REVISED PORTION
2.14      Information Systems Control and Audit


2.3.6 Agile Methodologies
This is a group of software development methodologies based on the iterative and incremental
development, where requirements and solutions evolve through collaboration between self-
organizing, cross-functional teams. It promotes adaptive planning, evolutionary development and
delivery; time boxed iterative approach and encourages rapid and flexible response to change. It is
a conceptual framework that promotes foreseen interactions throughout the development life cycle.
Basic Principles
Following are the key principles of this methodology:
·   Customer satisfaction by rapid delivery of useful software;
·   Welcome changing requirements, even late in development;
·   Working software is delivered frequently (weeks rather than months);
·   Working software is the principal measure of progress;
·   Sustainable development, able to maintain a constant pace;
·   Close, daily co-operation between business people and developers;
·   Face-to-face conversation is the best form of communication (co-location);
·   Projects are built around motivated individuals, who should be trusted;
·   Continuous attention to technical excellence and good design;
·   Simplicity;
·   Self-organizing teams; and
·   Regular adaptation to changing circumstances.
Strengths
·   Agile methodology has the concept of an adaptive team, which is able to respond to the
    changing requirements.
· The team does not have to invest time and effort and finally find that by the time they
    delivered the product, the requirement of the customer has changed.
· Face to face communication and continuous inputs from customer representative leaves no
    space for guesswork.
· The documentation is crisp and to the point to save time.
· The end result is the high quality software in least possible time duration and satisfied
    customer.
Weaknesses
·      In case of some software deliverables, especially the large ones, it is difficult to assess the
       efforts required at the beginning of the software development life cycle.
·      There is lack of emphasis on necessary designing and documentation.
·      Agile increases potential threats to business continuity and knowledge transfer. By nature,
       Agile projects are extremely light on documentation because the team focuses on verbal
       communication with the customer rather than on documents or manuals.
·      Agile requires more re-work. Because of the lack of long-term planning and the lightweight
       approach to architecture, re-work is often required on Agile projects when the various
       components of the software are combined and forced to interact.
System Development Life Cycle Methodology            2.27




We will now describe some of these tools in detail.
(a) Structured English : Structured English, also known as Program Design Language
(PDL) or Pseudo Code, is the use of the English language with the syntax of structured
programming. Thus, Structured English aims at getting the benefits of both the programming
logic and natural language. Program logic that helps to attain precision and natural language that
helps in getting the convenience of spoken languages.
(b) Flowcharts : Flowcharting is a graphic technique that can be used by analysts to
represent the inputs, outputs and processes of a business in a pictorial form. It is a common type
of chart, that represents an algorithm or process showing the steps as boxes of various kinds,
and their order by connecting these with arrows. Flowcharts are used in analyzing, designing,
2.28    Information Systems Control and Audit


documenting or managing a process or program in various fields.




(d) Decision Tree : A Decision Tree (or tree diagram) is a support tool that uses a tree-like
graph or model of decisions and their possible consequences, including chance event
outcomes, resource costs, and utility. Decision tree is commonly used in operations research,
specifically in decision analysis, to help identify a strategy most likely to reach a goal and to
calculate conditional probabilities.
System Development Life Cycle Methodology         2.53




    1.0  GENERAL INFORMATION
    1.1  SYSTEM OVERVIEW                   3.0           RUN DESCRIPTION
         1.2 Project References            3.1           RUN INVENTORY
         1.3 Authorized Use Permission     3.2           RUN DESCRIPTION
         1.4 Points of Contact                           *3.2.x [Run Identifier]
              1.4.1 Information                          3.2.x.1 Run             Interrupt
              1.4.2 Coordination                                Checkpoints
              1.4.3 Help Desk                            3.2.x.2 Set-Up and Diagnostic
         1.5 Organization of the Manual                            Procedures
         1.6 Acronyms and Abbreviations                  3.2.x.3 Error Messages
    2.0 SYSTEM OPERATIONS OVERVIEW                       3.2.x.4 Restart/Recovery
         2.1 System Operations                                  Procedures
         2.2 Software Inventory
         2.3 Information Inventory
              2.3.1    Resource Inventory
              2.3.2    Report Inventory                     * Each run should be under a
         2.4   Operational Inventory                        separate header. Generate new
         2.5   Processing Overview                          sections and subsections as
              2.5.1 System Restrictions                     necessary for each run from 3.2.1
              2.5.2 Waivers of Operational                  through 3.2.x.
                      Standards
              2.5.3 Interfaces with Other
                      Systems
        2.6    Communications Overview
        2.7    Security
                        Fig. 2.13.1 : Sample format of Operations Manual
2.14 Auditors’ Role In SDLC
The audit of systems under development can have three main objectives:
·         to provide an opinion on the efficiency, effectiveness, and economy of project
          management;
2.54       Information Systems Control and Audit


        ·      to assess the extent to which the system being developed provides for adequate audit
               trails and controls to ensure the integrity of data processed and stored; and
        ·      to assess the controls being provided for the management of the system's operation.
        For the first objective to achieve, an auditor will have to attend project and steering committee
        meetings and examine project control documentation and conducting interviews. This is to
        ensure what project control standards are to be complied with, (such as a formal systems
        development process) and determining the extent to which compliance is being achieved. For
        addressing second objective, the auditor is can examine system documentation, such as
        functional specifications, to arrive at an opinion on controls. The auditor's opinion will be
        based on the degree to which the system satisfies the general control objectives that any
        Information Technology system should meet. A list of such objectives should be provided to
        the auditee. The same is true for the third objective, viz. system's operational controls. The
        auditor should provide the a list of the standard controls, over such operational concerns as
        response time, CPU usage, and random access space availability, that the auditor has used
        as assessment criteria.
        An Auditor may adopt a rating system such as on scale of 1 to 10 in order to give rating to the
        various phases of SDLC. E.g. in rating a Feasibility Study, auditor can review Feasibility Study
        Report and different work products of this study phase. An interview with personnel who have
        conducted this feasibility study can be conducted. Depending on the content and quality of the
        Feasibility Study report and interviews, an auditor can arrive at a rating between 1 to 10 (10
        being best). After deriving such a rating for all the phases, the auditor can form his/her overall
        opinion about the SDLC phases.
        In order to audit technical work products (such as database design or physical design), auditor may
        opt to include a technical expert to seek his/her opinion on the technical aspects of SDLC.
        However, auditor will have to give control objectives, directives and in general validate the opinion
        expressed by technical experts. Some of the control considerations for an auditor are:
        ·      Documented policy and procedures;
        ·      Established Project team with all infrastructure and facilities ;
        ·      Developers/ IT managers are trained on the procedures ;
        ·      Appropriate approvals are being taken at identified mile-stones;
        ·      Development is carried over as per standards, functional specifications;
        ·      Separate test environment for development/ test/ production / test plans;
        ·      Design norms and naming conventions are as per standards and are adhered to;
        ·      Business owners testing and approval before system going live;
        ·      Version control on programs;
        ·      Source Code is properly secured;
        ·      Adequate audit trails are provided in system; and




© The Institute of Chartered Accountants of India
System Development Life Cycle Methodology         2.55


        ·    Appropriateness of methodologies selected.
        Further, Post-Implementation Review is performed to determine whether the system
        adequately meets earlier identified business requirements and needs (in feasibility studies or
        Requirements Specifications). Auditors should be able to determine if the expected benefits of
        the new system were realized and whether users are satisfied with the new system. In post
        implementation review, auditors need to review which of the SDLC phases have not met
        desired objectives and whether any corrective actions were taken. If there are differences
        between expectations and actual results, auditors need to determine the reasons for the
        same. E.g. it could be due to incomplete user requirements. Such reasons can help auditors to
        evaluate the current situation and offer guidelines for future projects.
        Master Checklist
        The process objectives are:
        ·    To ensure an appropriate acquisition and / or development of information systems
             including software, and
        ·    To maintain the information systems in an appropriate manner.
        The following checklist may be used by the IS Auditors for this purpose:
        S. No.                              Checkpoints                                    Status
        1.       Whether information system acquisition and / or development policy
                 and procedure documented?
        2.       Whether system acquisition and / or development policy and
                 procedure approved by the management?
        3.       Whether the policy and procedure cover the following:
                 · Problems faced in the existing system and need for
                    replacement
                 · Functionality of new IS
                 · Security needs
                 · Regulatory compliance
                 · Acceptance Criteria
                 · Proposed roles and responsibilities
                 · Transition/ Migration to new IS
                 · Interfaces with legacy systems
                 · Post implementation review
                 · Maintenance arrangements.
        4.       Whether policy and procedure documents are communicated /
                 available to the respective users?




© The Institute of Chartered Accountants of India
2.56    Information Systems Control and Audit


        5.       Whether policy and procedure documents are reviewed and
                 updated at regular intervals?
        6.       Whether the organization has evaluated requirement and
                 functionalities of proposed IS?
                 (Verify the requirement analysis conducted at three levels viz.
                 process level, application level and organization level. Verify the
                 site visit reports and other customer references obtained with
                 respect to functionalities of proposed IS).
        7.       Whether the organization carried out feasibility study in respect of
                 the following
                 · Financial feasibility
                 · Operational feasibility
                 · Technical feasibility
        8.       Whether the selection of vendor and acquisition terms considers
                 the following:
                 · Evaluation of alternative vendors
                 · Specification on service levels and deliverables
                 · Penalty for delays
                 · Escrow mechanism for Source codes
                 · Customization
                 · Upgrades
                 · Regulatory Compliance
                 · Support and maintenance.
        9.       Whether the organization has identified and assigned roles in
                 development activities to appropriate stakeholders?
                 (Verify the assigned roles should be on “need to know” and “need
                 to basis”. and duties of developers and operators are segregated).
        10.      Whether the organization has a separate development, test and
                 production environments?
        11.      Whether the IS developed plan is prepared and approved by the
                 management?
                 (Verify that IS development plan to include:
                 · Input data elements,
                 · Validations controls viz. Field/ Transactions/ File with
                      appropriate error reporting
                 · Process workflow




© The Institute of Chartered Accountants of India
System Development Life Cycle Methodology   2.57


      ·   data classifications with security are in place, viz. Read only
          for users, Read/ Write for authorized persons
      ·   Output).
12.   Whether the testing of IS includes:
      · Confirms the compliance to functional requirements
      · Confirms the compatibility with IS infrastructure
      · Identifies bugs and errors and addresses them by analyzing
          root causes
      Escalating functionality issues at appropriate levels.
13.   Whether the adequate documentation for:
      · Preserving test results for future reference
      · Preparation of manuals like systems manual, installation
         manual, user manual
      · Obtaining user sign off / acceptance
14.   Whether the implementation covers the following?
      · User Departments' involvement and their role
      · User Training
      · Acceptance Testing
      · Role of Vendor and period of Support
      · Required IS Infrastructure plan
      · Risk involved and actions required to mitigate the risks
      · Migration plan
15.   If the development activities are outsourced, are the outsourcing
      activities evaluated based on the following practices:
      · What is the objective behind Outsourcing?
      · What are the in-house capabilities in performing the job?
      · What is the economic viability?
      · What are the in-house infrastructure deficiencies and the time
            factor involved?
      · What are the Risks and security concerns?
      · What are the outsourcing arrangement and fall back method?
      · What are arrangements for obtaining the source code for the
            software?
      · Reviewing the capability and quality of software development
            activities by visit to vendor's premises?
      · Review of progress of IS development at periodic intervals.
2.58   Information Systems Control and Audit


16.    Whether the organization carried out a post implementation review
       of new IS?
17.    Whether a process exists for measuring vendors' performance
       against the agreed service levels?
18.    Whether the post implementation review results are documented?
DELETED PORTION
2.64   Information Systems Control and Audit


2.14   ORGANIZATIONAL STRUCTURE OF IT DEPARTMENT
We will now give a brief introduction about the management structure of IT department.
2.14.1 Management Structure
                                                   Line Management

           Management


                                                    Project Management

Line Management Structure : The information system management subsystems in an
organization attempt to ensure that the development, implementation, operation and
maintenance of information systems proceed in a planned and controlled manner. They
function to provide a stable environment in which information systems are built and operated
on a day-to-day basis. Several levels of management subsystems have been identified
corresponding to the organization hierarchy shown in Fig. 2.14.1 and major functions
performed within a data processing installation.

                                      Top Management


                                       IS Management


                             Systems Development Management


                                 Programming Management


                                     Data Administration


                                   Security Administration


                                  Operations Management


                               Quality assurance management

                 Fig. 2.14.1 : Several levels of management subsystems
System Development Life Cycle Methodology        2.65


Top Management : Top management of the organization must ensure that the data
processing installation is well managed. It is responsible primarily for long run policies
decisions on how computers will be used in the organization.
IS Management : IS management has overall responsibility for planning and control of all
computer activities and also provides inputs to top management’s long run policy decision
making and translates long run policies into short run goals and objectives.
Systems Development Management : Systems Development Management is responsible for
the design, implementation and maintenance of application systems.
Programming Management : Programming management is responsible for programming new
systems, maintaining old systems and providing general systems support software.
Data Administration : Data administration is responsible for the control and use of an
organization’s data including the database and library of application system files.
Security Administration : Security administration is responsible for the physical security of
the data processing and IS programs.
Operations Management : Operations Management controls the day-to-day operations of
data processing systems. It is responsible for data preparation; the data flow through the
installation, production running of systems, maintenance of hardware and sometimes
maintenance of program and file library facilities.
Quality Assurance Management : Quality Assurance Management undertakes an in-depth
quality assurance review of data processing in each application system. This review involves a
detailed check of the authenticity, accuracy and completeness of input, processing and output.
2.14.2 Project Management Structure : In project management, project requests are
submitted to and prioritized by the steering committee. The project manager, who may be a
non-IS staff member, should be given complete operational control of the project and be
allocated the appropriate resources for the successful completion of the project. IS auditors
may be included in the project team as control advocates and experts. They also provide an
independent, objective review to ensure that the level of commitment of the responsible
parties is appropriate.

                                          IS Manager



           Accounting                     Production                    Operations



      Systems Analysis          Programming

                         Fig. 2.14.2 : Roles performed by IS Manager
2.66      Information Systems Control and Audit


Duties and Responsibilities :
Fig. 2.14.2 shows the tasks performed by an IS Manager. The structure of an IT Department is
divided into two main areas of activity:
1.     Information processing.
2.     System development and enhancement.
Information Processing or IP is primarily concerned with the operational aspect of the
information-processing environment and often includes computer operations, systems
programming, telecommunications and librarian functions.
System development is concerned with the development, acquisition and maintenance of
computer application systems and performs systems analysis and programming functions.
•      Data entry : The data entry supervisor is responsible for ensuring whether the data is
       authorized, accurate and complete when entered into the system. Components in the
       input subsystem are responsible for bringing information into a system. The information
       takes two forms : first, it may be raw data to be processed and perhaps applied against
       the database; second, it may be instructions to direct the system to execute particular
       processes, updater or interrogate particular data, or prepare particular types of output.
       Both types of information input must be validated. Any errors detected must be controlled
       so that the input resubmission is authentic, accurate, complete, unique and timely.
•      File Library : The file librarian is responsible for recording, issuing, receiving and
       safeguarding all programs and data files that are maintained on computer tapes or disks.
       Managing the organization’s library of machine-readable files involves three functions.
       First, files must be used only for the purposes intended. Control must be exercised over
       program files, data files and procedure files. Second, the storage media used for files
       must be maintained in correct working order. Third, a file backup strategy and file
       retention strategy must be implemented. Within the IT department, responsibility for
       managing files is vested in a file library section.
•      Control Group : The control group manages the flow of data and is responsible fore the
       collection, conversion and control of input, and balancing the distribution of output to the
       user community. The input/output control group should be in a separate e area where
       only authorized personnel are permitted. The supervisor of the control group usually
       reports to the IPF operations managers.
•      Operations : Operations management is responsible for the daily running of hardware
       and software facilities so that the production application system can accomplish their
       work and development staff can design, implement and maintain systems. Though there
       are some variations across the organizations, the operations group within the IT
       department undertakes major functions like - Computer operations; Communication
       network control; Data preparation; Production work flow control; File library;
       Documentation library; and Performance monitoring.
System Development Life Cycle Methodology          2.67


•   Security Administration : The security administrator in a data processing organization
    is responsible for matters of physical security. In other words, the security administrator
    attempts to ensure that the physical facilities in which the systems are developed,
    implemented, maintained and operated are safe from threats that affect the continuity of
    operation.
•   Physical Security : A complete reliable protection scheme must take into account the
    possibility of physical attacks on the database, ranging from disclosure of a password to
    theft of the physical storage devices. We can protect well by encrypting data. A high
    security system needs better identification than a password, such as personal recognition
    of the user by a guard.
•   Data Security : Database management systems often provide controls over data
    definition and data manipulation facilities. In environments, which combine database
    management with online transaction processing, access to the database objects such as
    tables or views can be controlled through internal database mechanisms, which limit
    what the transaction or program, can do. Various auditing or journaling are also
    available. Utility access and submission, as well as monitoring and performance tools,
    should be restricted to appropriate personnel.
•   Conducting a Security program : A security program is a series of ongoing, regular,
    periodic evaluations conducted to ensure that the physical facilities of an Information
    System are safeguarded adequately. The first security evaluation conducted may be a
    major exercise; the security administrator has to consider an extensive list of possible
    threats to the organization, prepare an inventory of assets, evaluate the adequacy of
    controls, implement new controls, etc. Subsequent security evaluations may focus only
    on changes that have occurred, perhaps in light of the purchase of new hardware or a
    new threat etc. Nevertheless, even in the absence of visible changes, security
    evaluations need to be repeated periodically to determine whether covert changes have
    occurred that necessitate modifications to controls. Fig. 2.14.3 shows the activities
    involved in an organization.
•   Production Work Flow Control : Production workflow control in an Information System,
    is the responsibility of a control section. The control section manages the flow of data
    between users and the information system, and between data preparation and the
    computer room. It is also more difficult for operators and data preparation personnel to
    collude and to perpetrate a fraud – for example, by alerting input data.
2.68     Information Systems Control and Audit




    Organization                                 User




          Data preparation                 Control section              Computer room



        Data processing




                                            Service Bureau

                       Fig. 2.14.3 : Activities involved in an Organization
•      Quality Assurance : Quality Assurance group is responsible for testing and verifying
       whether the program changes and documentation adhere to standards and naming
       conventions before the programs are moved into production. The control section
       facilitates the orderly flow of data and checks to see that the input is in order by scanning
       it for reasonableness and completeness and by checking control totals. If the input
       passes the quality assurance check, it is entered into a log and dispatched either to the
       computer room, if it is already in machine-readable form or to data preparation, if it must
       be keyed to cards, tape or disk.
•      Systems Analysis : System analysts are responsible for interpreting the needs of the
       user, determining the programs and the programmers necessary to create the particular
       application. System analysts design systems based on the needs of the user. For the
       auditor acting as a participant in the system development process, the information
       processing system design phase is one of major involvement. From a system
       effectiveness viewpoint, the auditor is concerned with whether the design meets strategic
       requirements. From efficiency viewpoint the auditor is concerned with the resources that
       will be needed to run the system. From safeguarding access and data integrity viewpoint,
       the auditor is concerned with the controls designed into the system.
•      Applications Programming : Applications programmers are responsible for developing
       new systems and for monitoring systems in production. They should work in a test only
       environment and should not move test versions into the production environment.
       Application programmers should not have access to system program libraries.
•      Systems programming : System programmers are responsible for maintaining the
       systems software including the operating systems.
System Development Life Cycle Methodology          2.69


•    Local Area Network (LAN) Administration : LAN administrator is responsible for
     technical and administrative control over the local area network. This includes ensuring
     transmission links are functioning correctly, backups of the system are occurring and
     software/hardware purchases are authorized and properly installed. In smaller
     installations, this person may be responsible for security administration over the LAN.
     The LAN administrator should have no application responsibilities, but may have end-
     user responsibilities. The LAN administrator may report to the director of the IPF and in a
     decentralized operation, he can report to the end-user manager.
•    Help Desk Administration : The Help Desk Administrator is responsible for monitoring,
     improving and controlling system performance in mainframe and client/server hardware
     and software. The Help Desk Administration may be useful when data entry is not based
     upon a dedicated source document. If users are uncertain about the nature or format of
     the data to be entered into a particular field, they may ask the system to provide
     information to assist them.
References :
1.   Valacich George, Haffer, Essentials of Systems Analysis & Design, Prentice Hall India,
     IInd Edition 2004.
2.   Charles Parker & Thomas Case, Management Information System Strategy & Action, IInd
     Edition, Mcgraw Hill, 1993.
3.   http://www.cms.hhs.gov/SystemLifecycleFramework/Downloads/Selecting          Development
     Approach.pdf
4.   http://en.wikipedia.org/wiki/Systems_Development_Life_Cycle
5.   http://www.klbschool.org.uk/ict/gcse/theory/5_3/5_3_3_implementation.htm
6.   http://www.epmbook.com/pir.htm
Self - Examination Questions
1.   What is Systems Development Process?
2.   What activities are part of the Systems Development Life Cycle (SDLC)?
3.   Discuss various approaches to systems development.
4.   What types of systems are best for development by the traditional approach? What types
     of systems by prototyping approaches? What types by end user development?
5.   How is systems development handled in smaller organizations?
6.   What is the purpose of a preliminary investigation? What outcome is expected from it?
     Who caries out this investigation?
7.   What do you mean by feasibility study? How is it conducted?
8.   What systems costs are estimated during feasibility study for various alternative
     solutions?

Mais conteúdo relacionado

Mais procurados

Ch2-Software Engineering 9
Ch2-Software Engineering 9Ch2-Software Engineering 9
Ch2-Software Engineering 9Ian Sommerville
 
Real Time Software Design in Software Engineering SE13
Real Time Software Design in Software Engineering SE13Real Time Software Design in Software Engineering SE13
Real Time Software Design in Software Engineering SE13koolkampus
 
Se solns 9th edition
Se solns 9th editionSe solns 9th edition
Se solns 9th editionrajabaidyo
 
Software Configuration Management
Software Configuration ManagementSoftware Configuration Management
Software Configuration ManagementChandan Chaurasia
 
SE2_Lec 22_Software Configuration Management
SE2_Lec 22_Software Configuration ManagementSE2_Lec 22_Software Configuration Management
SE2_Lec 22_Software Configuration ManagementAmr E. Mohamed
 
Ch7-Software Engineering 9
Ch7-Software Engineering 9Ch7-Software Engineering 9
Ch7-Software Engineering 9Ian Sommerville
 
Ch20-Software Engineering 9
Ch20-Software Engineering 9Ch20-Software Engineering 9
Ch20-Software Engineering 9Ian Sommerville
 
Requirement configuration management
Requirement configuration managementRequirement configuration management
Requirement configuration managementAbdul Basit
 
Ch9-Software Engineering 9
Ch9-Software Engineering 9Ch9-Software Engineering 9
Ch9-Software Engineering 9Ian Sommerville
 
software configuratiom management role n resposnbilities
software configuratiom management role n resposnbilitiessoftware configuratiom management role n resposnbilities
software configuratiom management role n resposnbilitiesMahesh Panchal
 
المحاضرة الرابعة والخامسة
المحاضرة الرابعة والخامسةالمحاضرة الرابعة والخامسة
المحاضرة الرابعة والخامسةAhmed Alageed
 

Mais procurados (16)

Ch2-Software Engineering 9
Ch2-Software Engineering 9Ch2-Software Engineering 9
Ch2-Software Engineering 9
 
Real Time Software Design in Software Engineering SE13
Real Time Software Design in Software Engineering SE13Real Time Software Design in Software Engineering SE13
Real Time Software Design in Software Engineering SE13
 
Se solns 9th edition
Se solns 9th editionSe solns 9th edition
Se solns 9th edition
 
Software Configuration Management
Software Configuration ManagementSoftware Configuration Management
Software Configuration Management
 
SE2_Lec 22_Software Configuration Management
SE2_Lec 22_Software Configuration ManagementSE2_Lec 22_Software Configuration Management
SE2_Lec 22_Software Configuration Management
 
Ch7-Software Engineering 9
Ch7-Software Engineering 9Ch7-Software Engineering 9
Ch7-Software Engineering 9
 
Ch20-Software Engineering 9
Ch20-Software Engineering 9Ch20-Software Engineering 9
Ch20-Software Engineering 9
 
SCM PPT
SCM PPTSCM PPT
SCM PPT
 
Ch25 configuration management
Ch25 configuration managementCh25 configuration management
Ch25 configuration management
 
software maintenance
software maintenancesoftware maintenance
software maintenance
 
Requirement configuration management
Requirement configuration managementRequirement configuration management
Requirement configuration management
 
Ch9-Software Engineering 9
Ch9-Software Engineering 9Ch9-Software Engineering 9
Ch9-Software Engineering 9
 
Ch4 req eng
Ch4 req engCh4 req eng
Ch4 req eng
 
software configuratiom management role n resposnbilities
software configuratiom management role n resposnbilitiessoftware configuratiom management role n resposnbilities
software configuratiom management role n resposnbilities
 
المحاضرة الرابعة والخامسة
المحاضرة الرابعة والخامسةالمحاضرة الرابعة والخامسة
المحاضرة الرابعة والخامسة
 
Chap5 RE management
Chap5 RE managementChap5 RE management
Chap5 RE management
 

Semelhante a 461361 1013243 chapter_2_dec__11

3Audit Software & Tools.pptx
3Audit Software & Tools.pptx3Audit Software & Tools.pptx
3Audit Software & Tools.pptxjack952975
 
Software testing and introduction to quality
Software testing and introduction to qualitySoftware testing and introduction to quality
Software testing and introduction to qualityDhanashriAmbre
 
Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC
Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC
Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC Neetu Marwah
 
SE18_Lec 02_Software Life Cycle Model
SE18_Lec 02_Software Life Cycle ModelSE18_Lec 02_Software Life Cycle Model
SE18_Lec 02_Software Life Cycle ModelAmr E. Mohamed
 
19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittalsatyaragha786
 
Lightweight Processes: A Definition
Lightweight Processes: A DefinitionLightweight Processes: A Definition
Lightweight Processes: A DefinitionGlen Alleman
 
ppt on sOFTWARE DEVELOPMENT LIFE CYCLE
 ppt on sOFTWARE DEVELOPMENT LIFE CYCLE ppt on sOFTWARE DEVELOPMENT LIFE CYCLE
ppt on sOFTWARE DEVELOPMENT LIFE CYCLESwarnima Tiwari
 
Chap3 2007 Cisa Review Course
Chap3 2007 Cisa Review CourseChap3 2007 Cisa Review Course
Chap3 2007 Cisa Review CourseDesmond Devendran
 
DevOps Practices in a Nutshell
DevOps Practices in a NutshellDevOps Practices in a Nutshell
DevOps Practices in a NutshellFibonalabs
 
19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit MittalCourtney Esco
 
Online auction system srs riport
Online auction system srs  riportOnline auction system srs  riport
Online auction system srs riportDilip Prajapati
 
Introduction To Software Concepts Unit 1 & 2
Introduction To Software Concepts Unit 1 & 2Introduction To Software Concepts Unit 1 & 2
Introduction To Software Concepts Unit 1 & 2Raj vardhan
 
Lecture - 7-10.pptx
Lecture - 7-10.pptxLecture - 7-10.pptx
Lecture - 7-10.pptxFarHana74914
 

Semelhante a 461361 1013243 chapter_2_dec__11 (20)

3Audit Software & Tools.pptx
3Audit Software & Tools.pptx3Audit Software & Tools.pptx
3Audit Software & Tools.pptx
 
Software testing and introduction to quality
Software testing and introduction to qualitySoftware testing and introduction to quality
Software testing and introduction to quality
 
Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC
Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC
Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC
 
Sdlc1
Sdlc1Sdlc1
Sdlc1
 
S D L C
S D L CS D L C
S D L C
 
Process impact
Process impactProcess impact
Process impact
 
Software process
Software processSoftware process
Software process
 
Presentation2
Presentation2Presentation2
Presentation2
 
SE18_Lec 02_Software Life Cycle Model
SE18_Lec 02_Software Life Cycle ModelSE18_Lec 02_Software Life Cycle Model
SE18_Lec 02_Software Life Cycle Model
 
Chapter 2.pptx
Chapter 2.pptxChapter 2.pptx
Chapter 2.pptx
 
19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal
 
Lightweight Processes: A Definition
Lightweight Processes: A DefinitionLightweight Processes: A Definition
Lightweight Processes: A Definition
 
ppt on sOFTWARE DEVELOPMENT LIFE CYCLE
 ppt on sOFTWARE DEVELOPMENT LIFE CYCLE ppt on sOFTWARE DEVELOPMENT LIFE CYCLE
ppt on sOFTWARE DEVELOPMENT LIFE CYCLE
 
Control System - execution plan
Control System - execution planControl System - execution plan
Control System - execution plan
 
Chap3 2007 Cisa Review Course
Chap3 2007 Cisa Review CourseChap3 2007 Cisa Review Course
Chap3 2007 Cisa Review Course
 
DevOps Practices in a Nutshell
DevOps Practices in a NutshellDevOps Practices in a Nutshell
DevOps Practices in a Nutshell
 
19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal
 
Online auction system srs riport
Online auction system srs  riportOnline auction system srs  riport
Online auction system srs riport
 
Introduction To Software Concepts Unit 1 & 2
Introduction To Software Concepts Unit 1 & 2Introduction To Software Concepts Unit 1 & 2
Introduction To Software Concepts Unit 1 & 2
 
Lecture - 7-10.pptx
Lecture - 7-10.pptxLecture - 7-10.pptx
Lecture - 7-10.pptx
 

Último

Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 

Último (20)

Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 

461361 1013243 chapter_2_dec__11

  • 3. 2.14 Information Systems Control and Audit 2.3.6 Agile Methodologies This is a group of software development methodologies based on the iterative and incremental development, where requirements and solutions evolve through collaboration between self- organizing, cross-functional teams. It promotes adaptive planning, evolutionary development and delivery; time boxed iterative approach and encourages rapid and flexible response to change. It is a conceptual framework that promotes foreseen interactions throughout the development life cycle. Basic Principles Following are the key principles of this methodology: · Customer satisfaction by rapid delivery of useful software; · Welcome changing requirements, even late in development; · Working software is delivered frequently (weeks rather than months); · Working software is the principal measure of progress; · Sustainable development, able to maintain a constant pace; · Close, daily co-operation between business people and developers; · Face-to-face conversation is the best form of communication (co-location); · Projects are built around motivated individuals, who should be trusted; · Continuous attention to technical excellence and good design; · Simplicity; · Self-organizing teams; and · Regular adaptation to changing circumstances. Strengths · Agile methodology has the concept of an adaptive team, which is able to respond to the changing requirements. · The team does not have to invest time and effort and finally find that by the time they delivered the product, the requirement of the customer has changed. · Face to face communication and continuous inputs from customer representative leaves no space for guesswork. · The documentation is crisp and to the point to save time. · The end result is the high quality software in least possible time duration and satisfied customer. Weaknesses · In case of some software deliverables, especially the large ones, it is difficult to assess the efforts required at the beginning of the software development life cycle. · There is lack of emphasis on necessary designing and documentation. · Agile increases potential threats to business continuity and knowledge transfer. By nature, Agile projects are extremely light on documentation because the team focuses on verbal communication with the customer rather than on documents or manuals. · Agile requires more re-work. Because of the lack of long-term planning and the lightweight approach to architecture, re-work is often required on Agile projects when the various components of the software are combined and forced to interact.
  • 4. System Development Life Cycle Methodology 2.27 We will now describe some of these tools in detail. (a) Structured English : Structured English, also known as Program Design Language (PDL) or Pseudo Code, is the use of the English language with the syntax of structured programming. Thus, Structured English aims at getting the benefits of both the programming logic and natural language. Program logic that helps to attain precision and natural language that helps in getting the convenience of spoken languages. (b) Flowcharts : Flowcharting is a graphic technique that can be used by analysts to represent the inputs, outputs and processes of a business in a pictorial form. It is a common type of chart, that represents an algorithm or process showing the steps as boxes of various kinds, and their order by connecting these with arrows. Flowcharts are used in analyzing, designing,
  • 5. 2.28 Information Systems Control and Audit documenting or managing a process or program in various fields. (d) Decision Tree : A Decision Tree (or tree diagram) is a support tool that uses a tree-like graph or model of decisions and their possible consequences, including chance event outcomes, resource costs, and utility. Decision tree is commonly used in operations research, specifically in decision analysis, to help identify a strategy most likely to reach a goal and to calculate conditional probabilities.
  • 6. System Development Life Cycle Methodology 2.53 1.0 GENERAL INFORMATION 1.1 SYSTEM OVERVIEW 3.0 RUN DESCRIPTION 1.2 Project References 3.1 RUN INVENTORY 1.3 Authorized Use Permission 3.2 RUN DESCRIPTION 1.4 Points of Contact *3.2.x [Run Identifier] 1.4.1 Information 3.2.x.1 Run Interrupt 1.4.2 Coordination Checkpoints 1.4.3 Help Desk 3.2.x.2 Set-Up and Diagnostic 1.5 Organization of the Manual Procedures 1.6 Acronyms and Abbreviations 3.2.x.3 Error Messages 2.0 SYSTEM OPERATIONS OVERVIEW 3.2.x.4 Restart/Recovery 2.1 System Operations Procedures 2.2 Software Inventory 2.3 Information Inventory 2.3.1 Resource Inventory 2.3.2 Report Inventory * Each run should be under a 2.4 Operational Inventory separate header. Generate new 2.5 Processing Overview sections and subsections as 2.5.1 System Restrictions necessary for each run from 3.2.1 2.5.2 Waivers of Operational through 3.2.x. Standards 2.5.3 Interfaces with Other Systems 2.6 Communications Overview 2.7 Security Fig. 2.13.1 : Sample format of Operations Manual 2.14 Auditors’ Role In SDLC The audit of systems under development can have three main objectives: · to provide an opinion on the efficiency, effectiveness, and economy of project management;
  • 7. 2.54 Information Systems Control and Audit · to assess the extent to which the system being developed provides for adequate audit trails and controls to ensure the integrity of data processed and stored; and · to assess the controls being provided for the management of the system's operation. For the first objective to achieve, an auditor will have to attend project and steering committee meetings and examine project control documentation and conducting interviews. This is to ensure what project control standards are to be complied with, (such as a formal systems development process) and determining the extent to which compliance is being achieved. For addressing second objective, the auditor is can examine system documentation, such as functional specifications, to arrive at an opinion on controls. The auditor's opinion will be based on the degree to which the system satisfies the general control objectives that any Information Technology system should meet. A list of such objectives should be provided to the auditee. The same is true for the third objective, viz. system's operational controls. The auditor should provide the a list of the standard controls, over such operational concerns as response time, CPU usage, and random access space availability, that the auditor has used as assessment criteria. An Auditor may adopt a rating system such as on scale of 1 to 10 in order to give rating to the various phases of SDLC. E.g. in rating a Feasibility Study, auditor can review Feasibility Study Report and different work products of this study phase. An interview with personnel who have conducted this feasibility study can be conducted. Depending on the content and quality of the Feasibility Study report and interviews, an auditor can arrive at a rating between 1 to 10 (10 being best). After deriving such a rating for all the phases, the auditor can form his/her overall opinion about the SDLC phases. In order to audit technical work products (such as database design or physical design), auditor may opt to include a technical expert to seek his/her opinion on the technical aspects of SDLC. However, auditor will have to give control objectives, directives and in general validate the opinion expressed by technical experts. Some of the control considerations for an auditor are: · Documented policy and procedures; · Established Project team with all infrastructure and facilities ; · Developers/ IT managers are trained on the procedures ; · Appropriate approvals are being taken at identified mile-stones; · Development is carried over as per standards, functional specifications; · Separate test environment for development/ test/ production / test plans; · Design norms and naming conventions are as per standards and are adhered to; · Business owners testing and approval before system going live; · Version control on programs; · Source Code is properly secured; · Adequate audit trails are provided in system; and © The Institute of Chartered Accountants of India
  • 8. System Development Life Cycle Methodology 2.55 · Appropriateness of methodologies selected. Further, Post-Implementation Review is performed to determine whether the system adequately meets earlier identified business requirements and needs (in feasibility studies or Requirements Specifications). Auditors should be able to determine if the expected benefits of the new system were realized and whether users are satisfied with the new system. In post implementation review, auditors need to review which of the SDLC phases have not met desired objectives and whether any corrective actions were taken. If there are differences between expectations and actual results, auditors need to determine the reasons for the same. E.g. it could be due to incomplete user requirements. Such reasons can help auditors to evaluate the current situation and offer guidelines for future projects. Master Checklist The process objectives are: · To ensure an appropriate acquisition and / or development of information systems including software, and · To maintain the information systems in an appropriate manner. The following checklist may be used by the IS Auditors for this purpose: S. No. Checkpoints Status 1. Whether information system acquisition and / or development policy and procedure documented? 2. Whether system acquisition and / or development policy and procedure approved by the management? 3. Whether the policy and procedure cover the following: · Problems faced in the existing system and need for replacement · Functionality of new IS · Security needs · Regulatory compliance · Acceptance Criteria · Proposed roles and responsibilities · Transition/ Migration to new IS · Interfaces with legacy systems · Post implementation review · Maintenance arrangements. 4. Whether policy and procedure documents are communicated / available to the respective users? © The Institute of Chartered Accountants of India
  • 9. 2.56 Information Systems Control and Audit 5. Whether policy and procedure documents are reviewed and updated at regular intervals? 6. Whether the organization has evaluated requirement and functionalities of proposed IS? (Verify the requirement analysis conducted at three levels viz. process level, application level and organization level. Verify the site visit reports and other customer references obtained with respect to functionalities of proposed IS). 7. Whether the organization carried out feasibility study in respect of the following · Financial feasibility · Operational feasibility · Technical feasibility 8. Whether the selection of vendor and acquisition terms considers the following: · Evaluation of alternative vendors · Specification on service levels and deliverables · Penalty for delays · Escrow mechanism for Source codes · Customization · Upgrades · Regulatory Compliance · Support and maintenance. 9. Whether the organization has identified and assigned roles in development activities to appropriate stakeholders? (Verify the assigned roles should be on “need to know” and “need to basis”. and duties of developers and operators are segregated). 10. Whether the organization has a separate development, test and production environments? 11. Whether the IS developed plan is prepared and approved by the management? (Verify that IS development plan to include: · Input data elements, · Validations controls viz. Field/ Transactions/ File with appropriate error reporting · Process workflow © The Institute of Chartered Accountants of India
  • 10. System Development Life Cycle Methodology 2.57 · data classifications with security are in place, viz. Read only for users, Read/ Write for authorized persons · Output). 12. Whether the testing of IS includes: · Confirms the compliance to functional requirements · Confirms the compatibility with IS infrastructure · Identifies bugs and errors and addresses them by analyzing root causes Escalating functionality issues at appropriate levels. 13. Whether the adequate documentation for: · Preserving test results for future reference · Preparation of manuals like systems manual, installation manual, user manual · Obtaining user sign off / acceptance 14. Whether the implementation covers the following? · User Departments' involvement and their role · User Training · Acceptance Testing · Role of Vendor and period of Support · Required IS Infrastructure plan · Risk involved and actions required to mitigate the risks · Migration plan 15. If the development activities are outsourced, are the outsourcing activities evaluated based on the following practices: · What is the objective behind Outsourcing? · What are the in-house capabilities in performing the job? · What is the economic viability? · What are the in-house infrastructure deficiencies and the time factor involved? · What are the Risks and security concerns? · What are the outsourcing arrangement and fall back method? · What are arrangements for obtaining the source code for the software? · Reviewing the capability and quality of software development activities by visit to vendor's premises? · Review of progress of IS development at periodic intervals.
  • 11. 2.58 Information Systems Control and Audit 16. Whether the organization carried out a post implementation review of new IS? 17. Whether a process exists for measuring vendors' performance against the agreed service levels? 18. Whether the post implementation review results are documented?
  • 13. 2.64 Information Systems Control and Audit 2.14 ORGANIZATIONAL STRUCTURE OF IT DEPARTMENT We will now give a brief introduction about the management structure of IT department. 2.14.1 Management Structure Line Management Management Project Management Line Management Structure : The information system management subsystems in an organization attempt to ensure that the development, implementation, operation and maintenance of information systems proceed in a planned and controlled manner. They function to provide a stable environment in which information systems are built and operated on a day-to-day basis. Several levels of management subsystems have been identified corresponding to the organization hierarchy shown in Fig. 2.14.1 and major functions performed within a data processing installation. Top Management IS Management Systems Development Management Programming Management Data Administration Security Administration Operations Management Quality assurance management Fig. 2.14.1 : Several levels of management subsystems
  • 14. System Development Life Cycle Methodology 2.65 Top Management : Top management of the organization must ensure that the data processing installation is well managed. It is responsible primarily for long run policies decisions on how computers will be used in the organization. IS Management : IS management has overall responsibility for planning and control of all computer activities and also provides inputs to top management’s long run policy decision making and translates long run policies into short run goals and objectives. Systems Development Management : Systems Development Management is responsible for the design, implementation and maintenance of application systems. Programming Management : Programming management is responsible for programming new systems, maintaining old systems and providing general systems support software. Data Administration : Data administration is responsible for the control and use of an organization’s data including the database and library of application system files. Security Administration : Security administration is responsible for the physical security of the data processing and IS programs. Operations Management : Operations Management controls the day-to-day operations of data processing systems. It is responsible for data preparation; the data flow through the installation, production running of systems, maintenance of hardware and sometimes maintenance of program and file library facilities. Quality Assurance Management : Quality Assurance Management undertakes an in-depth quality assurance review of data processing in each application system. This review involves a detailed check of the authenticity, accuracy and completeness of input, processing and output. 2.14.2 Project Management Structure : In project management, project requests are submitted to and prioritized by the steering committee. The project manager, who may be a non-IS staff member, should be given complete operational control of the project and be allocated the appropriate resources for the successful completion of the project. IS auditors may be included in the project team as control advocates and experts. They also provide an independent, objective review to ensure that the level of commitment of the responsible parties is appropriate. IS Manager Accounting Production Operations Systems Analysis Programming Fig. 2.14.2 : Roles performed by IS Manager
  • 15. 2.66 Information Systems Control and Audit Duties and Responsibilities : Fig. 2.14.2 shows the tasks performed by an IS Manager. The structure of an IT Department is divided into two main areas of activity: 1. Information processing. 2. System development and enhancement. Information Processing or IP is primarily concerned with the operational aspect of the information-processing environment and often includes computer operations, systems programming, telecommunications and librarian functions. System development is concerned with the development, acquisition and maintenance of computer application systems and performs systems analysis and programming functions. • Data entry : The data entry supervisor is responsible for ensuring whether the data is authorized, accurate and complete when entered into the system. Components in the input subsystem are responsible for bringing information into a system. The information takes two forms : first, it may be raw data to be processed and perhaps applied against the database; second, it may be instructions to direct the system to execute particular processes, updater or interrogate particular data, or prepare particular types of output. Both types of information input must be validated. Any errors detected must be controlled so that the input resubmission is authentic, accurate, complete, unique and timely. • File Library : The file librarian is responsible for recording, issuing, receiving and safeguarding all programs and data files that are maintained on computer tapes or disks. Managing the organization’s library of machine-readable files involves three functions. First, files must be used only for the purposes intended. Control must be exercised over program files, data files and procedure files. Second, the storage media used for files must be maintained in correct working order. Third, a file backup strategy and file retention strategy must be implemented. Within the IT department, responsibility for managing files is vested in a file library section. • Control Group : The control group manages the flow of data and is responsible fore the collection, conversion and control of input, and balancing the distribution of output to the user community. The input/output control group should be in a separate e area where only authorized personnel are permitted. The supervisor of the control group usually reports to the IPF operations managers. • Operations : Operations management is responsible for the daily running of hardware and software facilities so that the production application system can accomplish their work and development staff can design, implement and maintain systems. Though there are some variations across the organizations, the operations group within the IT department undertakes major functions like - Computer operations; Communication network control; Data preparation; Production work flow control; File library; Documentation library; and Performance monitoring.
  • 16. System Development Life Cycle Methodology 2.67 • Security Administration : The security administrator in a data processing organization is responsible for matters of physical security. In other words, the security administrator attempts to ensure that the physical facilities in which the systems are developed, implemented, maintained and operated are safe from threats that affect the continuity of operation. • Physical Security : A complete reliable protection scheme must take into account the possibility of physical attacks on the database, ranging from disclosure of a password to theft of the physical storage devices. We can protect well by encrypting data. A high security system needs better identification than a password, such as personal recognition of the user by a guard. • Data Security : Database management systems often provide controls over data definition and data manipulation facilities. In environments, which combine database management with online transaction processing, access to the database objects such as tables or views can be controlled through internal database mechanisms, which limit what the transaction or program, can do. Various auditing or journaling are also available. Utility access and submission, as well as monitoring and performance tools, should be restricted to appropriate personnel. • Conducting a Security program : A security program is a series of ongoing, regular, periodic evaluations conducted to ensure that the physical facilities of an Information System are safeguarded adequately. The first security evaluation conducted may be a major exercise; the security administrator has to consider an extensive list of possible threats to the organization, prepare an inventory of assets, evaluate the adequacy of controls, implement new controls, etc. Subsequent security evaluations may focus only on changes that have occurred, perhaps in light of the purchase of new hardware or a new threat etc. Nevertheless, even in the absence of visible changes, security evaluations need to be repeated periodically to determine whether covert changes have occurred that necessitate modifications to controls. Fig. 2.14.3 shows the activities involved in an organization. • Production Work Flow Control : Production workflow control in an Information System, is the responsibility of a control section. The control section manages the flow of data between users and the information system, and between data preparation and the computer room. It is also more difficult for operators and data preparation personnel to collude and to perpetrate a fraud – for example, by alerting input data.
  • 17. 2.68 Information Systems Control and Audit Organization User Data preparation Control section Computer room Data processing Service Bureau Fig. 2.14.3 : Activities involved in an Organization • Quality Assurance : Quality Assurance group is responsible for testing and verifying whether the program changes and documentation adhere to standards and naming conventions before the programs are moved into production. The control section facilitates the orderly flow of data and checks to see that the input is in order by scanning it for reasonableness and completeness and by checking control totals. If the input passes the quality assurance check, it is entered into a log and dispatched either to the computer room, if it is already in machine-readable form or to data preparation, if it must be keyed to cards, tape or disk. • Systems Analysis : System analysts are responsible for interpreting the needs of the user, determining the programs and the programmers necessary to create the particular application. System analysts design systems based on the needs of the user. For the auditor acting as a participant in the system development process, the information processing system design phase is one of major involvement. From a system effectiveness viewpoint, the auditor is concerned with whether the design meets strategic requirements. From efficiency viewpoint the auditor is concerned with the resources that will be needed to run the system. From safeguarding access and data integrity viewpoint, the auditor is concerned with the controls designed into the system. • Applications Programming : Applications programmers are responsible for developing new systems and for monitoring systems in production. They should work in a test only environment and should not move test versions into the production environment. Application programmers should not have access to system program libraries. • Systems programming : System programmers are responsible for maintaining the systems software including the operating systems.
  • 18. System Development Life Cycle Methodology 2.69 • Local Area Network (LAN) Administration : LAN administrator is responsible for technical and administrative control over the local area network. This includes ensuring transmission links are functioning correctly, backups of the system are occurring and software/hardware purchases are authorized and properly installed. In smaller installations, this person may be responsible for security administration over the LAN. The LAN administrator should have no application responsibilities, but may have end- user responsibilities. The LAN administrator may report to the director of the IPF and in a decentralized operation, he can report to the end-user manager. • Help Desk Administration : The Help Desk Administrator is responsible for monitoring, improving and controlling system performance in mainframe and client/server hardware and software. The Help Desk Administration may be useful when data entry is not based upon a dedicated source document. If users are uncertain about the nature or format of the data to be entered into a particular field, they may ask the system to provide information to assist them. References : 1. Valacich George, Haffer, Essentials of Systems Analysis & Design, Prentice Hall India, IInd Edition 2004. 2. Charles Parker & Thomas Case, Management Information System Strategy & Action, IInd Edition, Mcgraw Hill, 1993. 3. http://www.cms.hhs.gov/SystemLifecycleFramework/Downloads/Selecting Development Approach.pdf 4. http://en.wikipedia.org/wiki/Systems_Development_Life_Cycle 5. http://www.klbschool.org.uk/ict/gcse/theory/5_3/5_3_3_implementation.htm 6. http://www.epmbook.com/pir.htm Self - Examination Questions 1. What is Systems Development Process? 2. What activities are part of the Systems Development Life Cycle (SDLC)? 3. Discuss various approaches to systems development. 4. What types of systems are best for development by the traditional approach? What types of systems by prototyping approaches? What types by end user development? 5. How is systems development handled in smaller organizations? 6. What is the purpose of a preliminary investigation? What outcome is expected from it? Who caries out this investigation? 7. What do you mean by feasibility study? How is it conducted? 8. What systems costs are estimated during feasibility study for various alternative solutions?