SlideShare uma empresa Scribd logo
1 de 3
Baixar para ler offline
Radar gun troubleshooting guide.                               Pin 1 of the Radar gun (4 pin round) connector is
                                                                connected to Pin 5 of the display (DB9)
Most of the procedures in this guide will require someone       connector.
with some technical and/or computer experience. The
visual inspection test can be performed by almost anyone.      Pin 2 of the Radar gun (4 pin round) connector is
The continuity and voltage tests may require someone            connected to Pin 2 of the display (DB9)
with electrical or electronics experience. The data             connector.
communications tests will require someone that has
computer experience.                                           Pin 3 of the Radar gun (4 pin round) connector is
                                                                connected to Pin 3 of the display (DB9)
Visual inspection                                               connector.

Visual inspection of the cable that connects between the       Pin 4 of the Radar gun (4 pin round) connector is
radar gun and the display. You may need a magnifying            connected to Pin 4 of the display (DB9)
lens to get a good look at the connectors unless you are        connector.
one of the rare few that have extremely good eyesight.
                                                            Testing the cable for shorts between pins.
   Check the radar gun end of the cable. There
    should be four pins in a rectangular fashion.              Obtain a multimeter that is capable of measuring
                                                                resistance and/or continuity. Almost any
   Check the display end of the cable. There should            continuity tester will work.
    be two rows of pins for a total of 9 pins.
                                                               Pins 4,5 should be open circuit.
   Straighten any bent pins. If any pins are broken,
    the cable will need to be sent to the factory for          Pins 3,5 should be open circuit.
    repair before use.
                                                               Pins 2,5 should be open circuit.
Cable Continuity test
                                                               Pins 3,4 should be open circuit.
Continuity test of the cable that connects between the
radar gun and the display.
                                                               Pins 2,4 should be open circuit.
The drawing below shows the wiring of the radar gun end
of the cable. The red dot is actually on the rear of the
                                                               Pins 2,3 should be open circuit.
connector. Note that the slot is wider nearest pin 1.
                                                            Cable and Radar Gun Resistance test
The drawing below shows the wiring of the display end of
the cable. Note that only pins 2,3,4 and 5 are used.        Continuity test of the display connector at the end of the
                                                            cable connected to the port connector on the radar gun.
DB-9 pin 1 – Not used
DB-9 pin 2 – RD - Yellow                                       For this test, make sure that the radar gun is off
DB-9 pin 3 – TD - Green                                         and that the batteries are removed from the
DB-9 pin 4 – DSR - Red                                          handle.
DB-9 pin 5 – SG - Black
                                                               Connect the round end of the cable to the radar
                                                                gun.
   For this test, make sure that the ends of the
    cable are disconnected from the radar gun and              Obtain a multimeter that is capable of measuring
    display respectively.                                       resistance

   Obtain a multimeter that is capable of measuring           Pins 4,5 should measure 1M to 2M ohm.
    resistance and/or continuity. Almost any                    (Nominal 1.8M ohm)
    continuity tester will work.

Alxatex, Inc. www.alzatex.com                           1                                                11/08/09
   Pins 3,5 should measure 4K to 5K ohms.                         Data signal test of the Display end connector on cable
    (Nominal 4.5K ohm)                                             connected to the radar gun.

   Pins 2,5 should be open circuit.                                  Go to the local Radio Shack or other electronics
                                                                       store and purchase an LED. Red is the
   Pins 3,4 should measure 1.8M ohm. (Nominal                         preferable color although any color will suffice.
    1.8M ohm)
                                                                      Connect the cable to the port connector on the
   Pins 2,4 should be open circuit.                                   radar gun.

   Pins 2,3 should be open circuit.                                  Install the batteries and turn the radar gun on by
                                                                       pressing the power button.

Radar Gun Voltage test

Voltage test of the display connector at the end of the
cable connected to the radar gun.

   Connect the cable to the port connector on the
    radar gun.

   Install the batteries and turn the radar gun on by
    pressing the power button.

   Pins 4,5 should measure 3 volts or more.
    (Nominal 3.1 volts)

   Pins 3,5 should measure 0 volts.

   Pins 2,5 should measure -6 to -7 volts. (Nominal                  Connect the LED between pins 2 and 5 on the
    6.5 volts)                                                         connector that connects to the display.

Voltage test of the port connector on the radar gun. If the           If the negative lead of the LED is connected to
previous test passes, there is no need to perform this test.           pin 2 and the positive lead of the LED is
                                                                       connected to pin 5, the LED should be lit.
   Do not do this test if the previous test passes. It
    is very easy to damage the pins on the radar gun                  If the positive lead is connected to pin 2 and the
    port connector.                                                    negative lead of the LED is connected to pin 5,
                                                                       the LED should be off.
   Disconnect the cable from the port connector on
    the radar gun.                                                    Leave the positive lead of the LED connected to
                                                                       pin 2 and the negative lead of the LED connected
   Install the batteries and turn the radar gun on by                 to pin 5.
    pressing the power button.
                                                                   Trigger the radar gun to measure a speed. The
   Pins 1,4 should measure 3 volts or more.                       speed should display in the LCD display on the radar
    (Nominal 3.1 volts)                                            gun. At the same time, the LED should flash on for a
                                                                   brief moment. This indicates that the radar gun just
   Pins 1,3 should measure 0 volts.                               sent data to the remote display.

   Pins 1,2 should measure -6 to -7 volts. (Nominal               Data signal test of the port connector on the radar gun.
    6.5 volts)

Alxatex, Inc. www.alzatex.com                                  2                                               11/08/09
the radar gun just sent data out on the port
                                                                        connector.

                                                                    Data Communication Test

                                                                    In this test we will be sending data from the radar gun to a
                                                                    computer.

                                                                    You will need a computer that has an RS-232 serial port. If
                                                                    your computer does not have an RS-232 serial port, but
                                                                    has a USB port, you can purchase a USB to RS-232 Serial
                                                                    converter. Belkin makes a good unit although almost any
                                                                    brand will work.

                                                                       Connect the cable to the port connector on the
                                                                        radar gun.

                                                                       Connect the other end of the cable to the RS-232
If the previous test passes, there is no need to perform this           serial port connector on the computer.
test.
                                                                       Open up the terminal program.
Do not do this test if the previous test passes. It is
very easy to damage the pins on the radar gun port
connector.
                                                                       Find the communications configuration menu and
                                                                        set the COMM port the match the actual
 Go to the local Radio Shack or other electronics                      communications port that you are using. Set the
    store and purchase an LED. Red is the                               baud rate to 1200. Set the number of data bits to
    preferable color although any color will suffice.                   8. Set the number of stop bits to one. Set the
                                                                        parity to NONE.
   Connect the cable to the port connector on the
    radar gun.                                                         Install the batteries and turn the radar gun on by
                                                                        pressing the power button.
   Install the batteries and turn the radar gun on by
    pressing the power button.                                         Trigger the radar gun to measure a speed. The
                                                                        speed should display in the LCD display on the
   Connect the LED between pins 1 and 2 on the                         radar gun. At the same time, the speed should
    connector that connects to the display.                             also appear in the terminal program window. This
                                                                        indicates that the radar gun just sent data out on
   If the negative lead of the LED is connected to                     the port connector. The format of the data will be
    pin 2 and the positive lead of the LED is                           “061000”.
    connected to pin 1, the LED should be lit.
                                                                    NOTE: If you are not sure that you have the correct
   If the positive lead is connected to pin 2 and the              COMM port, you can temporarily remove the cable.
    negative lead of the LED is connected to pin 1,                 Short pins 2 and 3 together on the RS232 DB9
    the LED should be off.                                          connector and type some characters in the terminal
                                                                    program window. If local echo is on, you will see two
   Leave the positive lead of the LED connected to                 characters for every character typed. If local echo is
    pin 2 and the negative lead of the LED                          off, you will see one character for every character
    connected to pin 1.                                             typed. Remove the short and type some more
                                                                    characters. If local echo is on, you will see one
   Trigger the radar gun to measure a speed. The                   character for every character typed. If local echo is
    speed should display in the LCD display on the                  off, you will see no characters.
    radar gun. At the same time, the LED should
    flash on for a brief moment. This indicates that

Alxatex, Inc. www.alzatex.com                                   3                                              11/08/09

Mais conteúdo relacionado

Mais de Alzatex, Inc.

Mais de Alzatex, Inc. (7)

Ds231 Alarm Timer V0.06
Ds231 Alarm Timer V0.06Ds231 Alarm Timer V0.06
Ds231 Alarm Timer V0.06
 
Dsa244 B Um
Dsa244 B UmDsa244 B Um
Dsa244 B Um
 
Ds017 E Rate1
Ds017 E Rate1Ds017 E Rate1
Ds017 E Rate1
 
Ds017afm Cutout
Ds017afm CutoutDs017afm Cutout
Ds017afm Cutout
 
Dc117 A Production Timer
Dc117 A Production TimerDc117 A Production Timer
Dc117 A Production Timer
 
Dc117a Wiring0
Dc117a Wiring0Dc117a Wiring0
Dc117a Wiring0
 
Code Encryptor Um
Code Encryptor UmCode Encryptor Um
Code Encryptor Um
 

Último

CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 

Último (20)

CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 

Jugs Radar Troubleshoot0

  • 1. Radar gun troubleshooting guide.  Pin 1 of the Radar gun (4 pin round) connector is connected to Pin 5 of the display (DB9) Most of the procedures in this guide will require someone connector. with some technical and/or computer experience. The visual inspection test can be performed by almost anyone.  Pin 2 of the Radar gun (4 pin round) connector is The continuity and voltage tests may require someone connected to Pin 2 of the display (DB9) with electrical or electronics experience. The data connector. communications tests will require someone that has computer experience.  Pin 3 of the Radar gun (4 pin round) connector is connected to Pin 3 of the display (DB9) Visual inspection connector. Visual inspection of the cable that connects between the  Pin 4 of the Radar gun (4 pin round) connector is radar gun and the display. You may need a magnifying connected to Pin 4 of the display (DB9) lens to get a good look at the connectors unless you are connector. one of the rare few that have extremely good eyesight. Testing the cable for shorts between pins.  Check the radar gun end of the cable. There should be four pins in a rectangular fashion.  Obtain a multimeter that is capable of measuring resistance and/or continuity. Almost any  Check the display end of the cable. There should continuity tester will work. be two rows of pins for a total of 9 pins.  Pins 4,5 should be open circuit.  Straighten any bent pins. If any pins are broken, the cable will need to be sent to the factory for  Pins 3,5 should be open circuit. repair before use.  Pins 2,5 should be open circuit. Cable Continuity test  Pins 3,4 should be open circuit. Continuity test of the cable that connects between the radar gun and the display.  Pins 2,4 should be open circuit. The drawing below shows the wiring of the radar gun end of the cable. The red dot is actually on the rear of the  Pins 2,3 should be open circuit. connector. Note that the slot is wider nearest pin 1. Cable and Radar Gun Resistance test The drawing below shows the wiring of the display end of the cable. Note that only pins 2,3,4 and 5 are used. Continuity test of the display connector at the end of the cable connected to the port connector on the radar gun. DB-9 pin 1 – Not used DB-9 pin 2 – RD - Yellow  For this test, make sure that the radar gun is off DB-9 pin 3 – TD - Green and that the batteries are removed from the DB-9 pin 4 – DSR - Red handle. DB-9 pin 5 – SG - Black  Connect the round end of the cable to the radar gun.  For this test, make sure that the ends of the cable are disconnected from the radar gun and  Obtain a multimeter that is capable of measuring display respectively. resistance  Obtain a multimeter that is capable of measuring  Pins 4,5 should measure 1M to 2M ohm. resistance and/or continuity. Almost any (Nominal 1.8M ohm) continuity tester will work. Alxatex, Inc. www.alzatex.com 1 11/08/09
  • 2. Pins 3,5 should measure 4K to 5K ohms. Data signal test of the Display end connector on cable (Nominal 4.5K ohm) connected to the radar gun.  Pins 2,5 should be open circuit.  Go to the local Radio Shack or other electronics store and purchase an LED. Red is the  Pins 3,4 should measure 1.8M ohm. (Nominal preferable color although any color will suffice. 1.8M ohm)  Connect the cable to the port connector on the  Pins 2,4 should be open circuit. radar gun.  Pins 2,3 should be open circuit.  Install the batteries and turn the radar gun on by pressing the power button. Radar Gun Voltage test Voltage test of the display connector at the end of the cable connected to the radar gun.  Connect the cable to the port connector on the radar gun.  Install the batteries and turn the radar gun on by pressing the power button.  Pins 4,5 should measure 3 volts or more. (Nominal 3.1 volts)  Pins 3,5 should measure 0 volts.  Pins 2,5 should measure -6 to -7 volts. (Nominal  Connect the LED between pins 2 and 5 on the 6.5 volts) connector that connects to the display. Voltage test of the port connector on the radar gun. If the  If the negative lead of the LED is connected to previous test passes, there is no need to perform this test. pin 2 and the positive lead of the LED is connected to pin 5, the LED should be lit.  Do not do this test if the previous test passes. It is very easy to damage the pins on the radar gun  If the positive lead is connected to pin 2 and the port connector. negative lead of the LED is connected to pin 5, the LED should be off.  Disconnect the cable from the port connector on the radar gun.  Leave the positive lead of the LED connected to pin 2 and the negative lead of the LED connected  Install the batteries and turn the radar gun on by to pin 5. pressing the power button. Trigger the radar gun to measure a speed. The  Pins 1,4 should measure 3 volts or more. speed should display in the LCD display on the radar (Nominal 3.1 volts) gun. At the same time, the LED should flash on for a brief moment. This indicates that the radar gun just  Pins 1,3 should measure 0 volts. sent data to the remote display.  Pins 1,2 should measure -6 to -7 volts. (Nominal Data signal test of the port connector on the radar gun. 6.5 volts) Alxatex, Inc. www.alzatex.com 2 11/08/09
  • 3. the radar gun just sent data out on the port connector. Data Communication Test In this test we will be sending data from the radar gun to a computer. You will need a computer that has an RS-232 serial port. If your computer does not have an RS-232 serial port, but has a USB port, you can purchase a USB to RS-232 Serial converter. Belkin makes a good unit although almost any brand will work.  Connect the cable to the port connector on the radar gun.  Connect the other end of the cable to the RS-232 If the previous test passes, there is no need to perform this serial port connector on the computer. test.  Open up the terminal program. Do not do this test if the previous test passes. It is very easy to damage the pins on the radar gun port connector.  Find the communications configuration menu and set the COMM port the match the actual  Go to the local Radio Shack or other electronics communications port that you are using. Set the store and purchase an LED. Red is the baud rate to 1200. Set the number of data bits to preferable color although any color will suffice. 8. Set the number of stop bits to one. Set the parity to NONE.  Connect the cable to the port connector on the radar gun.  Install the batteries and turn the radar gun on by pressing the power button.  Install the batteries and turn the radar gun on by pressing the power button.  Trigger the radar gun to measure a speed. The speed should display in the LCD display on the  Connect the LED between pins 1 and 2 on the radar gun. At the same time, the speed should connector that connects to the display. also appear in the terminal program window. This indicates that the radar gun just sent data out on  If the negative lead of the LED is connected to the port connector. The format of the data will be pin 2 and the positive lead of the LED is “061000”. connected to pin 1, the LED should be lit. NOTE: If you are not sure that you have the correct  If the positive lead is connected to pin 2 and the COMM port, you can temporarily remove the cable. negative lead of the LED is connected to pin 1, Short pins 2 and 3 together on the RS232 DB9 the LED should be off. connector and type some characters in the terminal program window. If local echo is on, you will see two  Leave the positive lead of the LED connected to characters for every character typed. If local echo is pin 2 and the negative lead of the LED off, you will see one character for every character connected to pin 1. typed. Remove the short and type some more characters. If local echo is on, you will see one  Trigger the radar gun to measure a speed. The character for every character typed. If local echo is speed should display in the LCD display on the off, you will see no characters. radar gun. At the same time, the LED should flash on for a brief moment. This indicates that Alxatex, Inc. www.alzatex.com 3 11/08/09