1. Data Center
-------
-------
Data Center TIER 4 2012
2. Data Center
A True Cloud
Data Center
The largest, most
sophisticated & Most
advanced in Israel
-------
-------
Data Center TIER 4 2012
3. Data Center
The largest in terms of
Energy.
The most sophisticated in terms of
Technology
The most advanced in terms of
Cloud Computing.
-------
-------
Data Center TIER 4 2012
4. Data Center
Electricity – Maximum power output 5MW
Two high voltage feeds: 2x22KV
Two transformation stations: 2x2.5MW
Redundant electrical panels for redundant feeds
2X(N+1) UPS systems
2N generator systems
-------
-------
Data Center TIER 4 2012
5. Data Center
Air-conditioning – 800 tons of refrigerant
Equivalent to cooling a Triple C building 55 stories high
N+1 redundant chiller configuration
Redundant cold water supply system
N+1 redundant rack cooling
N+1 redundant perimeter floor air-conditioning
-------
-------
Data Center TIER 4 2012
6. Data Center
Green Computing – Energy saving
Server consolidation and high density hosting
Economical and green computing equipment
Water cooled to a temperature of 15 C
Water cooling towers for efficiency and energy savings
In-Row Rack cooling
for maximum efficiency and green cooling
-------
-------
Data Center TIER 4 2012
7. Data Center
Production floor – 12KW or 64A per rack
Approx. 500 racks spread over three levels
An underground level with 150 racks
Two above ground levels with 340 racks
Racks connected to redundant power feeds
Control and management rooms on the ground floor
Work rooms for customers
-------
-------
Data Center TIER 4 2012
8. Data Center
UPS – Redundant systems for
redundant feeds
Two clusters of UPS systems for redundancy
Four rows of batteries per system for redundancy
Every UPS cluster in an N+1 configuration
for redundancy
-------
-------
Data Center TIER 4 2012
9. Data Center
Generator – Redundant systems for
redundant feeds
Maximum power output: 2x2.5MW
Two clusters of generator systems for redundancy
Each generator cluster in an N+1 configuration
for redundancy
-------
-------
Data Center TIER 4 2012
10. Data Center
TIER IV
Level Underground level Upper Level
TIER TIER IV TIER II
Redundancy level X(N+1) N+1
Reliability level 99.995% 99.749%
Downtime 0.4 22
Cost to KW
(USA prices) $22,000 $11,000
-------
-------
Data Center TIER 4 2012
12. Data Center
Networking - WAN
Network Level Protection
Dynamic packet filtering
Application level attack
Security zones
-------
-------
Data Center TIER 4 2012
13. Data Center
Networking – 10 GB LAN
Layer 2 and layer 3 switching capabilities
Virtual Chassis technology
10/100/1000BASE-T ports
Simplified Management and Operations,
Port security features including, snooping
DAI and MAC limiting
-------
-------
Data Center TIER 4 2012
15. Data Center
Information security
SSL VPN
Network level protection
Dynamic packet filtering
Application level attack
Security zones
IPS
-------
-------
Data Center TIER 4 2012
16. Data Center
Building management & Control system
Building control system
Entry control system
CCTV system
24x7 control, management and monitoring room
-------
-------
Data Center TIER 4 2012
17. Data Center
Monitoring & Control of computing
Computing control system
LAN and WAN communications control system
Rack surveillance and locking system
Rack temperature and humidity control system
24X7 Help Desk for service and support
-------
-------
Data Center TIER 4 2012
18. Data Center
Services
Cloud computing services
Colocation & Hosting services
Disaster Recovery (DR) services
-------
-------
Data Center TIER 4 2012
19. Data Center
Cloud computing services
Immediate availability
No need to invest in infrastructure purchases
Hardware and software
No administration and maintenance costs
Payment for use of services only!
The ability to regulate the computing power
Disk
Cloud SaaS PaaS IaaS
-------
-------
Data Center TIER 4 2012
20. Data Center
Services
Cloud services
Colocation & Hosting services
Disaster Recovery (DR) services
-------
-------
Data Center TIER 4 2012
21. Data Center
Disaster Recovery service
Placing a replication of an alternative site at your disposal
Definition of the SLA:
RPO (Recovery Point Objective): the maximum loss of data
acceptable to an organization in the event of a disaster
RTO (Recovery Time Objective): the maximum length
of time that the computing systems can be out of action
The work environment in a DR emergency
-------
-------
Data Center TIER 4 2012
22. Data Center
Advanced added value services
Advanced data security
Data storage
Backup and restore
Monitoring and reporting services
IT Managed Services
-------
-------
Data Center TIER 4 2012
23. Data Center
24/7 Support
24/7 Help Desk
On-site hardware maintenance
On-site software support
IT managed services
Basic remote operations
-------
-------
Data Center TIER 4 2012
24. Data Center
Security
Advanced measures
Round-the-clock access control
Biometric login
Monitoring and documentation by cameras
Site staffed round-the-clock
-------
-------
Data Center TIER 4 2012