SlideShare a Scribd company logo
1 of 15
Download to read offline
Automatic rickshaws
         from Finland

                                  Asko Kauppi
                                  BM Design Ltd.




Copyright 2010-13, BM Design Oy
BubbleMotion
light station
parallel station
Benefits
2-3 person cabin - right size   capable of operating also           integrates well with existing
for individual use              during floods (to 2-3 meters         public transport modes (s.a.
                                height)                             Bus Rapid Transit or metro)
group mode for up to 9
people                          capable of routing through          also usable as a stand-alone
                                parks, forests, wetlands without    community / campus network
no timetables; no interim       disturbing wildlife or park users
stops                                                               more comfortable than using a
                                minimal construction time and       private car
normal speed 45km/h             effort
                                                                    fully self-sustained (electricity,
fast mode (no intersections)    dynamic track; can be               communication)
70km/h                          dismantled and re-erected
                                elsewhere                           designed for resilience
stations always at pedestrian                                       (accidents, catastrophies s.a.
level (or within buildings)     no external electric contacts ->    earthquakes)
                                safe
climbs 0..90° effortlessly                                           the most energy efficient means
                                service based business model =      of motorised transportation
no protrusions in the track;    easy purchasing, proven quality     (combines the benefits of rail
ideal for snow, sand and        throughout the operations           and light vehicles)
durability
Energy efficiency
                                                         single   average         full
efficiency (passenger-km / kWh)
                                           Occupancy:
                                           Congestion:
                                                         none                     full



  20
                                                                             Better

                                                                             electric
  15                                                                         hybrid
                                                                              diesel
                                                                             gasoline


  10



   5



   0                                                                        effective
       0                  10     20   30                    40                speed
                                                                             (km/h)
Application areas
distance
(km)
                                                     local trains
   100


    50        local
              buses                             bus rapid transit
    10
              taxis BM        BM with
                   with small parallel
     5              stations stations
                                                                 metro
     1
             rickshaws
     0
                                                                      capacity
         0      100      500      1000   5000        10000
                                                                      (pphpd)
                                                      people per hour per direction
Markets

Urban      Tourist




Campus    Airports
Competition

ULTra: Heathrow T5, Amritsar, Gurgaon
   2GetThere: Masdar (Abu Dhabi)
   Vectus: Suncheon (South Korea)
Competition
   in urban transport,
  the existing solution
     is a competition
Current state
                        Concept feasibility
                         Business contacts
                           CAD modeling
                      Simulator sw (alpha)
             Pilot customer development
             Finnish government contacts



We have 2-3 eligible pilot cases being discussed with local transport planners and
cities. Also, the Finnish government is starting a ‘Smart cities’ project in spring 2013
focusing on part-financing 3-5 world-leading pilot cases. We aim to be one of them.


A patent application was filed in 2010 but it expired in lack of funds. However, we
have clearance that the current design is not offending anyone’s patents.
Why Finland?
Great talent and business
 - good educated workforce (software, automation, machinery, project management)
 - many global leaders founded in Finland (Kone, Cargotec, Ruukki, Rovio, ...)
 - small country where people generally ”know each other”
 - good cleantech brand globally


Emerging startup mentality
 - Lean Startup mentality is on the rise
 - society under stress from change = looking for new and more efficient ways
 - lot of construction going on in the Helsinki region (most within EU cities)


Government support
 - government agency Tekes launching ‘Smart Cities’ program for 2013-20
 - well established public/private partnerships
 - subsidies for piloting and rail-bound public transport  Challenges:
                                                            Finance infrastructure especially for
                                                            investments of 100k..1M eur is lacking.
Pilot
                                                                 13-15M

 Funding needs
                                                         Most funding
                                                          would come
                                                      from government
                                                      funds paid to the
                                                        customer. This
                                                       allows us to test
                                                       also the business
                                                             model.
                                    Proto
                                      2-5M

                          Seed
       Launch            150-300k
         60k
        20



                20



                       20



                               20



                                             20



                                                    20



                                                              20
20




          11



                  12



                         13



                                 14



                                               15



                                                      16



                                                                17
  10
Seed capital use
Software track simulator                           alpha phase
  - tool for planning pilot track                                   Using Scala programming
  - essential for customer communication                            language and framework
  = sales tool


Functional CAD modeling                              spec confirmation
  - making a functional model of track, vehicles and stations
  - simulating static loads, friction, vibrations, performance      Using Autodesk Inventor
  = blueprint for a proto
          20



                       20



                                   20



                                               20



                                                            20



                                                                   20



                                                                              20
20




            11



                         12



                                     13



                                                 14



                                                              15



                                                                     16



                                                                                17
  10
Thank you
asko@bmdesign.fi
twitter: @bmdesignhki




                        we want to move you

More Related Content

What's hot

Robert Evans - Overview of midlands PiP project
Robert Evans - Overview of midlands PiP projectRobert Evans - Overview of midlands PiP project
Robert Evans - Overview of midlands PiP project
Keith Nolan
 
Meriden on the Move
Meriden on the MoveMeriden on the Move
Meriden on the Move
sneapa
 

What's hot (19)

Session 14 1 Sven-Allan Bjerkemo
Session 14 1 Sven-Allan BjerkemoSession 14 1 Sven-Allan Bjerkemo
Session 14 1 Sven-Allan Bjerkemo
 
Robert Evans - Overview of midlands PiP project
Robert Evans - Overview of midlands PiP projectRobert Evans - Overview of midlands PiP project
Robert Evans - Overview of midlands PiP project
 
ERTMS Fact Sheet 6 - ERTMS deployment in Switzerland
ERTMS Fact Sheet 6 - ERTMS deployment in SwitzerlandERTMS Fact Sheet 6 - ERTMS deployment in Switzerland
ERTMS Fact Sheet 6 - ERTMS deployment in Switzerland
 
ERTMS Fact Sheet 17 - ERTMS deployment in Turkey
ERTMS Fact Sheet 17 - ERTMS deployment in TurkeyERTMS Fact Sheet 17 - ERTMS deployment in Turkey
ERTMS Fact Sheet 17 - ERTMS deployment in Turkey
 
Thomas Theisen Rwe
Thomas Theisen   RweThomas Theisen   Rwe
Thomas Theisen Rwe
 
ERTMS Fact Sheet 5 - ERTMS deployment in Spain
ERTMS Fact Sheet 5 - ERTMS deployment in SpainERTMS Fact Sheet 5 - ERTMS deployment in Spain
ERTMS Fact Sheet 5 - ERTMS deployment in Spain
 
Seoul topis
Seoul topisSeoul topis
Seoul topis
 
Brts
BrtsBrts
Brts
 
Dr. SUN Feng-chun, Vice President, Beijing Institute of Technology
Dr. SUN Feng-chun, Vice President, Beijing Institute of TechnologyDr. SUN Feng-chun, Vice President, Beijing Institute of Technology
Dr. SUN Feng-chun, Vice President, Beijing Institute of Technology
 
Metro lite guided tour2.0
Metro lite guided tour2.0Metro lite guided tour2.0
Metro lite guided tour2.0
 
ERTMS Fact Sheet 11 - Rail freight on the right tracks
ERTMS Fact Sheet 11 - Rail freight on the right tracksERTMS Fact Sheet 11 - Rail freight on the right tracks
ERTMS Fact Sheet 11 - Rail freight on the right tracks
 
ERTMS Fact Sheet 10 - Increasing infrastructure capacity
ERTMS Fact Sheet 10 - Increasing infrastructure capacityERTMS Fact Sheet 10 - Increasing infrastructure capacity
ERTMS Fact Sheet 10 - Increasing infrastructure capacity
 
Meriden on the Move
Meriden on the MoveMeriden on the Move
Meriden on the Move
 
CONNECTKaro 2015 - Session 10A - BRT - Challenges for Sustainable Transport S...
CONNECTKaro 2015 - Session 10A - BRT - Challenges for Sustainable Transport S...CONNECTKaro 2015 - Session 10A - BRT - Challenges for Sustainable Transport S...
CONNECTKaro 2015 - Session 10A - BRT - Challenges for Sustainable Transport S...
 
Germany
GermanyGermany
Germany
 
Road Based Public Transport V1
Road Based Public Transport  V1Road Based Public Transport  V1
Road Based Public Transport V1
 
ERTMS Fact Sheet 14 - ERTMS deployment in the UK
ERTMS Fact Sheet 14 - ERTMS deployment in the UKERTMS Fact Sheet 14 - ERTMS deployment in the UK
ERTMS Fact Sheet 14 - ERTMS deployment in the UK
 
Worldwide BRT Systems: Applicability of BRT Systems in Turkey
Worldwide BRT Systems: Applicability of BRT Systems in TurkeyWorldwide BRT Systems: Applicability of BRT Systems in Turkey
Worldwide BRT Systems: Applicability of BRT Systems in Turkey
 
Singapore MRT
Singapore MRTSingapore MRT
Singapore MRT
 

Similar to BubbleMotion automated rickshaws (Apr 2013)

Guadalajara
GuadalajaraGuadalajara
Guadalajara
alvarols
 
B. Mollstedt, "E.ON Mobility," in Electric Vehicle Integration Into Modern Po...
B. Mollstedt, "E.ON Mobility," in Electric Vehicle Integration Into Modern Po...B. Mollstedt, "E.ON Mobility," in Electric Vehicle Integration Into Modern Po...
B. Mollstedt, "E.ON Mobility," in Electric Vehicle Integration Into Modern Po...
Eamon Keane
 
1 a maglev movers brochures jan 2012
1 a maglev movers brochures jan  20121 a maglev movers brochures jan  2012
1 a maglev movers brochures jan 2012
Syl Juxon Smith - BSc
 
Саммит ТПП С-6 в Берлине: Презентация ТПП Парижа
Саммит ТПП С-6 в Берлине: Презентация ТПП ПарижаСаммит ТПП С-6 в Берлине: Презентация ТПП Парижа
Саммит ТПП С-6 в Берлине: Презентация ТПП Парижа
MoscowCCI
 
Mass Transport Solutions for Cebu City – Aerial Ropeways
Mass Transport Solutions for Cebu City – Aerial RopewaysMass Transport Solutions for Cebu City – Aerial Ropeways
Mass Transport Solutions for Cebu City – Aerial Ropeways
Kenneth Louie Rago
 
Sarwant estonia new business models
Sarwant estonia   new business modelsSarwant estonia   new business models
Sarwant estonia new business models
Marjola BRUCI
 
Trivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary StudyTrivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary Study
Ajay Prasad
 
A Better Path for Project Connect.pptx
A Better Path for Project Connect.pptxA Better Path for Project Connect.pptx
A Better Path for Project Connect.pptx
Brian Gettinger
 
Tod mpd-road map-08nov09
Tod mpd-road map-08nov09Tod mpd-road map-08nov09
Tod mpd-road map-08nov09
Paromita Roy
 

Similar to BubbleMotion automated rickshaws (Apr 2013) (20)

Guadalajara
GuadalajaraGuadalajara
Guadalajara
 
B. Mollstedt, "E.ON Mobility," in Electric Vehicle Integration Into Modern Po...
B. Mollstedt, "E.ON Mobility," in Electric Vehicle Integration Into Modern Po...B. Mollstedt, "E.ON Mobility," in Electric Vehicle Integration Into Modern Po...
B. Mollstedt, "E.ON Mobility," in Electric Vehicle Integration Into Modern Po...
 
1 a maglev movers brochures jan 2012
1 a maglev movers brochures jan  20121 a maglev movers brochures jan  2012
1 a maglev movers brochures jan 2012
 
Саммит ТПП С-6 в Берлине: Презентация ТПП Парижа
Саммит ТПП С-6 в Берлине: Презентация ТПП ПарижаСаммит ТПП С-6 в Берлине: Презентация ТПП Парижа
Саммит ТПП С-6 в Берлине: Презентация ТПП Парижа
 
Nordic Venture Forum 2011, Copenhagen
Nordic Venture Forum 2011, CopenhagenNordic Venture Forum 2011, Copenhagen
Nordic Venture Forum 2011, Copenhagen
 
Mass Transport Solutions for Cebu City – Aerial Ropeways
Mass Transport Solutions for Cebu City – Aerial RopewaysMass Transport Solutions for Cebu City – Aerial Ropeways
Mass Transport Solutions for Cebu City – Aerial Ropeways
 
UNIQUE CHARGING INFRASTRUCTURE SYSTEM: GRID EMOTION FLASH CHARGING
UNIQUE CHARGING INFRASTRUCTURE SYSTEM: GRID EMOTION FLASH CHARGINGUNIQUE CHARGING INFRASTRUCTURE SYSTEM: GRID EMOTION FLASH CHARGING
UNIQUE CHARGING INFRASTRUCTURE SYSTEM: GRID EMOTION FLASH CHARGING
 
Dubai metro paper in IRSE magazine
Dubai metro paper in IRSE magazineDubai metro paper in IRSE magazine
Dubai metro paper in IRSE magazine
 
GV-08-2017
GV-08-2017GV-08-2017
GV-08-2017
 
Sarwant estonia new business models
Sarwant estonia   new business modelsSarwant estonia   new business models
Sarwant estonia new business models
 
Trivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary StudyTrivandrum Monorail Preliminary Study
Trivandrum Monorail Preliminary Study
 
Waves5
Waves5Waves5
Waves5
 
Managing Viennas Tram and Metro Network
Managing Viennas Tram and Metro NetworkManaging Viennas Tram and Metro Network
Managing Viennas Tram and Metro Network
 
A Better Path for Project Connect.pptx
A Better Path for Project Connect.pptxA Better Path for Project Connect.pptx
A Better Path for Project Connect.pptx
 
PEV autonomy 2017
PEV autonomy 2017 PEV autonomy 2017
PEV autonomy 2017
 
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a PrerequisiteTransforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
 
Dedicated roads for autonomous vehicles
Dedicated roads for autonomous vehicles Dedicated roads for autonomous vehicles
Dedicated roads for autonomous vehicles
 
Tod mpd-road map-08nov09
Tod mpd-road map-08nov09Tod mpd-road map-08nov09
Tod mpd-road map-08nov09
 
Worldwide Developments in BRT
Worldwide Developments in BRT  Worldwide Developments in BRT
Worldwide Developments in BRT
 
Design school2 sds
Design school2 sdsDesign school2 sds
Design school2 sds
 

Recently uploaded

Recently uploaded (20)

Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 

BubbleMotion automated rickshaws (Apr 2013)

  • 1. Automatic rickshaws from Finland Asko Kauppi BM Design Ltd. Copyright 2010-13, BM Design Oy
  • 5. Benefits 2-3 person cabin - right size capable of operating also integrates well with existing for individual use during floods (to 2-3 meters public transport modes (s.a. height) Bus Rapid Transit or metro) group mode for up to 9 people capable of routing through also usable as a stand-alone parks, forests, wetlands without community / campus network no timetables; no interim disturbing wildlife or park users stops more comfortable than using a minimal construction time and private car normal speed 45km/h effort fully self-sustained (electricity, fast mode (no intersections) dynamic track; can be communication) 70km/h dismantled and re-erected elsewhere designed for resilience stations always at pedestrian (accidents, catastrophies s.a. level (or within buildings) no external electric contacts -> earthquakes) safe climbs 0..90° effortlessly the most energy efficient means service based business model = of motorised transportation no protrusions in the track; easy purchasing, proven quality (combines the benefits of rail ideal for snow, sand and throughout the operations and light vehicles) durability
  • 6. Energy efficiency single average full efficiency (passenger-km / kWh) Occupancy: Congestion: none full 20 Better electric 15 hybrid diesel gasoline 10 5 0 effective 0 10 20 30 40 speed (km/h)
  • 7. Application areas distance (km) local trains 100 50 local buses bus rapid transit 10 taxis BM BM with with small parallel 5 stations stations metro 1 rickshaws 0 capacity 0 100 500 1000 5000 10000 (pphpd) people per hour per direction
  • 8. Markets Urban Tourist Campus Airports
  • 9. Competition ULTra: Heathrow T5, Amritsar, Gurgaon 2GetThere: Masdar (Abu Dhabi) Vectus: Suncheon (South Korea)
  • 10. Competition in urban transport, the existing solution is a competition
  • 11. Current state Concept feasibility Business contacts CAD modeling Simulator sw (alpha) Pilot customer development Finnish government contacts We have 2-3 eligible pilot cases being discussed with local transport planners and cities. Also, the Finnish government is starting a ‘Smart cities’ project in spring 2013 focusing on part-financing 3-5 world-leading pilot cases. We aim to be one of them. A patent application was filed in 2010 but it expired in lack of funds. However, we have clearance that the current design is not offending anyone’s patents.
  • 12. Why Finland? Great talent and business - good educated workforce (software, automation, machinery, project management) - many global leaders founded in Finland (Kone, Cargotec, Ruukki, Rovio, ...) - small country where people generally ”know each other” - good cleantech brand globally Emerging startup mentality - Lean Startup mentality is on the rise - society under stress from change = looking for new and more efficient ways - lot of construction going on in the Helsinki region (most within EU cities) Government support - government agency Tekes launching ‘Smart Cities’ program for 2013-20 - well established public/private partnerships - subsidies for piloting and rail-bound public transport Challenges: Finance infrastructure especially for investments of 100k..1M eur is lacking.
  • 13. Pilot 13-15M Funding needs Most funding would come from government funds paid to the customer. This allows us to test also the business model. Proto 2-5M Seed Launch 150-300k 60k 20 20 20 20 20 20 20 20 11 12 13 14 15 16 17 10
  • 14. Seed capital use Software track simulator alpha phase - tool for planning pilot track Using Scala programming - essential for customer communication language and framework = sales tool Functional CAD modeling spec confirmation - making a functional model of track, vehicles and stations - simulating static loads, friction, vibrations, performance Using Autodesk Inventor = blueprint for a proto 20 20 20 20 20 20 20 20 11 12 13 14 15 16 17 10