MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
Maintanence
1. Lighting
Firstly carry out a visual check. You must make ensure that:
That there are ten CCT Fresnels in the rig. CCT Fresnels
are found in the back of the hall to the right under the lighting shelf.
That all lights a gel frame if required. Gel frames are found in the back of
hall, hung on the wall to the right. Gels are found in the back of the hall
in a draw to the right. Gels must be cut to fit light and slotted in at the top.
All are lights are assembled correctly. Forexample the lamp tray must be
attached to the bottomof the light correctly.
That the safety chain must be attached the rig by going under the arm and
clipped over the top of the arm.
That the G clamp must be attached with the light going under.
That all plugs are fully placed in the plug.
Sound
When setting up the sound desk you must ensure this is all in place:
That all cables are plugged into where they are needed. For example:
That the kettle leads must be plugged into the speakers and desk.
That the output of the speakers must be plugged into input of the desk.
That the laptop must be plugged into the mains.
That the mini jack must plugged into the laptop from the sound desk.
(All cables can be found in the technician’s office at the back of the hall
in labelled boxes.)
Projection
For the projection ensure all appropriate cables are plugged in. For
example the VGA must be plugged into the laptop.
The visual check list for the drama studio must take place every two weeks or
before any production this may be taking place.
Signature: Print: Date: