1. C U R R I C U L U M V I T A E
Full Name : Arie Pratama Saputra, ST
Place / Date of Birth : Duri / December 16th
, 1990
Sex : Male
Status : Single
Home Address : Jl Purnama No 113 , Duri 28884, Bengkalis , Riau
Phone : +628170071786 / +6281261112395
E-mail Address : ariepratama161290@gmail.com or ariepratamasaputra@gmail.com
EDUCATION BACKGROUND
Mechanical Engineering , Faculty of IndustrialTechnology, Trisakti University
(GPA = 3.04 Scale of 4.00)
Final Project Design of Wind Turbine of Alternative Energy
EDUCATION DESCRIPTION
My final project focuses on design Wind Turbine of Alternative Energy . I calculation and design as Wind
Turbine System, this part I must give solution for get eficiency planing Wind Turbine system. My final project
could be a reference goverment if any Business to make Smart plan in the future. My internship at PT.
Pertamina Refinery Unit II Dumai, I design and calculation to increase the efficiency of Mechanical Rotary
Equipment.
ORGANIZATIONAL EXPERIENCES
Board Member M-Solidarity (SOLIDARITY M FOREVER) [August 2009- Now]
Head of Dept Interior (BEM-FTI USAKTI) [2011]
Vice Chairman of KPU (Trisakti University) [2011]
Minister of Foreign Affairs Student (KEPRESMA USAKTI) [2013]
Steering Committee (BEM NUSANTARA VI Malang- East Java) [June 2014]
SKILLS AND INTERESTS
Technical Skills : Knowledge about Welding Inspection , NDT , Standard & Code , Knowledge of Mechanical
Rotary Equipment, Online Leak Sealing Technology and Alternative Energy.
Languages : Bahasa Indonesia and English (TOELF 504)
Other Interests : Travelling & Football
ADDITIONAL EXPERIENCE
Laboratory Assistant Energy Conversion Trisakti University [December 2012]
Field Trip PLTU Paiton East Java [July 2013]
Field Trip PT PAL East Java [July 2013]
Field Trip PT Petrokimia Gresik East Java [July 2013]
TRAININGS
Welding Metallurgy (Mechanical Engineering Trisakti University) [March 2012]
Alternative Energy Indonesia (Mechanical Engineering Trisakti University) [February 2014]
Behavior Based Safety OHSAS 18001 (RPP ENGINEERING) [October 2014]
Basic Sea Survival (Safety IndoPerkasa) [December 2014]
Operator Produksi Muda (LSP MIGAS) [December 2014]
2. Arie Pratama Saputra
Jl Purnama No 113 , Duri 28884, Bengkalis , Riau
+0765 596550 or +628170071786
ariepratamasaputra@gmail.com
ariepratama161290@gmail.com
Online Leak Sealing (TXY- Tianjin, China) [April 2015]
Petugas Keselamatan dan Kesehatan Kerja / K3 Migas (LSP MIGAS) [August 2015]
International Welding Inspector (B4T Bandung) [August-Nov 2015]
ASNT Radiographic Interpreter Level II (Multispec Sinergindo) [December 2015]
JOB EXPERIENCE
INTERNSHIP at Junior Maintenance Area 3 PT. PERTAMINA RU II [February 2013 – April 2013]
- Analysis Pump, Steam Turbine, Compressor and Boiler with the Daily Report
- Calculation of Pump, Steam Turbine, Compressor and Boiler
- Maintenance Mechanical Rotatic Equipment as a good condition and preparing spare part
- Repair, Replacement, Inspection for maintenance and repair of the equipment and Monitoring
technical procedures and reporting
- Character Bulding to Oil and Gas Experience
PT. UNICO UTAMA [June 2014 – September 2015]
Maintenance Engineer
Client : CNOOC SES Ltd Central Business Unit (offshore)
- Repair, Replacement, Inspection for Maintenance of the Equipment
- Maintenance and service of all mechanical equipment such as Compressor, Gen-Set, Crane,
Slop Pump and Wash Down Pump.
- Ensure all equipment, procedures and operation at platform with Safety Management Plan.
- Preparing and Reporting Material and Tools
- Integrity Preventive Maintenance
- Ensure Quality Acceptance & Control Of Quality
- Ensure Safety & Quality With Contract Procedure
- Reporting the project to the client (weekly progress)
PT. Wahanakarsa Swandiri EPC Company [December 2015– Now]
Field Engineer
Client : Chevron Pacific Indonesia (Duri-Heavy Oil)
- The project about Surface facility ( well program , normalization well , non well program )
- Preparing Request Of Information about the Project Include Material & Cost
- Prepare Crew Mobilization until Finished the Project
- Controlling the Project , Inspect , Built up The progress
- Inspection and Controlling during the project ( welding quality report )
- Reporting the Project to Client ( Weekly Progress , Monthly Progress , Yearly Progress )
- Request Verification of Work if he Project Has Done ( Closing )
I hereby certify that all information submitted on this curriculum vitae is true and accurate to the best of my
knowledge.
Arie Pratama Saputra, ST
2