TITLE :
  URBAN TRANSPORTATION


            ASSIGNMENT 1


NAME        : MUHAMMAD BIN RAMLAN

MATRIX NO   : P 57600

SUBJECT     : KKKA 6564

YEAR        : 2011/2012

LECTURER    : PROF IR DR RIZA ATIQ O.K. RAHMAT
QUESTION ASSIGNMENT 1

   A proposed development will be constructed near the Putrajaya-Kajang highway as
   shown in Figure 1.


                                   Proposed
                                   Development



              To Putrajaya                                         To Kajang




                                             Figure 1

   The development consists of an office building with 102,000 square meter floor area and
   a 295 units condominium tower.

   It is expected will attract 3.3 person-trips per 100 square meter floor area per hour in
   the morning, whereas the condominium will produce 1.45 person-trips per unit per
   hour. It is estimated that only 16% of the generated trip by the condominium destine to
   the office building in the development area.

                      Mode           Split              Average
                                                        Capacity

                      Car                    55%            1.9

                      Motorcycle             9%             1.15

                      Bus                    36%             50



   You are required to:

a) Compute production and attraction.
b) Compute the number of persons entering and exiting the development area per hour in
   the morning.
c) Compute the number of each transport mode entering and exiting the development in
   the morning.
d) If 80% of the attraction is from Kajang, determine the minimum width of the bridge.
SOLUTION ASSIGNMENT 1

a) Compute production and attraction

      Land Use          Residential Unit        Production rate       Morning production
                                              (person-trip / unit /    (person-trip / hr)
                                                      hr)
Condominium                   295                    1.45                    428


      Land Use        Residential Unit (m2)     Attraction rate       Morning Attraction
                                              (person-trip / m2 /      (person-trip / hr)
                                                      hr)
Office building       (102000/100) = 1020             3.3                    3366




b) Compute the number of persons entering and exiting the development area per hour in
the morning


      Land Use         Number of person       Number of persons       Number of persons
                            from the             entering the             exiting the
                          condominium         development area        development area
                                               (person-trip / hr)      (person-trip / hr)
                      destine to the office
                         building in the
                       development area
                        (person-trip / hr)
 Development area     (16/100) x 428 = 68      3366 – 68 = 3298         428 – 68 = 360
c) Compute the number of each transport mode entering and exiting the development in
the morning


       Number of each vehicle entering development:

 Land Use      Entering           Modal Split                Person Trip            Number of vehicles
                           car    motorcycle    bus    car   motorcycle     bus   car motorcycle bus
Development     3298       55%       9%         36%   1814      297        1187   955     258        24
    area
                                    TOTAL                                         955      258       24




       Number of each vehicle exiting development:

  Land Use       Exiting          Modal Split                Person Trip            Number of vehicles
                            car   motorcycle    bus    car   motorcycle    bus    car motorcycle bus
 Development      360       55%      9%         36%    198       32        130    104      28          3
     area
                                    TOTAL                                         955      258       24




D) If 80% of the attraction is from Kajang, determine the minimum width of the bridge.



    Land Use                                Attraction from kajang (person-trip / hr)
 Development area                                    (80/100) x 3298 = 2638



     Numbers                                               Quantity
       Cars                                             2638/1.9 = 1388
       Lane                *For Malaysian Standard: 1800 Cars Per Link

                                                      1388/1800 = 0.77 ≈ 1


       Items                                           Description
   Bridge Width            *assume 1 lane is 3.5m, road shoulder is 1m, marginal strip is 0.5m.

                           Therefore, bridge width for two lane is:
                           = (3.5m + 1m + 0.5m) x 2
                           = 10m

Mais conteúdo relacionado

Destaque

Excavation2014a-Lecture1
Excavation2014a-Lecture1Excavation2014a-Lecture1
Excavation2014a-Lecture1Anne Allan
 
Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Anne Allan
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Lee Pei Gie
 
Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Anne Allan
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)Chong jiayi
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantitiesalanchong88
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?Duc Tran Xuan
 
Stucture large span area
Stucture large span areaStucture large span area
Stucture large span areaAbhishek Mewada
 
design of staircase
design of staircasedesign of staircase
design of staircasevasu.chawla
 
Assignment 1 Site Visit Report
Assignment 1 Site Visit ReportAssignment 1 Site Visit Report
Assignment 1 Site Visit Reportarmada7000
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantityhlksd
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryAbhishek Shah
 
Flat Grid / Waffle Slab
Flat Grid / Waffle SlabFlat Grid / Waffle Slab
Flat Grid / Waffle SlabAkshay Gawade
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyI'mMiss Lily
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsHamdija Velagic
 

Destaque (20)

Excavation2014a-Lecture1
Excavation2014a-Lecture1Excavation2014a-Lecture1
Excavation2014a-Lecture1
 
Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Excavation 2014a-Lecture2
Excavation 2014a-Lecture2
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )
 
Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Excavation 2014a-Lecture3
Excavation 2014a-Lecture3
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)
 
Sgp4813 measurement of quantities
Sgp4813 measurement of quantitiesSgp4813 measurement of quantities
Sgp4813 measurement of quantities
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?
 
Stucture large span area
Stucture large span areaStucture large span area
Stucture large span area
 
design of staircase
design of staircasedesign of staircase
design of staircase
 
Stairs
StairsStairs
Stairs
 
Assignment 1 Site Visit Report
Assignment 1 Site Visit ReportAssignment 1 Site Visit Report
Assignment 1 Site Visit Report
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Different Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction IndustryDifferent Types of Formwork Syetem Used within Indian Construction Industry
Different Types of Formwork Syetem Used within Indian Construction Industry
 
Flat Grid / Waffle Slab
Flat Grid / Waffle SlabFlat Grid / Waffle Slab
Flat Grid / Waffle Slab
 
Folded plate structure
Folded plate structureFolded plate structure
Folded plate structure
 
Design of staircases
Design of staircasesDesign of staircases
Design of staircases
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Building Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldingsBuilding Construction 8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldings
 

Semelhante a KA6564 Assignment 1

Assignment 1 urban transport
Assignment 1 urban transportAssignment 1 urban transport
Assignment 1 urban transportHamza Thamer
 
Sustainable101 For Stupa4 [Compatibility Mode]
Sustainable101 For Stupa4 [Compatibility Mode]Sustainable101 For Stupa4 [Compatibility Mode]
Sustainable101 For Stupa4 [Compatibility Mode]Elisa Sutanudjaja
 
Managing Viennas Tram and Metro Network
Managing Viennas Tram and Metro NetworkManaging Viennas Tram and Metro Network
Managing Viennas Tram and Metro NetworkMarkus Ossberger
 
Shortest Path Search with pgRouting
Shortest Path Search with pgRoutingShortest Path Search with pgRouting
Shortest Path Search with pgRoutingFOSS4G 2011
 
Shortest Path search for real road networks with pgRouting
Shortest Path search for real road networks with pgRoutingShortest Path search for real road networks with pgRouting
Shortest Path search for real road networks with pgRoutingDaniel Kastl
 
DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT Deepak Kumar
 
Prediction of taxi rides ETA
Prediction of taxi rides ETAPrediction of taxi rides ETA
Prediction of taxi rides ETADaniel Marcous
 
Srushti Rath - Mode choice modeling for air taxis
Srushti Rath - Mode choice modeling for air taxisSrushti Rath - Mode choice modeling for air taxis
Srushti Rath - Mode choice modeling for air taxisJoseph Chow
 
RAHUL KUMAR PPT ON OSD.pptx
RAHUL KUMAR PPT ON OSD.pptxRAHUL KUMAR PPT ON OSD.pptx
RAHUL KUMAR PPT ON OSD.pptxRohitRodhia3
 
Esri Atac GIS
Esri Atac GISEsri Atac GIS
Esri Atac GISlukic83
 
The City Bus Terminal Amenities and Real Time Information Systems at Mysore C...
The City Bus Terminal Amenities and Real Time Information Systems at Mysore C...The City Bus Terminal Amenities and Real Time Information Systems at Mysore C...
The City Bus Terminal Amenities and Real Time Information Systems at Mysore C...WRI Ross Center for Sustainable Cities
 
Delhi Metro Project Case Study
Delhi Metro Project Case Study  Delhi Metro Project Case Study
Delhi Metro Project Case Study Soumya Bhadani
 
SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...
SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...
SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...IAEME Publication
 
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET Journal
 
Amira mostafa abdelmoneem
Amira mostafa abdelmoneemAmira mostafa abdelmoneem
Amira mostafa abdelmoneemAmiraMostafa71
 
Proposed cable car project, Uttarakhnad, India.
Proposed cable car project, Uttarakhnad, India.Proposed cable car project, Uttarakhnad, India.
Proposed cable car project, Uttarakhnad, India.Sameer Mohan
 

Semelhante a KA6564 Assignment 1 (20)

Assignment 1 urban transport
Assignment 1 urban transportAssignment 1 urban transport
Assignment 1 urban transport
 
Sustainable101 For Stupa4 [Compatibility Mode]
Sustainable101 For Stupa4 [Compatibility Mode]Sustainable101 For Stupa4 [Compatibility Mode]
Sustainable101 For Stupa4 [Compatibility Mode]
 
Managing Viennas Tram and Metro Network
Managing Viennas Tram and Metro NetworkManaging Viennas Tram and Metro Network
Managing Viennas Tram and Metro Network
 
Shortest Path Search with pgRouting
Shortest Path Search with pgRoutingShortest Path Search with pgRouting
Shortest Path Search with pgRouting
 
Shortest Path search for real road networks with pgRouting
Shortest Path search for real road networks with pgRoutingShortest Path search for real road networks with pgRouting
Shortest Path search for real road networks with pgRouting
 
DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT DMRC SUMMER INTERNSHIP REPORT
DMRC SUMMER INTERNSHIP REPORT
 
Prediction of taxi rides ETA
Prediction of taxi rides ETAPrediction of taxi rides ETA
Prediction of taxi rides ETA
 
02 traffic impact assessment
02 traffic impact assessment02 traffic impact assessment
02 traffic impact assessment
 
Srushti Rath - Mode choice modeling for air taxis
Srushti Rath - Mode choice modeling for air taxisSrushti Rath - Mode choice modeling for air taxis
Srushti Rath - Mode choice modeling for air taxis
 
RAHUL KUMAR PPT ON OSD.pptx
RAHUL KUMAR PPT ON OSD.pptxRAHUL KUMAR PPT ON OSD.pptx
RAHUL KUMAR PPT ON OSD.pptx
 
Esri Atac GIS
Esri Atac GISEsri Atac GIS
Esri Atac GIS
 
Major ppt
Major pptMajor ppt
Major ppt
 
The City Bus Terminal Amenities and Real Time Information Systems at Mysore C...
The City Bus Terminal Amenities and Real Time Information Systems at Mysore C...The City Bus Terminal Amenities and Real Time Information Systems at Mysore C...
The City Bus Terminal Amenities and Real Time Information Systems at Mysore C...
 
Delhi Metro Project Case Study
Delhi Metro Project Case Study  Delhi Metro Project Case Study
Delhi Metro Project Case Study
 
36551105 delhi-metro
36551105 delhi-metro36551105 delhi-metro
36551105 delhi-metro
 
SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...
SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...
SOLVING CONGESTION BY DESIGNING OF TRAFFIC SIGNAL AT T-INTERSECTION (QAMARWAR...
 
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...IRJET-  	  Design of Parking Area and Traffic Signal for Moodbidri Town based...
IRJET- Design of Parking Area and Traffic Signal for Moodbidri Town based...
 
Amira mostafa abdelmoneem
Amira mostafa abdelmoneemAmira mostafa abdelmoneem
Amira mostafa abdelmoneem
 
Proposed cable car project, Uttarakhnad, India.
Proposed cable car project, Uttarakhnad, India.Proposed cable car project, Uttarakhnad, India.
Proposed cable car project, Uttarakhnad, India.
 
Dubai metro paper in IRSE magazine
Dubai metro paper in IRSE magazineDubai metro paper in IRSE magazine
Dubai metro paper in IRSE magazine
 

Mais de armada7000

Sustainable Urban Design Report
Sustainable Urban Design ReportSustainable Urban Design Report
Sustainable Urban Design Reportarmada7000
 
Kajang Sim City Simulation
Kajang Sim City SimulationKajang Sim City Simulation
Kajang Sim City Simulationarmada7000
 
KA6414_Sustainable Kajang
KA6414_Sustainable KajangKA6414_Sustainable Kajang
KA6414_Sustainable Kajangarmada7000
 
P57600 Quiz Results Ecological Footprint Quiz by Center for Sustainable Economy
P57600 Quiz Results  Ecological Footprint Quiz by Center for Sustainable EconomyP57600 Quiz Results  Ecological Footprint Quiz by Center for Sustainable Economy
P57600 Quiz Results Ecological Footprint Quiz by Center for Sustainable Economyarmada7000
 
P57600 Lusas Presentation
P57600 Lusas PresentationP57600 Lusas Presentation
P57600 Lusas Presentationarmada7000
 
P57600 Lusas Report
P57600 Lusas ReportP57600 Lusas Report
P57600 Lusas Reportarmada7000
 
KA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport ReportKA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport Reportarmada7000
 
KA6564 Assignment 3
KA6564 Assignment 3KA6564 Assignment 3
KA6564 Assignment 3armada7000
 
KA6564 Assignment 2
KA6564 Assignment 2KA6564 Assignment 2
KA6564 Assignment 2armada7000
 
Assignment 3 Gantt Chart
Assignment 3 Gantt ChartAssignment 3 Gantt Chart
Assignment 3 Gantt Chartarmada7000
 
Assignment 2 Project Breakdown
Assignment 2 Project BreakdownAssignment 2 Project Breakdown
Assignment 2 Project Breakdownarmada7000
 
KA6954 P57600 Chapter 12
KA6954 P57600 Chapter 12KA6954 P57600 Chapter 12
KA6954 P57600 Chapter 12armada7000
 
KA6954 P57600 Chapter 11
KA6954 P57600 Chapter 11KA6954 P57600 Chapter 11
KA6954 P57600 Chapter 11armada7000
 
KA6954 P57600 Chapter 1
KA6954 P57600 Chapter 1KA6954 P57600 Chapter 1
KA6954 P57600 Chapter 1armada7000
 
KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4armada7000
 
KA6423 P57600 Assignment 3
KA6423 P57600 Assignment 3KA6423 P57600 Assignment 3
KA6423 P57600 Assignment 3armada7000
 
KA6423 P57600 Assignment 1
KA6423 P57600 Assignment 1KA6423 P57600 Assignment 1
KA6423 P57600 Assignment 1armada7000
 
Surface Water Hidrology - Chapter 5
Surface Water Hidrology - Chapter 5Surface Water Hidrology - Chapter 5
Surface Water Hidrology - Chapter 5armada7000
 
Surface Water Hidrology - Chapter 2
Surface Water Hidrology - Chapter 2Surface Water Hidrology - Chapter 2
Surface Water Hidrology - Chapter 2armada7000
 
KA6414_Sustainable Urban Design - Stockholm City
KA6414_Sustainable Urban Design - Stockholm CityKA6414_Sustainable Urban Design - Stockholm City
KA6414_Sustainable Urban Design - Stockholm Cityarmada7000
 

Mais de armada7000 (20)

Sustainable Urban Design Report
Sustainable Urban Design ReportSustainable Urban Design Report
Sustainable Urban Design Report
 
Kajang Sim City Simulation
Kajang Sim City SimulationKajang Sim City Simulation
Kajang Sim City Simulation
 
KA6414_Sustainable Kajang
KA6414_Sustainable KajangKA6414_Sustainable Kajang
KA6414_Sustainable Kajang
 
P57600 Quiz Results Ecological Footprint Quiz by Center for Sustainable Economy
P57600 Quiz Results  Ecological Footprint Quiz by Center for Sustainable EconomyP57600 Quiz Results  Ecological Footprint Quiz by Center for Sustainable Economy
P57600 Quiz Results Ecological Footprint Quiz by Center for Sustainable Economy
 
P57600 Lusas Presentation
P57600 Lusas PresentationP57600 Lusas Presentation
P57600 Lusas Presentation
 
P57600 Lusas Report
P57600 Lusas ReportP57600 Lusas Report
P57600 Lusas Report
 
KA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport ReportKA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport Report
 
KA6564 Assignment 3
KA6564 Assignment 3KA6564 Assignment 3
KA6564 Assignment 3
 
KA6564 Assignment 2
KA6564 Assignment 2KA6564 Assignment 2
KA6564 Assignment 2
 
Assignment 3 Gantt Chart
Assignment 3 Gantt ChartAssignment 3 Gantt Chart
Assignment 3 Gantt Chart
 
Assignment 2 Project Breakdown
Assignment 2 Project BreakdownAssignment 2 Project Breakdown
Assignment 2 Project Breakdown
 
KA6954 P57600 Chapter 12
KA6954 P57600 Chapter 12KA6954 P57600 Chapter 12
KA6954 P57600 Chapter 12
 
KA6954 P57600 Chapter 11
KA6954 P57600 Chapter 11KA6954 P57600 Chapter 11
KA6954 P57600 Chapter 11
 
KA6954 P57600 Chapter 1
KA6954 P57600 Chapter 1KA6954 P57600 Chapter 1
KA6954 P57600 Chapter 1
 
KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4
 
KA6423 P57600 Assignment 3
KA6423 P57600 Assignment 3KA6423 P57600 Assignment 3
KA6423 P57600 Assignment 3
 
KA6423 P57600 Assignment 1
KA6423 P57600 Assignment 1KA6423 P57600 Assignment 1
KA6423 P57600 Assignment 1
 
Surface Water Hidrology - Chapter 5
Surface Water Hidrology - Chapter 5Surface Water Hidrology - Chapter 5
Surface Water Hidrology - Chapter 5
 
Surface Water Hidrology - Chapter 2
Surface Water Hidrology - Chapter 2Surface Water Hidrology - Chapter 2
Surface Water Hidrology - Chapter 2
 
KA6414_Sustainable Urban Design - Stockholm City
KA6414_Sustainable Urban Design - Stockholm CityKA6414_Sustainable Urban Design - Stockholm City
KA6414_Sustainable Urban Design - Stockholm City
 

KA6564 Assignment 1

  • 1. TITLE : URBAN TRANSPORTATION ASSIGNMENT 1 NAME : MUHAMMAD BIN RAMLAN MATRIX NO : P 57600 SUBJECT : KKKA 6564 YEAR : 2011/2012 LECTURER : PROF IR DR RIZA ATIQ O.K. RAHMAT
  • 2. QUESTION ASSIGNMENT 1 A proposed development will be constructed near the Putrajaya-Kajang highway as shown in Figure 1. Proposed Development To Putrajaya To Kajang Figure 1 The development consists of an office building with 102,000 square meter floor area and a 295 units condominium tower. It is expected will attract 3.3 person-trips per 100 square meter floor area per hour in the morning, whereas the condominium will produce 1.45 person-trips per unit per hour. It is estimated that only 16% of the generated trip by the condominium destine to the office building in the development area. Mode Split Average Capacity Car 55% 1.9 Motorcycle 9% 1.15 Bus 36% 50 You are required to: a) Compute production and attraction. b) Compute the number of persons entering and exiting the development area per hour in the morning. c) Compute the number of each transport mode entering and exiting the development in the morning. d) If 80% of the attraction is from Kajang, determine the minimum width of the bridge.
  • 3. SOLUTION ASSIGNMENT 1 a) Compute production and attraction Land Use Residential Unit Production rate Morning production (person-trip / unit / (person-trip / hr) hr) Condominium 295 1.45 428 Land Use Residential Unit (m2) Attraction rate Morning Attraction (person-trip / m2 / (person-trip / hr) hr) Office building (102000/100) = 1020 3.3 3366 b) Compute the number of persons entering and exiting the development area per hour in the morning Land Use Number of person Number of persons Number of persons from the entering the exiting the condominium development area development area (person-trip / hr) (person-trip / hr) destine to the office building in the development area (person-trip / hr) Development area (16/100) x 428 = 68 3366 – 68 = 3298 428 – 68 = 360
  • 4. c) Compute the number of each transport mode entering and exiting the development in the morning Number of each vehicle entering development: Land Use Entering Modal Split Person Trip Number of vehicles car motorcycle bus car motorcycle bus car motorcycle bus Development 3298 55% 9% 36% 1814 297 1187 955 258 24 area TOTAL 955 258 24 Number of each vehicle exiting development: Land Use Exiting Modal Split Person Trip Number of vehicles car motorcycle bus car motorcycle bus car motorcycle bus Development 360 55% 9% 36% 198 32 130 104 28 3 area TOTAL 955 258 24 D) If 80% of the attraction is from Kajang, determine the minimum width of the bridge. Land Use Attraction from kajang (person-trip / hr) Development area (80/100) x 3298 = 2638 Numbers Quantity Cars 2638/1.9 = 1388 Lane *For Malaysian Standard: 1800 Cars Per Link 1388/1800 = 0.77 ≈ 1 Items Description Bridge Width *assume 1 lane is 3.5m, road shoulder is 1m, marginal strip is 0.5m. Therefore, bridge width for two lane is: = (3.5m + 1m + 0.5m) x 2 = 10m