SlideShare uma empresa Scribd logo
1 de 17
How to Schedule A Project in
     MS Project 2003
           Bill Cole
Overview

Scheduling is a primary activity of project management.
PMI calls scheduling: Time Management.

Schedule is NOT a one time activity during a project!
Think of scheduling properly with MS Project is like learning
how to properly use a power saw for a carpenter.
What can MS Project Do?

•   Create a schedule
•   Communicate the scope
•   Communicate roles for the team
•   Communicate expectations
•   Communicate the status
•   Tool for project changes
What MS Project Can Not Do

•   Creates estimates
•   Provide the tasks necessary to complete the project
•   Point out faulty dependencies between tasks
•   Pop up a box when key tasks are missing
•   Manage the project
Existing vs Scratch Plan

Should One Use an Existing Plan or Set Up a Plan from
Scratch?

Advantages of Existing Plan
 • May not have to touch 100% of tasks

Disadvantages of Existing Plan
• May have to touch 90% of tasks anyway
• The auto scheduling feature may be impacted by something
   the prevous plan owner did and you can't seem to find it
• End up spending as much as, or more time doctoring up an
   existing plan.
Existing vs Scratch Plan


Advantages of Scratch

•   Clean set of tasks
•   Clean project information
•   Less time finding and fixing gotchas from a former schedule
•   Lets MS Project do its job: create the schedule

Disadvantages of Scratch
• Enter all tasks
Schedule in MS Project 2003

1. Set Up MS Project
2. Enter Tasks
3. Enter Estimates
4. Enter task dependencies
5. Enter constraints, deadlines and task calendars
6. Enter resources
7. Assign resources
8. Optimize the schedule



See "Dynamic Scheduling with MS Project 2003 by Eric Uyttewaal, PMP
Set up MS Project

1. Describe your project
   1.File Properties
   2.Project Information
2. Set MS Project Options:
   1.Date Format
   2.Hours per day
   3.Set default task type
   4.Calculate automatically
3. Manual Resource Leveling
4. Set Project Calendar
Enter Tasks

• Several Types of Tasks
  o Summary Tasks
  o Detail Tasks
  o Milestones
• How much detail?
  o Match status periods
  o 1% to 10% Rule
  o 40 to 80 hours
• What are tasks used for?
  o Task assignment
  o Communication
  o Status
  o Dependency and criticality to the overall schedule
Enter Estimates

• What are estimates?
• What's a method for estimating?
   o Experience
   o SWAG
   o Size based
• Types of tasks and relationship to estimating:
   o Fixed Duration(Training session or paint drying)
   o Fixed Work (Building a home)
   o Fixed Unit (1 woman and 9 months)
Enter task dependencies

• What are dependencies?
• Why use dependencies?
• Types of Dependencies
   o Finish-to-start (FS)
   o Start-to-start (SS)
   o Finish-to-finish (FF)
   o Start-to-finish (SF)
Enter constraints, deadlines and task
calendars
• What is a constraint?
• What is a deadline?
• What is a task calendar?
Enter resources

Types of resources:
 • Human
 • Facility
 • Machine
 • Material
Types of resource availability:
 • Part-time
 • Full Time
 • Overtime
 • Compressed work week
Assign Resources

Assignment associates one task with one or more resources.

Assignment types:
• Fixed Duration
• Fixed Units
• Fixed Work
Optimize the Schedule

Two basic types of optimization
 • Time
 • Time and cost

Both types utilize the Critical Path.
Optimize for Time

Steps to Optimize Time
• Hightlight Critical Path
• Sort tasks on Duration
• Find longest Duration
• Make a change on the longest duration
• Consider impact
• Repeat
Optimize for Time and Cost

Steps to Optimize for Time and Cost
• Optimize for Time first.
• Sort tasks based on cost
• Find the most expensive task
• Make a change on the most expensive task
• Consider impact
• Repeat

Mais conteúdo relacionado

Mais procurados

Chap 6 Developing A Project Plan
Chap 6 Developing A Project PlanChap 6 Developing A Project Plan
Chap 6 Developing A Project Planproject management
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueChris Carson
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingSHAZEBALIKHAN1
 
Project management ppt @ bec doms
Project management ppt @ bec doms Project management ppt @ bec doms
Project management ppt @ bec doms Babasab Patil
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation TafseerKishan Solankimbaccepmp
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingSHAZEBALIKHAN1
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-controleidalin95
 
Time Impact Analysis
Time Impact AnalysisTime Impact Analysis
Time Impact AnalysisChris Carson
 
How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2Abdelhay Ghanem
 
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
 EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTSHossamNegidaPMPRMPPS
 
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...Gaurav Verma
 
Monitoring and information systems
Monitoring and information systemsMonitoring and information systems
Monitoring and information systemsLibra chudry
 
Subcontractor Scheduling
Subcontractor SchedulingSubcontractor Scheduling
Subcontractor SchedulingChris Carson
 

Mais procurados (20)

Monitoring the control
Monitoring the control Monitoring the control
Monitoring the control
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Chap 6 Developing A Project Plan
Chap 6 Developing A Project PlanChap 6 Developing A Project Plan
Chap 6 Developing A Project Plan
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned Value
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential Building
 
Project management ppt @ bec doms
Project management ppt @ bec doms Project management ppt @ bec doms
Project management ppt @ bec doms
 
Project Control- Overview Presentation Tafseer
Project Control- Overview Presentation   TafseerProject Control- Overview Presentation   Tafseer
Project Control- Overview Presentation Tafseer
 
Extension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed IbarhimExtension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed Ibarhim
 
Construction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential BuildingConstruction Project Schedule Template- Residential Building
Construction Project Schedule Template- Residential Building
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-control
 
project monitoring and control
project monitoring and controlproject monitoring and control
project monitoring and control
 
Time Impact Analysis
Time Impact AnalysisTime Impact Analysis
Time Impact Analysis
 
How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2How to prepare recovery or revised schedule rev.2
How to prepare recovery or revised schedule rev.2
 
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
 EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
 
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
A case study of Delay Analysis of construction project: Al Kut Olympic Stadiu...
 
Monitoring and information systems
Monitoring and information systemsMonitoring and information systems
Monitoring and information systems
 
Pert, cpm & gert
Pert, cpm & gertPert, cpm & gert
Pert, cpm & gert
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Subcontractor Scheduling
Subcontractor SchedulingSubcontractor Scheduling
Subcontractor Scheduling
 

Destaque

Microsoft office project 2007
Microsoft office project 2007Microsoft office project 2007
Microsoft office project 2007Sapperg
 
Using Microsoft Project 2003
Using Microsoft Project 2003Using Microsoft Project 2003
Using Microsoft Project 2003pparakh
 
Microsoft Project 2003 Configuration Training Level 2 Itvamp 2007
Microsoft Project 2003 Configuration Training Level 2 Itvamp 2007Microsoft Project 2003 Configuration Training Level 2 Itvamp 2007
Microsoft Project 2003 Configuration Training Level 2 Itvamp 2007ITVAMP, LLC
 
MS Project 2010 Getting Started
MS Project 2010 Getting StartedMS Project 2010 Getting Started
MS Project 2010 Getting Startedmsprojectpros
 
نموذج للامتحان
نموذج للامتحاننموذج للامتحان
نموذج للامتحانu083125
 
Duration - The Holy Grail of MS Project?
Duration - The Holy Grail of MS Project?Duration - The Holy Grail of MS Project?
Duration - The Holy Grail of MS Project?dmdk12
 
Ms Project 2007(advanced)
Ms Project 2007(advanced)Ms Project 2007(advanced)
Ms Project 2007(advanced)Dinesh Singh
 
2010 ms project 2010 (2)
2010 ms project 2010 (2)2010 ms project 2010 (2)
2010 ms project 2010 (2)douggillis
 
Project Management using MS Project 2010
Project Management using MS Project 2010Project Management using MS Project 2010
Project Management using MS Project 2010Abdul Ghaffar, PMP
 
Ms Project - Tracking Indicator
Ms Project - Tracking IndicatorMs Project - Tracking Indicator
Ms Project - Tracking IndicatorMic Xen, MSc, PMP
 
Green transportation
Green  transportationGreen  transportation
Green transportationMs Wilson
 
Ms project trainee
Ms project traineeMs project trainee
Ms project traineeziadfdaher
 

Destaque (20)

Microsoft office project 2007
Microsoft office project 2007Microsoft office project 2007
Microsoft office project 2007
 
Using Microsoft Project 2003
Using Microsoft Project 2003Using Microsoft Project 2003
Using Microsoft Project 2003
 
Microsoft Project 2003 Configuration Training Level 2 Itvamp 2007
Microsoft Project 2003 Configuration Training Level 2 Itvamp 2007Microsoft Project 2003 Configuration Training Level 2 Itvamp 2007
Microsoft Project 2003 Configuration Training Level 2 Itvamp 2007
 
MS Project 2010 Getting Started
MS Project 2010 Getting StartedMS Project 2010 Getting Started
MS Project 2010 Getting Started
 
نموذج للامتحان
نموذج للامتحاننموذج للامتحان
نموذج للامتحان
 
Duration - The Holy Grail of MS Project?
Duration - The Holy Grail of MS Project?Duration - The Holy Grail of MS Project?
Duration - The Holy Grail of MS Project?
 
Ms Project 2007(advanced)
Ms Project 2007(advanced)Ms Project 2007(advanced)
Ms Project 2007(advanced)
 
Ms project
Ms projectMs project
Ms project
 
2010 ms project 2010 (2)
2010 ms project 2010 (2)2010 ms project 2010 (2)
2010 ms project 2010 (2)
 
Project Management using MS Project 2010
Project Management using MS Project 2010Project Management using MS Project 2010
Project Management using MS Project 2010
 
Ms Project - Tracking Indicator
Ms Project - Tracking IndicatorMs Project - Tracking Indicator
Ms Project - Tracking Indicator
 
Green transportation
Green  transportationGreen  transportation
Green transportation
 
مشروع4
مشروع4مشروع4
مشروع4
 
Ms project training ver 01
Ms project training ver 01Ms project training ver 01
Ms project training ver 01
 
Ms project trainee
Ms project traineeMs project trainee
Ms project trainee
 
MS Project 2007 Tips and Tricks
MS Project 2007 Tips and TricksMS Project 2007 Tips and Tricks
MS Project 2007 Tips and Tricks
 
Ms project
Ms  projectMs  project
Ms project
 
Strategic Value of Project Management - Arabic
Strategic Value of Project Management - ArabicStrategic Value of Project Management - Arabic
Strategic Value of Project Management - Arabic
 
Ms Project 2010
Ms Project 2010Ms Project 2010
Ms Project 2010
 
MS Project
MS ProjectMS Project
MS Project
 

Semelhante a How to schedule_a_project_in_ms_project_2003

It's not a bug, it's a feature!
It's not a bug, it's a feature!It's not a bug, it's a feature!
It's not a bug, it's a feature!SPC Adriatics
 
Online3-SlideDeck.pptx
Online3-SlideDeck.pptxOnline3-SlideDeck.pptx
Online3-SlideDeck.pptxssuserf9e6b31
 
MICROSOFT PROJECT
MICROSOFT PROJECTMICROSOFT PROJECT
MICROSOFT PROJECTSmit Patel
 
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...Kuldeep Kumar
 
Sem 2 project management part 1
Sem 2 project management part 1Sem 2 project management part 1
Sem 2 project management part 1Est
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..pptPedadaSaikumar
 
Yom Institute Presentations lecture notes of project management
Yom Institute Presentations lecture notes of project managementYom Institute Presentations lecture notes of project management
Yom Institute Presentations lecture notes of project managementAbebaw31
 
Lesson 1 PMT Project Life Cycle (Microsoft Project Management)
Lesson 1 PMT Project Life Cycle (Microsoft Project Management)Lesson 1 PMT Project Life Cycle (Microsoft Project Management)
Lesson 1 PMT Project Life Cycle (Microsoft Project Management)amirasghar6
 
Microsoft project 2013
Microsoft project 2013Microsoft project 2013
Microsoft project 2013Jipin Nakarmi
 
Sharing Knowledge Microsoft Project 2013.pptx
Sharing Knowledge Microsoft Project 2013.pptxSharing Knowledge Microsoft Project 2013.pptx
Sharing Knowledge Microsoft Project 2013.pptxLukasDhani
 
Software project management tools
Software project management toolsSoftware project management tools
Software project management toolsDarshak Mehta
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterpreetidamakale
 
Project-Time-Line.pdf
Project-Time-Line.pdfProject-Time-Line.pdf
Project-Time-Line.pdfNabeel Ahmad
 
construction project planing
 construction project planing construction project planing
construction project planingSANJEEV Wazir
 
Task Management System (TMS)
Task Management System (TMS)Task Management System (TMS)
Task Management System (TMS)kanfotechnology
 

Semelhante a How to schedule_a_project_in_ms_project_2003 (20)

It's not a bug, it's a feature!
It's not a bug, it's a feature!It's not a bug, it's a feature!
It's not a bug, it's a feature!
 
Online3-SlideDeck.pptx
Online3-SlideDeck.pptxOnline3-SlideDeck.pptx
Online3-SlideDeck.pptx
 
MICROSOFT PROJECT
MICROSOFT PROJECTMICROSOFT PROJECT
MICROSOFT PROJECT
 
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
MS Project Management (Overviews) | Software Mange Tool | Software Project Ma...
 
Sem 2 project management part 1
Sem 2 project management part 1Sem 2 project management part 1
Sem 2 project management part 1
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
Yom Institute Presentations lecture notes of project management
Yom Institute Presentations lecture notes of project managementYom Institute Presentations lecture notes of project management
Yom Institute Presentations lecture notes of project management
 
Lesson 1 PMT Project Life Cycle (Microsoft Project Management)
Lesson 1 PMT Project Life Cycle (Microsoft Project Management)Lesson 1 PMT Project Life Cycle (Microsoft Project Management)
Lesson 1 PMT Project Life Cycle (Microsoft Project Management)
 
Ms.project brochure
Ms.project   brochureMs.project   brochure
Ms.project brochure
 
Microsoft project 2013
Microsoft project 2013Microsoft project 2013
Microsoft project 2013
 
Sharing Knowledge Microsoft Project 2013.pptx
Sharing Knowledge Microsoft Project 2013.pptxSharing Knowledge Microsoft Project 2013.pptx
Sharing Knowledge Microsoft Project 2013.pptx
 
Software project management tools
Software project management toolsSoftware project management tools
Software project management tools
 
Chapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapterChapt5.pptx it is notes of the 5th chapter
Chapt5.pptx it is notes of the 5th chapter
 
Adamson "Project Management, Predictive Planning"
Adamson "Project Management, Predictive Planning"Adamson "Project Management, Predictive Planning"
Adamson "Project Management, Predictive Planning"
 
Project-Time-Line.pdf
Project-Time-Line.pdfProject-Time-Line.pdf
Project-Time-Line.pdf
 
Task management System (TMS)
Task management System (TMS)Task management System (TMS)
Task management System (TMS)
 
Adamson "Blueprint for Managing Your Project"
Adamson "Blueprint for Managing Your Project"Adamson "Blueprint for Managing Your Project"
Adamson "Blueprint for Managing Your Project"
 
construction project planing
 construction project planing construction project planing
construction project planing
 
Task Management System (TMS)
Task Management System (TMS)Task Management System (TMS)
Task Management System (TMS)
 
Microsoft Project Foundations Course.pptx
Microsoft Project Foundations Course.pptxMicrosoft Project Foundations Course.pptx
Microsoft Project Foundations Course.pptx
 

Último

A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
What is Artificial Intelligence?????????
What is Artificial Intelligence?????????What is Artificial Intelligence?????????
What is Artificial Intelligence?????????blackmambaettijean
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embeddingZilliz
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 

Último (20)

A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
What is Artificial Intelligence?????????
What is Artificial Intelligence?????????What is Artificial Intelligence?????????
What is Artificial Intelligence?????????
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embedding
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 

How to schedule_a_project_in_ms_project_2003

  • 1. How to Schedule A Project in MS Project 2003 Bill Cole
  • 2. Overview Scheduling is a primary activity of project management. PMI calls scheduling: Time Management. Schedule is NOT a one time activity during a project! Think of scheduling properly with MS Project is like learning how to properly use a power saw for a carpenter.
  • 3. What can MS Project Do? • Create a schedule • Communicate the scope • Communicate roles for the team • Communicate expectations • Communicate the status • Tool for project changes
  • 4. What MS Project Can Not Do • Creates estimates • Provide the tasks necessary to complete the project • Point out faulty dependencies between tasks • Pop up a box when key tasks are missing • Manage the project
  • 5. Existing vs Scratch Plan Should One Use an Existing Plan or Set Up a Plan from Scratch? Advantages of Existing Plan • May not have to touch 100% of tasks Disadvantages of Existing Plan • May have to touch 90% of tasks anyway • The auto scheduling feature may be impacted by something the prevous plan owner did and you can't seem to find it • End up spending as much as, or more time doctoring up an existing plan.
  • 6. Existing vs Scratch Plan Advantages of Scratch • Clean set of tasks • Clean project information • Less time finding and fixing gotchas from a former schedule • Lets MS Project do its job: create the schedule Disadvantages of Scratch • Enter all tasks
  • 7. Schedule in MS Project 2003 1. Set Up MS Project 2. Enter Tasks 3. Enter Estimates 4. Enter task dependencies 5. Enter constraints, deadlines and task calendars 6. Enter resources 7. Assign resources 8. Optimize the schedule See "Dynamic Scheduling with MS Project 2003 by Eric Uyttewaal, PMP
  • 8. Set up MS Project 1. Describe your project 1.File Properties 2.Project Information 2. Set MS Project Options: 1.Date Format 2.Hours per day 3.Set default task type 4.Calculate automatically 3. Manual Resource Leveling 4. Set Project Calendar
  • 9. Enter Tasks • Several Types of Tasks o Summary Tasks o Detail Tasks o Milestones • How much detail? o Match status periods o 1% to 10% Rule o 40 to 80 hours • What are tasks used for? o Task assignment o Communication o Status o Dependency and criticality to the overall schedule
  • 10. Enter Estimates • What are estimates? • What's a method for estimating? o Experience o SWAG o Size based • Types of tasks and relationship to estimating: o Fixed Duration(Training session or paint drying) o Fixed Work (Building a home) o Fixed Unit (1 woman and 9 months)
  • 11. Enter task dependencies • What are dependencies? • Why use dependencies? • Types of Dependencies o Finish-to-start (FS) o Start-to-start (SS) o Finish-to-finish (FF) o Start-to-finish (SF)
  • 12. Enter constraints, deadlines and task calendars • What is a constraint? • What is a deadline? • What is a task calendar?
  • 13. Enter resources Types of resources: • Human • Facility • Machine • Material Types of resource availability: • Part-time • Full Time • Overtime • Compressed work week
  • 14. Assign Resources Assignment associates one task with one or more resources. Assignment types: • Fixed Duration • Fixed Units • Fixed Work
  • 15. Optimize the Schedule Two basic types of optimization • Time • Time and cost Both types utilize the Critical Path.
  • 16. Optimize for Time Steps to Optimize Time • Hightlight Critical Path • Sort tasks on Duration • Find longest Duration • Make a change on the longest duration • Consider impact • Repeat
  • 17. Optimize for Time and Cost Steps to Optimize for Time and Cost • Optimize for Time first. • Sort tasks based on cost • Find the most expensive task • Make a change on the most expensive task • Consider impact • Repeat