SlideShare uma empresa Scribd logo
1 de 14
Business Industrial Network
    www.DowntimeCentral.com




     True Downtime Cost
Quick Help Results
                             12

                             10             Without BIN
   Our customers can
                                            BIN Customers
    see ROI of 1000%      8

   BIN makes             6
    Manufactures,         4
    Vendors, and
    Support companies 2
    more profitable       0
    through TDC
                 Hours Down
    information.


                  www.DowntimeCentral.com
True Downtime Cost (TDC)
 Corrugators   = $ 10,000 per hour
  6 Hours saved in Unplanned downtime,
    $60K
 Air   compressor = $ 30,000 per hour
  6 Hours saved in Unplanned downtime,
    $180K
 Cell   Bottleneck = $ 3,000 per hour
  6 Hours saved in Unplanned downtime,
    $18K
                 www.DowntimeCentral.com
Overview (Definition:)
       TDC – True Downtime Cost

•A method of recording and analyzing all significant cost
metrics associated with equipment downtime in a building
or manufacturing facility.
•TDC provides a way to assign time and/or monetary value
to previously considered “non-tangible” cost of downtime.
•Also TDC includes downtime factors commonly overlook to
arrive at a more true value for the cost of downtime.


                     www.DowntimeCentral.com
Focus on the 80%

 80%   of the failures come from 20% of
  the failure modes.
 TDC helps you focus on the greatest
  cost of downtime, as opposed to
  traditional broad categories such as
  “Maintenance” , “Labor”, etc.


               www.DowntimeCentral.com
Why use TDC?
   Executive Management
       True (Better) information, allows you to make
        better decisions.
   Maintenance Management
       TDC gives you the tools to cost justify those much
        needed equipment upgrades and replacements.
   All Service and Product Suppliers
       Allows you to show customers the true value and
        savings of your product or service.
       Helps your customers cost justify purchasing from
        you.

                      www.DowntimeCentral.com
You’ve seen the value in CMMS,
now see that value increase.
 CMMS,   might pay for itself in 18-30
  months
 Targeted cost/risk review of projects
  and maintenance requirements will
  typically achieve net payback in 3-6
  months.

          www.DowntimeCentral.com
A Quick Look at TDC metrics
             Equipment       Labor            Downtime

  Categories                LPP/M                        Time

   People                                            Reduced
                              QC
                                                         Scrap
   Product
                         Maintenance                Band-Aid
   Start-Up
                                                         OEM
                         Engineering
  Bottleneck
                                                     Tooling
                         Management
  Sales Exp                                         Part / Ship
                          Overhead

                    www.DowntimeCentral.com
A greater return is why we see
the popularity of …

 TPM
     (Total   Productive Maintenance)
   RCM
     (Reliability   Centered Maintenance)



               www.DowntimeCentral.com
TDC shows at least 10 times the
cost that conventional methods
show.

 This is why TDC amplifies the value
  of asset management programs by
  many times.



            www.DowntimeCentral.com
TDC made easy by growing
number of Computer systems

 Arebeing recognized as necessary and
 valuable for …
   asset information
   work management

   condition monitoring



            www.DowntimeCentral.com
The Old Mindsets
  The relationships are poorly
  understood, the mathematics
  are too nasty, and the available
  raw data is usually inadequate.
  However, much has changed
  through the TDC project.

              www.DowntimeCentral.com
TDC to OEE
 OEE  can appear improved by actions
  such as purchasing oversize equipment,
  providing redundant supporting systems
  and increasing the frequency of
  overhauls.
 Also complete understanding of OEE is
  required to make sound decisions.
 TDC enhances OEE accuracy, and
  places it in perspective.
              www.DowntimeCentral.com
TDC represents the final
bottlenecks to a fully integrated
and auditable approach to
                                  “LEAN”
maintenance strategy            TPM, RCM, PM
development / justification.
                                                    TDC

Click the link to learn more about       ERP,CMMS,EDI,DCS,PLC
•TDC Data Source
•TDC Cost Factors

                          www.DowntimeCentral.com

Mais conteúdo relacionado

Destaque

Introduction to condition based maintenance
Introduction to condition based maintenanceIntroduction to condition based maintenance
Introduction to condition based maintenance
ASQ Reliability Division
 
Maintenance strategy & cbm basic introduction
Maintenance strategy & cbm basic introductionMaintenance strategy & cbm basic introduction
Maintenance strategy & cbm basic introduction
Smruti Ranjan Jena
 

Destaque (6)

Condition Monitoring Solutions for Reciprocating Compressors
Condition Monitoring Solutions for Reciprocating CompressorsCondition Monitoring Solutions for Reciprocating Compressors
Condition Monitoring Solutions for Reciprocating Compressors
 
Introduction to condition based maintenance
Introduction to condition based maintenanceIntroduction to condition based maintenance
Introduction to condition based maintenance
 
Maintenance strategy & cbm basic introduction
Maintenance strategy & cbm basic introductionMaintenance strategy & cbm basic introduction
Maintenance strategy & cbm basic introduction
 
An Introduction to Condition Based Maintenance (CBM)
An Introduction to  Condition Based Maintenance (CBM)An Introduction to  Condition Based Maintenance (CBM)
An Introduction to Condition Based Maintenance (CBM)
 
Condition monitoring of rotating machines ppt
Condition monitoring of rotating machines pptCondition monitoring of rotating machines ppt
Condition monitoring of rotating machines ppt
 
Siemens PLC Programming Example #2
Siemens PLC Programming Example #2Siemens PLC Programming Example #2
Siemens PLC Programming Example #2
 

Mais de Business Industrial Network

Mais de Business Industrial Network (20)

Rotary Gear Type Pump Whitepaper
Rotary Gear Type Pump WhitepaperRotary Gear Type Pump Whitepaper
Rotary Gear Type Pump Whitepaper
 
Process Hazards Analysis
Process Hazards AnalysisProcess Hazards Analysis
Process Hazards Analysis
 
Machinery Failure Analysis and Troubleshooting
Machinery Failure Analysis and TroubleshootingMachinery Failure Analysis and Troubleshooting
Machinery Failure Analysis and Troubleshooting
 
Total Quality Management TQM
Total Quality Management TQMTotal Quality Management TQM
Total Quality Management TQM
 
Process Risk Management
Process Risk ManagementProcess Risk Management
Process Risk Management
 
Equipment Reliability Example
Equipment Reliability ExampleEquipment Reliability Example
Equipment Reliability Example
 
How to learn SCADA
How to learn SCADAHow to learn SCADA
How to learn SCADA
 
PLC Programming Example - PLC Clock - Answ
PLC Programming Example - PLC Clock - AnswPLC Programming Example - PLC Clock - Answ
PLC Programming Example - PLC Clock - Answ
 
What is a PLC ?
What is a PLC ?What is a PLC ?
What is a PLC ?
 
PLC Networking Basics - Instructor's notes
PLC Networking Basics - Instructor's notesPLC Networking Basics - Instructor's notes
PLC Networking Basics - Instructor's notes
 
Plc networking basics - controllogix
Plc networking basics - controllogixPlc networking basics - controllogix
Plc networking basics - controllogix
 
Best plc-programming
Best plc-programmingBest plc-programming
Best plc-programming
 
PC vs PLC
PC vs PLCPC vs PLC
PC vs PLC
 
Thank You Veterans for your service
Thank You Veterans for your serviceThank You Veterans for your service
Thank You Veterans for your service
 
USA Manufacturing Jobs Analysis
USA Manufacturing Jobs AnalysisUSA Manufacturing Jobs Analysis
USA Manufacturing Jobs Analysis
 
Best Practices in PLC Programming
Best Practices in PLC ProgrammingBest Practices in PLC Programming
Best Practices in PLC Programming
 
Support Workforce Wednesdays
Support Workforce WednesdaysSupport Workforce Wednesdays
Support Workforce Wednesdays
 
7 warnings: Before Hiring a Web Developer
7 warnings: Before Hiring a Web Developer7 warnings: Before Hiring a Web Developer
7 warnings: Before Hiring a Web Developer
 
Change Management Process sample
Change Management Process sampleChange Management Process sample
Change Management Process sample
 
Industrial doodles
Industrial doodlesIndustrial doodles
Industrial doodles
 

Último

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Último (20)

Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 

True Downtime Cost (TDC) overview

  • 1. Business Industrial Network www.DowntimeCentral.com True Downtime Cost
  • 2. Quick Help Results 12 10 Without BIN  Our customers can BIN Customers see ROI of 1000% 8  BIN makes 6 Manufactures, 4 Vendors, and Support companies 2 more profitable 0 through TDC Hours Down information. www.DowntimeCentral.com
  • 3. True Downtime Cost (TDC)  Corrugators = $ 10,000 per hour 6 Hours saved in Unplanned downtime, $60K  Air compressor = $ 30,000 per hour 6 Hours saved in Unplanned downtime, $180K  Cell Bottleneck = $ 3,000 per hour 6 Hours saved in Unplanned downtime, $18K www.DowntimeCentral.com
  • 4. Overview (Definition:) TDC – True Downtime Cost •A method of recording and analyzing all significant cost metrics associated with equipment downtime in a building or manufacturing facility. •TDC provides a way to assign time and/or monetary value to previously considered “non-tangible” cost of downtime. •Also TDC includes downtime factors commonly overlook to arrive at a more true value for the cost of downtime. www.DowntimeCentral.com
  • 5. Focus on the 80%  80% of the failures come from 20% of the failure modes.  TDC helps you focus on the greatest cost of downtime, as opposed to traditional broad categories such as “Maintenance” , “Labor”, etc. www.DowntimeCentral.com
  • 6. Why use TDC?  Executive Management  True (Better) information, allows you to make better decisions.  Maintenance Management  TDC gives you the tools to cost justify those much needed equipment upgrades and replacements.  All Service and Product Suppliers  Allows you to show customers the true value and savings of your product or service.  Helps your customers cost justify purchasing from you. www.DowntimeCentral.com
  • 7. You’ve seen the value in CMMS, now see that value increase.  CMMS, might pay for itself in 18-30 months  Targeted cost/risk review of projects and maintenance requirements will typically achieve net payback in 3-6 months. www.DowntimeCentral.com
  • 8. A Quick Look at TDC metrics Equipment Labor Downtime Categories LPP/M Time People Reduced QC Scrap Product Maintenance Band-Aid Start-Up OEM Engineering Bottleneck Tooling Management Sales Exp Part / Ship Overhead www.DowntimeCentral.com
  • 9. A greater return is why we see the popularity of …  TPM  (Total Productive Maintenance)  RCM  (Reliability Centered Maintenance) www.DowntimeCentral.com
  • 10. TDC shows at least 10 times the cost that conventional methods show. This is why TDC amplifies the value of asset management programs by many times. www.DowntimeCentral.com
  • 11. TDC made easy by growing number of Computer systems  Arebeing recognized as necessary and valuable for …  asset information  work management  condition monitoring www.DowntimeCentral.com
  • 12. The Old Mindsets The relationships are poorly understood, the mathematics are too nasty, and the available raw data is usually inadequate. However, much has changed through the TDC project. www.DowntimeCentral.com
  • 13. TDC to OEE  OEE can appear improved by actions such as purchasing oversize equipment, providing redundant supporting systems and increasing the frequency of overhauls.  Also complete understanding of OEE is required to make sound decisions.  TDC enhances OEE accuracy, and places it in perspective. www.DowntimeCentral.com
  • 14. TDC represents the final bottlenecks to a fully integrated and auditable approach to “LEAN” maintenance strategy TPM, RCM, PM development / justification. TDC Click the link to learn more about ERP,CMMS,EDI,DCS,PLC •TDC Data Source •TDC Cost Factors www.DowntimeCentral.com