiler
Combustion in a CFBC BoilerCombustion in a CFBC Boiler
Combustion in a CFBC Boiler
 
Air & flue gas system
Air & flue gas system Air & flue gas system
Air & flue gas system
 
Steam generator part 2
Steam generator part 2Steam generator part 2
Steam generator part 2
 
Heat rate of coal fired power plant
Heat rate of coal fired power plantHeat rate of coal fired power plant
Heat rate of coal fired power plant
 

Viewers also liked

Electrostatic Precipitator
Electrostatic Precipitator Electrostatic Precipitator
Electrostatic Precipitator Ninad Ghormade
 
Electrostatic precipitator design
Electrostatic precipitator designElectrostatic precipitator design
Electrostatic precipitator designIRS srl
 
Electrostatic Precipitators (ESP) Analysis Using CFD
Electrostatic Precipitators (ESP) Analysis Using CFDElectrostatic Precipitators (ESP) Analysis Using CFD
Electrostatic Precipitators (ESP) Analysis Using CFDiMentor Education
 
Electrostatic Smoke Precipitator (ESP)
Electrostatic Smoke Precipitator (ESP)Electrostatic Smoke Precipitator (ESP)
Electrostatic Smoke Precipitator (ESP)Khusro Kamaluddin
 
EQUIPMENTS TO CONTROL AIR POLLUTION
EQUIPMENTS TO CONTROL AIR POLLUTIONEQUIPMENTS TO CONTROL AIR POLLUTION
EQUIPMENTS TO CONTROL AIR POLLUTIONArun Sarasan
 
Air pollution control methods and equipments
Air pollution control methods and equipmentsAir pollution control methods and equipments
Air pollution control methods and equipmentsJinto Cv
 
Bag filter operation pradeep kumar
Bag filter operation  pradeep kumarBag filter operation  pradeep kumar
Bag filter operation pradeep kumarpradeepdeepi
 
Economiser & air preheater
Economiser & air preheaterEconomiser & air preheater
Economiser & air preheaterdishti7
 
DESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERDESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERGopi Chand
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsHrishikesh Devan
 
Electrostatic precipitator EPS Maintenance
Electrostatic precipitator EPS MaintenanceElectrostatic precipitator EPS Maintenance
Electrostatic precipitator EPS MaintenanceFebrianto Utomo
 
ESP - English for specific purposes
ESP - English for specific purposesESP - English for specific purposes
ESP - English for specific purposesBasharat Mirza
 
Badarpur Thermal Power Station
Badarpur Thermal Power StationBadarpur Thermal Power Station
Badarpur Thermal Power StationAyush Khare
 
Final Year Thesis.PDF
Final Year Thesis.PDFFinal Year Thesis.PDF
Final Year Thesis.PDFOmer Farooqi
 

Viewers also liked (20)

Electrostatic Precipitator
Electrostatic Precipitator Electrostatic Precipitator
Electrostatic Precipitator
 
Electrostatic precipitator design
Electrostatic precipitator designElectrostatic precipitator design
Electrostatic precipitator design
 
Esp ppt
Esp pptEsp ppt
Esp ppt
 
Electrostatic Precipitators (ESP) Analysis Using CFD
Electrostatic Precipitators (ESP) Analysis Using CFDElectrostatic Precipitators (ESP) Analysis Using CFD
Electrostatic Precipitators (ESP) Analysis Using CFD
 
Electrostatic Smoke Precipitator (ESP)
Electrostatic Smoke Precipitator (ESP)Electrostatic Smoke Precipitator (ESP)
Electrostatic Smoke Precipitator (ESP)
 
EQUIPMENTS TO CONTROL AIR POLLUTION
EQUIPMENTS TO CONTROL AIR POLLUTIONEQUIPMENTS TO CONTROL AIR POLLUTION
EQUIPMENTS TO CONTROL AIR POLLUTION
 
Baghouse
BaghouseBaghouse
Baghouse
 
Air pollution control methods and equipments
Air pollution control methods and equipmentsAir pollution control methods and equipments
Air pollution control methods and equipments
 
Bag filter operation pradeep kumar
Bag filter operation  pradeep kumarBag filter operation  pradeep kumar
Bag filter operation pradeep kumar
 
Bag filters
Bag filtersBag filters
Bag filters
 
Esp presentation
Esp presentationEsp presentation
Esp presentation
 
Economiser & air preheater
Economiser & air preheaterEconomiser & air preheater
Economiser & air preheater
 
DESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZERDESIGN OF AIR PRE HEATER AND ECONOMIZER
DESIGN OF AIR PRE HEATER AND ECONOMIZER
 
Steam Boilers OR Steam Generators
Steam Boilers OR Steam GeneratorsSteam Boilers OR Steam Generators
Steam Boilers OR Steam Generators
 
Electrostatic precipitator EPS Maintenance
Electrostatic precipitator EPS MaintenanceElectrostatic precipitator EPS Maintenance
Electrostatic precipitator EPS Maintenance
 
ESP - English for specific purposes
ESP - English for specific purposesESP - English for specific purposes
ESP - English for specific purposes
 
Badarpur Thermal Power Station
Badarpur Thermal Power StationBadarpur Thermal Power Station
Badarpur Thermal Power Station
 
Esp electrical1
Esp electrical1Esp electrical1
Esp electrical1
 
Final Year Thesis.PDF
Final Year Thesis.PDFFinal Year Thesis.PDF
Final Year Thesis.PDF
 
FIS Low Nox Burners
FIS Low Nox BurnersFIS Low Nox Burners
FIS Low Nox Burners
 

Similar to ESP

Bag filter system supplier in Indore
Bag filter system supplier in IndoreBag filter system supplier in Indore
Bag filter system supplier in Indoremantra12
 
Steam Condenser types,function, tube test, condenser vacuum
Steam Condenser types,function, tube test, condenser vacuumSteam Condenser types,function, tube test, condenser vacuum
Steam Condenser types,function, tube test, condenser vacuumwaqarahmed445
 
Water and Waste Water Treatment - EN - 140716 - webreduced
Water and Waste Water Treatment - EN - 140716 - webreducedWater and Waste Water Treatment - EN - 140716 - webreduced
Water and Waste Water Treatment - EN - 140716 - webreducedTomas Eriksson
 
Water and Waste Water Treatment - EN - 140716 - webreduced
Water and Waste Water Treatment - EN - 140716 - webreducedWater and Waste Water Treatment - EN - 140716 - webreduced
Water and Waste Water Treatment - EN - 140716 - webreducedRenan Norbiate de Melo
 
Electrostatic_Precipitator.pptx
Electrostatic_Precipitator.pptxElectrostatic_Precipitator.pptx
Electrostatic_Precipitator.pptxssuser4d73a8
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plantsSHIVAJI CHOUDHURY
 
Hydrogen in power plants
Hydrogen in power plantsHydrogen in power plants
Hydrogen in power plantsYogendra Sharma
 
HT 6.6 KV VCB OPERATION AND MAINTENANCE PPT
HT 6.6 KV VCB OPERATION AND MAINTENANCE PPTHT 6.6 KV VCB OPERATION AND MAINTENANCE PPT
HT 6.6 KV VCB OPERATION AND MAINTENANCE PPTprasenjitmsit22
 
S3 Supply Devices and Room Air Distribution
S3 Supply Devices and Room Air DistributionS3 Supply Devices and Room Air Distribution
S3 Supply Devices and Room Air Distributionno suhaila
 
Steam Power Plant and Boiler power plant.pptx
Steam Power Plant and Boiler power plant.pptxSteam Power Plant and Boiler power plant.pptx
Steam Power Plant and Boiler power plant.pptxsanzy2
 
Air Blast & SF6 Circuit Breaker Design and Construction
Air Blast & SF6 Circuit Breaker Design and Construction Air Blast & SF6 Circuit Breaker Design and Construction
Air Blast & SF6 Circuit Breaker Design and Construction anuphowlader1
 
Underground car parking ventilation system
Underground car parking ventilation systemUnderground car parking ventilation system
Underground car parking ventilation systemMohamed Hashish
 
Plasma spraying (type of thernal spraying)
Plasma spraying (type of thernal spraying)Plasma spraying (type of thernal spraying)
Plasma spraying (type of thernal spraying)ROLWYN CARDOZA
 

Similar to ESP (20)

Bag filter system supplier in Indore
Bag filter system supplier in IndoreBag filter system supplier in Indore
Bag filter system supplier in Indore
 
ESP.ppt
ESP.pptESP.ppt
ESP.ppt
 
Air heater
Air heaterAir heater
Air heater
 
Steam Condenser types,function, tube test, condenser vacuum
Steam Condenser types,function, tube test, condenser vacuumSteam Condenser types,function, tube test, condenser vacuum
Steam Condenser types,function, tube test, condenser vacuum
 
Water and Waste Water Treatment - EN - 140716 - webreduced
Water and Waste Water Treatment - EN - 140716 - webreducedWater and Waste Water Treatment - EN - 140716 - webreduced
Water and Waste Water Treatment - EN - 140716 - webreduced
 
Water and Waste Water Treatment - EN - 140716 - webreduced
Water and Waste Water Treatment - EN - 140716 - webreducedWater and Waste Water Treatment - EN - 140716 - webreduced
Water and Waste Water Treatment - EN - 140716 - webreduced
 
Electrostatic_Precipitator.pptx
Electrostatic_Precipitator.pptxElectrostatic_Precipitator.pptx
Electrostatic_Precipitator.pptx
 
dayline__1_
dayline__1_dayline__1_
dayline__1_
 
Industrial fan(ID FD Fans)
Industrial fan(ID FD Fans)Industrial fan(ID FD Fans)
Industrial fan(ID FD Fans)
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plants
 
AHP and ESP PPT.pptx
AHP and ESP PPT.pptxAHP and ESP PPT.pptx
AHP and ESP PPT.pptx
 
Paras ppt
Paras pptParas ppt
Paras ppt
 
Hydrogen in power plants
Hydrogen in power plantsHydrogen in power plants
Hydrogen in power plants
 
30120130406007
3012013040600730120130406007
30120130406007
 
HT 6.6 KV VCB OPERATION AND MAINTENANCE PPT
HT 6.6 KV VCB OPERATION AND MAINTENANCE PPTHT 6.6 KV VCB OPERATION AND MAINTENANCE PPT
HT 6.6 KV VCB OPERATION AND MAINTENANCE PPT
 
S3 Supply Devices and Room Air Distribution
S3 Supply Devices and Room Air DistributionS3 Supply Devices and Room Air Distribution
S3 Supply Devices and Room Air Distribution
 
Steam Power Plant and Boiler power plant.pptx
Steam Power Plant and Boiler power plant.pptxSteam Power Plant and Boiler power plant.pptx
Steam Power Plant and Boiler power plant.pptx
 
Air Blast & SF6 Circuit Breaker Design and Construction
Air Blast & SF6 Circuit Breaker Design and Construction Air Blast & SF6 Circuit Breaker Design and Construction
Air Blast & SF6 Circuit Breaker Design and Construction
 
Underground car parking ventilation system
Underground car parking ventilation systemUnderground car parking ventilation system
Underground car parking ventilation system
 
Plasma spraying (type of thernal spraying)
Plasma spraying (type of thernal spraying)Plasma spraying (type of thernal spraying)
Plasma spraying (type of thernal spraying)
 

More from A Y V CHENULU

More from A Y V CHENULU (15)

History of flight
History of flightHistory of flight
History of flight
 
Personality development notes
Personality development notesPersonality development notes
Personality development notes
 
The art of_being_well
The art of_being_wellThe art of_being_well
The art of_being_well
 
Indian history by A ADARSH
Indian history by A ADARSHIndian history by A ADARSH
Indian history by A ADARSH
 
Bhagavat gita simplified
Bhagavat gita simplifiedBhagavat gita simplified
Bhagavat gita simplified
 
Ethics in business
Ethics in businessEthics in business
Ethics in business
 
Principles of eagle
Principles of eaglePrinciples of eagle
Principles of eagle
 
Steelindustry an introduction
Steelindustry an introductionSteelindustry an introduction
Steelindustry an introduction
 
Six sigma
Six sigmaSix sigma
Six sigma
 
The weather
The weatherThe weather
The weather
 
The ant story
The ant storyThe ant story
The ant story
 
TEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONSTEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONS
 
Bhilai Sms 1.
Bhilai Sms 1.Bhilai Sms 1.
Bhilai Sms 1.
 
Gayatrimantra
GayatrimantraGayatrimantra
Gayatrimantra
 
The Beautyful Shree Ganesha
The Beautyful Shree GaneshaThe Beautyful Shree Ganesha
The Beautyful Shree Ganesha
 

Recently uploaded

Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abrahamssuserbb03ff
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012sapnasaifi408
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...Cluster TWEED
 
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Bookingtanu pandey
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...ranjana rawat
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurSuhani Kapoor
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girlsPooja Nehwal
 

Recently uploaded (20)

Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
Horizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben AbrahamHorizon Net Zero Dawn – keynote slides by Ben Abraham
Horizon Net Zero Dawn – keynote slides by Ben Abraham
 
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
Call Girls South Delhi Delhi reach out to us at ☎ 9711199012
 
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
webinaire-green-mirror-episode-2-Smart contracts and virtual purchase agreeme...
 
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Pune Airport Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls ServicesGandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
Gandhi Nagar (Delhi) 9953330565 Escorts, Call Girls Services
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service GorakhpurVIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
VIP Call Girl Gorakhpur Aashi 8250192130 Independent Escort Service Gorakhpur
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girlsMumbai Call Girls, 💞  Prity 9892124323, Navi Mumbai Call girls
Mumbai Call Girls, 💞 Prity 9892124323, Navi Mumbai Call girls
 

ESP

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.  Ash resistivity . Particle size distribution . Number of ESP per boiler . Minimum No. of fields required . Minimum specific collecting area . Maximum gas velocity . Minimum aspect ratio . Maximum area connected to one TR set . Collecting electrode spacing
  • 7. . Recovery of material for economic reasons Pulp and paper Industries (sodium sulphate ) . Removal of abrasive material in the dust to reduce wear and tear of the Fan components . Removal of objectionable matter in the dust -NO2 and SO2
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. Specific Collecting Area Amount of collecting area required to be provided to collect dust in gas flow rate of 1 m3 /s. Flue gas Velocity, m/s = Flue gas flow in m3 ESP effective cross section m2 Aspect ratio = Effective Length of ESP Collecting electrode height Treatment Time, sec =Effective Length of ESP in m Flue gas Velocity in m/s
  • 14. Gas Velocity. . Velocity is decided by the gas flow and collection efficiency required . Higher the gas velocity,higher the carryover of dust particles without Collection - Re – entertainment . Very poor velocity alters the flow distribution and effects settling of Dust particles . Optimum velocity depends upon the application will improve the Performance.
  • 15. Aspect Ratio. . During the rapping, the falling of dust particle take a trajectory form . Lower the aspect ratio, the trajectory dust travel along with gas flow  Without falling in to hoppers – Leads to re- entrainment loss. . Higher the ratio, performance will be good . Optimum aspect ratio depends on allowable velocity, required collection  Efficiency and available space.
  • 16. Treatment Time. . Time available for capturing the dust particle . More treatment time at reasonable velocity improves the collection efficiency . Probability of capturing the re-entrained particles improves with time.
  • 17. RECOVERY ELECTOSTATIC PRECIPITATOR The Paper mills are often located in a sensitive environment with strict requirements of emission of dust particles and gaseous pollutants to the atmosphere. The dust particles are very fine and sticky in nature. The gases are also highly corrosive. Dedusting by means of Electrostatic Precipitators are the preferred technology in Paper mills. Black liquor recovery boilers are de-dusted by a multi chamber ElectrostatiC Precipitator often with a casing made of concrete
  • 18. The casing of the precipitator for recovery boiler applications are preferred to be made of REINFORCED CEMENT CONCRETE. As the gas is rich in moisture and highly corrosive due to the presence of sulphur compounds ( sodium sulphate and sodium sulphide used in the pulp digesters ), the concrete casing is preferred to withstand corrosion.
  • 19. For the same reason, the collecting electrode ( the thinnest part in the electrode system ) is made of corrosion resistant steels – CORTEN - A or CORTEN – B or equivalent. The thickness can be 1.5 mm to provide for an enhanced life of the collecting system. The emitting electrode shall be of austenitic stainless steel having excellent corrosion resistant properties (conforming to UHB 904L or AISI 316L or equivalent)
  • 20. The load of the collecting and emitting systems are transferred to the casing through load bearing members called ‘casing inserts’. These are small parts made of steel and embedded in the concrete casing at the time of casting the same. This is done in-site. The hopper system for these precipitators shall be of flat bottom. No pyramidal nor trapezoidal type of hoppers are used for such applications. The bottom floor of the casing itself serves as the hopper and the dust from the collecting / emitting and the gas distribution screens are allowed to fall on to this floor.
  • 21. The collected dust on the floor is scrapped by means of ‘SCRAPPER CONVEYOR’ which runs between the inlet of the precipitator and the outlet. Structural members are mounted at desired locations on two end-less chains and scrap the collected dust to bring it to the inlet end of the precipitator casing. The conveyor is electrically driven by motors mounted on the outside of the casing
  • 22. In addition to the scrapper conveyor, a CHAIN CONVEYOR is also employed to transfer the dust to a ROTARY FEEDER mounted external to the precipitator casing. The chain conveyor runs across the precipitator at the inlet end of the casing and is located inside the precipitator casing. The chain conveyor is also electric driven by a motor mounted external to the precipitator casing. The dust discharged from the chain conveyor into the rotary feeder is further conveyed to the mixing chamber where it is mixed with the spent liquor and recycled
  • 23. The drives of the scrap per conveyor, chain conveyor and the rotary feeder are to be interlocked in a particular sequence by monitoring their operation through speed monitoring devices mounted on the drive shafts of these conveyors. This is essential to avoid overloading of the conveyors / their drives. The operation of the scrapper conveyor shall be interlocked with the Transformer – Rectifier set so that the fields are de-energized automatically when the scrapper conveyor is NOT in operation. As the dust is sticky in nature due to the high moisture content, the gas distributor screens at the inlet of the precipitator will be rapped at the same frequency as that of the
  • 24. As the flue gas is highly corrosive and rich in moisture content, special care has to be taken to ensure that the flue gas temperature at the inlet of the precipitator is sufficiently above the acid / moisture dew point to avoid any condensation on the precipitator surfaces and cause corrosion. Temperature monitors are required to be installed at the inlet duct. Some customers may prefer to have a bye-pass duct when the gas temperature is NOT sufficiently above the dew points. In such cases, diverter dampers may be required at the inlet and outlet of the precipitator casing to prevent gas flow through the precipitator. This will add to the cost of the precipitator system.
  • 25. . Gas tight dampers are required to be installed at the inlet and outlet of the precipitator casing for purposes of maintenance. The ingress / leakage of atmospheric air into the precipitator casing has to be completely avoided from the point of eliminating the possibility of any local corrosion. The inspection doors on the casing have to be therefore of double construction. One inspection door located very close ( on the concrete casing ) and the other one mounted over the inner door. The concrete casing also requires thermal insulation on the outside. Light Resin Bonded (LRB) mattresses of adequate thickness can be used.
  • 26. CONSTRUCTION OF ELECTROSTATIC PRECIPITATOR This consists of Supporting structure and support Bearing , these are the rigid structure supporting the entire load of the ESP. The bearings are provided between the casing colume and supporting structure to act freely for thermal expansion. CASING.  The casing is known as IB casing, the side walls are made of horizontal panels, it is a leak proof arrangement with roof beams of Longitudinal and Transverse to support the internals of Collecting and Emitting systems. HOPPER. Pyramidal and flat bottom hoppers are provided under the casing to collect the ashes. It should not be treated as storage bunker.
  • 27. EMITTING SYSTEM. Emitting system consists of rigid emitting frame suspended from four points on the top. The four suspension points are supported on support Insulators to give electrical insulation to the emitting frame. EMITTING ELECTRODES. The Discharge electrodes consist of hard drawn spiral wires. The coil spring form emitting electrodes are self tensioning, this stabilized positioning permits the highest possible operating voltage. The self tensioning spiral discharge electrodes allow for better transmission of the rapping force. The spiral wire electrode provides a uniform current distribution and the corona discharge occurs around the entire surface of the wire.
  • 28. Rapping mechanism for Discharge electrode. A Traction of the dust will be collected on the discharge electrode and the corona will be suppressed as the dust layer grows. Frequent rapping is required to keep the electrode clean always. COLLECTING SYSTEM. The collecting system is of dimensional stability. The upper edges of the collecting plate are hung on hooks provided on the roof and the bottom is fixed with the shock bar. The collecting electrodes are made of cold rolled carbon steel or corton steel material of the order of 1.5mm thickness with G profile at the end
  • 29. RAPPING MECHANISM FOR GOLLECTING ELECTRODE. The system employs tumbling hammers which are mounted on a horizontal shaft in a staggered fashion with one hammer for each shock bar. The shock bar transmits the blow simultaneously to all of the collecting plates in one row because of their direct contact with the shock bar. ELECTRICS . Rectifier Transformers are provided on top of ESP, the control panels are located in ESP control room situated in the ground. Auxiliary control panels are housed in the ESP control room to control the auxiliary equipments of ESP like Heaters, Rapping motors, conveyers etc.LT distribution board also housed in control room.
  • 30. OPERATION AND MAINTENANCE OF RECOVERY ESP. ESP’s are constant efficient equipment, if the input parameters are maintained to the design value then the out put efficiency (emission) will be maintained, Provided the ESP fields should be healthy. We have to ensure the healthiness of each and every equipment independently. The HVR and EC controllers should be tuned to the optimum level Depending upon the load in the steam unit. Monitor the optimum operation of the boiler by periodical check of O2 levels in different point in the flue gas circuit. The controllers should be kept at just below spark level Always monitor the conveyors to work smooth to avoid any Jamming.
  • 31. MAINTENANCE. Check all the Heaters are in service with thermostat control in operation. Check all the rapping motors are working as per the program set. Check the conveyors are running smooth Check the current and voltage are to the set level in the controllers. Check the boiler is operated with optimum design condition without any excess flue gas Any pluggage problem in the entire flue gas path from boiler outlet to chimney Inlet. To monitor the maximum solid content in the liquor to be fired.
  • 32.  Maintain history of firing proportion to emission with parameter recording The gas distribution to be studied for better correction.  Optimization of rapping to avoid offset in the system. Repair and replacement of rapping mechanism by suitably replacing the worn-out components.  Field alignment to be checked perfectly to attain max. current and voltage Corona quenching problems to be studied and attended. The ESP rapping system should impart as high acceleration to the precipitator internals as possible to increase the intensity of rapping by increasing the size.
  • 33. Poor ESP power input Dust build-ups Gas flow issues Over load . Poor ESP power input : Due to mechanical alignment deficiency, that reduces the gap between +ve and –ve electrodes, sparks controls the current build up and reduce the collection efficiency. Dust build- up : The formation of accumulation is due to the reaction between solid sodium sulfate and gaseous So2, which results in the formation of acid sulfate,NaHso4 and thus corona quenching.
  • 34. Gas Flow : Gas distribution, if it is not even then current distribution will be uneven, In leakage of air increases the flow rate , sneakage of gases flowing in untreated levels carry the dust. Over load : Due to higher production in the mill, Poor boiler operation with high amount of excess air, leakages in the flue gas path.
  • 35. Leakages in the flue gas path to be controlled Internal alignment to be checked and corrected, Gas distribution to be checked for uniform distribution, Gas sneakage points to be arrested for efficiency improvement, Rapping mechanism to be checked for effective dislodging of dust particles, Cleaning of internals either by air lashing or water washing. Power supply sources to the ESP to be checked.
  • 36.
  • 37. Electrical migration Electrical mobility Corona discharge ESP theory Charging mechanisms Ash resistivity Flue gas conditioning Power consumption Reading: Chap. 5 Positive Negative Republican Democrat Love Hate Ying Yang Man Woman Hell Heaven Cation Anion War Peace Attraction Repel
  • 38. Coulomb’s law Statcoulomb (stC): the charge that causes a repulsive force of 1 dyne when 2 equal charges are separated by 1 cm (3.33×10-10 C) Unit charge: 4.8 ×10-10 stC (1.6×10-19 C) 2 21 r qq KF EE = E F q E = (q=ne) Electric Field
  • 39. (Robert Millikan, US, 1868-1953; Nobel Prize Laureate, 1923) Hinds, Aerosol Technology, 1999 http://nobelprize.org/nobel_prizes/physics/laureates/1923/millikan-bio.html
  • 40. Terminal velocity in an electrical field (electrical migration velocity/drift velocity) c TEp C Vd qE πµ3 = ( ) qEB d qEC wV p c TE ===⇒ πµ3 qB d qC E V Z p cTE ===⇒ πµ3 (force balance) DE FF = (for Re < 1) Q: What is the physical meaning of electrical mobility? Q: When does a particle have a higher mobility? May the force be with the particles! Q: Difference between cyclone and ESP in terms of forces acting on the system? What’s the effect?
  • 41. Positive Corona Negative Corona + - + - + + - + + + - - + - + - + - - - + + Corona Discharge Step 1 Step 2 Step 3 Step 4 Collection Plate Collection Plate Electron Molecule Particle Electrode Electrode Q: How can we generate charges? Ozone generation - http://www.mtcnet.net/~jdhogg/ozone/ozonation.html
  • 42. 1 2 3 1 2 3 (20) (12) (8) Turbulent Flow with Lateral Mixing Model Electrostatic Precipitator
  • 43. Deutsch-Anderson Equation R dtV R dtRV N dN TETE 22 2 −=−= π π ) 2 exp( )( 0 R tV N tN TE −=⇒       −−=−=η⇒ Q AV P cTE exp11 Ac/Q: Specific Collection Area (SCA) • Turbulent flow: uniformly mixing • Perfect Collection •The fraction of the particles removed in unit time = the ratio of the area traveled by drift velocity in unit time to the total cross- section Q: How to increase the efficiency?
  • 44. Q: An ESP that treats 10,000 m3 /min of air is expected to be 98% efficient. The effective drift velocity of the particles is 6.0 m/min. (a) What is the total collection area? (b) Assuming the plates are 6 m high and 3 m long, what is the number of plates required? 6 m 3 m Internal Configuration: self-review
  • 45. Random collisions between ions and particles         += kT tNecd e kTd n iipp 2 1ln 2 2 2 π Q: Does q depend on time? Does q depend on dp? The total number of charges on a particle (ci ~ 2.4×104 cm/s) neq = The total charges on a particle Use esu, not SI units.
  • 46. Bombardment of ions in the presence of a strong field eZ1 eZ 42 3 i i 2       +              + = tN tN e Ed n i ip π π ε ε Total number of charges by field charging Q: Is the charging rate dependent on particle size? On field strength? On time? On material? Aerosol Technology, Hinds, W. C., John Wiley & Sons, 1999.               + = e Ed n p s 42 3 2 ε ε Saturation charge (Zi ~ 450 cm2 /stV•s)
  • 47. Comparison of Diffusion & Field Charging Q: Does collection efficiency increase as particle size increase (because of a higher number of charges)? dp (um) ndiff nfield ntotal Zdiff ZField Z (stC•s/g) 0.01 0.10 0.02 0.12 0.66 0.10 0.76 0.02 0.30 0.06 0.36 0.49 0.11 0.60 0.05 1.1 0.40 1.50 0.31 0.12 0.43 0.1 2.8 1.6 4.38 0.23 0.13 0.36 0.2 7 6.5 13.2 0.18 0.17 0.35 0.5 21 40 61.2 0.15 0.30 0.45 1 48 161 209 0.16 0.52 0.68 2 108 646 754 0.16 0.98 1.14 5 311 4035 4346 0.18 2.34 2.52 10 683 16140 16824 0.20 4.61 4.80 20 1490 64562 66052 0.21 9.16 9.37 50 4134 403510 407644 0.23 22.78 23.0 Nit = 107 s/cm3 ε= 5.1 E = 5 KV/cm T = 298 K
  • 48. Typical fly ash size distribution Q: If the ESP is used to collect the fly ash, how will the particle size distribution at ESP outlet look like?
  • 49. Impact of particles’ resistivity on ESP’s performance: Factors: temperature, composition Flue gas conditioning 109 - 1010 ohm-cm is desired Q: How does resistivity affect an ESP’s performance?
  • 50. Effects of sulfur content and temperature on resistivity Q: Is S in coal good or bad?
  • 51. Water spray for cement kiln dust Flue Gas Conditioning
  • 52. Effective drift velocity as a function of resistivity by measurement Use the same Deutsch-Anderson Equation with new we. Q: Estimate the total collection area required for a 95% efficient fly-ash ESP that treats 8000 m3 /min. The ash resistivity is 1.6×1010 ohm-cm.
  • 53. Good for moderate collection efficiency (90% ~ 95%)
  • 54. High Efficiency ESP (>95%) Matts-Ohnfeldt Equation               −−= k e C w Q A exp1η Use k = 1 for fly ash k = 0.5 or 0.6 for industrial category Rule of Thumb • Below 95%, use Deutsch-Anderson Equation • Above 99%, use Matts-Ohnfeldt Equation • Between them, use an average Q: In designing a high efficiency ESP, a smaller drift velocity is to be used. Why?
  • 55. avgCC VIP = C C e A kP w = Power density ~ 1-2 W/ft2       − −= Q kPC exp1η Corona power Drift velocity Efficiency vs. Corona Power k = 0.55 for Pc/Q in W/cfs up to 98.5%
  • 58. 20/04/13 58 Positive Corona Negative Corona + - - - + - - - + + + - + electron molecule particle Collection Plate Collection PlateElectrode Electrode Step 1 + - +Step 2 + - + Step 3 + + - Step 4
  • 59. 20/04/13 59 Electrostatic Precipitator (ESP) ҉ Drift velocity of particles between the ESP plates
  • 60. 20/04/13 60 Types of ESPs in terms of shape ҉ Cylindrical type ҉ Plate type Types of ESPs in terms of flow direction ҉ Vertical gas-flow ҉ Horizontal gas-flow Types of ESPs in terms performance ҉ One stage or two stages ҉ Dry or wet Plate type, horizontal gas-flow, one stage and dry ESPs are the most common ESP type in industrial application.
  • 61. 20/04/13 61 Electrostatic Precipitator (ESP) One-stage ESP Two-stage ESP Discharge electrodes Collecting electrodes The observed minimum is because of Cunningham factor in calculation of drift velocity.