Authorities
No Procedure Time to
complete
Cost
associated
MRM
1 Submission to Local Authority through OSC
Builders can apply for all the pre-building approvals at the One Stop Center of the Municipality of Kuala
Lumpur. However, the builder still needs to visit each of the agencies that provide the pre-approvals in
order to obtain confirmation. The One Stop Center charges a processing fee of MYR 480. This process is
partly regulated by Federal Territory (Planning) Act, 1982.
Agency: Municipality of Kuala Lumpur DBKL
1 480
2 Obtain Development Order (DO) from Planning Dept
Planning permission, which is issued as a Development Order by the Planning Department of the local
authority, authorizes development of the land. The permit is valid for 12 months, within which time
construction must begin.
The processing time for the applications is usually as follows:
• 120 days for large-scale projects (consisting of complicated development plans, buildings of more than
five levels, construction involving layout plans for a development area of more than 2 acres, or projects
affecting the population density and change of zone area)
• 60 days for mid-scale projects (requiring construction plans of buildings of fewer than five levels, a
temporary change in land/building usage involving a land area of fewer than 5,000 square feet or involving
changes/additions/alterations made to the available shops/housing units)
• 45 days for small-scale projects (involving suggested additions/changes/alterations to existing bungalow
units, two-story units and terrace units, and new bungalow units built in accordance with approved layout
plans only)
Agency: Municipality of Kuala Lumpur DBKL
28 0
4 Obtain Sewerage Approval
Agency: Sewage Services Department IWK
14 0
5 Obtain Fire Safety (Arch) Comment
Fire safety procedures are regulated by Fire Services Act 1988 and Uniform Building Bylaws 1984
(Chapter 8)
Agency: Fire Department
14 0
6 Obtain Hoarding & Signboard Approval
Agency: Municipality of Kuala Lumpur DBKL
7 1,514
7 Obtain RORO Bin Approval
Agency: Municipality of Kuala Lumpur DBKL
7 0
8 Obtain Earthwork Approval
Agency: Municipality of Kuala Lumpur DBKL
7 100
9 Obtain Road and Drainage Approval
Agency: Municipality of Kuala Lumpur DBKL
7 0
10 Obtain Landscape Approval
Agency: Municipality of Kuala Lumpur DBKL
7 0
11 Obtain Street Lighting Approval
Street lightning regulations are governed by Street, Drainage and Building Act, 1974
Agency: Municipality of Kuala Lumpur DBKL
7 0
12 Obtain Car Park Approval
Agency: Municipality of Kuala Lumpur DBKL
7 0
13 Obtain MSMA and SPAH Approvals
Agency: Municipality of Kuala Lumpur DBKL
7 0
14 Obtain Building Plan Approval
The approval of the building plans authorizes construction of the building within 12 months from the date of
approval. Approval is granted by the Building Department of the local authority.
The filing fees for the application for building plan approval are MYR 10.00 per 10 sq. m. or any part
thereof (a minimum of MYR 100.00) under the First Schedule of the Federal Territory of Kuala Lumpur
Building By-Laws of 1985. In the case here, involving a 1,300.6 sq. m. built-up area, the application fee
would be MYR 1,300.60.
Agency: Municipality of Kuala Lumpur DBKL
17 1301
15 Obtain Fire Safety (M&E) Approval
Agency: Fire Department
14 0
16 Obtain Permission to start work from Building Department (KMB)
Agency: Municipality of Kuala Lumpur DBKL
1 0
17 Notification to start Earthwork from Engineering Department (B FORM)
Agency: Municipality of Kuala Lumpur DBKL
1 0
18 Notification to Start Sewerage Work (PDC 6)
Agency: Municipality of Kuala Lumpur DBKL
1 0
19 Request sewerage inspection
Agency: Sewage Services Department IWK
1 0
20 Sewerage inspection
Agency: Sewage Services Department IWK
1 0
21 Sewerage report
Agency: Sewage Services Department IWK
1 0
22 Request Road & Drainage Clearance
After construction has been completed, a final inspection is conducted by the Building Department to issue
its approval. Approval is granted only after all approvals are obtained from the various departments listed
in the development order, and is meant to ensure that the construction has been completed in compliance
with the approved building plan and the requirements listed in it. The period of 3 to 4 months is just an
estimate and might vary with the time it takes the various other departments or agencies to issue their
approvals.
The Building Department supervises the construction work stage-by-stage by conducting on-site
inspections and reviewing the progress report usually submitted by the architect after each stage.
Agency: Sewage Services Department IWK
1 0
23 Road and Drainage Inspection
Agency: Municipality of Kuala Lumpur DBKL
1 0
24 Road and Drainage Report
Agency: Municipality of Kuala Lumpur DBKL
12 0
25 Request Sewerage Clearance
Agency: Sewage Services Department IWK
1 0
26 Sewerage Inspection
Agency: Sewage Services Department IWK
1 0
27 Sewerage Report
Agency: Sewage Services Department IWK
12 0
28 Request Fire Safety Clearance
Agency: Fire Department
1 111
29 Fire Safety Inspection
Agency: Fire Department
1 0
30 Fire Safety Report
Agency: Fire Department
12 0
31 Request Water Clearance
Agency: Water Authority SYABAS
1 1000
32 Water Inspection
Agency: Water Authority SYABAS
1 0
33 Water Report
Agency: Water Authority SYABAS
11 3
34 Deposit G1 - G21 Forms and F Form to OSC
The Certificate of Completion has been introduced substituting the Certificate of Fitness for Occupation in
2007. Upon the coming into force (in force from November 27, 2007) of By-Law 23 of the Building (Federal
Territory of Kuala Lumpur)(Amendment) By-Laws 1985, the Certificate of Completion is issued when forms
G1 to G21 in respect of stage certifications as set out in the Second Schedule of the By-Laws 1985 have
been duly certified and received by the principal submitting person. This person must also certify in Form F
that the construction and completion of building was under his supervision and that to the best of his
knowledge and belief the building has been constructed and completed in accordance with the Act, the By-
Laws and the approved plans.
Agency: Municipality of Kuala Lumpur DBKL
1 495
35 Deposit G1 - G21 Forms and F Form to Board of Arch / Eng Malaysia
A copy of forms G1 G2 should also be submitted to the Order of Architects and Engineers of Malaysia
Agency: Board of Architecs and Engineers of Malaysia
1 0
36 Obtain Water Connection
Agency: Water Authority SYABAS
1 30
37 Obtain Telco Connection
Agency: Telekom Malaysia (Telco)
15 495

More Related Content

Viewers also liked

Enbe.final project brief
Enbe.final project briefEnbe.final project brief
Enbe.final project briefAnthony Chew
 
Malaysian Property Development
Malaysian Property DevelopmentMalaysian Property Development
Malaysian Property DevelopmentDebbie Loh
 
Authorities involved in the project1
Authorities  involved  in  the  project1Authorities  involved  in  the  project1
Authorities involved in the project1Eelyn Cheong
 
ARC2615 REPORT FILE_AngelineKonKeeHooi0302068
ARC2615 REPORT FILE_AngelineKonKeeHooi0302068ARC2615 REPORT FILE_AngelineKonKeeHooi0302068
ARC2615 REPORT FILE_AngelineKonKeeHooi0302068Angeline KH
 
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOHMEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOHYen Min Khor
 
Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618Chenyi Teo
 
Training report - Interior Designing
Training report - Interior DesigningTraining report - Interior Designing
Training report - Interior DesigningSaurav Koundal
 
Internship Report Nadia Othman
Internship Report Nadia OthmanInternship Report Nadia Othman
Internship Report Nadia Othmannadiacbass
 
Internship report 2007eit043
Internship report 2007eit043Internship report 2007eit043
Internship report 2007eit043Isha Jain
 
Esd project mcmc august 2014 (1)
Esd project mcmc august 2014 (1)Esd project mcmc august 2014 (1)
Esd project mcmc august 2014 (1)Anthony Chew
 
Project 2 integration (1)
Project 2  integration (1)Project 2  integration (1)
Project 2 integration (1)Anthony Chew
 
Cts performance day
Cts performance dayCts performance day
Cts performance dayAnthony Chew
 
B. structure project 2 brief august 2015 (1)
B. structure project 2 brief august 2015 (1)B. structure project 2 brief august 2015 (1)
B. structure project 2 brief august 2015 (1)Anthony Chew
 
The idea journal 3
The idea journal 3The idea journal 3
The idea journal 3Anthony Chew
 

Viewers also liked (20)

Enbe.final project brief
Enbe.final project briefEnbe.final project brief
Enbe.final project brief
 
Malaysian Property Development
Malaysian Property DevelopmentMalaysian Property Development
Malaysian Property Development
 
The Project Brief
The Project BriefThe Project Brief
The Project Brief
 
Authorities involved in the project1
Authorities  involved  in  the  project1Authorities  involved  in  the  project1
Authorities involved in the project1
 
ARC2615 REPORT FILE_AngelineKonKeeHooi0302068
ARC2615 REPORT FILE_AngelineKonKeeHooi0302068ARC2615 REPORT FILE_AngelineKonKeeHooi0302068
ARC2615 REPORT FILE_AngelineKonKeeHooi0302068
 
INTERNSHIP PRESENTATION
INTERNSHIP PRESENTATIONINTERNSHIP PRESENTATION
INTERNSHIP PRESENTATION
 
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOHMEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
MEASURED DRAWING - RAINBOW SHOP HOUSES, IPOH
 
Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618Arc2625 report file teo chenyi0320618
Arc2625 report file teo chenyi0320618
 
Training report - Interior Designing
Training report - Interior DesigningTraining report - Interior Designing
Training report - Interior Designing
 
Internship Report Nadia Othman
Internship Report Nadia OthmanInternship Report Nadia Othman
Internship Report Nadia Othman
 
Internship report 2007eit043
Internship report 2007eit043Internship report 2007eit043
Internship report 2007eit043
 
Dv project one a
Dv project one aDv project one a
Dv project one a
 
Esd project mcmc august 2014 (1)
Esd project mcmc august 2014 (1)Esd project mcmc august 2014 (1)
Esd project mcmc august 2014 (1)
 
REport
REportREport
REport
 
Project 2 integration (1)
Project 2  integration (1)Project 2  integration (1)
Project 2 integration (1)
 
Cts performance day
Cts performance dayCts performance day
Cts performance day
 
Cts final project
Cts final projectCts final project
Cts final project
 
B. structure project 2 brief august 2015 (1)
B. structure project 2 brief august 2015 (1)B. structure project 2 brief august 2015 (1)
B. structure project 2 brief august 2015 (1)
 
The idea journal 3
The idea journal 3The idea journal 3
The idea journal 3
 
Tj 02
Tj 02Tj 02
Tj 02
 

Similar to Authorities ici

Dealing with construction permits in malaysia doing business - world bank g...
Dealing with construction permits in malaysia   doing business - world bank g...Dealing with construction permits in malaysia   doing business - world bank g...
Dealing with construction permits in malaysia doing business - world bank g...Jaclyn Hwang
 
Dealing with construction permits in malaysia doing business - world bank g...
Dealing with construction permits in malaysia   doing business - world bank g...Dealing with construction permits in malaysia   doing business - world bank g...
Dealing with construction permits in malaysia doing business - world bank g...Jaclyn Hwang
 
building plan and designing and ppt.ppt
building plan and designing and  ppt.pptbuilding plan and designing and  ppt.ppt
building plan and designing and ppt.pptSureshKumarMP3
 
ICI FINAL REPORT PDF
ICI FINAL REPORT PDFICI FINAL REPORT PDF
ICI FINAL REPORT PDFClement Seong
 
Design approval procedure
Design approval procedureDesign approval procedure
Design approval procedureIqbál Ãzàm
 
14 intimation of disapproval - iod
14   intimation of disapproval - iod14   intimation of disapproval - iod
14 intimation of disapproval - iodspandane
 
Ontario's Building Regulations for Designers
Ontario's Building Regulations for DesignersOntario's Building Regulations for Designers
Ontario's Building Regulations for DesignersAnthony Boyko
 
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafaPreventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafaSakib Nizam
 
0 construction method 2020 eng society
0 construction method 2020 eng society0 construction method 2020 eng society
0 construction method 2020 eng societyFuadGalaydh
 
Neda contractor performance evaluation system
Neda contractor performance evaluation system Neda contractor performance evaluation system
Neda contractor performance evaluation system Mabelle Gaytano
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CVTawfig Adham
 
Permits and procedures generally required for construction of a real estate p...
Permits and procedures generally required for construction of a real estate p...Permits and procedures generally required for construction of a real estate p...
Permits and procedures generally required for construction of a real estate p...Green Realtech Projects Pvt. Ltd
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017DarrenTofu
 
SHP development in India - A roadmap
SHP development in India - A roadmapSHP development in India - A roadmap
SHP development in India - A roadmapNikhil Jaipurkar
 

Similar to Authorities ici (20)

Dealing with construction permits in malaysia doing business - world bank g...
Dealing with construction permits in malaysia   doing business - world bank g...Dealing with construction permits in malaysia   doing business - world bank g...
Dealing with construction permits in malaysia doing business - world bank g...
 
Dealing with construction permits in malaysia doing business - world bank g...
Dealing with construction permits in malaysia   doing business - world bank g...Dealing with construction permits in malaysia   doing business - world bank g...
Dealing with construction permits in malaysia doing business - world bank g...
 
building plan and designing and ppt.ppt
building plan and designing and  ppt.pptbuilding plan and designing and  ppt.ppt
building plan and designing and ppt.ppt
 
ICI FINAL REPORT PDF
ICI FINAL REPORT PDFICI FINAL REPORT PDF
ICI FINAL REPORT PDF
 
ICI FINAL REPORT
ICI FINAL REPORTICI FINAL REPORT
ICI FINAL REPORT
 
Design approval procedure
Design approval procedureDesign approval procedure
Design approval procedure
 
14 intimation of disapproval - iod
14   intimation of disapproval - iod14   intimation of disapproval - iod
14 intimation of disapproval - iod
 
Ontario's Building Regulations for Designers
Ontario's Building Regulations for DesignersOntario's Building Regulations for Designers
Ontario's Building Regulations for Designers
 
Preventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafaPreventing savar like tragedy by engr. golam mostafa
Preventing savar like tragedy by engr. golam mostafa
 
0 construction method 2020 eng society
0 construction method 2020 eng society0 construction method 2020 eng society
0 construction method 2020 eng society
 
What is completion certificate and how to obtain it
What is completion certificate and how to obtain itWhat is completion certificate and how to obtain it
What is completion certificate and how to obtain it
 
Neda contractor performance evaluation system
Neda contractor performance evaluation system Neda contractor performance evaluation system
Neda contractor performance evaluation system
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
Decision Notice
Decision NoticeDecision Notice
Decision Notice
 
M Simpson coursework
M Simpson courseworkM Simpson coursework
M Simpson coursework
 
Permits and procedures generally required for construction of a real estate p...
Permits and procedures generally required for construction of a real estate p...Permits and procedures generally required for construction of a real estate p...
Permits and procedures generally required for construction of a real estate p...
 
Cv ahmad harith.
Cv   ahmad harith.Cv   ahmad harith.
Cv ahmad harith.
 
RSR LATEST TRESUME
RSR LATEST TRESUMERSR LATEST TRESUME
RSR LATEST TRESUME
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017
 
SHP development in India - A roadmap
SHP development in India - A roadmapSHP development in India - A roadmap
SHP development in India - A roadmap
 

More from Anthony Chew

Project 1-performance-evaluation-2
Project 1-performance-evaluation-2Project 1-performance-evaluation-2
Project 1-performance-evaluation-2Anthony Chew
 
Bscience report ff
Bscience report ffBscience report ff
Bscience report ffAnthony Chew
 
B sc (hons)(arch) tau arc61301 project mac 2016 (2)
B sc (hons)(arch)  tau arc61301 project mac 2016 (2)B sc (hons)(arch)  tau arc61301 project mac 2016 (2)
B sc (hons)(arch) tau arc61301 project mac 2016 (2)Anthony Chew
 
B sc (hons)(arch) tau arc61301 synopsis mac 2016
B sc (hons)(arch)  tau arc61301 synopsis mac 2016B sc (hons)(arch)  tau arc61301 synopsis mac 2016
B sc (hons)(arch) tau arc61301 synopsis mac 2016Anthony Chew
 
Sunshading device studies 1 05-02-16
Sunshading device studies 1   05-02-16Sunshading device studies 1   05-02-16
Sunshading device studies 1 05-02-16Anthony Chew
 
Building structure (1) (1)
Building structure (1) (1)Building structure (1) (1)
Building structure (1) (1)Anthony Chew
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxoAnthony Chew
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015Anthony Chew
 
Asian architecture
Asian architectureAsian architecture
Asian architectureAnthony Chew
 
Abstract ( asian architecture )
Abstract ( asian architecture )Abstract ( asian architecture )
Abstract ( asian architecture )Anthony Chew
 
Topic issue proposal 2014
Topic  issue proposal 2014Topic  issue proposal 2014
Topic issue proposal 2014Anthony Chew
 
B sc (hons)(arch) asian architecture arc60403 project aug 2015 (4)
B sc (hons)(arch)  asian architecture arc60403 project aug 2015 (4)B sc (hons)(arch)  asian architecture arc60403 project aug 2015 (4)
B sc (hons)(arch) asian architecture arc60403 project aug 2015 (4)Anthony Chew
 
B sc (hons)(arch) asian architecture arc60403 outline aug 2015 (2)
B sc (hons)(arch)  asian architecture arc60403 outline aug 2015 (2)B sc (hons)(arch)  asian architecture arc60403 outline aug 2015 (2)
B sc (hons)(arch) asian architecture arc60403 outline aug 2015 (2)Anthony Chew
 

More from Anthony Chew (20)

Project 1-performance-evaluation-2
Project 1-performance-evaluation-2Project 1-performance-evaluation-2
Project 1-performance-evaluation-2
 
Bscience report ff
Bscience report ffBscience report ff
Bscience report ff
 
Theories report
Theories reportTheories report
Theories report
 
Synopsis 4
Synopsis 4Synopsis 4
Synopsis 4
 
Sypnosis 3
Sypnosis 3Sypnosis 3
Sypnosis 3
 
Synopsis 2
Synopsis 2Synopsis 2
Synopsis 2
 
Synopsis 1
Synopsis 1Synopsis 1
Synopsis 1
 
B sc (hons)(arch) tau arc61301 project mac 2016 (2)
B sc (hons)(arch)  tau arc61301 project mac 2016 (2)B sc (hons)(arch)  tau arc61301 project mac 2016 (2)
B sc (hons)(arch) tau arc61301 project mac 2016 (2)
 
B sc (hons)(arch) tau arc61301 synopsis mac 2016
B sc (hons)(arch)  tau arc61301 synopsis mac 2016B sc (hons)(arch)  tau arc61301 synopsis mac 2016
B sc (hons)(arch) tau arc61301 synopsis mac 2016
 
Tau march 2016
Tau march 2016Tau march 2016
Tau march 2016
 
Sunshading device studies 1 05-02-16
Sunshading device studies 1   05-02-16Sunshading device studies 1   05-02-16
Sunshading device studies 1 05-02-16
 
Building structure (1) (1)
Building structure (1) (1)Building structure (1) (1)
Building structure (1) (1)
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015
 
Asian architecture
Asian architectureAsian architecture
Asian architecture
 
Aa presentatin
Aa presentatinAa presentatin
Aa presentatin
 
Abstract ( asian architecture )
Abstract ( asian architecture )Abstract ( asian architecture )
Abstract ( asian architecture )
 
Topic issue proposal 2014
Topic  issue proposal 2014Topic  issue proposal 2014
Topic issue proposal 2014
 
B sc (hons)(arch) asian architecture arc60403 project aug 2015 (4)
B sc (hons)(arch)  asian architecture arc60403 project aug 2015 (4)B sc (hons)(arch)  asian architecture arc60403 project aug 2015 (4)
B sc (hons)(arch) asian architecture arc60403 project aug 2015 (4)
 
B sc (hons)(arch) asian architecture arc60403 outline aug 2015 (2)
B sc (hons)(arch)  asian architecture arc60403 outline aug 2015 (2)B sc (hons)(arch)  asian architecture arc60403 outline aug 2015 (2)
B sc (hons)(arch) asian architecture arc60403 outline aug 2015 (2)
 

Recently uploaded

Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 

Recently uploaded (20)

Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 

Authorities ici

  • 1. Authorities No Procedure Time to complete Cost associated MRM 1 Submission to Local Authority through OSC Builders can apply for all the pre-building approvals at the One Stop Center of the Municipality of Kuala Lumpur. However, the builder still needs to visit each of the agencies that provide the pre-approvals in order to obtain confirmation. The One Stop Center charges a processing fee of MYR 480. This process is partly regulated by Federal Territory (Planning) Act, 1982. Agency: Municipality of Kuala Lumpur DBKL 1 480 2 Obtain Development Order (DO) from Planning Dept Planning permission, which is issued as a Development Order by the Planning Department of the local authority, authorizes development of the land. The permit is valid for 12 months, within which time construction must begin. The processing time for the applications is usually as follows: • 120 days for large-scale projects (consisting of complicated development plans, buildings of more than five levels, construction involving layout plans for a development area of more than 2 acres, or projects affecting the population density and change of zone area) • 60 days for mid-scale projects (requiring construction plans of buildings of fewer than five levels, a temporary change in land/building usage involving a land area of fewer than 5,000 square feet or involving changes/additions/alterations made to the available shops/housing units) • 45 days for small-scale projects (involving suggested additions/changes/alterations to existing bungalow units, two-story units and terrace units, and new bungalow units built in accordance with approved layout plans only) Agency: Municipality of Kuala Lumpur DBKL 28 0 4 Obtain Sewerage Approval Agency: Sewage Services Department IWK 14 0 5 Obtain Fire Safety (Arch) Comment Fire safety procedures are regulated by Fire Services Act 1988 and Uniform Building Bylaws 1984 (Chapter 8) Agency: Fire Department 14 0 6 Obtain Hoarding & Signboard Approval Agency: Municipality of Kuala Lumpur DBKL 7 1,514 7 Obtain RORO Bin Approval Agency: Municipality of Kuala Lumpur DBKL 7 0 8 Obtain Earthwork Approval Agency: Municipality of Kuala Lumpur DBKL 7 100 9 Obtain Road and Drainage Approval Agency: Municipality of Kuala Lumpur DBKL 7 0 10 Obtain Landscape Approval Agency: Municipality of Kuala Lumpur DBKL 7 0 11 Obtain Street Lighting Approval Street lightning regulations are governed by Street, Drainage and Building Act, 1974 Agency: Municipality of Kuala Lumpur DBKL 7 0 12 Obtain Car Park Approval Agency: Municipality of Kuala Lumpur DBKL 7 0 13 Obtain MSMA and SPAH Approvals Agency: Municipality of Kuala Lumpur DBKL 7 0
  • 2. 14 Obtain Building Plan Approval The approval of the building plans authorizes construction of the building within 12 months from the date of approval. Approval is granted by the Building Department of the local authority. The filing fees for the application for building plan approval are MYR 10.00 per 10 sq. m. or any part thereof (a minimum of MYR 100.00) under the First Schedule of the Federal Territory of Kuala Lumpur Building By-Laws of 1985. In the case here, involving a 1,300.6 sq. m. built-up area, the application fee would be MYR 1,300.60. Agency: Municipality of Kuala Lumpur DBKL 17 1301 15 Obtain Fire Safety (M&E) Approval Agency: Fire Department 14 0 16 Obtain Permission to start work from Building Department (KMB) Agency: Municipality of Kuala Lumpur DBKL 1 0 17 Notification to start Earthwork from Engineering Department (B FORM) Agency: Municipality of Kuala Lumpur DBKL 1 0 18 Notification to Start Sewerage Work (PDC 6) Agency: Municipality of Kuala Lumpur DBKL 1 0 19 Request sewerage inspection Agency: Sewage Services Department IWK 1 0 20 Sewerage inspection Agency: Sewage Services Department IWK 1 0 21 Sewerage report Agency: Sewage Services Department IWK 1 0 22 Request Road & Drainage Clearance After construction has been completed, a final inspection is conducted by the Building Department to issue its approval. Approval is granted only after all approvals are obtained from the various departments listed in the development order, and is meant to ensure that the construction has been completed in compliance with the approved building plan and the requirements listed in it. The period of 3 to 4 months is just an estimate and might vary with the time it takes the various other departments or agencies to issue their approvals. The Building Department supervises the construction work stage-by-stage by conducting on-site inspections and reviewing the progress report usually submitted by the architect after each stage. Agency: Sewage Services Department IWK 1 0 23 Road and Drainage Inspection Agency: Municipality of Kuala Lumpur DBKL 1 0 24 Road and Drainage Report Agency: Municipality of Kuala Lumpur DBKL 12 0 25 Request Sewerage Clearance Agency: Sewage Services Department IWK 1 0 26 Sewerage Inspection Agency: Sewage Services Department IWK 1 0 27 Sewerage Report Agency: Sewage Services Department IWK 12 0 28 Request Fire Safety Clearance Agency: Fire Department 1 111 29 Fire Safety Inspection Agency: Fire Department 1 0 30 Fire Safety Report Agency: Fire Department 12 0 31 Request Water Clearance Agency: Water Authority SYABAS 1 1000
  • 3. 32 Water Inspection Agency: Water Authority SYABAS 1 0 33 Water Report Agency: Water Authority SYABAS 11 3 34 Deposit G1 - G21 Forms and F Form to OSC The Certificate of Completion has been introduced substituting the Certificate of Fitness for Occupation in 2007. Upon the coming into force (in force from November 27, 2007) of By-Law 23 of the Building (Federal Territory of Kuala Lumpur)(Amendment) By-Laws 1985, the Certificate of Completion is issued when forms G1 to G21 in respect of stage certifications as set out in the Second Schedule of the By-Laws 1985 have been duly certified and received by the principal submitting person. This person must also certify in Form F that the construction and completion of building was under his supervision and that to the best of his knowledge and belief the building has been constructed and completed in accordance with the Act, the By- Laws and the approved plans. Agency: Municipality of Kuala Lumpur DBKL 1 495 35 Deposit G1 - G21 Forms and F Form to Board of Arch / Eng Malaysia A copy of forms G1 G2 should also be submitted to the Order of Architects and Engineers of Malaysia Agency: Board of Architecs and Engineers of Malaysia 1 0 36 Obtain Water Connection Agency: Water Authority SYABAS 1 30 37 Obtain Telco Connection Agency: Telekom Malaysia (Telco) 15 495