Changing with the Times:

          Major Improvements to the
         Energy Efficiency of an Aging
           Residential Community

                            Amber Wood
                       Manager, Energy Programs

                       International Builders’ Show
                            February 11, 2012

Driving Innovation in Housing Technology
Building America

   Private/public R&D
    partnership sponsored by
    DOE
   Energy-efficient solutions
    for new and existing
    housing
       Technologies/Systems
       Whole-House Test Homes
       Quality Processes
Presentation Topics

   Greenbelt Homes (GHI) pilot
    project
   GHI Crawlspace Scope of Work
    (SOW)
   Needs & motivations for adding
    energy efficiency to remodeling


                                      3
Greenbelt Homes, Inc.

   Privately-owned
    co-op
   1,600 units
   4 units/building


                       Courtesy of www.greenbelt.com
   1930’s-40’s
   Roosevelt work-
    force housing
5
Courtesy of www.greenbelt.com
6
Courtesy of www.greenbelt.com
1970’s Energy Upgrade

   Insulation               Install 52 gal electric
       Attic                 water heaters
       Crawlspaces          Upgrade electrical
       Exterior walls
   Replace steel frame
    windows
   Remove oil-fired
    boilers
   Install electric
    baseboard

                                                        7
GHI Pilot Program

   Community            Goals:
    Upgrade in 2015          Health & safety
                             Comfort
   7 buildings, 28          Increased IEQ
    units                    Durability
       3 block
       2 frame              Affordability
       2 brick
Why?

Motivations for pilot program:
 Lower utility bills

 Comfort
   Lower life-cycle costs
       Maintenance & replacement




                Photo by Doriann Asch courtesy of www.greenbelthomes.net
Pilot Program

   Baseline Monitoring (underway)
     Pre-Retrofit baseline
     Install Monitoring Equipment

     Air infiltration

     Temperature/Humidity/Energy Use

     Humidity
Pilot Program

   Building Envelope Upgrades
       Retrofit building envelopes
       Monitor envelope upgrade


   HVAC Upgrades
       Retrofit HVAC
       Monitor upgrade package
Pilot House Assessment

   Walk-Through Evaluation
       Visual Inspection
       Homeowner Operation
       Utility Bills
   Short-term Testing




                                                                         12
           Photo by Celestine Ranney-Howes courtesy of www.greenbelthomes.net
Walk-Through Evaluation

   Dimensions
   Insulation
       Walls, ceilings, and foundations,
   Baseboard heaters
       Locations , calculating capacity
   Hot water system
   Appliances

                                            13
14
Construction                                                                Total No. of
                                    General Conditions
    Type                                                                       Units
   Frame     Built in 1941-42, unit sizes range from 574 to 928 sq ft. and      992
 Vinyl-Sided consist of the following features:                               (140 of
             • Common ventilated crawl space of 8” CMU block, 4 ½            these are
                 courses high (3’)                                          apartments)
             • 2x8-16”o.c. floor joists with mid-span dropped beam 3-
                 2x10” on CMU piers
             • R-11 kraft-faced fiberglass batt insulation in floor joists
                 (1980)
             • Balloon-framed 2x4-16”o.c walls
             • Blown-in cellulose insulation in walls (1980)
             • Board wall and roof sheathing (1x6/1x8)
             • Double glazed vinyl or aluminum windows (1980)
             • Vinyl siding, no WRB
             • Gable roof with asphalt shingles
             • Ventilated attic
             • Attics are insulated with rock wool, blown-in cellulose, and
                 fiberglass batt floor insulation (1980 to present)


                                                                                      15
Construction                                                                 Total No.
                                     General Conditions
    Type                                                                     of Units
   Frame     Built in 1935-38, unit sizes range from 555 to 1,577 sq ft. and   318
Brick-Veneer consist of the following features:
             • Formed concrete crawl space foundations, with structural
                 concrete first floors over common crawl spaces
             • Crawl spaces are 4’ and retrofitted as closed crawlspaces
                 with 1” to 2” of rigid extruded polystyrene foam applied to
                 the perimeter walls
             • Crawl space walls extend under front and rear porch slabs
                 (many exposed to ambient conditions)
             • Structural concrete first floor
             • Main house and porch slabs lack thermal breaks
             • Balloon- framed 2x4-16”o.c. walls with plasterboard interior
                 finish
             • Blown-in cellulose/rock wool insulation in walls (1980)
             • Board wall and roof sheathing (1x6/1x8)
             • Exterior brick veneer, no WRB
             • Double glazed vinyl windows (1980)
             • Gable roofs with slate shingles
             • Ventilated attic with rock wool, blown-in cellulose, and
                 fiberglass batt floor insulation (1980 to current)
                                                                                     16
Construction                                                                   Total No.
                                     General Conditions
   Type                                                                        of Units
  Block -    Built in 1935-38, unit sizes range from 555 to 1,577 sq ft. and     256
  8” CMU     consist of the following features:
             • Formed concrete crawl space foundations, with structural
                 concrete first floors over common crawl spaces
             • Crawl spaces are 4’ and retrofitted as closed crawlspaces
                 with 1” to 2” of rigid extruded polystyrene foam applied to
                 the perimeter walls
             • Crawl space walls extend under front and rear porch slabs
                 (many exposed to ambient conditions)
             • Structural concrete floors (1st and 2nd levels)
             • Main house and porch slabs lack thermal breaks
             • CMU walls, finished with plaster
             • Some interior common walls are wood-framed (where
                 party walls breach the adjacent units’ footprint).
             • Double glazed vinyl windows (1980)
             • Exterior walls are painted (B) or have vinyl siding attached
                 (BV)
             • Flat concrete roofs retrofitted with 3 ½” of polyisocianurate
                 insulating tapered sheathing and EPDM roofing

                                                                                       17
Baseline Short-term
                 Testing
   Blower door test




                                   Courtesy of www. energyconservatory.com
       Multi-point house
        depressurization


   Multiple blower doors
       Simultaneous testing in
        adjacent units




                                  18
Baseline Short-term
              Testing
   Significant air leakage
     Attic access panels
     Air conditioners

     Penetrations (doors, mail slots,
      windows, electrical, plumbing)




                                         19
Pre-Remodel Assessment
       Summary
Simulation Parameters
   13 of the 28 homes                  Frame w/Brick
   Painted block                            End & inside units
       End & inside units              Frame w/Vinyl
   Block w/ Vinyl                           End & inside units
       End & inside units                   End, front addition
       End & inside units w/                End, side addition w/ large
        basement                              glass area
                                             End, full rear addition
                                             Inside, full rear addition




                                                                                  21
                        Artwork by Isabelle Gournay courtesy of www.greenbelthomes.net
Beopt Energy Simulation
        Optimizations
   All electric
       Source savings = electricity savings
   Annualized cost of the upgrades + utility costs
       30 years at 7%


   Block unit example:




                                                  22
Energy Simulation
         Optimization
   Block unit example
   Costs & savings comparison




                                 23
Installation Costs for Building
   Envelope Improvements
     Evaluated on a per-building
      basis
     Do not include remediation
      associated with environmental
      hazards (such as lead paint,
      radon, or asbestos)
     Costs are exclusive of
      management fees
                                      24
25
Durability & IAQ
   Mechanical ventilation
   Crawlspace moisture management




                                     26
GHI Reserve Funds
Cost Analysis




                28
Masonry Block Building
           Recommendations
   Exterior Wall                       Crawlspace Wall
    Insulation                           Insulation Repair
       R-12 (2”-3”)                        Continuous R-10
       Finishing                       Porch Slab
            Siding                      Insulation
            Ext insulation finish
             system (EIFS)
                                         Installation
                                            R-12 (2” closed cell
   Window
                                             spray foam)
       U=0.30 &SHGC=0.30
   Exterior Door
       U-value ≤ 0.23                                         29
Frame w/Brick Building
           Recommendations
   Attic Sealing &                  Crawlspace Wall
    Insulation                        Insulation Repair
       R-38                             Continuous R-10
       Storage?                     Porch Slab
            Create space using       Insulation
             2” rigid foam and
             OSB                      Installation
   Window                               R-12 (2” closed cell
                                          spray foam)
       U=0.30 &SHGC=0.30
   Exterior Door
       U-value ≤ 0.23                                                30
                                  Photo courtesy of www.greenbelthomes.net
Frame w/Vinyl Building
           Recommendations
   Exterior Wall                Window
    Insulation                       U=0.30
       Taped WRB                     &SHGC=0.30
       R-5 (1” rigid foam)      Exterior Door
       Replace siding               U-value ≤ 0.23
   Attic Sealing &              Crawlspace Wall
    Insulation                    Insulation Repair
       R-38                         R-19 (3” closed cell
       Storage?                      spray foam)

                                                        31
Energy & Performance
          Monitoring
   Indoor air temperature and relative
    humidity in multiple locations;
   Crawlspace and outdoor temperature and
    relative humidity;
   Heating energy use (where feasible);
   Hot water energy use;
   Dryer energy use (if applicable); and
   Total electric energy use.



                                                             32
                         Photo courtesy of www.greenbelthomes.net
Parameter of            Test Method                                 Purpose
   Interest
Whole House       Energy transducer and            Record whole house electricity use
Electric Energy   recording devices                Develop use profile for winter months
Use                                                Integrate energy use data with general weather
                                                   data
                                                   Provide comparison with energy simulation results
Space and Water Energy transducers and             Proportion heating energy use as a fraction of total
Heating and     recording devices                  energy use
Dryer Energy                                       Summarize total internal heating energy and
Use                                                major loads

Indoor            Temperature/Relative             Provide indoor conditions for energy analysis
Environment       Humidity sensors – 3 to 4        Assess interior moisture loading/dilution
                  devices per unit, located 1st    Support ventilation option development and control
                  and 2nd floors                   Assess range of indoor temperature settings


Foundation        Temperature/humidity             Provide crawl space foundation conditions for
Environment       loggers, at least 2 sensors in   energy analysis
                  crawl space                      Assess potential moisture issues
                                                   Compare with air sealing/ventilation/insulation
                                                   options in pilot renovation plan


                                                                                                     33
34
Long-term Monitoring




                       35
Energy Use Analysis




                      36
Retrofit Solutions for
Enhancing Energy Efficiency
         Energy Savings: Household to National
         Comfort:        Temperature swings to
                          consistency
         Moisture:       Reduce potential problems
         Indoor Air:     Controlled ventilation
         Technology:     Options and performance
         Installation:   Contractor training/QA
         Cost:           Installation/operation/savings
         Value:          Demonstrate values at sale
GHI Crawlspace Scope of
      Work (SOW)




                          38
HPH Quality Management
       Systems
         Concrete slabs and vinyl
          siding wall updates with
          CAD details
         Crawlspace research &
          scopes outline

         Quality management
          section update of ToolBase
QA Strategy

   Inspection/ assessment
   Design, specification,
    planning
   Work execution
   Completion inspection/
    assessment




                             40
Pre-Design Assessment (PDA)




                          41
PDA (cont.)




              42
43
Crawlspace Scope of
          Work (SOW)
   Vented or Unvented
   Correct existing issues
   Address moisture
   Air sealing
   Insulation




                              44
Detailed SOW

   A. Correct exterior moisture and thermal conditions
   B. Remove wet products and debris from the interior
   C. Repair structural damage
   D. Repair/install interior foundation drain system
   E. Correct interior floor moisture conditions
   F. Correct interior wall moisture
   G. Remove mold and replace rotten wood
   H. Repair/install ground vapor barrier
   I. Correct structural defects – i.e. load path tie-down hardware
   J. Repair/replace HVAC, pipes, ducts, and equipment within crawlspace
   K. Seal interior thermal boundaries
   L. Insulate floor system and air seal assembly (ventilated crawlspace)
   M. Insulate crawlspace wall (closed crawlspace)
                                                                        45
GHI Crawlspace SOW




                     46
47
48
49
50
Existing Home SOW

        Emphasis on existing
         conditions
        Create complete bid
         package
        More accurate costing
        Set expectations




                                 51
Needs & Motivations of
Remodelers for Adding
  Energy Efficiency




                         52
Needs & Motivations of
        Remodelers
   Current remodeling industry
   Role of energy efficiency
   Identify the gaps and barriers

   Quantify and prioritize needs to
    increase sales & projects involving
    improving home energy efficiency


                                          53
Remodelers’ View of Current
Industry & Energy Efficiency

(initial set of focus groups)




                                54
Current Remodeling Industry

    The economic climate has shifted greater
     to focus to remodeling
        More consumers are staying in their homes
        Many builders are turning to remodeling work


    Competitive, price sensitive market due to
        Lending restrictions
        Lack of appraisal value on energy efficient
         upgrades
        Flood of individuals into the remodeling arena


                                                          55
Current Industry (cont.)

   Qualified remodelers strive to
    differentiate themselves
       Convey to the consumer the value of an
        experienced, qualified remodeler
       Position the remodeler as the expert &
        serve to build trust and confidence
        among consumers




                                                 56
“This is the way we build”
Believe energy efficient upgrades are part of “doing things the right way”;
incorporate as part of their business model
Have certain upgrades that include as standard part of process, if warranted
Approach as “this is what we’re going to do” then educate consumer as to
why they do it



                “My responsibility to recommend”
Believe energy efficient upgrades are in customer’s best interest and actively
seek opportunities to recommend upgrades
Seek to guide consumers as to benefits; try to drive them toward it
May recommend upfront, but most often wait until have gotten a feel for the
house and customer



                     “We’ll offer as an option”
Intellectually know it should be recommended, but don’t have strength of
conviction
View more as a consumer driven decision; give them information then let them
decide
Anticipate consumer bottom line focus




                                                                                 57
Role of Energy Efficiency
         in Remodeling
   Provide a cost/benefit analysis for
    energy efficient upgrades
        Include an energy audit assessing
         energy consumption & lifestyle
        Demonstrate potential savings for
         various upgrades; connect the dots in
         terms of upgrades and real world
         benefits.



                                                 58
Best Approach to Energy
           Efficiency
   Knowledgeable
    recommendation with the
    consumer’s best interest in
    mind

   Sales attempt with the
    remodeler’s/builder’s
    financial interest in mind.
                                  59
Remodelers’ Gaps & Barriers to
 Adding Energy Efficiency into
         Remodeling

       (2nd set of focus
           groups)




                            60
Gaps & Barriers to Adding
   Energy Efficiency
   See growth potential for energy
    efficient upgrades
   Long-term success is dependent on
    upgrades becoming market driven.
       Need incentives based on improved home
        performance (not specific products)
       Shifting homeowner mindsets to
        “performance” of the home



                                             61
Challenges . . .

   Perceived value in doing energy
    efficient upgrades
   Costs
     Auditing/testing
     Limited homeowner resources

     Energy savings vs. upgrade investment

     Energy efficient improvements do not
      add appraisal value
                                         62
Reasons to Invest in Energy
            Upgrades
   Motivators Include:
        Reducing monthly energy bills
        Having more predictable energy bills
        Increased comfort
        Improving indoor air quality
        Environment, conservation, and/or green


   Helping homeowners to connect the dots
    between a problem and solutions is
    necessary for buy in
                                                   63
Selling vs. Solutions for
              Remodelers
   Educational information regarding
    energy inefficiency can create
    awareness
       Did you know that you could be paying
        more than you should be in monthly
        energy costs because of leaky ducts,
        drafts, outdated heating & cooling systems
        or insufficient insulation?



                                                     64
Growing Energy Upgrades

    Nationwide existing home
     performance scores
    Establishing appraisal value for
     energy efficient upgrades
    Realtor education as to value energy
     efficient upgrades bring, and how to
     sell the features
    Points off mortgage interest for
     energy efficient upgrades
                                       65
Tools Needed

   Informational/educational resources
       Shift consumer thinking to home
        performance
       Increase understanding of problems
       Understand benefits of various types of
        upgrades
       Website, DVD, printed materials




                                                  66
Tools Needed (cont.)

   Consumer campaign
   Free/low cost energy audits for
    homeowners
   Key questions to ask in order to
    identify opportunities
   Means of quantifying impact of
    energy efficient upgrades
   Connecting remodelers with energy
    auditors to develop referral network
                                           67
Remodelers’ Needs for
Improving Home Energy
      Efficiency

  (quantitative market
research based on focus
        groups)


                          68
Prioritize the Support
                 Needs
   Quantitative market research
    with remodelers.
   Build upon the qualitative
    remodeler focus groups,
   Quantify and prioritize the
    support needs
       Increase sales and projects
        involving improving home energy
        efficiency                        69
   What percentage of your recent clients
    fit into the following groups when it
    comes to accepting energy efficient
    upgrades?

    % Clients in Following Groups                     Mean
    Bottom line focused - will not spend any more     40%
    than they have to.
    Can be convinced - may or may not think about     39%
    energy efficiency, but are open to the upgrades
    once they understand the benefits.
    Embraces, or actively seeks, energy efficiency.   21%
    Total                                             100%




                                                             70
   When working with clients, which of
    the following statements most closely
    describes your company’s approach to
    energy efficient upgrades?

    Company Approach to Energy Efficient Upgrades         Freq.
    We do not try to sell or offer energy efficient        6%
    upgrades unless they are specifically asked for by
    the client.
    We offer or recommend it when the energy              51%
    efficient upgrade is cost effective and is directly
    related to the home improvement project.
    We believe energy efficient upgrades are part of      43%
    “doing it the right way” and incorporate this into
    as many remodeling jobs as possible.
    Total                                                 100%

                                                                  71
   What is the relative importance of all of
       the issues?

Priority Issues sorted by Importance to Remodelers
   1     Appraisal values factor into what type of remodels clients are
         willing to undertake, and energy efficiency is difficult to value.
   2     Clients are typically unable to discern between high quality and low
         quality construction at the bidding phase. Often they select the
         lowest cost bidder. This makes selling upgraded energy efficiency
         difficult.
   3     Realtors, who are in contact with homeowners as they buy/sell
         homes, aren’t able to describe the value of energy efficiency.
   4     There is no standard way to compare a home’s energy efficiency
         when buying or selling an existing home.
   5     Homeowners want to see tangible differences, often focusing on
         aesthetics or functionality, which makes energy efficiency a difficult
         sell.

                                                                            72
   What is the relative importance of all of
       the issues?

Priority Issues sorted by Importance to Remodelers
   6     One popular way to determine airtighness, a blower door test, is
         expensive and most clients are not willing to pay for just an
         evaluation.
   7     Homeowners see energy efficiency upgrade costs as an expense
         and not an investment.
   8     Clients don’t understand the value of energy efficiency. They place
         little value on it. If consumers don’t see a problem, then they won’t
         purchase the solution.
   9     There is little real demand for energy efficiency. Homeowners are
         just following the money for rebates.
   10    No coordinated efforts between the federal government, state
         government, and utilities when it comes to offering, applying for,
         and complying with energy efficiency incentive programs.

                                                                           73
Next Steps

   Outline potential solutions
   Determine homeowners gaps &
    needs




                                  74
Resources
   Building America
       www.eere.energy.gov/buildings/building_america
   Builders Challenge
       Program: www.eere.energy.gov/buildings/challenge


   NAHB Research Center
       Main Website: www.nahbrc.com
       Technical Info: www.toolbase.org
Questions?


             76
Thank You!


                            Amber Wood
                        NAHB Research Center
                       Manager, Energy Programs

           400 Prince George’s Blvd  Upper Marlboro, MD 20774
                  (direct) 301.430.6309  (fax) 301.430.6180
                              www.nahbrc.com

Driving Innovation in Housing Technology

More Related Content

What's hot

Repairs Renovation Gilmore Backup
Repairs Renovation Gilmore BackupRepairs Renovation Gilmore Backup
Repairs Renovation Gilmore BackupLouisGilmore
 
Bcon report - Tropical bus shelter
Bcon report - Tropical bus shelterBcon report - Tropical bus shelter
Bcon report - Tropical bus shelterJoe Onn Lim
 
Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study Jonathan Flanagan
 
Base Ambrico 3 4 08 (Nx Power Lite)
Base Ambrico 3 4 08 (Nx Power Lite)Base Ambrico 3 4 08 (Nx Power Lite)
Base Ambrico 3 4 08 (Nx Power Lite)mty917
 
March 2012 Cost vs Value
March 2012 Cost vs ValueMarch 2012 Cost vs Value
March 2012 Cost vs ValueJennifer Slinn
 
Cost vs. Value Webinar Slides
Cost vs. Value Webinar SlidesCost vs. Value Webinar Slides
Cost vs. Value Webinar SlidesRealtormag
 
Kw standard features
Kw standard featuresKw standard features
Kw standard featuresKingsWayHomes
 
Hoop house construction_for_new_mexico
Hoop house construction_for_new_mexicoHoop house construction_for_new_mexico
Hoop house construction_for_new_mexicoGherghescu Gabriel
 
Facades and envelopes
Facades and envelopesFacades and envelopes
Facades and envelopesDanishPathan7
 
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANSMill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANSSin Byrne
 
Podpassiv specifications
Podpassiv specificationsPodpassiv specifications
Podpassiv specificationsPODPASSIV
 
Advance technologies in foundation & roof finishes
Advance technologies in foundation & roof finishesAdvance technologies in foundation & roof finishes
Advance technologies in foundation & roof finishesAr. Manisha Khandelwal
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSSin Byrne
 
Admission in india 2015
Admission in india 2015Admission in india 2015
Admission in india 2015Edhole.com
 

What's hot (17)

Repairs Renovation Gilmore Backup
Repairs Renovation Gilmore BackupRepairs Renovation Gilmore Backup
Repairs Renovation Gilmore Backup
 
Bcon report - Tropical bus shelter
Bcon report - Tropical bus shelterBcon report - Tropical bus shelter
Bcon report - Tropical bus shelter
 
Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study
 
Base Ambrico 3 4 08 (Nx Power Lite)
Base Ambrico 3 4 08 (Nx Power Lite)Base Ambrico 3 4 08 (Nx Power Lite)
Base Ambrico 3 4 08 (Nx Power Lite)
 
March 2012 Cost vs Value
March 2012 Cost vs ValueMarch 2012 Cost vs Value
March 2012 Cost vs Value
 
Cost vs. Value Webinar Slides
Cost vs. Value Webinar SlidesCost vs. Value Webinar Slides
Cost vs. Value Webinar Slides
 
Kw standard features
Kw standard featuresKw standard features
Kw standard features
 
Hoop house construction_for_new_mexico
Hoop house construction_for_new_mexicoHoop house construction_for_new_mexico
Hoop house construction_for_new_mexico
 
Facades and envelopes
Facades and envelopesFacades and envelopes
Facades and envelopes
 
East Hill Infill Presentation
East Hill Infill  PresentationEast Hill Infill  Presentation
East Hill Infill Presentation
 
Full PORTFOLIO 5
Full PORTFOLIO 5Full PORTFOLIO 5
Full PORTFOLIO 5
 
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANSMill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
Mill 14-1-15 - Sheet - A101 - GROUND FLOOR PLANS
 
final dcc
final dccfinal dcc
final dcc
 
Podpassiv specifications
Podpassiv specificationsPodpassiv specifications
Podpassiv specifications
 
Advance technologies in foundation & roof finishes
Advance technologies in foundation & roof finishesAdvance technologies in foundation & roof finishes
Advance technologies in foundation & roof finishes
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
 
Admission in india 2015
Admission in india 2015Admission in india 2015
Admission in india 2015
 

Viewers also liked

กีตาร์
กีตาร์กีตาร์
กีตาร์kittiyajoy
 
2010 05-17 performing as designed - amber wood
2010 05-17 performing as designed - amber wood2010 05-17 performing as designed - amber wood
2010 05-17 performing as designed - amber woodAmber Joan Wood
 
2011 08-09 nahbrc-ip - reetum test houses ghi
2011 08-09 nahbrc-ip - reetum test houses ghi2011 08-09 nahbrc-ip - reetum test houses ghi
2011 08-09 nahbrc-ip - reetum test houses ghiAmber Joan Wood
 
2011 03-14 nahbrc-greenprints afford-housingefficiency
2011 03-14 nahbrc-greenprints afford-housingefficiency2011 03-14 nahbrc-greenprints afford-housingefficiency
2011 03-14 nahbrc-greenprints afford-housingefficiencyAmber Joan Wood
 
2012 06-07 nahb leading suppliers council - start-up kit
2012 06-07 nahb leading suppliers council - start-up kit2012 06-07 nahb leading suppliers council - start-up kit
2012 06-07 nahb leading suppliers council - start-up kitAmber Joan Wood
 
TKConf Сетевые орг. структуры
TKConf Сетевые орг. структурыTKConf Сетевые орг. структуры
TKConf Сетевые орг. структурыVladimir Kalenov
 

Viewers also liked (8)

กีตาร์
กีตาร์กีตาร์
กีตาร์
 
Adobe photoshop
Adobe photoshopAdobe photoshop
Adobe photoshop
 
2010 05-17 performing as designed - amber wood
2010 05-17 performing as designed - amber wood2010 05-17 performing as designed - amber wood
2010 05-17 performing as designed - amber wood
 
2011 08-09 nahbrc-ip - reetum test houses ghi
2011 08-09 nahbrc-ip - reetum test houses ghi2011 08-09 nahbrc-ip - reetum test houses ghi
2011 08-09 nahbrc-ip - reetum test houses ghi
 
2011 03-14 nahbrc-greenprints afford-housingefficiency
2011 03-14 nahbrc-greenprints afford-housingefficiency2011 03-14 nahbrc-greenprints afford-housingefficiency
2011 03-14 nahbrc-greenprints afford-housingefficiency
 
Stg2spec
Stg2specStg2spec
Stg2spec
 
2012 06-07 nahb leading suppliers council - start-up kit
2012 06-07 nahb leading suppliers council - start-up kit2012 06-07 nahb leading suppliers council - start-up kit
2012 06-07 nahb leading suppliers council - start-up kit
 
TKConf Сетевые орг. структуры
TKConf Сетевые орг. структурыTKConf Сетевые орг. структуры
TKConf Сетевые орг. структуры
 

Similar to 2012 02-11 ibs nahbrc - changing with the times

2011 09-14 eeba - nahbrc building america high performance retrofits
2011 09-14 eeba - nahbrc building america high performance retrofits2011 09-14 eeba - nahbrc building america high performance retrofits
2011 09-14 eeba - nahbrc building america high performance retrofitsAmber Joan Wood
 
Visual Dictionary 1 of 2
Visual Dictionary 1 of 2Visual Dictionary 1 of 2
Visual Dictionary 1 of 2spandrel
 
Civil Engineering Materiel's 2017
Civil Engineering Materiel's 2017   Civil Engineering Materiel's 2017
Civil Engineering Materiel's 2017 ABIR A HAPZU
 
AintreeInfra Gypsum Block
AintreeInfra Gypsum BlockAintreeInfra Gypsum Block
AintreeInfra Gypsum BlockMerina Kunjumon
 
Glass Fiber Reinforced Gypsum (GFRG) Panel
Glass Fiber Reinforced Gypsum (GFRG) Panel Glass Fiber Reinforced Gypsum (GFRG) Panel
Glass Fiber Reinforced Gypsum (GFRG) Panel M.SAAD ATTARWALA
 
Green needham nsl weatherization colonials and ranches
Green needham nsl weatherization   colonials and ranchesGreen needham nsl weatherization   colonials and ranches
Green needham nsl weatherization colonials and ranchesGreen Needham
 
visual dictionary final project
visual dictionary final projectvisual dictionary final project
visual dictionary final projectAuburn University
 
Ambrico Overview Presentation
Ambrico Overview PresentationAmbrico Overview Presentation
Ambrico Overview PresentationR. Tyler Smith
 
Insulated concrete formwork
Insulated concrete formworkInsulated concrete formwork
Insulated concrete formworkSafaSheriff
 
Beyond Zero Carbon Housing - Peter Conboy
Beyond Zero Carbon Housing - Peter ConboyBeyond Zero Carbon Housing - Peter Conboy
Beyond Zero Carbon Housing - Peter ConboyCreative Energy Homes
 
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelOldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelBlake Johnson
 
From The Ground Up 1
From The Ground Up 1From The Ground Up 1
From The Ground Up 1kimieromeo
 

Similar to 2012 02-11 ibs nahbrc - changing with the times (20)

2011 09-14 eeba - nahbrc building america high performance retrofits
2011 09-14 eeba - nahbrc building america high performance retrofits2011 09-14 eeba - nahbrc building america high performance retrofits
2011 09-14 eeba - nahbrc building america high performance retrofits
 
Cosmo House
Cosmo HouseCosmo House
Cosmo House
 
Visual Dictionary 1 of 2
Visual Dictionary 1 of 2Visual Dictionary 1 of 2
Visual Dictionary 1 of 2
 
Civil Engineering Materiel's 2017
Civil Engineering Materiel's 2017   Civil Engineering Materiel's 2017
Civil Engineering Materiel's 2017
 
Fsi module 2 v2 reorganized corium
Fsi module 2 v2 reorganized coriumFsi module 2 v2 reorganized corium
Fsi module 2 v2 reorganized corium
 
Presentation on Concrete Thermal Mass Wall System
Presentation on Concrete Thermal Mass Wall SystemPresentation on Concrete Thermal Mass Wall System
Presentation on Concrete Thermal Mass Wall System
 
AintreeInfra Gypsum Block
AintreeInfra Gypsum BlockAintreeInfra Gypsum Block
AintreeInfra Gypsum Block
 
Glass Fiber Reinforced Gypsum (GFRG) Panel
Glass Fiber Reinforced Gypsum (GFRG) Panel Glass Fiber Reinforced Gypsum (GFRG) Panel
Glass Fiber Reinforced Gypsum (GFRG) Panel
 
Space frame - Intro
Space frame -  IntroSpace frame -  Intro
Space frame - Intro
 
Green needham nsl weatherization colonials and ranches
Green needham nsl weatherization   colonials and ranchesGreen needham nsl weatherization   colonials and ranches
Green needham nsl weatherization colonials and ranches
 
visual dictionary
visual dictionaryvisual dictionary
visual dictionary
 
visual dictionary final project
visual dictionary final projectvisual dictionary final project
visual dictionary final project
 
Monolithic dome ppt
Monolithic dome pptMonolithic dome ppt
Monolithic dome ppt
 
material ppt
material pptmaterial ppt
material ppt
 
Ambrico Overview Presentation
Ambrico Overview PresentationAmbrico Overview Presentation
Ambrico Overview Presentation
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
Insulated concrete formwork
Insulated concrete formworkInsulated concrete formwork
Insulated concrete formwork
 
Beyond Zero Carbon Housing - Peter Conboy
Beyond Zero Carbon Housing - Peter ConboyBeyond Zero Carbon Housing - Peter Conboy
Beyond Zero Carbon Housing - Peter Conboy
 
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelOldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
 
From The Ground Up 1
From The Ground Up 1From The Ground Up 1
From The Ground Up 1
 

More from Amber Joan Wood

2013 04 - sipa nexus energy homes
2013 04 - sipa nexus energy homes2013 04 - sipa nexus energy homes
2013 04 - sipa nexus energy homesAmber Joan Wood
 
2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct designAmber Joan Wood
 
2012 06-07 nahb leading suppliers council - zeh final
2012 06-07 nahb leading suppliers council - zeh final2012 06-07 nahb leading suppliers council - zeh final
2012 06-07 nahb leading suppliers council - zeh finalAmber Joan Wood
 
2011 09-16 eeba - nahbrc national green bld std overview
2011 09-16 eeba - nahbrc national green bld std overview2011 09-16 eeba - nahbrc national green bld std overview
2011 09-16 eeba - nahbrc national green bld std overviewAmber Joan Wood
 
2010 07-15 rbeem nahbrc industry partnership 07-15-10
2010 07-15 rbeem nahbrc industry partnership 07-15-102010 07-15 rbeem nahbrc industry partnership 07-15-10
2010 07-15 rbeem nahbrc industry partnership 07-15-10Amber Joan Wood
 
2010 07-15 rbeem nahbrc marine miranda 07-15-10
2010 07-15 rbeem nahbrc marine miranda 07-15-102010 07-15 rbeem nahbrc marine miranda 07-15-10
2010 07-15 rbeem nahbrc marine miranda 07-15-10Amber Joan Wood
 
2010 07-15 rbeem nahbrc quality management
2010 07-15 rbeem nahbrc quality management2010 07-15 rbeem nahbrc quality management
2010 07-15 rbeem nahbrc quality managementAmber Joan Wood
 
2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bc2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bcAmber Joan Wood
 
2010 10-20 nahbrc greening midwest
2010 10-20 nahbrc greening midwest2010 10-20 nahbrc greening midwest
2010 10-20 nahbrc greening midwestAmber Joan Wood
 
2011 01-15 nahbrc - whole-house energy retrofits
2011 01-15 nahbrc - whole-house energy retrofits2011 01-15 nahbrc - whole-house energy retrofits
2011 01-15 nahbrc - whole-house energy retrofitsAmber Joan Wood
 
2011 06-21 green365 nahbrc - hph reoccuring issues
2011 06-21 green365 nahbrc - hph reoccuring issues2011 06-21 green365 nahbrc - hph reoccuring issues
2011 06-21 green365 nahbrc - hph reoccuring issuesAmber Joan Wood
 
2011 08-09 nahbrc-ip - reetum business start-up kit
2011 08-09 nahbrc-ip - reetum business start-up kit2011 08-09 nahbrc-ip - reetum business start-up kit
2011 08-09 nahbrc-ip - reetum business start-up kitAmber Joan Wood
 
2011 09-16 eeba - nahbrc-ip zeh
2011 09-16 eeba - nahbrc-ip zeh2011 09-16 eeba - nahbrc-ip zeh
2011 09-16 eeba - nahbrc-ip zehAmber Joan Wood
 

More from Amber Joan Wood (13)

2013 04 - sipa nexus energy homes
2013 04 - sipa nexus energy homes2013 04 - sipa nexus energy homes
2013 04 - sipa nexus energy homes
 
2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design2012 09 - eeba nahbrcip-prod_bldr struct design
2012 09 - eeba nahbrcip-prod_bldr struct design
 
2012 06-07 nahb leading suppliers council - zeh final
2012 06-07 nahb leading suppliers council - zeh final2012 06-07 nahb leading suppliers council - zeh final
2012 06-07 nahb leading suppliers council - zeh final
 
2011 09-16 eeba - nahbrc national green bld std overview
2011 09-16 eeba - nahbrc national green bld std overview2011 09-16 eeba - nahbrc national green bld std overview
2011 09-16 eeba - nahbrc national green bld std overview
 
2010 07-15 rbeem nahbrc industry partnership 07-15-10
2010 07-15 rbeem nahbrc industry partnership 07-15-102010 07-15 rbeem nahbrc industry partnership 07-15-10
2010 07-15 rbeem nahbrc industry partnership 07-15-10
 
2010 07-15 rbeem nahbrc marine miranda 07-15-10
2010 07-15 rbeem nahbrc marine miranda 07-15-102010 07-15 rbeem nahbrc marine miranda 07-15-10
2010 07-15 rbeem nahbrc marine miranda 07-15-10
 
2010 07-15 rbeem nahbrc quality management
2010 07-15 rbeem nahbrc quality management2010 07-15 rbeem nahbrc quality management
2010 07-15 rbeem nahbrc quality management
 
2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bc2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bc
 
2010 10-20 nahbrc greening midwest
2010 10-20 nahbrc greening midwest2010 10-20 nahbrc greening midwest
2010 10-20 nahbrc greening midwest
 
2011 01-15 nahbrc - whole-house energy retrofits
2011 01-15 nahbrc - whole-house energy retrofits2011 01-15 nahbrc - whole-house energy retrofits
2011 01-15 nahbrc - whole-house energy retrofits
 
2011 06-21 green365 nahbrc - hph reoccuring issues
2011 06-21 green365 nahbrc - hph reoccuring issues2011 06-21 green365 nahbrc - hph reoccuring issues
2011 06-21 green365 nahbrc - hph reoccuring issues
 
2011 08-09 nahbrc-ip - reetum business start-up kit
2011 08-09 nahbrc-ip - reetum business start-up kit2011 08-09 nahbrc-ip - reetum business start-up kit
2011 08-09 nahbrc-ip - reetum business start-up kit
 
2011 09-16 eeba - nahbrc-ip zeh
2011 09-16 eeba - nahbrc-ip zeh2011 09-16 eeba - nahbrc-ip zeh
2011 09-16 eeba - nahbrc-ip zeh
 

Recently uploaded

1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxran17april2001
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 

Recently uploaded (20)

1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptx
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 

2012 02-11 ibs nahbrc - changing with the times

  • 1. Changing with the Times: Major Improvements to the Energy Efficiency of an Aging Residential Community Amber Wood Manager, Energy Programs International Builders’ Show February 11, 2012 Driving Innovation in Housing Technology
  • 2. Building America  Private/public R&D partnership sponsored by DOE  Energy-efficient solutions for new and existing housing  Technologies/Systems  Whole-House Test Homes  Quality Processes
  • 3. Presentation Topics  Greenbelt Homes (GHI) pilot project  GHI Crawlspace Scope of Work (SOW)  Needs & motivations for adding energy efficiency to remodeling 3
  • 4. Greenbelt Homes, Inc.  Privately-owned co-op  1,600 units  4 units/building Courtesy of www.greenbelt.com  1930’s-40’s  Roosevelt work- force housing
  • 7. 1970’s Energy Upgrade  Insulation  Install 52 gal electric  Attic water heaters  Crawlspaces  Upgrade electrical  Exterior walls  Replace steel frame windows  Remove oil-fired boilers  Install electric baseboard 7
  • 8. GHI Pilot Program  Community  Goals: Upgrade in 2015  Health & safety  Comfort  7 buildings, 28  Increased IEQ units  Durability  3 block  2 frame  Affordability  2 brick
  • 9. Why? Motivations for pilot program:  Lower utility bills  Comfort  Lower life-cycle costs  Maintenance & replacement Photo by Doriann Asch courtesy of www.greenbelthomes.net
  • 10. Pilot Program  Baseline Monitoring (underway)  Pre-Retrofit baseline  Install Monitoring Equipment  Air infiltration  Temperature/Humidity/Energy Use  Humidity
  • 11. Pilot Program  Building Envelope Upgrades  Retrofit building envelopes  Monitor envelope upgrade  HVAC Upgrades  Retrofit HVAC  Monitor upgrade package
  • 12. Pilot House Assessment  Walk-Through Evaluation  Visual Inspection  Homeowner Operation  Utility Bills  Short-term Testing 12 Photo by Celestine Ranney-Howes courtesy of www.greenbelthomes.net
  • 13. Walk-Through Evaluation  Dimensions  Insulation  Walls, ceilings, and foundations,  Baseboard heaters  Locations , calculating capacity  Hot water system  Appliances 13
  • 14. 14
  • 15. Construction Total No. of General Conditions Type Units Frame Built in 1941-42, unit sizes range from 574 to 928 sq ft. and 992 Vinyl-Sided consist of the following features: (140 of • Common ventilated crawl space of 8” CMU block, 4 ½ these are courses high (3’) apartments) • 2x8-16”o.c. floor joists with mid-span dropped beam 3- 2x10” on CMU piers • R-11 kraft-faced fiberglass batt insulation in floor joists (1980) • Balloon-framed 2x4-16”o.c walls • Blown-in cellulose insulation in walls (1980) • Board wall and roof sheathing (1x6/1x8) • Double glazed vinyl or aluminum windows (1980) • Vinyl siding, no WRB • Gable roof with asphalt shingles • Ventilated attic • Attics are insulated with rock wool, blown-in cellulose, and fiberglass batt floor insulation (1980 to present) 15
  • 16. Construction Total No. General Conditions Type of Units Frame Built in 1935-38, unit sizes range from 555 to 1,577 sq ft. and 318 Brick-Veneer consist of the following features: • Formed concrete crawl space foundations, with structural concrete first floors over common crawl spaces • Crawl spaces are 4’ and retrofitted as closed crawlspaces with 1” to 2” of rigid extruded polystyrene foam applied to the perimeter walls • Crawl space walls extend under front and rear porch slabs (many exposed to ambient conditions) • Structural concrete first floor • Main house and porch slabs lack thermal breaks • Balloon- framed 2x4-16”o.c. walls with plasterboard interior finish • Blown-in cellulose/rock wool insulation in walls (1980) • Board wall and roof sheathing (1x6/1x8) • Exterior brick veneer, no WRB • Double glazed vinyl windows (1980) • Gable roofs with slate shingles • Ventilated attic with rock wool, blown-in cellulose, and fiberglass batt floor insulation (1980 to current) 16
  • 17. Construction Total No. General Conditions Type of Units Block - Built in 1935-38, unit sizes range from 555 to 1,577 sq ft. and 256 8” CMU consist of the following features: • Formed concrete crawl space foundations, with structural concrete first floors over common crawl spaces • Crawl spaces are 4’ and retrofitted as closed crawlspaces with 1” to 2” of rigid extruded polystyrene foam applied to the perimeter walls • Crawl space walls extend under front and rear porch slabs (many exposed to ambient conditions) • Structural concrete floors (1st and 2nd levels) • Main house and porch slabs lack thermal breaks • CMU walls, finished with plaster • Some interior common walls are wood-framed (where party walls breach the adjacent units’ footprint). • Double glazed vinyl windows (1980) • Exterior walls are painted (B) or have vinyl siding attached (BV) • Flat concrete roofs retrofitted with 3 ½” of polyisocianurate insulating tapered sheathing and EPDM roofing 17
  • 18. Baseline Short-term Testing  Blower door test Courtesy of www. energyconservatory.com  Multi-point house depressurization  Multiple blower doors  Simultaneous testing in adjacent units 18
  • 19. Baseline Short-term Testing  Significant air leakage  Attic access panels  Air conditioners  Penetrations (doors, mail slots, windows, electrical, plumbing) 19
  • 21. Simulation Parameters  13 of the 28 homes  Frame w/Brick  Painted block  End & inside units  End & inside units  Frame w/Vinyl  Block w/ Vinyl  End & inside units  End & inside units  End, front addition  End & inside units w/  End, side addition w/ large basement glass area  End, full rear addition  Inside, full rear addition 21 Artwork by Isabelle Gournay courtesy of www.greenbelthomes.net
  • 22. Beopt Energy Simulation Optimizations  All electric  Source savings = electricity savings  Annualized cost of the upgrades + utility costs  30 years at 7%  Block unit example: 22
  • 23. Energy Simulation Optimization  Block unit example  Costs & savings comparison 23
  • 24. Installation Costs for Building Envelope Improvements  Evaluated on a per-building basis  Do not include remediation associated with environmental hazards (such as lead paint, radon, or asbestos)  Costs are exclusive of management fees 24
  • 25. 25
  • 26. Durability & IAQ  Mechanical ventilation  Crawlspace moisture management 26
  • 29. Masonry Block Building Recommendations  Exterior Wall  Crawlspace Wall Insulation Insulation Repair  R-12 (2”-3”)  Continuous R-10  Finishing  Porch Slab  Siding Insulation  Ext insulation finish system (EIFS) Installation  R-12 (2” closed cell  Window spray foam)  U=0.30 &SHGC=0.30  Exterior Door  U-value ≤ 0.23 29
  • 30. Frame w/Brick Building Recommendations  Attic Sealing &  Crawlspace Wall Insulation Insulation Repair  R-38  Continuous R-10  Storage?  Porch Slab  Create space using Insulation 2” rigid foam and OSB Installation  Window  R-12 (2” closed cell spray foam)  U=0.30 &SHGC=0.30  Exterior Door  U-value ≤ 0.23 30 Photo courtesy of www.greenbelthomes.net
  • 31. Frame w/Vinyl Building Recommendations  Exterior Wall  Window Insulation  U=0.30  Taped WRB &SHGC=0.30  R-5 (1” rigid foam)  Exterior Door  Replace siding  U-value ≤ 0.23  Attic Sealing &  Crawlspace Wall Insulation Insulation Repair  R-38  R-19 (3” closed cell  Storage? spray foam) 31
  • 32. Energy & Performance Monitoring  Indoor air temperature and relative humidity in multiple locations;  Crawlspace and outdoor temperature and relative humidity;  Heating energy use (where feasible);  Hot water energy use;  Dryer energy use (if applicable); and  Total electric energy use. 32 Photo courtesy of www.greenbelthomes.net
  • 33. Parameter of Test Method Purpose Interest Whole House Energy transducer and Record whole house electricity use Electric Energy recording devices Develop use profile for winter months Use Integrate energy use data with general weather data Provide comparison with energy simulation results Space and Water Energy transducers and Proportion heating energy use as a fraction of total Heating and recording devices energy use Dryer Energy Summarize total internal heating energy and Use major loads Indoor Temperature/Relative Provide indoor conditions for energy analysis Environment Humidity sensors – 3 to 4 Assess interior moisture loading/dilution devices per unit, located 1st Support ventilation option development and control and 2nd floors Assess range of indoor temperature settings Foundation Temperature/humidity Provide crawl space foundation conditions for Environment loggers, at least 2 sensors in energy analysis crawl space Assess potential moisture issues Compare with air sealing/ventilation/insulation options in pilot renovation plan 33
  • 34. 34
  • 37. Retrofit Solutions for Enhancing Energy Efficiency  Energy Savings: Household to National  Comfort: Temperature swings to consistency  Moisture: Reduce potential problems  Indoor Air: Controlled ventilation  Technology: Options and performance  Installation: Contractor training/QA  Cost: Installation/operation/savings  Value: Demonstrate values at sale
  • 38. GHI Crawlspace Scope of Work (SOW) 38
  • 39. HPH Quality Management Systems  Concrete slabs and vinyl siding wall updates with CAD details  Crawlspace research & scopes outline  Quality management section update of ToolBase
  • 40. QA Strategy  Inspection/ assessment  Design, specification, planning  Work execution  Completion inspection/ assessment 40
  • 43. 43
  • 44. Crawlspace Scope of Work (SOW)  Vented or Unvented  Correct existing issues  Address moisture  Air sealing  Insulation 44
  • 45. Detailed SOW  A. Correct exterior moisture and thermal conditions  B. Remove wet products and debris from the interior  C. Repair structural damage  D. Repair/install interior foundation drain system  E. Correct interior floor moisture conditions  F. Correct interior wall moisture  G. Remove mold and replace rotten wood  H. Repair/install ground vapor barrier  I. Correct structural defects – i.e. load path tie-down hardware  J. Repair/replace HVAC, pipes, ducts, and equipment within crawlspace  K. Seal interior thermal boundaries  L. Insulate floor system and air seal assembly (ventilated crawlspace)  M. Insulate crawlspace wall (closed crawlspace) 45
  • 47. 47
  • 48. 48
  • 49. 49
  • 50. 50
  • 51. Existing Home SOW  Emphasis on existing conditions  Create complete bid package  More accurate costing  Set expectations 51
  • 52. Needs & Motivations of Remodelers for Adding Energy Efficiency 52
  • 53. Needs & Motivations of Remodelers  Current remodeling industry  Role of energy efficiency  Identify the gaps and barriers  Quantify and prioritize needs to increase sales & projects involving improving home energy efficiency 53
  • 54. Remodelers’ View of Current Industry & Energy Efficiency (initial set of focus groups) 54
  • 55. Current Remodeling Industry  The economic climate has shifted greater to focus to remodeling  More consumers are staying in their homes  Many builders are turning to remodeling work  Competitive, price sensitive market due to  Lending restrictions  Lack of appraisal value on energy efficient upgrades  Flood of individuals into the remodeling arena 55
  • 56. Current Industry (cont.)  Qualified remodelers strive to differentiate themselves  Convey to the consumer the value of an experienced, qualified remodeler  Position the remodeler as the expert & serve to build trust and confidence among consumers 56
  • 57. “This is the way we build” Believe energy efficient upgrades are part of “doing things the right way”; incorporate as part of their business model Have certain upgrades that include as standard part of process, if warranted Approach as “this is what we’re going to do” then educate consumer as to why they do it “My responsibility to recommend” Believe energy efficient upgrades are in customer’s best interest and actively seek opportunities to recommend upgrades Seek to guide consumers as to benefits; try to drive them toward it May recommend upfront, but most often wait until have gotten a feel for the house and customer “We’ll offer as an option” Intellectually know it should be recommended, but don’t have strength of conviction View more as a consumer driven decision; give them information then let them decide Anticipate consumer bottom line focus 57
  • 58. Role of Energy Efficiency in Remodeling  Provide a cost/benefit analysis for energy efficient upgrades  Include an energy audit assessing energy consumption & lifestyle  Demonstrate potential savings for various upgrades; connect the dots in terms of upgrades and real world benefits. 58
  • 59. Best Approach to Energy Efficiency  Knowledgeable recommendation with the consumer’s best interest in mind  Sales attempt with the remodeler’s/builder’s financial interest in mind. 59
  • 60. Remodelers’ Gaps & Barriers to Adding Energy Efficiency into Remodeling (2nd set of focus groups) 60
  • 61. Gaps & Barriers to Adding Energy Efficiency  See growth potential for energy efficient upgrades  Long-term success is dependent on upgrades becoming market driven.  Need incentives based on improved home performance (not specific products)  Shifting homeowner mindsets to “performance” of the home 61
  • 62. Challenges . . .  Perceived value in doing energy efficient upgrades  Costs  Auditing/testing  Limited homeowner resources  Energy savings vs. upgrade investment  Energy efficient improvements do not add appraisal value 62
  • 63. Reasons to Invest in Energy Upgrades  Motivators Include:  Reducing monthly energy bills  Having more predictable energy bills  Increased comfort  Improving indoor air quality  Environment, conservation, and/or green  Helping homeowners to connect the dots between a problem and solutions is necessary for buy in 63
  • 64. Selling vs. Solutions for Remodelers  Educational information regarding energy inefficiency can create awareness  Did you know that you could be paying more than you should be in monthly energy costs because of leaky ducts, drafts, outdated heating & cooling systems or insufficient insulation? 64
  • 65. Growing Energy Upgrades  Nationwide existing home performance scores  Establishing appraisal value for energy efficient upgrades  Realtor education as to value energy efficient upgrades bring, and how to sell the features  Points off mortgage interest for energy efficient upgrades 65
  • 66. Tools Needed  Informational/educational resources  Shift consumer thinking to home performance  Increase understanding of problems  Understand benefits of various types of upgrades  Website, DVD, printed materials 66
  • 67. Tools Needed (cont.)  Consumer campaign  Free/low cost energy audits for homeowners  Key questions to ask in order to identify opportunities  Means of quantifying impact of energy efficient upgrades  Connecting remodelers with energy auditors to develop referral network 67
  • 68. Remodelers’ Needs for Improving Home Energy Efficiency (quantitative market research based on focus groups) 68
  • 69. Prioritize the Support Needs  Quantitative market research with remodelers.  Build upon the qualitative remodeler focus groups,  Quantify and prioritize the support needs  Increase sales and projects involving improving home energy efficiency 69
  • 70. What percentage of your recent clients fit into the following groups when it comes to accepting energy efficient upgrades? % Clients in Following Groups Mean Bottom line focused - will not spend any more 40% than they have to. Can be convinced - may or may not think about 39% energy efficiency, but are open to the upgrades once they understand the benefits. Embraces, or actively seeks, energy efficiency. 21% Total 100% 70
  • 71. When working with clients, which of the following statements most closely describes your company’s approach to energy efficient upgrades? Company Approach to Energy Efficient Upgrades Freq. We do not try to sell or offer energy efficient 6% upgrades unless they are specifically asked for by the client. We offer or recommend it when the energy 51% efficient upgrade is cost effective and is directly related to the home improvement project. We believe energy efficient upgrades are part of 43% “doing it the right way” and incorporate this into as many remodeling jobs as possible. Total 100% 71
  • 72. What is the relative importance of all of the issues? Priority Issues sorted by Importance to Remodelers 1 Appraisal values factor into what type of remodels clients are willing to undertake, and energy efficiency is difficult to value. 2 Clients are typically unable to discern between high quality and low quality construction at the bidding phase. Often they select the lowest cost bidder. This makes selling upgraded energy efficiency difficult. 3 Realtors, who are in contact with homeowners as they buy/sell homes, aren’t able to describe the value of energy efficiency. 4 There is no standard way to compare a home’s energy efficiency when buying or selling an existing home. 5 Homeowners want to see tangible differences, often focusing on aesthetics or functionality, which makes energy efficiency a difficult sell. 72
  • 73. What is the relative importance of all of the issues? Priority Issues sorted by Importance to Remodelers 6 One popular way to determine airtighness, a blower door test, is expensive and most clients are not willing to pay for just an evaluation. 7 Homeowners see energy efficiency upgrade costs as an expense and not an investment. 8 Clients don’t understand the value of energy efficiency. They place little value on it. If consumers don’t see a problem, then they won’t purchase the solution. 9 There is little real demand for energy efficiency. Homeowners are just following the money for rebates. 10 No coordinated efforts between the federal government, state government, and utilities when it comes to offering, applying for, and complying with energy efficiency incentive programs. 73
  • 74. Next Steps  Outline potential solutions  Determine homeowners gaps & needs 74
  • 75. Resources  Building America  www.eere.energy.gov/buildings/building_america  Builders Challenge  Program: www.eere.energy.gov/buildings/challenge  NAHB Research Center  Main Website: www.nahbrc.com  Technical Info: www.toolbase.org
  • 77. Thank You! Amber Wood NAHB Research Center Manager, Energy Programs 400 Prince George’s Blvd  Upper Marlboro, MD 20774 (direct) 301.430.6309  (fax) 301.430.6180 www.nahbrc.com Driving Innovation in Housing Technology

Editor's Notes

  1. Oil fired boilers replaced for safety reasons – changed to baseboard heatingIndividually controlled baseboard electric heaters were installed in each room, except in kitchens and bathrooms where ceiling fan-coil heaters with wall-thermostats were installed; Upgraded electrical and installed individual meters for each unitFifty-two (52) gallon electric water heaters were installed for use in every home;Insulation was added in attics, crawl spaces and exterior walls of vinyl-sided frame homes; in attics and crawl spaces of brick homes and in crawl spaces of block homes.Original steel-frame casement windows were replaced with vinyl or aluminum double-glazed window units.
  2. BackgroundGoals: Health & safety Comfort Increased IEQ Durability Affordability Lower utility bills Maintenance
  3. Collaboration of GHI, NAHBRC, & NREL
  4. Collaboration of GHI, NAHBRC, & NREL
  5. Recording house and window dimensions (including additions),Determining insulation levels in the walls, ceilings, and foundations,Documenting equipment and appliance models,Noting locations of baseboard heaters,Calculating capacity of heating and cooling equipmentDetermining the hot water system configuration
  6. The Research Center performed short-term testing in conjunction with the walk-through evaluations. This testing included performing a blower door test for each unit (hot water temperatures and fixture flow rates were also measured). Multi-point house depressurization measurements provided total air leakage (which would include leakage to adjacent units) and leakage to the outdoors. Leakage to outdoors was determined by simultaneously running blower doors in adjacent units. Significant air leakage was consistently noticed at the attic access panels, around through-wall and through-window air conditioners, doors, mail slots, and windows, particularly the windows that were unlatched due to malfunction. Frame houses all had significant leakage through the floor at electrical and plumbing penetrations, particularly at the water heater closet. A duct blaster test was performed on the one unit with a ducted system. The air flow of the bath exhaust fans was measured using a flow hood. The actual air leakage measurements were used in simulation models for specific units.
  7. The Research Center performed short-term testing in conjunction with the walk-through evaluations. This testing included performing a blower door test for each unit (hot water temperatures and fixture flow rates were also measured). Multi-point house depressurization measurements provided total air leakage (which would include leakage to adjacent units) and leakage to the outdoors. Leakage to outdoors was determined by simultaneously running blower doors in adjacent units. Significant air leakage was consistently noticed at the attic access panels, around through-wall and through-window air conditioners, doors, mail slots, and windows, particularly the windows that were unlatched due to malfunction. Frame houses all had significant leakage through the floor at electrical and plumbing penetrations, particularly at the water heater closet. A duct blaster test was performed on the one unit with a ducted system. The air flow of the bath exhaust fans was measured using a flow hood. The actual air leakage measurements were used in simulation models for specific units.
  8. Plus visual inspection & utility bills
  9. Energy Simulation Optimization
  10. Energy Simulation Optimization
  11. Features that are not directly responsible for increased energy efficiency were added to the estimated cost analysis to enhance building durability and/or indoor air quality. These are: Mechanical ventilation and controls to provide point source and whole house air exchange; andRemediate crawlspaces to improve insulation performance and indoor air quality through minimizing moisture entrance to the home through the crawlspace
  12.  While it is admittedly tidy and perhaps overly-simplistic, the majority of the building envelope improvements recommended have been assigned useful life spans of 30 years. The life span coincides with the estimated life of the assumed mortgage (if used to purchase the upgrades). GHI reserve estimates have placed various life spans from 35 to 40 years (vinyl siding on smaller frame homes and windows) to 85 years (exterior doors) on these building elements. Because they are each integral components of the building system, replacement should be planned to occur at the same time to protect the integrity of the buildings. For internal reporting and reserve calculations, the useful lives can be adapted to reflect the experience of GHI and warranty periods offered by the manufacturers whose products are selected for the pilot study.
  13. Exterior Wall Insulation2” thickness (extruded polystyrene, XPS, or polyisocyanurate) or 3” expanded polystyrene or polyisocyanurate materialThe masonry block and masonry brick frame crawlspace foundations extend continuously around the buildings encompassing the front and rear porch slabs, as well as the conditioned spaces. Where these do not have an addition (conditioned space) above, two inches of closed cell SPF, R-12, should be applied to the bottom of the slab, accessible from the crawlspace. Unconditioned porch slabs average roughly 400 square feet per building.
  14. Attic insulation currently is about R-16
  15. For this building type, it is recommended that the existing siding be removed and a weather resistant barrier (WRB) is installed over the wood sheathing and sealed. One inch thickness of rigid foam, R-5 to R-7, installed beneath the horizontal vinyl siding that is scheduled for replacement between 2015 and 2023, is also recommended to compensate for the blown-in cavity insulation which may have settled in the wall. The WRB or the foam should be installed and taped to provide an air barrier over the exterior sheathing which consists of 1”x6”/1”x8” boards.
  16. Integrating needs & values
  17. Homeowner mindset - better conditions them to understand the value of making energy efficient upgrades beyond the scope of their remodeling project.