Overview of CCP/911 Issues

 2012 budget shortfall and necessary action
 Update on revisions to CCP Interlocal
 Possible relocation of 911 dispatch center
 P25 upgrade project and funding discussions
2012 CCP Budget

 During Interlocal negotiations, some City expenses
    were inadvertently left out (radio shop, etc)
   Agreement calls for 70/30 split based, so County’s
    30% number constrains City’s 70% number
   ‘Gap’ is between CCP budget and amount provided
    under Interlocal formula
   Budget assumed all E911 revenues would be
    contributed, whereas only wired was appropriated
   City and County both contributing to ‘gap’ funding
Amendments to CCP Interlocal

 Amendments are needed to address known issues
   Fix perpetual shortfall resulting from unknown budget items
    not included in negotiations of original Interlocal
   Changes to operations board of CCP

   Clarification that all E911 fees will go to CCP

   Clarification of what happens if CCP budget needs to increase

 Revisions have been discussed between Mayor,
  Commissioner and CCP attorneys
911 Dispatch Relocation

 Previous cursory study showed Rousseau Centre
  basement could be modified to create minimal
  additional square footage, but as it stands now, is not
  best suited for the new system
 Looking at locations outside of Rousseau Centre
 Hoping to work with community partners
 Space needs to allow for opportunities for regional
  dispatch in the future
Upgrade to new 911 system

 Multiple negotiation sessions with Motorola
   Motorola has given discounts and incentives beyond the bid
    price
 Final negotiated price of $16,986,484
   City share @ $9,826,277

   County share@ $7,160,207
     Radios @ $2,904,436
     50% of Backbone @ $4,255,771
How do we pay for it?

 Finance Lease with outside lender
 Bond against future taxes or revenue
 Pay with cash
Commissioners’ Recommendation

 For County portion of 911 upgrade, use available
 cash on hand
    CEDIT/COIT ‘windfall’ - $4.8M
    Rainy Day - $2.3M
 Appropriate $1.4M in July from E911 fund to fix ‘gap’
  for 2012 budget
 Preserve remaining balance of E911 fund for possible
  911 relocation and cash reserve for CCP

Mais conteúdo relacionado

Semelhante a 911 upgrade presentation

CEF Councillors Briefing 18 January 2012
CEF Councillors Briefing 18 January 2012CEF Councillors Briefing 18 January 2012
CEF Councillors Briefing 18 January 2012crifcambs
 
2011 Preliminary Budget & Levy Presentation
2011 Preliminary Budget & Levy Presentation2011 Preliminary Budget & Levy Presentation
2011 Preliminary Budget & Levy PresentationCity of Hopkins
 
Keppel Corporation 2H & FY 2020 Results Presentation Slides
Keppel Corporation 2H & FY 2020 Results Presentation SlidesKeppel Corporation 2H & FY 2020 Results Presentation Slides
Keppel Corporation 2H & FY 2020 Results Presentation SlidesKeppelCorporation
 
2010 legislative breakfast
2010 legislative breakfast2010 legislative breakfast
2010 legislative breakfastguestc483d27
 
2014 Financial Report for Penn South
2014 Financial Report for Penn South2014 Financial Report for Penn South
2014 Financial Report for Penn Southpennsouthoffice
 
Briefing to Dublin City Council on Irish Water
Briefing to Dublin City Council on Irish WaterBriefing to Dublin City Council on Irish Water
Briefing to Dublin City Council on Irish WaterNaoise
 
HVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 PresentationHVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 Presentationpennsouthoffice
 
CEF stage 2 final report Executive Summary
CEF stage 2 final report Executive SummaryCEF stage 2 final report Executive Summary
CEF stage 2 final report Executive Summarycrifcambs
 
Peterborough City Council Financial Report 2010-11
Peterborough City Council Financial Report 2010-11Peterborough City Council Financial Report 2010-11
Peterborough City Council Financial Report 2010-11Peterborough Telegraph
 
Burke County 911 PSAP Funding Presentation - Winter 2014 NCLGBA Conference
Burke County 911 PSAP Funding Presentation - Winter 2014 NCLGBA ConferenceBurke County 911 PSAP Funding Presentation - Winter 2014 NCLGBA Conference
Burke County 911 PSAP Funding Presentation - Winter 2014 NCLGBA ConferencePublicFinanceTV
 
Quarterly performance report Q3.pptx
Quarterly performance report Q3.pptxQuarterly performance report Q3.pptx
Quarterly performance report Q3.pptxErYogeshRaj
 
2015 Penn South Annual Meeting Financial Presentation
2015 Penn South Annual Meeting Financial Presentation2015 Penn South Annual Meeting Financial Presentation
2015 Penn South Annual Meeting Financial Presentationpennsouthoffice
 
Charles River Pollution Control District - Presentation 2/5/09
Charles River Pollution Control District - Presentation 2/5/09Charles River Pollution Control District - Presentation 2/5/09
Charles River Pollution Control District - Presentation 2/5/09Franklin Matters
 
Robbinsville_ReExam_Print
Robbinsville_ReExam_PrintRobbinsville_ReExam_Print
Robbinsville_ReExam_PrintEric Tuvel
 
Parkrose Township
Parkrose TownshipParkrose Township
Parkrose TownshipChad Yowler
 
Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...
Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...
Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...Ravikant Joshi
 
Results presentation 4 q11
Results presentation 4 q11Results presentation 4 q11
Results presentation 4 q11comgasri
 
Township of Langley Budget Presentation March 10
Township of Langley Budget Presentation March 10Township of Langley Budget Presentation March 10
Township of Langley Budget Presentation March 10jgabateman
 
Melbourne IT H1 2011 Investor Presentation
Melbourne IT H1 2011 Investor PresentationMelbourne IT H1 2011 Investor Presentation
Melbourne IT H1 2011 Investor PresentationMelbourne IT
 

Semelhante a 911 upgrade presentation (20)

CEF Councillors Briefing 18 January 2012
CEF Councillors Briefing 18 January 2012CEF Councillors Briefing 18 January 2012
CEF Councillors Briefing 18 January 2012
 
Pp lg 2011 workshop
Pp lg 2011 workshopPp lg 2011 workshop
Pp lg 2011 workshop
 
2011 Preliminary Budget & Levy Presentation
2011 Preliminary Budget & Levy Presentation2011 Preliminary Budget & Levy Presentation
2011 Preliminary Budget & Levy Presentation
 
Keppel Corporation 2H & FY 2020 Results Presentation Slides
Keppel Corporation 2H & FY 2020 Results Presentation SlidesKeppel Corporation 2H & FY 2020 Results Presentation Slides
Keppel Corporation 2H & FY 2020 Results Presentation Slides
 
2010 legislative breakfast
2010 legislative breakfast2010 legislative breakfast
2010 legislative breakfast
 
2014 Financial Report for Penn South
2014 Financial Report for Penn South2014 Financial Report for Penn South
2014 Financial Report for Penn South
 
Briefing to Dublin City Council on Irish Water
Briefing to Dublin City Council on Irish WaterBriefing to Dublin City Council on Irish Water
Briefing to Dublin City Council on Irish Water
 
HVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 PresentationHVAC Financing at Penn South - 2013 Presentation
HVAC Financing at Penn South - 2013 Presentation
 
CEF stage 2 final report Executive Summary
CEF stage 2 final report Executive SummaryCEF stage 2 final report Executive Summary
CEF stage 2 final report Executive Summary
 
Peterborough City Council Financial Report 2010-11
Peterborough City Council Financial Report 2010-11Peterborough City Council Financial Report 2010-11
Peterborough City Council Financial Report 2010-11
 
Burke County 911 PSAP Funding Presentation - Winter 2014 NCLGBA Conference
Burke County 911 PSAP Funding Presentation - Winter 2014 NCLGBA ConferenceBurke County 911 PSAP Funding Presentation - Winter 2014 NCLGBA Conference
Burke County 911 PSAP Funding Presentation - Winter 2014 NCLGBA Conference
 
Quarterly performance report Q3.pptx
Quarterly performance report Q3.pptxQuarterly performance report Q3.pptx
Quarterly performance report Q3.pptx
 
2015 Penn South Annual Meeting Financial Presentation
2015 Penn South Annual Meeting Financial Presentation2015 Penn South Annual Meeting Financial Presentation
2015 Penn South Annual Meeting Financial Presentation
 
Charles River Pollution Control District - Presentation 2/5/09
Charles River Pollution Control District - Presentation 2/5/09Charles River Pollution Control District - Presentation 2/5/09
Charles River Pollution Control District - Presentation 2/5/09
 
Robbinsville_ReExam_Print
Robbinsville_ReExam_PrintRobbinsville_ReExam_Print
Robbinsville_ReExam_Print
 
Parkrose Township
Parkrose TownshipParkrose Township
Parkrose Township
 
Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...
Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...
Financial and Operating Plan - A Tool for Strategic Municipal Investment and ...
 
Results presentation 4 q11
Results presentation 4 q11Results presentation 4 q11
Results presentation 4 q11
 
Township of Langley Budget Presentation March 10
Township of Langley Budget Presentation March 10Township of Langley Budget Presentation March 10
Township of Langley Budget Presentation March 10
 
Melbourne IT H1 2011 Investor Presentation
Melbourne IT H1 2011 Investor PresentationMelbourne IT H1 2011 Investor Presentation
Melbourne IT H1 2011 Investor Presentation
 

Último

Slicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup BerlinSlicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup BerlinAnton Skornyakov
 
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003believeminhh
 
To Create Your Own Wig Online To Create Your Own Wig Online
To Create Your Own Wig Online  To Create Your Own Wig OnlineTo Create Your Own Wig Online  To Create Your Own Wig Online
To Create Your Own Wig Online To Create Your Own Wig Onlinelng ths
 
Developing Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursDeveloping Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursKaiNexus
 
UNLEASHING THE POWER OF PROGRAMMATIC ADVERTISING
UNLEASHING THE POWER OF PROGRAMMATIC ADVERTISINGUNLEASHING THE POWER OF PROGRAMMATIC ADVERTISING
UNLEASHING THE POWER OF PROGRAMMATIC ADVERTISINGlokeshwarmaha
 
Project Brief & Information Architecture Report
Project Brief & Information Architecture ReportProject Brief & Information Architecture Report
Project Brief & Information Architecture Reportamberjiles31
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxWorkforce Group
 
MoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor PresentationMoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor Presentationbaron83
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfJohnCarloValencia4
 
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...AustraliaChapterIIBA
 
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView
 
Upgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsUpgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsIntellect Design Arena Ltd
 
Tata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerakTata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerakEditores1
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access
 
MC Heights construction company in Jhang
MC Heights construction company in JhangMC Heights construction company in Jhang
MC Heights construction company in Jhangmcgroupjeya
 
A flour, rice and Suji company in Jhang.
A flour, rice and Suji company in Jhang.A flour, rice and Suji company in Jhang.
A flour, rice and Suji company in Jhang.mcshagufta46
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access
 
Fabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsFabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsWristbands Ireland
 
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdfChicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdfSourav Sikder
 

Último (20)

WAM Corporate Presentation Mar 25 2024.pdf
WAM Corporate Presentation Mar 25 2024.pdfWAM Corporate Presentation Mar 25 2024.pdf
WAM Corporate Presentation Mar 25 2024.pdf
 
Slicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup BerlinSlicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup Berlin
 
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
 
To Create Your Own Wig Online To Create Your Own Wig Online
To Create Your Own Wig Online  To Create Your Own Wig OnlineTo Create Your Own Wig Online  To Create Your Own Wig Online
To Create Your Own Wig Online To Create Your Own Wig Online
 
Developing Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursDeveloping Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, Ours
 
UNLEASHING THE POWER OF PROGRAMMATIC ADVERTISING
UNLEASHING THE POWER OF PROGRAMMATIC ADVERTISINGUNLEASHING THE POWER OF PROGRAMMATIC ADVERTISING
UNLEASHING THE POWER OF PROGRAMMATIC ADVERTISING
 
Project Brief & Information Architecture Report
Project Brief & Information Architecture ReportProject Brief & Information Architecture Report
Project Brief & Information Architecture Report
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
 
MoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor PresentationMoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor Presentation
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
 
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
IIBA® Melbourne - Navigating Business Analysis - Excellence for Career Growth...
 
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
 
Upgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsUpgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking Applications
 
Tata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerakTata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerak
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024
 
MC Heights construction company in Jhang
MC Heights construction company in JhangMC Heights construction company in Jhang
MC Heights construction company in Jhang
 
A flour, rice and Suji company in Jhang.
A flour, rice and Suji company in Jhang.A flour, rice and Suji company in Jhang.
A flour, rice and Suji company in Jhang.
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024
 
Fabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsFabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and Festivals
 
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdfChicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
 

911 upgrade presentation

  • 1. CCP Budget and Funding of 911 Upgrade BOARD OF COMMISSIONERS- 6/21/2012
  • 2. Overview of CCP/911 Issues  2012 budget shortfall and necessary action  Update on revisions to CCP Interlocal  Possible relocation of 911 dispatch center  P25 upgrade project and funding discussions
  • 3. 2012 CCP Budget  During Interlocal negotiations, some City expenses were inadvertently left out (radio shop, etc)  Agreement calls for 70/30 split based, so County’s 30% number constrains City’s 70% number  ‘Gap’ is between CCP budget and amount provided under Interlocal formula  Budget assumed all E911 revenues would be contributed, whereas only wired was appropriated  City and County both contributing to ‘gap’ funding
  • 4. Amendments to CCP Interlocal  Amendments are needed to address known issues  Fix perpetual shortfall resulting from unknown budget items not included in negotiations of original Interlocal  Changes to operations board of CCP  Clarification that all E911 fees will go to CCP  Clarification of what happens if CCP budget needs to increase  Revisions have been discussed between Mayor, Commissioner and CCP attorneys
  • 5. 911 Dispatch Relocation  Previous cursory study showed Rousseau Centre basement could be modified to create minimal additional square footage, but as it stands now, is not best suited for the new system  Looking at locations outside of Rousseau Centre  Hoping to work with community partners  Space needs to allow for opportunities for regional dispatch in the future
  • 6. Upgrade to new 911 system  Multiple negotiation sessions with Motorola  Motorola has given discounts and incentives beyond the bid price  Final negotiated price of $16,986,484  City share @ $9,826,277  County share@ $7,160,207  Radios @ $2,904,436  50% of Backbone @ $4,255,771
  • 7. How do we pay for it?  Finance Lease with outside lender  Bond against future taxes or revenue  Pay with cash
  • 8. Commissioners’ Recommendation  For County portion of 911 upgrade, use available cash on hand  CEDIT/COIT ‘windfall’ - $4.8M  Rainy Day - $2.3M  Appropriate $1.4M in July from E911 fund to fix ‘gap’ for 2012 budget  Preserve remaining balance of E911 fund for possible 911 relocation and cash reserve for CCP