The document summarizes the 13 steps taken to assemble a Machine Machine To Make (MTM) snap-lock machine. It describes cleaning and organizing the parts, carefully installing shafts and guides, testing moving parts, calibrating supports, and manufacturing acrylic engines. The conclusions note that coordinating work schedules was difficult, assembly was challenging due to missing parts, the MTM system requires two people, and experience helped in understanding the machine.
1. MECHANICAL DESIGN (Apr 18)
STUDENT: WALTER HECTOR GONZALES ARNAO
Fab academy 2012
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
2. summary
This week was held the election of the theme to work.
AND WAS THE MTM (MACHINE MACHINE TO MAKE SNAP).
Fab
THAT BROUGHT THE CREATORS OF THE MTM (NADYA AND JHONATAN), IN WHICH LEFT
INCOMPLETE FAB 7.
THAT TIME IS WITH OXIDE
http://mtm.cba.mit.edu/machines/mtm_snap-lock/
academy
CLASS 13: mechanical design (Apr 18)
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
3. FIRST STEP. An inventory of the parts of MTM, the structure
CLASS 13: mechanical design (Apr 18)
Fab
academy
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
4. STEP 2.
Fab
-the electronics was packaged, and agree to ordain importance
-then proceeded to clean all
CLASS 13: mechanical design (Apr 18)
academy
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
5. Fab
academy
STEP 3.
-once clean.
-MTM is assembled UNIVERSIDAD NACIONAL DE INGENIERÍA
CLASS 13: mechanical design (Apr 18) FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
6. Fab
academy
STEP 4.
-the installation of shafts and guides was done carefully and accurately
CLASS 13: mechanical design (Apr 18) UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
7. Fab
STEP 5.
academy
was performed twice the installation of the axles..
Failure in armed
CLASS 13: mechanical design (Apr 18)
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
8. Fab
academy
STEP 6.
- testing was performed moving parts
CLASS 13: mechanical design (Apr 18) UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
9. Fab
academy
STEP 7.
-was calibrated parties that support the moving parts
2012
UNIVERSIDAD NACIONAL DE INGENIERÍA
CLASS 13: mechanical design (Apr 18) FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
10. Fab
academy
STEP 8.
was placed on the workpiece motor Cell
CLASS 13: mechanical design (Apr 18)
2012
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
11. Fab
academy
STEP 9.
-will place the last piece
CLASS 13: mechanical design (Apr 18)
2012
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
12. UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
Fab
academy
STEP 10.
because is employed tools they need experience
2012
CLASS 13: mechanical design (Apr 18)
13. Fab
academy
STEP 11.
-proceeds has to verify that all parts are complete to complete
the assemblyPUSH
2012
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
CLASS 13: mechanical design (Apr 18)
14. part 1
part 2
part 3 Fab
academy
STEP 12.
-support were manufactured engines 1, 2 and 3
-Diego was manufactured in acrylic
CLASS 13: mechanical design (Apr 18)
2012
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES
15. Conclusions.
1. coordinate schedules between the hours of work, was difficult.
2. the assembly is difficult because of lack of parts.
Fab
3. el sistema de ensambles del MTM requiere 2 personas
4. experience has helped to know in detail this machine
academy
STEP 13. MTM shows the armed
CLASS 13: mechanical design (Apr 18)
2012
UNIVERSIDAD NACIONAL DE INGENIERÍA
FACULTAD DE ARQUITECTURA, URBANISMO Y ARTES