SlideShare uma empresa Scribd logo
1 de 7
Baixar para ler offline
ALFRED J. SOCIAS, CSI, CDT
                91-1200 Keaunui Drive #400
                Ewa Beach, HI 96706
                Home: [808] 888-0633
                Mobile: [925] 451-1761
                E-mail: alsocias@sbcglobal.net

OBJECTIVE       Employment as a job captain / project architect on commercial building
                or educational building project types.

EDUCATION       Revit Training Videos (Scott Onstott) – June 2008
                Revit Fundamentals Class – April 2008
                Design + Technology of Roofing Systems Class - May 2003
                Better Understanding of Roof Systems Institute
                Principal & Practices of Specifying Class - March 2003
                East Bay/Oakland CSI Chapter
                2001 CBC Non-Structural Update Class - June 2002
                International Conference of Building Officials
                Building Codes Semester Long Class [1998 UBC] - December 2000
                San Francisco City College
                Bachelor of Architecture - December 1991
                California State Polytechnic University, Pomona, California
                Graphic Arts Certificate - December 1988
                Mount San Antonio College, Walnut, California
                Contra Costa College, San Pablo, California

CERTIFICATION   Construction Documents Technologist Certificate 2000
LICENSURE       Construction Specifications Institute
                2 NCARB tests away from Architectural Licensure

MANAGEMENT      Captained a variety of architectural projects such as school laboratory
                buildings, school modernizations, grocery store additions / remodels,
                retail shell buildings, mid-rise offices, tenant improvements, warehouses,
                single and multi-family housing developments, custom estate residences,
                residential room addition/remodels, and churches. All included consultant
                coordination, project file management, specification coordination, and
                some construction administration.

TECHNICAL       Drafted architectural design development packages, construction
                documents, addenda, and clarifications on CAD. Prepared detailed
                building code analysis for various project types including assigning
                building occupancy classification and construction types. Determined
                occupancy, and or area separation requirements, exterior wall protection,
                allowable area and occupant loads. Prepared allowable area
                calculations, and exit width calculations. Researched and incorporated
                architectural products into projects. Solved architectural, fireproofing and
                waterproofing details. Coordinated architectural drawings with consultant
                drawings. Edited specification sections including door hardware groups.
                Assisted with construction administration including shop drawing and
                submittal processing, and clarification generation. Field verified existing
                fire & life safety exiting schemes. Field verified existing accessible or
                non-accessible conditions.

DESIGN          Designed exiting schemes from hallways to corridors to enclosed stair
                towers. Designed accessible and non-accessible site parking, drive
                aisles, site and building paths of travel. Designed ramps, stairs, toilet
rooms, areas of rescue assistance, wheelchair lifts and elevators for
                school modernization projects. Design developed various project types in
                preparation for construction documents.

QUALITY         Helped devised custom CAD production systems for various architectural
ASSURANCE       project types. QA systems included an orthographic projection technique
                using rotated user coordinate systems within view ports to facilitate the
                rapid creation of complex elevations. Helped to create a CSI based detail
                library, detail component blocks, a detail sheet preparation technique
                based on xreffing pre-bordered & pre-titled details, and working drawing
                (.dwt) sheet templates which incorporated pre-loaded symbols, details
                and architectural notation pertinent to each sheet.

COMPUTER        Windows XP: Revit 8.1, AutoCAD 2010, Microstation CAD V8, Microsoft
                Outlook, Microsoft Word, Microsoft Excel, Adobe Acrobat, and WinZip.
                Windows Mobile: Pocket Word, Pocket Excel, Adobe Reader, Pocket
                CAD

COMMUNICATION   Direct communication with project consultants - civil, structural,
                mechanical, electrical, plumbing, landscape, fire alarm,
                telecommunication, and title 24 energy.

PROJECTS        AOL, Palo Alto, CA - Construction Documents & Construction
                Administration
                Interior tenant improvement & office remodel of existing type II building
                including entry lobby & custom furniture and graphics.

                Box.net, Palo Alto, CA - Construction Documents
                Interior tenant improvement & office remodel

                Hangar 42 Studios, Walker, MI
                Interior remodel of office & support spaces for future movie studio.

                University of California, Berkeley, School of Law Building, Boalt Hall,
                Berkeley, CA - Construction Documents
                Interior tenant improvement of existing law school building. Program
                included distance learning room, classrooms, offices & journal rooms.

                Albertsons Grocery Store, Lake Forest, CA – Construction Documents &
                Specifications
                Existing 43,000 s.f. grocery store remodel / addition. Entry piece
                addition, new interior décor package, and new refrigeration.

                Traditions Building, Walnut Creek, CA - Construction Documents
                Interior tenant improvement and minor exterior building improvements.
                Phased project included obtaining demolition permit, site development
                permit, tenant improvement permit, exterior building improvements
                permit, and fire district approval.

                Hillcrest Village, Antioch, CA – Site Plan Design Development
                16 building office / retail / restaurant on a 1,004,000 s.f. site. Calculated
                parking basis including HCP. Determined fire truck access and
                accessible paths of travel.

                Enea Plaza, Dublin, CA - Site Plan Design Development
                3 retail buildings on a 166,800 s.f. site. Calculated parking basis
including HCP. Determined fire truck access and accessible paths of
travel.

Buchanan Crossings, Antioch, CA - Site Plan Design Development
9 building office / retail / restaurant on a 590,000 s.f. site. Calculated
parking basis including HCP. Determined fire truck access and
accessible paths of travel.

Canyon Oaks Plaza, Chico, CA - Site Plan Design Development
6 building office / retail / restaurant on a 245,600 s.f. site. Calculated
parking basis including HCP. Determined fire truck access and
accessible paths of travel.

Kiernan Plaza, Salida, CA - Construction Documents
New 12,000 s.f. retail shell building that was subdivided into 8 tenant
spaces. Built on a 52,000 s.f. lot.

Bristol Farms Grocery Store, Santa Barbara, CA - Construction
Documents & Specifications
Existing 34,700 s.f. grocery store remodel. Included minor exterior
building architectural elements, new interior décor, and new refrigeration.

557 Merrimac, Oakland, CA - Construction Documents
Mixed use multi-family residential / retail building with 3 stories of
apartments, 1 story of retail / parking garage and basement parking. 30
total dwelling units, elevator, storefront, basically 3 stories of wood frame
construction on a concrete podium. Calculated as 3 separate buildings
for allowable area purposes.

Contra Costa Gospel Church, Walnut Creek, CA – Construction
Documents
New 3096 s.f. multi-purpose building on an existing church site.

Leonard Flynn Elementary School Modernization, San Francisco, CA -
Construction Documents
One building which includes a day care center, multi-purpose room,
library, and classrooms whose scope of work included accessibility and
fire-life safety upgrades to current code, separate exit routes for
kindergarten and elementary students, exterior door replacement, interior
finishes and casework, toilet room remodels, and electrical, plumbing
systems upgrades.

Tileshop Warehouse, Berkeley, CA - Construction Documents
New 23,000 s.f. two story warehouse with ancillary office space features
metal cladding over steel and metal stud structure.

Thurgood Marshall High School Modernization, San Franciso, CA -
Construction Documents
One 150,000 s.f. building which included an auditorium, gymnasium,
cafeteria, library, classrooms, and laboratories whose scope of work
included accessibility and fire-life safety upgrades to current code,
gymnasium addition, roofing and waterproofing, interior finishes and
casework, toilet room remodels, and electrical, plumbing, and data-
communication systems upgrades.

Salvio Street Parking Structure, Concord, CA - Construction Documents
Addtition-remodel of existing 6 story post tension structure parking
garage. Work included new offices, accessible parking re-stripping, new
accessible toilets, and upgrade mechanical, electrical and plumbing
systems.

Zio Fraedo's Banquet Hall, Pleasant Hill, CA - Construction Documents
New Mediterranean influenced 8700 s.f. banquet facility with restaurant,
commercial kitchen, and offices.

King of Thai Noodle House, San Francisco, CA - Construction
Documents
Tenant improvement of two story restaurant with commercial kitchen,
and offices.

Palo Alto High School Science Building, Palo Alto, CA - Construction
Documents & Specifications
New 28,000 s.f. 1 story science building on an existing campus.
Building program included 10 labs, prep space, and a teachers' office
suite.

California State University Hayward Library Fire Repair, Hayward CA -
Construction Documents
Interior remodel of fire damaged library. Included offices, instructional
media center and a high tech distance learning classroom. Seismic
upgrade included floor to ceiling high steel K bracing.

AC Transit Headquarters, Oakland, CA - Construction Documents
7 floor tenant improvement of an existing 10 floor mid-rise office building.
Includes custom ticket window casework with butt glazing, computer
casework and new manufacturer workstations.

AT Systems Armored Transport Facility, Oakland, CA - Construction
Documents
Existing 12,000 s.f. repair garage converted to a mixed use repair
garage-coin counting facility.

Jackson Center One, Oakland, CA - Construction Documents
Tenant improvement and seismic upgrade of the existing mid-rise
defunct State Office Building. 10 floor scope includes new gunite
exterior, exterior granite cladding, exterior metal canopies, new built-up
roofing, and storefront.

Foley & Lardner Law Offices, San Francisco, CA - Construction
Documents
Two floors of high rise, high end, high tech design interior tenant
improvement. Includes custom detailed desks, cabinetry, partitions,
soffits, glass railed stairways, and doors. Approximately 33,000 s.f.

Villa Cortona, San Jose, CA - Construction Documents
New 72 unit French Provincial multi-family housing project consisting of 2
duplex town home building types and 2 condominium building types of
approximately 4800 to 10,300 s.f., all units are multi-level which
exempted accessible requirements, and all are located on a complex
sloping site.

Palo Alto High School Modernization, Palo Alto, CA - Construction
Documents
               19 existing buildings whose scope of work included accessibility and fire-
               life safety upgrades to current code, exterior door replacement, roofing
               and waterproofing, interior finishes and casework, toilet room remodels,
               and electrical, plumbing, and data-communication systems upgrades.

               Vallejo School Modernization, Vallejo, CA - Construction Documents
               8 elementary school modernization projects whose scope of work
               included accessibility and fire-life safety upgrades to current code,
               exterior door and window replacement, interior finishes and casework,
               toilet room remodels, and electrical, plumbing, and data-communication
               systems upgrades.

               Marr Residence, Atherton, CA - Construction Documents
               A new 11,000 s.f. French Normandy style custom estate home included
               a sunroom greenhouse, swimming pool, pool pavilion, three car garage,
               carriage house, guest house, tennis courts, a hidden garden and 'smart
               home' electronics.

               Del Grande Residence, Los Gatos, CA - Construction Documents
               A new 7,600 s.f. hillside custom estate home reflects the architecture of
               Carmel. It features decks and terraces that take full advantage of a
               panoramic valley view below, swimming pool and croquet lawn.

               Nepenthe, Sedona, AZ - Construction Documents
               A new 182 unit complex of multi-family town houses comprised of four,
               five, and seven unit buildings. Geometric shapes and colors relate to the
               Sedona's surrounding red sandstone Bell Mountain which is adjacent to
               the site.

               Highlands at Clearbrook, Hayward, CA - Construction Documents
               2 designs of new single family production housing about 2600 s.f. to
               3200 s.f. each. Both designs were for lots with a 2:1 downward slope and
               incorporated view decks from both the first and second floors.

AWARDS         San Jose Veterans Memorial Design Competition, 1993,
COMPETITIONS   participant. San Francisco Waterfront Competition, 1992, Honorable
               mention/gallery exhibitor. Tijuana Cultural Center Demountable Roof
               Structure Competition, 1991. Douglas Conelly Memorial Scholarship in
               Architecture, Contra Costa College, San Pablo, California, 1987. Solano
               County fair ribbons in architectural and mechanical drafting, 1984.

EMPLOYMENT     PROJECT ARCHITECT
               Studio O+A, San Francisco, CA 9/09 to present
               PROJECT ARCHITECT (Contract Work)
               ID Architecture, Pleasanton, CA 2/09 to 8/09
               PROJECT ARCHITECT
               The Ratcliff Architects, Emeryville, CA 2/08 to 12/08
               JOB CAPTAIN
               Craig+Grant Architects, Danville, CA 11/05 to 1/08
               JOB CAPTAIN
               VBN Architects, Oakland, CA 4/98 to 11/05
               JOB CAPTAIN
               Loving & Campos Architects, Inc., Walnut Creek, CA 3/95 to 4/98
               JUNIOR ARCHITECT
               Kattenburg & Associates, Benicia, CA 6/92 to11/94
ARCHITECTURAL DRAFTSMAN
                Architectural Design, San Dimas, CA 6/88 to 5/90
                ENGINEERING AIDE
                Vallejo Sanitation & Flood Control District, Vallejo, CA 4/83 to 8/87

ORGANIZATIONS   Construction Specifications Institute - Professional Member - SF Chapter
                - 2000 to 2003
                International Conference of Building Officials/International Code Council
                - Professional Member, 1998 to 2004
                Filipino American Society of Architects and Engineers - National Board of
                Directors, 1998 to 2001

PORTFOLIO       Available upon request

REFERENCES      Primo Orpilla, Owner, Studio O+A, San Francisco, CA
                [415] 908-1880
                Moshe Dinar, Owner, Dinar & Associates, Oakland, CA
                [510] 893-8300
                Oren Rubin, Principal, VBN Architects, Oakland, CA
                [510] 763-1313
                Bill Douglas, Owner, ID Architecture, Pleasanton, CA
                [925] 484-5245




AOL Lobby
AOL Lobby




AOL Conference Room   AOL Reception Desk

Mais conteúdo relacionado

Mais procurados

Sample Design Portfolio
Sample Design PortfolioSample Design Portfolio
Sample Design Portfoliotonytso
 
SCPE Portfolio
SCPE PortfolioSCPE Portfolio
SCPE Portfoliodocapri
 
IV Consulting - Architectural Projects
IV Consulting - Architectural ProjectsIV Consulting - Architectural Projects
IV Consulting - Architectural ProjectsLucian Gunter IV
 
A Liliana Lopez 2010
A Liliana Lopez 2010A Liliana Lopez 2010
A Liliana Lopez 2010Liliana Lopez
 
Newton Peter Master 04 15 09
Newton Peter Master 04 15 09Newton Peter Master 04 15 09
Newton Peter Master 04 15 09Archicon
 
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011Hans Goetze
 
Spa capability statement 2020
Spa capability statement 2020Spa capability statement 2020
Spa capability statement 2020Krishna Rao
 
Meske Portfolio
Meske PortfolioMeske Portfolio
Meske Portfoliochrismeske
 
Stan Shipley Folio 11jly01
Stan Shipley   Folio 11jly01Stan Shipley   Folio 11jly01
Stan Shipley Folio 11jly01stan_shipley
 
Portfolio Robert Abell Linkin
Portfolio Robert Abell LinkinPortfolio Robert Abell Linkin
Portfolio Robert Abell Linkinbobabell
 
Mnkhan architects general profile
Mnkhan architects general profileMnkhan architects general profile
Mnkhan architects general profileMahbuba Khan
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2john rhynold
 
Derek Rubinoff Resume 01 2009
Derek Rubinoff Resume 01 2009Derek Rubinoff Resume 01 2009
Derek Rubinoff Resume 01 2009drubinoff
 
Pauls Portfolio
Pauls PortfolioPauls Portfolio
Pauls Portfoliopcgrimes
 
Resume Siluri w samples 2017
Resume Siluri w samples 2017Resume Siluri w samples 2017
Resume Siluri w samples 2017ANDREAS SILURI
 

Mais procurados (20)

Sample Design Portfolio
Sample Design PortfolioSample Design Portfolio
Sample Design Portfolio
 
Resume Kenneth Johnson
Resume Kenneth JohnsonResume Kenneth Johnson
Resume Kenneth Johnson
 
SCPE Portfolio
SCPE PortfolioSCPE Portfolio
SCPE Portfolio
 
IV Consulting - Architectural Projects
IV Consulting - Architectural ProjectsIV Consulting - Architectural Projects
IV Consulting - Architectural Projects
 
A Liliana Lopez 2010
A Liliana Lopez 2010A Liliana Lopez 2010
A Liliana Lopez 2010
 
Newton Peter Master 04 15 09
Newton Peter Master 04 15 09Newton Peter Master 04 15 09
Newton Peter Master 04 15 09
 
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
 
Spa capability statement 2020
Spa capability statement 2020Spa capability statement 2020
Spa capability statement 2020
 
Meske Portfolio
Meske PortfolioMeske Portfolio
Meske Portfolio
 
Clarence Bricklyne - Resume
Clarence Bricklyne - ResumeClarence Bricklyne - Resume
Clarence Bricklyne - Resume
 
Stan Shipley Folio 11jly01
Stan Shipley   Folio 11jly01Stan Shipley   Folio 11jly01
Stan Shipley Folio 11jly01
 
CDM PPT 2011
CDM PPT 2011CDM PPT 2011
CDM PPT 2011
 
MMA.Architects
MMA.ArchitectsMMA.Architects
MMA.Architects
 
Portfolio Robert Abell Linkin
Portfolio Robert Abell LinkinPortfolio Robert Abell Linkin
Portfolio Robert Abell Linkin
 
Mnkhan architects general profile
Mnkhan architects general profileMnkhan architects general profile
Mnkhan architects general profile
 
resume for john rhynold 2015 #2
resume for john rhynold 2015 #2resume for john rhynold 2015 #2
resume for john rhynold 2015 #2
 
Derek Rubinoff Resume 01 2009
Derek Rubinoff Resume 01 2009Derek Rubinoff Resume 01 2009
Derek Rubinoff Resume 01 2009
 
Pauls Portfolio
Pauls PortfolioPauls Portfolio
Pauls Portfolio
 
Resume Siluri w samples 2017
Resume Siluri w samples 2017Resume Siluri w samples 2017
Resume Siluri w samples 2017
 
191031 | IDD Presentation
191031 | IDD Presentation 191031 | IDD Presentation
191031 | IDD Presentation
 

Semelhante a Alfred J. Socias CSI CDT Architectural Resume

Steve Binger - Resume & Project List
Steve Binger - Resume & Project ListSteve Binger - Resume & Project List
Steve Binger - Resume & Project ListStephen Binger
 
KGEIGER_PROJECTHISTORY2015
KGEIGER_PROJECTHISTORY2015KGEIGER_PROJECTHISTORY2015
KGEIGER_PROJECTHISTORY2015Kelly Geiger
 
Renee m thomas resume
Renee m thomas resumeRenee m thomas resume
Renee m thomas resumeRenee Thomas
 
David h page 2 and 3 resume
David h page 2 and 3 resumeDavid h page 2 and 3 resume
David h page 2 and 3 resumeguestd769e2
 
Amy Frerker_Resume_Detailed Proj Exp
Amy Frerker_Resume_Detailed Proj ExpAmy Frerker_Resume_Detailed Proj Exp
Amy Frerker_Resume_Detailed Proj ExpAmy Frerker
 
Enriquez_Adriana_Portfolio binder
Enriquez_Adriana_Portfolio binderEnriquez_Adriana_Portfolio binder
Enriquez_Adriana_Portfolio binderAdriana Enriquez
 
101014 Melton Jennifer Resume
101014 Melton Jennifer Resume101014 Melton Jennifer Resume
101014 Melton Jennifer Resumejenmelt10
 
Charles Ytzen project architect
Charles Ytzen project architectCharles Ytzen project architect
Charles Ytzen project architectCharles Ytzen
 
BAQAI_Ifti_15_06_03
BAQAI_Ifti_15_06_03BAQAI_Ifti_15_06_03
BAQAI_Ifti_15_06_03Ifti Baqai
 
CDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdfCDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdf8-koi
 
Dickey Project Portfolio 06-20-15
Dickey Project Portfolio 06-20-15Dickey Project Portfolio 06-20-15
Dickey Project Portfolio 06-20-15Ben Dickey
 

Semelhante a Alfred J. Socias CSI CDT Architectural Resume (20)

Steve Binger - Resume & Project List
Steve Binger - Resume & Project ListSteve Binger - Resume & Project List
Steve Binger - Resume & Project List
 
KGEIGER_PROJECTHISTORY2015
KGEIGER_PROJECTHISTORY2015KGEIGER_PROJECTHISTORY2015
KGEIGER_PROJECTHISTORY2015
 
Renee m thomas resume
Renee m thomas resumeRenee m thomas resume
Renee m thomas resume
 
David h page 2 and 3 resume
David h page 2 and 3 resumeDavid h page 2 and 3 resume
David h page 2 and 3 resume
 
Amy Frerker_Resume_Detailed Proj Exp
Amy Frerker_Resume_Detailed Proj ExpAmy Frerker_Resume_Detailed Proj Exp
Amy Frerker_Resume_Detailed Proj Exp
 
Enriquez_Adriana_Portfolio binder
Enriquez_Adriana_Portfolio binderEnriquez_Adriana_Portfolio binder
Enriquez_Adriana_Portfolio binder
 
101014 Melton Jennifer Resume
101014 Melton Jennifer Resume101014 Melton Jennifer Resume
101014 Melton Jennifer Resume
 
Shital_Resume
Shital_ResumeShital_Resume
Shital_Resume
 
Charles Ytzen project architect
Charles Ytzen project architectCharles Ytzen project architect
Charles Ytzen project architect
 
Resume
ResumeResume
Resume
 
M walker resume_current
M walker resume_currentM walker resume_current
M walker resume_current
 
Timothy-Bennett-CV
Timothy-Bennett-CVTimothy-Bennett-CV
Timothy-Bennett-CV
 
BAQAI_Ifti_15_06_03
BAQAI_Ifti_15_06_03BAQAI_Ifti_15_06_03
BAQAI_Ifti_15_06_03
 
Whitfield resume
Whitfield   resume Whitfield   resume
Whitfield resume
 
CDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdfCDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdf
 
Resume of Djuan Jackson
Resume of Djuan JacksonResume of Djuan Jackson
Resume of Djuan Jackson
 
Resume sol_2016
Resume sol_2016Resume sol_2016
Resume sol_2016
 
Resume_SOl_2016
Resume_SOl_2016Resume_SOl_2016
Resume_SOl_2016
 
Resume_SOl_2016
Resume_SOl_2016Resume_SOl_2016
Resume_SOl_2016
 
Dickey Project Portfolio 06-20-15
Dickey Project Portfolio 06-20-15Dickey Project Portfolio 06-20-15
Dickey Project Portfolio 06-20-15
 

Mais de Alfred Socias

Mais de Alfred Socias (15)

Snagels
SnagelsSnagels
Snagels
 
08-5
08-508-5
08-5
 
BASE-FLR-6
BASE-FLR-6BASE-FLR-6
BASE-FLR-6
 
oplusa-aol_0001B
oplusa-aol_0001Boplusa-aol_0001B
oplusa-aol_0001B
 
Microsoft Building 4
Microsoft Building 4Microsoft Building 4
Microsoft Building 4
 
CSUH CDs AutoCAD Finished Photos
CSUH CDs AutoCAD Finished PhotosCSUH CDs AutoCAD Finished Photos
CSUH CDs AutoCAD Finished Photos
 
AOL Cds AutoCAD
AOL Cds AutoCADAOL Cds AutoCAD
AOL Cds AutoCAD
 
Foley & Lardner Finished Photos
Foley & Lardner Finished PhotosFoley & Lardner Finished Photos
Foley & Lardner Finished Photos
 
Nazareth Terrace CDs AutoCAD
Nazareth Terrace CDs AutoCADNazareth Terrace CDs AutoCAD
Nazareth Terrace CDs AutoCAD
 
Evernote Finished Photos
Evernote Finished PhotosEvernote Finished Photos
Evernote Finished Photos
 
Photoshop Illustrator Work
Photoshop Illustrator WorkPhotoshop Illustrator Work
Photoshop Illustrator Work
 
Revit Screen Shots
Revit Screen ShotsRevit Screen Shots
Revit Screen Shots
 
CAD CD Screen Shots
CAD CD Screen ShotsCAD CD Screen Shots
CAD CD Screen Shots
 
AOL Headquarters
AOL HeadquartersAOL Headquarters
AOL Headquarters
 
557 Merrimac
557 Merrimac557 Merrimac
557 Merrimac
 

Alfred J. Socias CSI CDT Architectural Resume

  • 1. ALFRED J. SOCIAS, CSI, CDT 91-1200 Keaunui Drive #400 Ewa Beach, HI 96706 Home: [808] 888-0633 Mobile: [925] 451-1761 E-mail: alsocias@sbcglobal.net OBJECTIVE Employment as a job captain / project architect on commercial building or educational building project types. EDUCATION Revit Training Videos (Scott Onstott) – June 2008 Revit Fundamentals Class – April 2008 Design + Technology of Roofing Systems Class - May 2003 Better Understanding of Roof Systems Institute Principal & Practices of Specifying Class - March 2003 East Bay/Oakland CSI Chapter 2001 CBC Non-Structural Update Class - June 2002 International Conference of Building Officials Building Codes Semester Long Class [1998 UBC] - December 2000 San Francisco City College Bachelor of Architecture - December 1991 California State Polytechnic University, Pomona, California Graphic Arts Certificate - December 1988 Mount San Antonio College, Walnut, California Contra Costa College, San Pablo, California CERTIFICATION Construction Documents Technologist Certificate 2000 LICENSURE Construction Specifications Institute 2 NCARB tests away from Architectural Licensure MANAGEMENT Captained a variety of architectural projects such as school laboratory buildings, school modernizations, grocery store additions / remodels, retail shell buildings, mid-rise offices, tenant improvements, warehouses, single and multi-family housing developments, custom estate residences, residential room addition/remodels, and churches. All included consultant coordination, project file management, specification coordination, and some construction administration. TECHNICAL Drafted architectural design development packages, construction documents, addenda, and clarifications on CAD. Prepared detailed building code analysis for various project types including assigning building occupancy classification and construction types. Determined occupancy, and or area separation requirements, exterior wall protection, allowable area and occupant loads. Prepared allowable area calculations, and exit width calculations. Researched and incorporated architectural products into projects. Solved architectural, fireproofing and waterproofing details. Coordinated architectural drawings with consultant drawings. Edited specification sections including door hardware groups. Assisted with construction administration including shop drawing and submittal processing, and clarification generation. Field verified existing fire & life safety exiting schemes. Field verified existing accessible or non-accessible conditions. DESIGN Designed exiting schemes from hallways to corridors to enclosed stair towers. Designed accessible and non-accessible site parking, drive aisles, site and building paths of travel. Designed ramps, stairs, toilet
  • 2. rooms, areas of rescue assistance, wheelchair lifts and elevators for school modernization projects. Design developed various project types in preparation for construction documents. QUALITY Helped devised custom CAD production systems for various architectural ASSURANCE project types. QA systems included an orthographic projection technique using rotated user coordinate systems within view ports to facilitate the rapid creation of complex elevations. Helped to create a CSI based detail library, detail component blocks, a detail sheet preparation technique based on xreffing pre-bordered & pre-titled details, and working drawing (.dwt) sheet templates which incorporated pre-loaded symbols, details and architectural notation pertinent to each sheet. COMPUTER Windows XP: Revit 8.1, AutoCAD 2010, Microstation CAD V8, Microsoft Outlook, Microsoft Word, Microsoft Excel, Adobe Acrobat, and WinZip. Windows Mobile: Pocket Word, Pocket Excel, Adobe Reader, Pocket CAD COMMUNICATION Direct communication with project consultants - civil, structural, mechanical, electrical, plumbing, landscape, fire alarm, telecommunication, and title 24 energy. PROJECTS AOL, Palo Alto, CA - Construction Documents & Construction Administration Interior tenant improvement & office remodel of existing type II building including entry lobby & custom furniture and graphics. Box.net, Palo Alto, CA - Construction Documents Interior tenant improvement & office remodel Hangar 42 Studios, Walker, MI Interior remodel of office & support spaces for future movie studio. University of California, Berkeley, School of Law Building, Boalt Hall, Berkeley, CA - Construction Documents Interior tenant improvement of existing law school building. Program included distance learning room, classrooms, offices & journal rooms. Albertsons Grocery Store, Lake Forest, CA – Construction Documents & Specifications Existing 43,000 s.f. grocery store remodel / addition. Entry piece addition, new interior décor package, and new refrigeration. Traditions Building, Walnut Creek, CA - Construction Documents Interior tenant improvement and minor exterior building improvements. Phased project included obtaining demolition permit, site development permit, tenant improvement permit, exterior building improvements permit, and fire district approval. Hillcrest Village, Antioch, CA – Site Plan Design Development 16 building office / retail / restaurant on a 1,004,000 s.f. site. Calculated parking basis including HCP. Determined fire truck access and accessible paths of travel. Enea Plaza, Dublin, CA - Site Plan Design Development 3 retail buildings on a 166,800 s.f. site. Calculated parking basis
  • 3. including HCP. Determined fire truck access and accessible paths of travel. Buchanan Crossings, Antioch, CA - Site Plan Design Development 9 building office / retail / restaurant on a 590,000 s.f. site. Calculated parking basis including HCP. Determined fire truck access and accessible paths of travel. Canyon Oaks Plaza, Chico, CA - Site Plan Design Development 6 building office / retail / restaurant on a 245,600 s.f. site. Calculated parking basis including HCP. Determined fire truck access and accessible paths of travel. Kiernan Plaza, Salida, CA - Construction Documents New 12,000 s.f. retail shell building that was subdivided into 8 tenant spaces. Built on a 52,000 s.f. lot. Bristol Farms Grocery Store, Santa Barbara, CA - Construction Documents & Specifications Existing 34,700 s.f. grocery store remodel. Included minor exterior building architectural elements, new interior décor, and new refrigeration. 557 Merrimac, Oakland, CA - Construction Documents Mixed use multi-family residential / retail building with 3 stories of apartments, 1 story of retail / parking garage and basement parking. 30 total dwelling units, elevator, storefront, basically 3 stories of wood frame construction on a concrete podium. Calculated as 3 separate buildings for allowable area purposes. Contra Costa Gospel Church, Walnut Creek, CA – Construction Documents New 3096 s.f. multi-purpose building on an existing church site. Leonard Flynn Elementary School Modernization, San Francisco, CA - Construction Documents One building which includes a day care center, multi-purpose room, library, and classrooms whose scope of work included accessibility and fire-life safety upgrades to current code, separate exit routes for kindergarten and elementary students, exterior door replacement, interior finishes and casework, toilet room remodels, and electrical, plumbing systems upgrades. Tileshop Warehouse, Berkeley, CA - Construction Documents New 23,000 s.f. two story warehouse with ancillary office space features metal cladding over steel and metal stud structure. Thurgood Marshall High School Modernization, San Franciso, CA - Construction Documents One 150,000 s.f. building which included an auditorium, gymnasium, cafeteria, library, classrooms, and laboratories whose scope of work included accessibility and fire-life safety upgrades to current code, gymnasium addition, roofing and waterproofing, interior finishes and casework, toilet room remodels, and electrical, plumbing, and data- communication systems upgrades. Salvio Street Parking Structure, Concord, CA - Construction Documents
  • 4. Addtition-remodel of existing 6 story post tension structure parking garage. Work included new offices, accessible parking re-stripping, new accessible toilets, and upgrade mechanical, electrical and plumbing systems. Zio Fraedo's Banquet Hall, Pleasant Hill, CA - Construction Documents New Mediterranean influenced 8700 s.f. banquet facility with restaurant, commercial kitchen, and offices. King of Thai Noodle House, San Francisco, CA - Construction Documents Tenant improvement of two story restaurant with commercial kitchen, and offices. Palo Alto High School Science Building, Palo Alto, CA - Construction Documents & Specifications New 28,000 s.f. 1 story science building on an existing campus. Building program included 10 labs, prep space, and a teachers' office suite. California State University Hayward Library Fire Repair, Hayward CA - Construction Documents Interior remodel of fire damaged library. Included offices, instructional media center and a high tech distance learning classroom. Seismic upgrade included floor to ceiling high steel K bracing. AC Transit Headquarters, Oakland, CA - Construction Documents 7 floor tenant improvement of an existing 10 floor mid-rise office building. Includes custom ticket window casework with butt glazing, computer casework and new manufacturer workstations. AT Systems Armored Transport Facility, Oakland, CA - Construction Documents Existing 12,000 s.f. repair garage converted to a mixed use repair garage-coin counting facility. Jackson Center One, Oakland, CA - Construction Documents Tenant improvement and seismic upgrade of the existing mid-rise defunct State Office Building. 10 floor scope includes new gunite exterior, exterior granite cladding, exterior metal canopies, new built-up roofing, and storefront. Foley & Lardner Law Offices, San Francisco, CA - Construction Documents Two floors of high rise, high end, high tech design interior tenant improvement. Includes custom detailed desks, cabinetry, partitions, soffits, glass railed stairways, and doors. Approximately 33,000 s.f. Villa Cortona, San Jose, CA - Construction Documents New 72 unit French Provincial multi-family housing project consisting of 2 duplex town home building types and 2 condominium building types of approximately 4800 to 10,300 s.f., all units are multi-level which exempted accessible requirements, and all are located on a complex sloping site. Palo Alto High School Modernization, Palo Alto, CA - Construction
  • 5. Documents 19 existing buildings whose scope of work included accessibility and fire- life safety upgrades to current code, exterior door replacement, roofing and waterproofing, interior finishes and casework, toilet room remodels, and electrical, plumbing, and data-communication systems upgrades. Vallejo School Modernization, Vallejo, CA - Construction Documents 8 elementary school modernization projects whose scope of work included accessibility and fire-life safety upgrades to current code, exterior door and window replacement, interior finishes and casework, toilet room remodels, and electrical, plumbing, and data-communication systems upgrades. Marr Residence, Atherton, CA - Construction Documents A new 11,000 s.f. French Normandy style custom estate home included a sunroom greenhouse, swimming pool, pool pavilion, three car garage, carriage house, guest house, tennis courts, a hidden garden and 'smart home' electronics. Del Grande Residence, Los Gatos, CA - Construction Documents A new 7,600 s.f. hillside custom estate home reflects the architecture of Carmel. It features decks and terraces that take full advantage of a panoramic valley view below, swimming pool and croquet lawn. Nepenthe, Sedona, AZ - Construction Documents A new 182 unit complex of multi-family town houses comprised of four, five, and seven unit buildings. Geometric shapes and colors relate to the Sedona's surrounding red sandstone Bell Mountain which is adjacent to the site. Highlands at Clearbrook, Hayward, CA - Construction Documents 2 designs of new single family production housing about 2600 s.f. to 3200 s.f. each. Both designs were for lots with a 2:1 downward slope and incorporated view decks from both the first and second floors. AWARDS San Jose Veterans Memorial Design Competition, 1993, COMPETITIONS participant. San Francisco Waterfront Competition, 1992, Honorable mention/gallery exhibitor. Tijuana Cultural Center Demountable Roof Structure Competition, 1991. Douglas Conelly Memorial Scholarship in Architecture, Contra Costa College, San Pablo, California, 1987. Solano County fair ribbons in architectural and mechanical drafting, 1984. EMPLOYMENT PROJECT ARCHITECT Studio O+A, San Francisco, CA 9/09 to present PROJECT ARCHITECT (Contract Work) ID Architecture, Pleasanton, CA 2/09 to 8/09 PROJECT ARCHITECT The Ratcliff Architects, Emeryville, CA 2/08 to 12/08 JOB CAPTAIN Craig+Grant Architects, Danville, CA 11/05 to 1/08 JOB CAPTAIN VBN Architects, Oakland, CA 4/98 to 11/05 JOB CAPTAIN Loving & Campos Architects, Inc., Walnut Creek, CA 3/95 to 4/98 JUNIOR ARCHITECT Kattenburg & Associates, Benicia, CA 6/92 to11/94
  • 6. ARCHITECTURAL DRAFTSMAN Architectural Design, San Dimas, CA 6/88 to 5/90 ENGINEERING AIDE Vallejo Sanitation & Flood Control District, Vallejo, CA 4/83 to 8/87 ORGANIZATIONS Construction Specifications Institute - Professional Member - SF Chapter - 2000 to 2003 International Conference of Building Officials/International Code Council - Professional Member, 1998 to 2004 Filipino American Society of Architects and Engineers - National Board of Directors, 1998 to 2001 PORTFOLIO Available upon request REFERENCES Primo Orpilla, Owner, Studio O+A, San Francisco, CA [415] 908-1880 Moshe Dinar, Owner, Dinar & Associates, Oakland, CA [510] 893-8300 Oren Rubin, Principal, VBN Architects, Oakland, CA [510] 763-1313 Bill Douglas, Owner, ID Architecture, Pleasanton, CA [925] 484-5245 AOL Lobby
  • 7. AOL Lobby AOL Conference Room AOL Reception Desk