Increasing Power Generation Efficiency
            in Russia and CIS Countries
   through Further Development of the
           Alstom GT13E2 Gas Turbine
                     Conference Paper




                                 POWER
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                                                    through Further Development of the GT13E2 Gas Turbine




Russia Power 2012                                                                                                                      05-07 March 2012, Moscow, Russia
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is
complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject
to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Paper presented at Russia Power in Moscow, Russia, 05-07 March 2012



Increasing Power Generation Efficiency in Russia and
  CIS Countries through Further Development of the
             Alstom GT13E2 Gas Turbine

        Bernard Tripod, Klaus Doebbeling, Christof Pfeiffer, Rudolf Heimerl
                                            Alstom Power
                                          Baden, Switzerland


1    Introduction ................................................................................................................... 4

2    The GT13E2 Development History.................................................................................. 7

3    GT13E2 – A Most Versatile Engine............................................................................... 10

4    GT13E2 Upgrade .......................................................................................................... 11

5    GT13E2 Benefits........................................................................................................... 14

6    Field Experience ........................................................................................................... 19

7    Service Offering............................................................................................................ 21

8    Summary & Conclusions ............................................................................................... 22

9    Bibliography ................................................................................................................. 23
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                                                    through Further Development of the GT13E2 Gas Turbine




1 Introduction
Changing market requirements
Today’s power market generally requires solutions delivering the most economic electric power while
minimizing the impact on the environment. This trend is likely to go on, putting increasing pressure on the
development of new power generation products.
The market requirements may vary strongly depending on the regions, driven by local power generation
market structures and grid operation characteristics and, therefore, the priorities and the relative importance
of these requirements may changes across the regions. However, the general trends show that large power
generation plants need to be designed for the highest efficiency and operational flexibility to save fuel cost over
a broad range of operating conditions, and matching a strongly changing power demand. This market
segment is generally covered by combined cycle power plants based on large gas turbine units of the advanced
technology offering the utmost performance levels.
But in addition to this high-end market, another market segment exists requiring solutions based on smaller
gas turbine units, sometimes in multi-unit configurations. For these projects, the main requirements for the
gas turbine is the capability to meet the specific project requirements, to adapt plant configuration to the
various applications to be served, and to offer the best customized solution with highest reliability, however
without compromise on performance and environmental issues.
For this segment, versatility is the key word. The GT13E2 gas turbine has already demonstrated to be a most
versatile engine, being used in connection with many different applications, and meeting a very broad range of
environment and operation conditions. The GT13E2 upgrade described in this paper further improves these
capabilities.




Russian gas power market development
In the last two years the Russian power industry has gone through fundamental changes in regards to its
power project developments. One goal of the Russian privatisation program was and still is to boost the
installation of new and highly efficient power generation facilities, so that more gas could be sold on the
international market.
The recent trend has been to move away from highly standardised power generation towards optimised and
tailored Combined Cycle Power Plants (CCPP). Together with the international procurement of main CCPP
components such as the gas turbine(s), the heat recovery steam generator(s) (HRSG), the turbogenerator(s)
and the steam turbine(s), this trend is just at its start and will steadily increase, so that the current project
development process in general may have to be adjusted accordingly. Certified design institutes, for example,



Russia Power 2012                                                                                                                      05-07 March 2012, Moscow, Russia
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is
complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject
to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                         through Further Development of the GT13E2 Gas Turbine




will depend during the pre-feasibility stage more on the support and quality of input provided by equipment
suppliers.
Foreign Original Equipment Manufacturers (OEM’s) and EPC contractors have encountered difficulties when
dealing with Russian codes and standards, as well as Russian work processes. In the course of these
experiences many foreign OEM’s / EPC contractors are reluctant to offer turnkey CCPP’s. Hence, local Russian
companies have to-date tended to build the combined cycle and/or cogeneration power plants and are still
doing so.
Depending on their experience, however, difficulties have occurred when the Russian EPC contractors have
tried to integrate the main equipment components purchased abroad into a functional combined cycle power
plant. The Russian EPC contractors have experienced challenges such as omitted/missing scope and final
commissioning co-ordination issues, which in some cases, has made it extremely difficult to meet performance
guarantees, project schedules and pricing budgets. This meanwhile has reached even federal authorities
attention. One of the already initiated counter-measures for example is that the federal office
GLAVGOSEXPERTIZA is putting increased attention to compliance of the complete development process (e.g.
мдс -80-8.2000 “Guidelines”), in accordance with the Urban Planning Code, for the development of technical
scope of tender documentation”), before a new CCPP permit is granted.
With the different technical needs, EPC contractors are also faced with new commercial challenges. For
example, balancing the risk profile in view of own capabilities versus scope of supply to be purchased and
therefore level of risk outsourced becomes the important question for a competitive CCPP offer.
For EPC contractors, with a strong in-house engineering division, it may look commercially more attractive to
purchase individual equipment only and therefore take on more risk regarding possible omitted scope, overall
performance guarantees, project time schedule etc. While for other EPC contractors it may be commercially
more attractive to look for a greater risk-share with the main component supplier, e.g. in terms of Power
Island (PI) overall performance guarantees, or commissioning schedule of the main PI components.
With its unique power generation portfolio, Alstom has developed standard solutions ranging from the supply
of main components to fully integrated power island solutions specifically engineered for the needs of the
Russian market conditions. For all such solutions a scope description and clear division of work (DOW) will
serve as a starting point with developers/owners and/or EPC contractors to tailor the project specific scope
and DOW including the project risk sharing.
With flexible product offerings, Alstom can tailor and customize its approach so that developers/owners and
EPC contractors have more flexibility to optimise their in-house resources versus the technical and commercial
requirements and finally the overall project risk profile.
To-date, Alstom has supplied either directly or in consortium more than 170 turnkey Combined Cycle Power
Plants worldwide, and continues to be one of the leading turnkey suppliers of CCPP solutions.
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                                                    through Further Development of the GT13E2 Gas Turbine




Russian market requirements
The Russian & CIS power market has grown rapidly over the last decade. Russia is the fourth largest electricity
producer in the world, behind only the US, China and Japan, and electricity consumption in the near- to mid-
term is expected to grow at about 2% per year. Demand for new capacity is driven both by economic growth
and by the need to retire old plants. Nearly half of the installed capacity in Russia is over 30 years old, and a
majority of these units are inefficient gas-fired steam plants. Based on new plant orders over the last five
years, gas plants top nuclear, conventional steam, and hydro as Russia’s top choice for new capacity. This
trend is expected to continue, with 60% of new capacity in the next ten years coming from gas turbine based
power plants.
A common market requirement is that the plant must be able to meet the steam needs of existing Combined
Heat and Power (CHP) systems, which are prevalent throughout Russia. Repowering is another important
market segment, where existing conventional steam plants are transformed into the steam cycle for a
combined cycle plant. The choice of gas turbines is sometimes simply based on which provides the best fit with
the existing power plant. The most challenging requirement for gas plants in the Russian market, however, is
the need to deal with extremely wide ranges of ambient temperatures. Operating temperatures typically are
specified as a range from –40°C to +40°C.
To cope with all the diverse conditions and requirements, a highly versatile type of engine is required. The
Alstom GT13E2 gas turbine is well adapted to the specific conditions of the Russian & CIS market and offers
the highest performance in its class to produce economic and clean power. The GT13E2 operation and
experience records show that the GT13E2 has proved to be the perfect fit for power generation projects, also
including special applications like cogeneration projects for district heating, desalination or other industrial
applications, or repowering opportunities.
Only last year Alstom has been awarded 8 GT13E2 units for projects in the region. Most of them will be used
in combined cycle CHP projects for district heating application.




Russia Power 2012                                                                                                                      05-07 March 2012, Moscow, Russia
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is
complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject
to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                         through Further Development of the GT13E2 Gas Turbine




2 The GT13E2 Development History
In 2013, we will celebrate the 20th birthday of the GT13E2 gas turbine. Since its first operation in 1993, the
GT13E2 gas turbines have demonstrated significant user’s advantages of this technology platform.
Unprecedented operational flexibility, robust design, high gas turbine efficiency, low emissions over a wide
load range with world-class levels of reliability and availability are characteristics of these gas turbines.
The GT13E2 is a medium sized gas turbine of the 200 MW class. It has a 21-stage compressor with a variable
inlet guide vane, an annular combustion system with closed loop combustor cooling and a 5-stage turbine.




Figure 2.1: GT13E2 gas turbine thermal block


The annular combustion system includes 72 EV (EnVironmental) burners. The EV burner is a dry low NOx
burner with a long operating history and is used in the entire Alstom gas turbine portfolio, which allows a
concentrated development and cross feed of improvements between the different gas turbine platforms. To
cover the different power output requirements different numbers of burners are used in the different
platforms.
In 1993 the first GT13E2 started operation. Major scope of the 2002 upgrade was a new turbine that pushed
performance from 166 MW at 35.7% initially to 172 MW at 36.4% gas turbine efficiency. This upgrade also
included TBC coating on the downstream part of the combustor, the so-called combustor zone 2, as well as
the option to operate the engine at two different operation modes. These two different operation modes are
using two different firing temperature levels such that for the lower temperature firing level the lifetime
consumption is lower and hence operation intervals between inspections are longer. In parallel fuel switch
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                                                    through Further Development of the GT13E2 Gas Turbine




over from natural gas to fuel oil and vice versa was optimized such that fuel switch over can reliably be done
also at full load.


                             • Alstom Standard EV            • Compressor upflow                            • Incremental
               PERFORMANCE




                               Burner                                                                         improvements in Turbine
                                                             • Turbine Blade 5 and
                                                                                                              and Combustor
                             • M-Turbine upgrade               Combustor Improvements
                               implemented                                                                  • Auxiliary system
                                                             • Performance
                                                                                                              improvements
                             • Performance                     Gross: 178 MW, 36.7%
                               Gross: 172 MW, 36.4%



                                                                                                            2006, 2009, 2010
                                                                                                            180, 182, 184 MW
                                                                                                            36.9, 37.4, 37.8 %                       2012
                                                                                                             Basis: ISO

                                                               2005
                               2002
              FLEXIBILITY




                             • Flexible lifetime concept
                                                                • Extension of capability                  • High fogging power
                               (performance optimized
                                                                  for low and high ambient                   augmentation
                               and maintenance cost
                                                                  temperature
                               optimized mode)                                                             • Fast start
                             • High fuel flexibility


Figure 2.2: GT13E2 performance and flexibility evolution


In the 2005 upgrade the compressor stages 1-5 have been re-staggered to increase the mass flow by
approximately 4%. The profile of the last turbine blade was optimized to match the increased mass flow. In the
front part of the combustor, the so-called combustor zone 1 liner segments, thermal barrier coating (TBC) was
applied and the film-cooling pattern was adapted. As a result improved flame stability and lower NOx
emissions over a wider ambient temperature range were achieved.
Continuous improvements and product care especially through the use of optimized coatings, through leakage
reductions and reduction of auxiliary power consumption as result of feedback obtained from of over hundred
operating GT13E2 engines in 2005 allowed stepwise performance increase to 184 MW and 37.8% gross
efficiency. Upgrades of the control software and hardware resulted in faster start and higher load gradients.
Implementation of power augmentation options like air inlet cooling, high fogging and water injection resulted
in the possibility to keep the power output almost constant from 15°c ambient temperature up to 45°c.
Today, the GT13E2 has been sold more than 150 times worldwide and the fleet has accumulated more than
7.5 million operating hours and over 54’000 starts. 21 engines have accumulated more than 100’000 fired
hours with the fleet leader having achieved over 128’000 hours. 10 engines had more than 1’000 start/stop
cycles.



Russia Power 2012                                                                                                                      05-07 March 2012, Moscow, Russia
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is
complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject
to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                                                                  through Further Development of the GT13E2 Gas Turbine




                                                                                               RUSSIA & CIS
                                                                                               SC – 3 UNITS
                                                             WESTERN EUROPE                    CC – 9 UNITS
                                                             SC – 5 UNITS                                                   MIDDLE EAST
                                                             CC – 21 UNITS                                                  SC – 12 UNITS


                                                        NORTH AFRICA                                                                 CHINA
                                                        SC – 12 UNITS                                                                SC – 1 UNITS
                                                        CC – 2 UNITS
                                                                                                                                      ASIA
                                                     WESTERN AFRICA                                                                   SC – 27 UNITS
                                                     SC – 6 UNITS                                                                     CC – 4 UNITS
                                                     CC – 3 UNITS
                                                                                                        INDIA
                                                                                                        SC – 1 UNITS
                                                                                     GULF
                                                                                     SC – 20 UNITS
                                                                                     CC – 13 UNITS               OCEANIA
                                                        LATIN AMERICA                                            SC – 12 UNITS
                                                        CC – 2 UNITS                                             CC – 4 UNITS



Figure 2.3: GT13E2 global references


The GT13E2 has demonstrated superior reliability. Figure 2.3 shows the latest reliability figures over the period
from 3rd quarter 2010 to 3rd quarter 2011 from the ORAP report of the independent SPS/ORAP report. The
reliability figures of the GT13E2 are clearly and consistently above that of the average of the industry.
                                                     100%



                                                      98%
                                 Reliability ( % )




                                                      96%



                                                      94%


                                                      92%



                                                      90%

                                                                 3Q 1 0               4 Q 10            1Q 1 1            2 Q 11            3Q 1 1

                                                       GT13E2 ORAP RAM Values                  GT13E2
                                                       (12 Month Rolling Averages)             E Class Technology
                                                                 All Values are for Simple Cycle Plant (GT, Generator, and Station Equipment)



Figure 2.3: GT13E2 reliability
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                                                    through Further Development of the GT13E2 Gas Turbine




3 GT13E2 – A most Versatile Engine
Over the years, the GT13E2 has proved its unsurpassed versatility in countless projects around the world,
being used with benefits in all kinds of applications or plant configurations, and under a wide range of
operational conditions.
-     Used under very different ambient conditions, from cold to hot places, from dry sandy sites to wet
      seashores or polluted industrial areas
-     Used extensively for both simple cycle as well as combined cycle plants
-     Used in connection with very demanding industrial application, like aluminium smelters etc., often
      powering small island electrical grids, without connection or support from large utility networks
-     One third of the installed fleet used for simple cycle or combined cycle cogeneration applications (CHP
      plants), with heat supplied to district heating systems, desalination plants or industrial processes
-     Several projects were started as simple cycle then converted into full combined cycle plants through steam
      tail add-on, while some GT13E2 units have been used in repowering applications, for the conversion of
      existing steam power plants into combined cycle plants
-     Many combined cycle plants have been fitted with bypass stack, some of them for phased installation and
      operation first of the gas and later of the steam turbine(s) – i.e. steam tail add-on as above mentioned
-     Many of them, especially in very hot climatic regions, have been fitted with air inlet cooling systems
-     Running on very different types of fuel, with a broad range of gas or liquid fuel compositions, and also
      varying compositions during operation, etc., in gas only, dual fuel, or oil only configurations
Figure 3.1 shows the example of Alba combined cycle plant, in Bahrain, based on three blocks KA13D-3 (3-
on-1 configuration) and two blocks KA13E2-2 (2-on-1 configuration) for a total of 1530 MW, mostly operated
in island configuration




Figure 3.1: Alba – One of the largest aluminium smelter plants in the world




Russia Power 2012                                                                                                                      05-07 March 2012, Moscow, Russia
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is
complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject
to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                             through Further Development of the GT13E2 Gas Turbine




4 GT13E2 Upgrade
Development focus
In the recent years even more challenging requirements for flexibility and environmental friendliness have
emerged. New governmental regulations on emission reduction over a broad load range and for largely
varying natural gas composition have or will be put in force. Varying energy demand during day/night and
summer/ winter as well as the increasing number of wind and solar power generation units further make
operational flexibility a key requirement. Already today Alstom gas turbines meet most of these future
conditions and requirements.
In order to further enhance performance and operational flexibility of the GT13E2 an upgrade has been
defined, based on
-   integration of a proven compressor with higher mass flow and better turndown capability
-   upgraded combustion system

                                                                           Combustor
                                                              Advanced EnVironmental (AEV) burners
                               Compressor
                  LP compressor of the GT26 gas turbine




Figure 4.1: GT13E2 development focus



Compressor
To increase the power output and the turndown capability of the GT13E2 the first 16 stages of the proven
compressor used in the GT26 have been integrated into the GT13E2 engine. Three variable guide vanes allow
a wider range of turn down at higher compressor efficiency as compared to the previous compressor with
single variable guide vane row. The mass flow of the engine is increased by approximately 10%. The
compressor blades and vanes as well as the compressor housing and the compressor section of the rotor have
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                                                    through Further Development of the GT13E2 Gas Turbine




been taken over from the GT26 with minor adaptations to the GT13E2. The air intake system and the rotor
bearing on the compressor side are also adapted from the GT26 design so that the previously used
intermediate shaft to the generator is no longer required resulting in a shorter arrangement. Compressor
bleeds have been found to match well the turbine cooling system requirements. Blow off during start-up of the
engine is injected into the exhaust system eliminating the previously used blow off silencers.

                                             GT26 Gas Turbine
                                  LP Compressor




Figure 4.2– GT13E2 Gas Turbine compressor based on the GT26 compressor


The compressor design builds on a fleet experience of more than sixty GT26 engines. It includes the air inlet
cooling and power augmentation systems successfully in operation on many GT26 turbines.



Combustor
The combustion system has been upgraded to further enhance the emission behaviour and the operational
flexibility of the GT13E2 by implementing the Advanced EnVironmental (AEV) burner. The AEV burner is based
on the well proven standard Alstom gas turbine EV burner technology as an evolutionary approach for both
gas and fuel oil operation.
The design features of the AEV burner are shown in figure 4.3. Main difference between the AEV and the EV
burner is the dedicated mixing section in the burner body downstream of the swirler. The design of the four-
slot swirler is aerodynamically optimized with a higher throughput of combustion air as compared to the
existing GT13E2 EV design. As a result the number of burners is reduced, from 72 EV burners to 48 AEV
burners.



Russia Power 2012                                                                                                                      05-07 March 2012, Moscow, Russia
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is
complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject
to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                          through Further Development of the GT13E2 Gas Turbine




Figure 4.3: AEV burner design features


The integration of the mixing section downstream of the swirler in the burner body ensures an almost perfectly
homogeneous mixture of fuel and combustion air, resulting in very low NOx emissions on both gas and oil
operation.
For oil operation, the mixing section provides sufficient residence time for atomization, pre-vaporization and
mixing of the liquid fuel. As a consequence less than half of the water is consumed for control of the NOx
emissions compared to the EV burner.
An important feature of the AEV burner is the front stage gas injection through multiple nozzles, which are
arranged circumferentially around the burner exit plane. With this solution the stability of the flame generated
by the internal fuel stage is increased against flame extinction and pulsations. Hence the AEV burner system
can be permanently operated over the entire load range with low NOx emissions.
A robust combustion is obtained by the presence of the mixing section, the flame front being insensitive to
variations of air temperature and humidity as well as natural gas composition and gas temperature. Therefore,
the GT13E2 upgrade with AEV burner sees its fuel and operational flexibility further enhanced. As a direct
consequence of the AEV operation concept, the fuel system is simplified.


Other improvement areas
Further to the major changes on the compressor and combustor as described above, the GT13E2 upgrade can
benefit from of a number of small design improvements and refinements:
-   The same turbine from the 2005 rating is used for this upgrade, as the large cross sectional flow of the last
    turbine stage allows accommodating the higher mass flow from the compressor. Because of the change of
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                                                     through Further Development of the GT13E2 Gas Turbine




      the firing temperature by less than 20°C, the first blade row received full thermal barrier coating (TBC)
      coverage for improved lifetime
-     A larger type of TOPAIR air-cooled generator is used to accommodate the higher power output of the gas
      turbine, with margins for power augmentation. It can be optimized to allowing for 3 different ratings in
      the range of 255 to 280 MVA, hence enabling adjustment to plant specific requirements at maximized
      generator efficiency
-     The arrangement of the gas turbine auxiliary systems has been optimised with increased modularization
      through the use of pre-engineered and factory tested functional modules
-     Further, to reduce and simplify maintenance several small improvements have been brought to the gas
      turbine to facilitate tasks like alignment or lifting of components



5 GT13E2 Benefits
Performance
The GT13E2 upgrade brings performance improvements in many regards:
-     Engine nominal output and efficiency
-     Combined cycle plant output
-     Simple cycle and combined cycle part load efficiency
-     Engine performance at high ambient conditions

Nominal performance
Since its first operation in 1993, the GT13E2 could claim the best performance in it class. With the new
upgrade, it becomes even better: 202.7 MW / 38% gross engine performance at generator terminals, i.e. a 10%
power output increase, and +0.2%-pt efficiency improvement.
The combined cycle plant performance is also boosted, gaining 48 MW in a 2-on-1 plant configuration, with
net plant efficiency maintained at high level.
                   GT13E2 Engine Performance

                   Gross electrical output                            MW               202.7
                   Gross electrical efficiency (LHV)                  %                38.0                  - ISO Conditions
                   Gross heat rate (LHV)                              kJ/kWh           9476                  - Natural gas
                                                                      Btu/kWh          8982                  - Gross performance at generator terminals
                                                                                                              no inlet/outlet losses



                   KA13E2-2 Combined Cycle Power Plant Performance

                   Net plant electrical output                        MW               565                   - ISO Conditions
                   Net plant electrical efficiency (LHV)              %                53.8                  - Natural gas
                   Net plant heat rate (LHV)                          kJ/kWh           6696                  - Double pressure non reheat CCPP configuration
                                                                      Btu/kWh          6347                  - Net plant performance
                                                                                                              at main step-up transformer HV terminals




Russia Power 2012                                                                                                                      05-07 March 2012, Moscow, Russia
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is
complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject
to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                         through Further Development of the GT13E2 Gas Turbine




Part load behaviour
The use of the GT26 low-pressure compressor with 3 variable guide vanes (VGV’s) instead of just one results
in a better part-load efficiency characteristics for both simple cycle and combined cycle applications. The
improved part-load performance permits to generate significant fuel savings. As an example, the GT13E2
upgrade operating on gas at 75% GT load will consume about 2% less fuel than with the previous rating,
therefore positively contributing to any project economic results.

                           Plant
                           Relative
                           Efficiency
                                100%
                                                               > 1%
                                                                        GT13E2
                                                                        Upgrade




                                                              GT13E2
                                                              before upgrade      4-5%




                                   100%                75%                     50%
                                                 Gas Turbine Load


Figure 5.1: KA13E2-2 part load behaviour
Figure 5.1 shows the gain in efficiency of a KA13E2-2 combined cycle 2-on-1 plant configuration. The part
load behaviour of the upgrade permits to save more than 1% fuel when operating at 75% GT load, and as much
as to 4-5% at 50% GT load.

Performance at hot ambient conditions
While the GT13E2 efficiency at low ambient conditions remains significantly better than any comparable
machine, the characteristics of the 2012 upgrade permits to offer better efficiency at high ambient conditions.
This is especially valuable in typical hot climate countries where hot summer conditions also mean the highest
power demand, because of air conditioning loads. As an example, at 45°C ambient temperature, the new
upgrade will still have 16 MW more power than the previous rating in simple cycle, with an efficiency benefit
of more than 0.8%-pt.
In addition, the range of air inlet cooling options (evaporative cooling, fogging, high fogging) permit to keep
the power output characteristics flat over a wide range of ambient temperature.
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                                                    through Further Development of the GT13E2 Gas Turbine




Emissions
The introduction of the AEV burners permits to significantly improve the environmental performance of the
machine: Running on natural gas, the full load NOx emissions are reduced from 25 vppm1 down to 15 vppm.
The turndown is also improved, since the GT13E2 upgrade is able to operate down to 70% load meeting the
low 15 vppm NOx emissions, and further down to 50% GT load not exceeding the 25 vppm NOx World Bank
standards.
The AEV burner brings also important benefits when running on #2 oil, as the GT13E2 is now able to run with
25 vppm NOx emission in the 100% down to 70% GT load range. The 42 vppm (typical European standard
requirement) can even be met down to 50% load. NOx control on oil operation is by water injection, which
could be strongly reduced. The amount of water required to meet 42 vppm NOx is about 60% lower.
The AEV burner environmental performance is almost immune to variations of the air conditions at GT inlet,
meaning that the gas turbine can deliver clean power at low ambient conditions as well as in hot climate, even
with air inlet cooling systems in operation.
Finally, it must be mentioned that the CO2 emissions are reduced as a direct consequence of the better
efficiency of the gas turbine - both at full load and at part loads.


Fuel flexibility
The superior fuel flexibility demonstrated already with the GT13E2 fleet in operation is fully achieved with the
AEV-equipped GT13E2 upgrade as well. The experience range with respect to the Wobbe Index extends from
31 MJ/m3 to 49 MJ/m3, i.e. a ±23% range. In terms of C2+ content, values of up to 25% in volume are
demonstrated without negative impact on performance, reliability and compliance with emission
requirements. The robustness of the combustion system and the associated control system allows these
engines to operate under these varying conditions without the need for re-adjustment of settings or changes
of hardware. The GT13E2 is not only capable to run on a wide range of fuel gas compositions, it can also allow
fast and wide variations in the fuel gas quality.


On-line fuel switch-over
In case of decreasing fuel gas supply pressure, fast fuel switch over from gas to oil operation ensures
uninterrupted stable power supply. Such fuel switch over can be executed while the machine remains at full
load. Switch over at constant load is also possible at part loads down to 40% GT load.




1
    Note: vppm to be read as vppm, dry (corrected to 15% O2)



Russia Power 2012                                                                                                                      05-07 March 2012, Moscow, Russia
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is
complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject
to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                                                                 through Further Development of the GT13E2 Gas Turbine




Start-up
The permanent operation of the AEV burner with two fuel stages allows a fast adjustment of the combustion
resulting in an improved behaviour for transient operation conditions such as fast loading, frequency response
or load rejection.
The standard start-up time is 25 minutes from start initiation (push button) to more than 200 MW at the
generator terminals (ISO conditions). With the upgrade GT13E2 the start-up time can be even reduced to 15
minutes (figure 5.2). This is done through increased start-up power during the rotor acceleration phase
combined with a smart ramp-up load control, allowing for higher loading gradients within a selected load
range. Warm and hot start-up times of 15 minutes are possible without additional lifetime counting on the
gas turbine as compared to the 25 min start. By making use of an optional roller shutter in the air intake, the
status “warm engine” can be extended up-to 60 hours from shut-down.

                                                                                  Synchronization
                                                         Acceleration                  Loading
                                               100
                                       (Base Load)




                                                80
                              Parameters [%]




                                                                                                 rt




                                                          Speed                                                             rt
                                                                                               Sta




                                                                                                                       ta
                                                60                                                                   .S
                                                                                                n.




                                                                                                                   in
                                                                                                               m
                                                                                             mi




                                                                                                          25
                                                                                          15




                                                40


                                                20


                                                0
                                                     0               5                               15              20          25
                                    Starting times including engine preparation time                                                  Time [min.]

                                                                  Over 200 MW in only 15 minutes


Figure 5.2: GT13E2 start-up



Operation at low ambient conditions
Reliable operation at very low ambient condition is no exceptional feat for the GT13E2 upgrade, which became
even more robust, and saw its capability at very low ambient conditions improved:  
-   Emission compliant operation without air pre-heater down to -10°C ambient temperature down to 50%
    relative GT load; as a consequence, the pre-heater size can be reduced for lower ambient temperatures as
    only -10°C must be achieved at GT inlet
-   Cold starts are allowed down to –30°C ambient temperature without air pre-heater in operation
-   With pre-heater the gas turbine is operational down to -50°C
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                                                    through Further Development of the GT13E2 Gas Turbine




Cogeneration operation
Cogeneration (CHP – Combined Heat and Power) operation very often requires that the heat supply can be
ensured independently of the gas turbine power output. Also, the steam parameters must normally be kept
constant so that the operation of the process using the steam is not disturbed.
The use of three rows of variable guide vanes not only offers superior part load performance, but it also
ensures that the gas turbine exhaust temperature remains high over a wide range of GT operating loads. This
generally represents a key benefit for CHP plants, as it permits to keep the steam parameters constant
independently of the gas turbine power output, over a wide load range.

Maintenance improvements
A number of small refinements and improvements have been made so as to increase the ease of maintenance.
Measures have been taken to facilitate maintenance tasks such as alignments and lifting of components. Pre-
engineered functional modules have been introduced for the auxiliary systems, and the fuel system has been
simplified. Together with the reduction in the number of parts (e.g. from 72 EV burners down to 48 AEV
burners), the duration of the maintenance work and effort is reduced.

Further benefits of the GT13E2
In addition to the specific benefits of the GT13E2 above described, this machine also features many advanced
characteristics inherited from the previous GT13E2 rating, such as:

Flexible operation modes
The GT13E2 can be operated either in the so-called “Performance Optimized” (PO) operation mode or in the
“Maintenance Cost Optimized” (MCO) operation mode. For a slight decrease in the performance (<5% power,
<0.5%-pt. efficiency), the intervals between inspections can be increased up to 50%. The operator can switch
between the two operation modes at any time and, as a consequence, optimize the plant economics. The
benefits of an operation in the MCO operation mode applies automatically at part load of less then around 95%
GT load.

Power augmentation options
Like the previous rating, the GT13E2 can be equipped with an air inlet cooling system (evaporative cooling,
fogging or high fogging) to further increase power output at high ambient temperatures. Alstom has
developed in-house the systems using fogging or high fogging devices with the clear advantage of being
designed and integrated by the gas turbine equipment manufacturer itself:
-     no impact of the inlet cooling system operation on interval between inspections
-     the compressor surge margin is maintained within safe limits at all operation points
-     the control and protection systems of both gas turbine and inlet cooling equipment are fully integrated
-     performance guarantees available for full Alstom air inlet cooling portfolio



Russia Power 2012                                                                                                                      05-07 March 2012, Moscow, Russia
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is
complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject
to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                                      through Further Development of the GT13E2 Gas Turbine




GT13E2 based combined cycle power plants can easily be fitted with large supplementary firing, allowing high
power supply flexibility, and increased power vs. heat production flexibility for CHP plants.


                                                                                 Low Emissions CC



                     CC + HF + SF
                                 CC



                                                                  Low Emissions SC                          PA CC


                           SC + HF
                                 SC
                                                                                       PA SC
           • SC   Simple Cycle
                                                 50         100        150       200       250        300     350   MWel
           • CC   Combined Cycle
           • HF   High Fogging
           • SF   Supplementary Firing
           • PA   Power Augmentation                      SC        CC           SC              CC
                                                        min. Environmental
           Basis: One GT unit / ISO conditions               Turndown


Figure 5.3: SC13E2 / KA13E2 high power output flexibility


Figure 5.3 shows the wide power output range at ISO conditions of the simple cycle and 1-on-1 combined
cycle configurations. The emission-compliant range extends for the combined cycle case from 50% (min.
environmental turndown) to + 118% (full load combined cycle power output, with HF and SF). This range
increases at high ambient conditions, as the air inlet cooling will become more effective.



6 Field Experience
Compressor
The first 16 stages of the well-proven GT26 compressor are now used for the GT13E2 upgrade development.
Extensive compressor testing, including surge test have been performed in 2002 at the Alstom test GT26 test
power plant in Birr, Switzerland. This compressor design is now installed and running in more than sixty GT26
gas turbines where it could demonstrate its reliability. Today, the cumulated experience amounts to over 1.2
million fired hours, with the fleet leader having achieved more than 60’000 operating hours.
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                                                                                               through Further Development of the GT13E2 Gas Turbine




Combustor
After full-scale tests in the Alstom GT8C2 Test Power Plant, the AEV combustor upgrade package has been
installed in three GT13E2 customer units, the first already in 2006, and was very successfully validated,
demonstrating the improved operational flexibility and the reduced emissions. At different ambient conditions
stable low NOx emissions well below the emission permit levels on gas fuel and on fuel oil could be
demonstrated without any need for re-adjustment of the engine or tuning of the combustor system.




               Figure 6.1 – Alstom GT8C2 Test plant                                                                                                     Figure 6.2 – Vattenfall’ Berlin Mitte Power Plant
                                                                  2006                                           2007                                               2008                                           2009                                           2010
                                              1   2   3   4   5   6   7   8   9   10 11 12   1   2   3   4   5   6   7   8   9   10   11   12   1   2   3   4   5   6   7   8   9   10 11 12   1   2   3   4   5   6   7   8   9   10 11 12   1   2   3   4   5   6   7   8   9   10   11   12




                                 RWE
                             Ludwigshaven                                                    1st Gas
                                GT13E2
                                                                                             AEV upgrade
                                Vattenfall
                               Berlin Mitte                                                                                                                                         Dual fuel AEV upgrade
                                 GT13E2


                                 Nuon
                                Diemen
                                                                                                                                                                                                                               2nd Gas
                                GT13E2                                                                                                                                                                                         AEV upgrade


                              Figure 6.3 – Plants operating with AEV Retrofit Upgrade
To date the total operation experience with the AEV burners on GT13E2 gas turbines has exceeded 80’000
operation hours. The GT13E2 gas turbine with dual fuel operation is operating reliably for more than two years
and has accumulated more than 16’500 OH with the AEV dual fuel burner. The AEV Burner is now offered
both as retrofit to the existing fleet, as well as standard component for the new GT13E2 engines.




Russia Power 2012                                                                                                                      05-07 March 2012, Moscow, Russia
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is
complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject
to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                           through Further Development of the GT13E2 Gas Turbine




7 Service Offering
Alstom has more than 100 years of experience in engineering, procurement and construction (EPC) of new
power plants, and our engineers are also experts in retrofitting, modernizing and servicing existing plants.
With operations in over 70 countries, Alstom is close to their customers all over the world, ensuring rapid
response and service at all times. Utilities, independent power producers and merchant power generators are
all looking to maximize the returns on their investments, by optimizing operations and managing risks. As a
leading Gas Turbine Original Equipment Manufacturer (OEM) and turnkey power plant provider, Alstom
possesses the unique extensive technical expertise and equipment know-how to ensure that their client’s
equipment remains competitive throughout the lifecycle of the product.
The OEM commitment to continuous development efforts on all major equipment products, such as
performance upgrade packages using the latest state-of-the-art gas turbine and combustion technology help
the plant owners to produce more power, while using less fuel and reducing emissions. Extending operation
intervals between scheduled outages enables more production and lower maintenance costs. Innovative
reconditioning of hot gas path parts uses the latest proven technology to keep engines operational, with a
quality assurance that can only be provided by the OEM supplier.
Alstom’s flexible and customized expert services cover solutions at all stages of the plant lifecycle, including:
-   New and improved parts, reconditioning of parts
-   Advice and operational support
-   Field service
-   Performance improvements on components and full plant
-   Plant integration capabilities
-   Service contracts, also on other OEM gas turbine equipment
Alstom’s service contracts for GT and CCPP are tailored to meet the needs of all operational, maintenance and
support requirements. From Long Term Agreements (LTA) covering the supply of parts and provision of
services, to Operation and Maintenance (O&M) contracts, which allow plant owners to devise completely new
management strategies by outsourcing risks and responsibilities, Alstom’s O&M contracts allow clients to take
advantage of performance and availability guarantees through tailored agreements that perfectly suit the
required service and equipment scope.
With existing commercial power plants in Armenia (Hrazdan, Yerevan), Belarus (Minsk) and Russia
(Moscow), and a rapidly expanding GT13E2 fleet in Russia, Alstom’s commitment to provision of local services
in Russia and CIS countries is in direct focus. The availability of local services from Russian-speaking teams is
considered to be of vital importance to provide the necessary OEM support for the growing fleet.
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                                                    through Further Development of the GT13E2 Gas Turbine




8 Summary & Conclusions
The very successful Alstom GT13E2 gas turbine with best-in-class performance, high reliability, high
operational flexibility and unique versatility to adapt to a broad range of applications and operation conditions
has been further improved. The GT13E2 upgrade significantly extends the already well-recognized benefits of
the machine:
-     Increased simple cycle performance – more than 200 MW at 38% gross efficiency (+10% output / + 0.2%-pt
      efficiency)
-     Improved net combined cycle plant performance - 565 MW / 53.8% (+9% output / + 0.2%-pt efficiency) for
      a 2-on-1 power plant configuration
-     Improved part load efficiency
-     Improved high ambient temperature performance / improved low ambient temperature capability
-     Reduced emissions levels, improved environmental turndown and environment compliant power
      augmentation solutions
-     Fast GT start with >200 MW available in 15 minutes, without additional lifetime counting vs. 25 min.
      start, for warm and hot starts
-     High fuel composition flexibility without hardware changes
-     On-line fuel switch-over at constant load, for gas turbine loads between 40% and 100%
-     Switchable (on-line) operation modes to adjust the gas turbine performance according to market
      requirements and, therefore, optimize the plant economics
-     Improved capability for cogeneration operation, due to the improved gas turbine exhaust gas temperature
      characteristics
-     Full range of power augmentation options with guaranteed performance and no impact on intervals
      between inspections
-     Reduced maintenance requirements
The development of the 2012 upgrade was entirely based on an evolutionary approach, making full use of the
well-proven GT13E2 platform, together fully validated components:
- The first 16 stages of the GT26 compressor design used for this upgrade is operating in more than sixty
    GT26 units, totalling more than 1’200’000 running hours experience.
- The Advanced EV burner (AEV burner), a further development of the standard EV burner used in all Alstom
    gas turbines, is operating commercially in three customer engines, with more than 80’000 fired hours
    experience.



…The Best becomes Better!



Russia Power 2012                                                                                                                      05-07 March 2012, Moscow, Russia
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is
complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject
to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Increasing Power Generation Efficiency in Russia and CIS Countries
                                                      through Further Development of the GT13E2 Gas Turbine




9 Bibliography

[1]   Upgrade of Alstom’s Highly Efficient GT13E2 Gas Turbine
      Stephen Philipson, Michael Ladwig, Frank Nickel, Klaus Döbbeling, Alexander Hoffs
      Paper presented at the Power-Gen Europe Conference 2006

[2]   Combining Operational Flexibility with Clean, Reliable Power Generation in the Alstom Gas Turbine
      GT13E2
      Klaus Döbbeling, Jürgen Pacholleck, Alexander Hoffs
      Paper presented at the Power-Gen Asia Sept. 2007

[3]   Fuel Flexibility of the Alstom GT13E2 medium sized Gas Turbine
      Klaus Döbbeling, Thiemo Meeuwissen, Martin Zajadatz, Peter Flohr, Alstom
      Paper GT2008-50950 presented at ASME Turbo Expo Berlin, June 2008

[4]   GT13E2 flexibility powering industrial plants
      Klaus Döbbeling, Lucas Fischer, Frank Nickel, ALSTOM
      Paper presented at the Power-Gen Middle East Conference 2009, Bahrain

[5]   Alstom GT13E2 Combustor Upgrade for Vattenfall's Berlin Mitte
      K. Döbbeling, M. Zajadatz, R. Zoli, ALSTOM, and
      E. Reichstein, Vattenfall Europe Wärme AG, Berlin
      Paper presented at the VGB Fachtagung, 2011
Alstom Power

© ALSTOM 2012. All rights reserved. Information
contained in this document is indicative only. No
representation or warranty is given or should be
relied on that it is complete or correct or will apply to
any particular project. This will depend on the
technical and commercial circumstances. It is
provided without liability and is subject to change
without notice. Reproduction, use or disclosure to
third parties, without express written authority, is
strictly prohibited.
Photo credit:

www.alstom.com/power

More Related Content

What's hot

Modelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES modelModelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES modelIEA-ETSAP
 
Renewable Energy and Storage Systems
Renewable Energy and Storage SystemsRenewable Energy and Storage Systems
Renewable Energy and Storage SystemsEnel S.p.A.
 
Lesson - Air Brake System.ppt
Lesson - Air Brake System.pptLesson - Air Brake System.ppt
Lesson - Air Brake System.pptMarcel Imperial
 
Suspension system in automobiles
Suspension  system  in automobilesSuspension  system  in automobiles
Suspension system in automobilesIndranil95
 
Electromagnetic Suspension
Electromagnetic SuspensionElectromagnetic Suspension
Electromagnetic SuspensionMahaveer Kakade
 
Catálogo Williams _ V series
Catálogo Williams _ V series Catálogo Williams _ V series
Catálogo Williams _ V series Vibropac
 
30 ton lpg storage tank
30 ton lpg storage tank30 ton lpg storage tank
30 ton lpg storage tankLinda Zhang
 
Energy Management PowerPoint Presentation Slides
Energy Management PowerPoint Presentation SlidesEnergy Management PowerPoint Presentation Slides
Energy Management PowerPoint Presentation SlidesSlideTeam
 
TABELA DE CONSULTA RÁPIDA SPICER (DANA)
TABELA DE CONSULTA RÁPIDA SPICER (DANA)TABELA DE CONSULTA RÁPIDA SPICER (DANA)
TABELA DE CONSULTA RÁPIDA SPICER (DANA)Kesley de Souza
 
396976683 zl30br-catalogo-de-pecas
396976683 zl30br-catalogo-de-pecas396976683 zl30br-catalogo-de-pecas
396976683 zl30br-catalogo-de-pecasM45t3R16
 
Mechanical mini project
Mechanical mini projectMechanical mini project
Mechanical mini projectAbi Nesan
 
Energy Storage Inverters
Energy Storage InvertersEnergy Storage Inverters
Energy Storage InvertersMircea Gingu
 
Substation Structure Catalog Pdf
Substation Structure Catalog PdfSubstation Structure Catalog Pdf
Substation Structure Catalog Pdfjrodg97
 
Catálogo Peças Motor Bomba branco
Catálogo Peças Motor Bomba branco  Catálogo Peças Motor Bomba branco
Catálogo Peças Motor Bomba branco André Sá
 
Relief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsRelief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsSHIVAJI CHOUDHURY
 
Case Study of Energy Audit
Case Study of Energy Audit Case Study of Energy Audit
Case Study of Energy Audit Darshan Vithani
 

What's hot (20)

Modelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES modelModelling different Thermal Energy Storage (TES) options in a TIMES model
Modelling different Thermal Energy Storage (TES) options in a TIMES model
 
Renewable Energy and Storage Systems
Renewable Energy and Storage SystemsRenewable Energy and Storage Systems
Renewable Energy and Storage Systems
 
Lesson - Air Brake System.ppt
Lesson - Air Brake System.pptLesson - Air Brake System.ppt
Lesson - Air Brake System.ppt
 
Suspension system in automobiles
Suspension  system  in automobilesSuspension  system  in automobiles
Suspension system in automobiles
 
Electromagnetic Suspension
Electromagnetic SuspensionElectromagnetic Suspension
Electromagnetic Suspension
 
Catálogo Williams _ V series
Catálogo Williams _ V series Catálogo Williams _ V series
Catálogo Williams _ V series
 
30 ton lpg storage tank
30 ton lpg storage tank30 ton lpg storage tank
30 ton lpg storage tank
 
Energy Management PowerPoint Presentation Slides
Energy Management PowerPoint Presentation SlidesEnergy Management PowerPoint Presentation Slides
Energy Management PowerPoint Presentation Slides
 
AVEO - CHEVY.pdf
AVEO - CHEVY.pdfAVEO - CHEVY.pdf
AVEO - CHEVY.pdf
 
Basics of fans
Basics of fansBasics of fans
Basics of fans
 
TABELA DE CONSULTA RÁPIDA SPICER (DANA)
TABELA DE CONSULTA RÁPIDA SPICER (DANA)TABELA DE CONSULTA RÁPIDA SPICER (DANA)
TABELA DE CONSULTA RÁPIDA SPICER (DANA)
 
U.S. Bellows 101: The Basics of Expansion Joints
U.S. Bellows 101: The Basics of Expansion JointsU.S. Bellows 101: The Basics of Expansion Joints
U.S. Bellows 101: The Basics of Expansion Joints
 
396976683 zl30br-catalogo-de-pecas
396976683 zl30br-catalogo-de-pecas396976683 zl30br-catalogo-de-pecas
396976683 zl30br-catalogo-de-pecas
 
Mechanical mini project
Mechanical mini projectMechanical mini project
Mechanical mini project
 
Ddec pin dat
Ddec pin datDdec pin dat
Ddec pin dat
 
Energy Storage Inverters
Energy Storage InvertersEnergy Storage Inverters
Energy Storage Inverters
 
Substation Structure Catalog Pdf
Substation Structure Catalog PdfSubstation Structure Catalog Pdf
Substation Structure Catalog Pdf
 
Catálogo Peças Motor Bomba branco
Catálogo Peças Motor Bomba branco  Catálogo Peças Motor Bomba branco
Catálogo Peças Motor Bomba branco
 
Relief and safety valves for thermal power plants
Relief and safety valves for thermal power plantsRelief and safety valves for thermal power plants
Relief and safety valves for thermal power plants
 
Case Study of Energy Audit
Case Study of Energy Audit Case Study of Energy Audit
Case Study of Energy Audit
 

Viewers also liked

B tech ii year i (r09) semester regular supplementary examinations november 2...
B tech ii year i (r09) semester regular supplementary examinations november 2...B tech ii year i (r09) semester regular supplementary examinations november 2...
B tech ii year i (r09) semester regular supplementary examinations november 2...prasadmvreddy
 
IG-JADE-PKSlib: An Agent-Based Framework for Advanced Web Service Composition...
IG-JADE-PKSlib: An Agent-Based Framework for Advanced Web Service Composition...IG-JADE-PKSlib: An Agent-Based Framework for Advanced Web Service Composition...
IG-JADE-PKSlib: An Agent-Based Framework for Advanced Web Service Composition...Erick Ornio
 
B tech ii year ii (r07) semester supplementary
B tech ii year ii (r07) semester supplementaryB tech ii year ii (r07) semester supplementary
B tech ii year ii (r07) semester supplementaryprasadmvreddy
 
Presentation To Shaw Group Final Nov 6
Presentation To Shaw Group Final Nov 6Presentation To Shaw Group Final Nov 6
Presentation To Shaw Group Final Nov 6André Darmanin
 
Publitapias URC
Publitapias URCPublitapias URC
Publitapias URCZuhaill
 
Transit policy utsc presentation june 24 [compatibility mode]
Transit policy utsc presentation   june 24 [compatibility mode]Transit policy utsc presentation   june 24 [compatibility mode]
Transit policy utsc presentation june 24 [compatibility mode]André Darmanin
 

Viewers also liked (7)

B tech ii year i (r09) semester regular supplementary examinations november 2...
B tech ii year i (r09) semester regular supplementary examinations november 2...B tech ii year i (r09) semester regular supplementary examinations november 2...
B tech ii year i (r09) semester regular supplementary examinations november 2...
 
IG-JADE-PKSlib: An Agent-Based Framework for Advanced Web Service Composition...
IG-JADE-PKSlib: An Agent-Based Framework for Advanced Web Service Composition...IG-JADE-PKSlib: An Agent-Based Framework for Advanced Web Service Composition...
IG-JADE-PKSlib: An Agent-Based Framework for Advanced Web Service Composition...
 
Chapter 20 final
Chapter 20 finalChapter 20 final
Chapter 20 final
 
B tech ii year ii (r07) semester supplementary
B tech ii year ii (r07) semester supplementaryB tech ii year ii (r07) semester supplementary
B tech ii year ii (r07) semester supplementary
 
Presentation To Shaw Group Final Nov 6
Presentation To Shaw Group Final Nov 6Presentation To Shaw Group Final Nov 6
Presentation To Shaw Group Final Nov 6
 
Publitapias URC
Publitapias URCPublitapias URC
Publitapias URC
 
Transit policy utsc presentation june 24 [compatibility mode]
Transit policy utsc presentation   june 24 [compatibility mode]Transit policy utsc presentation   june 24 [compatibility mode]
Transit policy utsc presentation june 24 [compatibility mode]
 

Similar to Gt13 e2 gas turbine (in russia and cis countries)

keppel-2-ka26-combined-cycle-power-plant-singapore
keppel-2-ka26-combined-cycle-power-plant-singaporekeppel-2-ka26-combined-cycle-power-plant-singapore
keppel-2-ka26-combined-cycle-power-plant-singaporeDaniel ANG
 
An Introduction to PowerCo.pdf
An Introduction to PowerCo.pdfAn Introduction to PowerCo.pdf
An Introduction to PowerCo.pdfjoetyson3
 
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...Dutch Power
 
tuas-ccp5-singapore-ka26-gas-combined-cycle-plant
tuas-ccp5-singapore-ka26-gas-combined-cycle-planttuas-ccp5-singapore-ka26-gas-combined-cycle-plant
tuas-ccp5-singapore-ka26-gas-combined-cycle-plantDaniel ANG
 
Generator set design parameters
Generator set design parametersGenerator set design parameters
Generator set design parametersBruno De Wachter
 
Estimating the cost of a CCS System - Jean-François Léandri, Alstom
Estimating the cost of a CCS System - Jean-François Léandri, AlstomEstimating the cost of a CCS System - Jean-François Léandri, Alstom
Estimating the cost of a CCS System - Jean-François Léandri, AlstomGlobal CCS Institute
 
3. DNV GL - Koen Broess
3. DNV GL - Koen Broess3. DNV GL - Koen Broess
3. DNV GL - Koen BroessDutch Power
 
Plazma conversion ltd full presentation
Plazma conversion ltd full presentationPlazma conversion ltd full presentation
Plazma conversion ltd full presentationAlexander Dvoenko
 
Design and analysis of an external rotor internal-stator doubly fed induction...
Design and analysis of an external rotor internal-stator doubly fed induction...Design and analysis of an external rotor internal-stator doubly fed induction...
Design and analysis of an external rotor internal-stator doubly fed induction...Mellah Hacene
 
Techno-Economic Modelling of Cogeneration Options for the South African Sugar...
Techno-Economic Modelling of Cogeneration Options for the South African Sugar...Techno-Economic Modelling of Cogeneration Options for the South African Sugar...
Techno-Economic Modelling of Cogeneration Options for the South African Sugar...IEA-ETSAP
 
Experimenal investigation of performance and
Experimenal investigation of performance andExperimenal investigation of performance and
Experimenal investigation of performance andeSAT Publishing House
 
Power-to-gas Market Growth, Demand and Challenges of the Key Industry Players...
Power-to-gas Market Growth, Demand and Challenges of the Key Industry Players...Power-to-gas Market Growth, Demand and Challenges of the Key Industry Players...
Power-to-gas Market Growth, Demand and Challenges of the Key Industry Players...IMARC Group
 
Noncatalytic methane conversion technology in the microwave plasma torch by p...
Noncatalytic methane conversion technology in the microwave plasma torch by p...Noncatalytic methane conversion technology in the microwave plasma torch by p...
Noncatalytic methane conversion technology in the microwave plasma torch by p...Aleksei Lavrin
 
Comparative performances analysis of different rotor types for pmsg used in w...
Comparative performances analysis of different rotor types for pmsg used in w...Comparative performances analysis of different rotor types for pmsg used in w...
Comparative performances analysis of different rotor types for pmsg used in w...Mellah Hacene
 
The EU Medium Combustion Plant Directive (MCPD) – what it could mean for your...
The EU Medium Combustion Plant Directive (MCPD) – what it could mean for your...The EU Medium Combustion Plant Directive (MCPD) – what it could mean for your...
The EU Medium Combustion Plant Directive (MCPD) – what it could mean for your...EMEX
 

Similar to Gt13 e2 gas turbine (in russia and cis countries) (20)

keppel-2-ka26-combined-cycle-power-plant-singapore
keppel-2-ka26-combined-cycle-power-plant-singaporekeppel-2-ka26-combined-cycle-power-plant-singapore
keppel-2-ka26-combined-cycle-power-plant-singapore
 
An Introduction to PowerCo.pdf
An Introduction to PowerCo.pdfAn Introduction to PowerCo.pdf
An Introduction to PowerCo.pdf
 
Samra
SamraSamra
Samra
 
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
 
Az-Zour
Az-ZourAz-Zour
Az-Zour
 
tuas-ccp5-singapore-ka26-gas-combined-cycle-plant
tuas-ccp5-singapore-ka26-gas-combined-cycle-planttuas-ccp5-singapore-ka26-gas-combined-cycle-plant
tuas-ccp5-singapore-ka26-gas-combined-cycle-plant
 
Carbon Capture
Carbon CaptureCarbon Capture
Carbon Capture
 
Small Power Generation Plant
Small Power Generation PlantSmall Power Generation Plant
Small Power Generation Plant
 
Generator set design parameters
Generator set design parametersGenerator set design parameters
Generator set design parameters
 
Estimating the cost of a CCS System - Jean-François Léandri, Alstom
Estimating the cost of a CCS System - Jean-François Léandri, AlstomEstimating the cost of a CCS System - Jean-François Léandri, Alstom
Estimating the cost of a CCS System - Jean-François Léandri, Alstom
 
3. DNV GL - Koen Broess
3. DNV GL - Koen Broess3. DNV GL - Koen Broess
3. DNV GL - Koen Broess
 
Plazma conversion ltd full presentation
Plazma conversion ltd full presentationPlazma conversion ltd full presentation
Plazma conversion ltd full presentation
 
Design and analysis of an external rotor internal-stator doubly fed induction...
Design and analysis of an external rotor internal-stator doubly fed induction...Design and analysis of an external rotor internal-stator doubly fed induction...
Design and analysis of an external rotor internal-stator doubly fed induction...
 
Techno-Economic Modelling of Cogeneration Options for the South African Sugar...
Techno-Economic Modelling of Cogeneration Options for the South African Sugar...Techno-Economic Modelling of Cogeneration Options for the South African Sugar...
Techno-Economic Modelling of Cogeneration Options for the South African Sugar...
 
Ch5
Ch5Ch5
Ch5
 
Experimenal investigation of performance and
Experimenal investigation of performance andExperimenal investigation of performance and
Experimenal investigation of performance and
 
Power-to-gas Market Growth, Demand and Challenges of the Key Industry Players...
Power-to-gas Market Growth, Demand and Challenges of the Key Industry Players...Power-to-gas Market Growth, Demand and Challenges of the Key Industry Players...
Power-to-gas Market Growth, Demand and Challenges of the Key Industry Players...
 
Noncatalytic methane conversion technology in the microwave plasma torch by p...
Noncatalytic methane conversion technology in the microwave plasma torch by p...Noncatalytic methane conversion technology in the microwave plasma torch by p...
Noncatalytic methane conversion technology in the microwave plasma torch by p...
 
Comparative performances analysis of different rotor types for pmsg used in w...
Comparative performances analysis of different rotor types for pmsg used in w...Comparative performances analysis of different rotor types for pmsg used in w...
Comparative performances analysis of different rotor types for pmsg used in w...
 
The EU Medium Combustion Plant Directive (MCPD) – what it could mean for your...
The EU Medium Combustion Plant Directive (MCPD) – what it could mean for your...The EU Medium Combustion Plant Directive (MCPD) – what it could mean for your...
The EU Medium Combustion Plant Directive (MCPD) – what it could mean for your...
 

Recently uploaded

Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHelp Desk Migration
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansNugget Global
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdfSherl Simon
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Careerr98588472
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Aggregage
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 

Recently uploaded (20)

Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your Business
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business Loans
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Career
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 

Gt13 e2 gas turbine (in russia and cis countries)

  • 1. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the Alstom GT13E2 Gas Turbine Conference Paper POWER
  • 2. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine Russia Power 2012 05-07 March 2012, Moscow, Russia © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 3. Paper presented at Russia Power in Moscow, Russia, 05-07 March 2012 Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the Alstom GT13E2 Gas Turbine Bernard Tripod, Klaus Doebbeling, Christof Pfeiffer, Rudolf Heimerl Alstom Power Baden, Switzerland 1 Introduction ................................................................................................................... 4 2 The GT13E2 Development History.................................................................................. 7 3 GT13E2 – A Most Versatile Engine............................................................................... 10 4 GT13E2 Upgrade .......................................................................................................... 11 5 GT13E2 Benefits........................................................................................................... 14 6 Field Experience ........................................................................................................... 19 7 Service Offering............................................................................................................ 21 8 Summary & Conclusions ............................................................................................... 22 9 Bibliography ................................................................................................................. 23
  • 4. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine 1 Introduction Changing market requirements Today’s power market generally requires solutions delivering the most economic electric power while minimizing the impact on the environment. This trend is likely to go on, putting increasing pressure on the development of new power generation products. The market requirements may vary strongly depending on the regions, driven by local power generation market structures and grid operation characteristics and, therefore, the priorities and the relative importance of these requirements may changes across the regions. However, the general trends show that large power generation plants need to be designed for the highest efficiency and operational flexibility to save fuel cost over a broad range of operating conditions, and matching a strongly changing power demand. This market segment is generally covered by combined cycle power plants based on large gas turbine units of the advanced technology offering the utmost performance levels. But in addition to this high-end market, another market segment exists requiring solutions based on smaller gas turbine units, sometimes in multi-unit configurations. For these projects, the main requirements for the gas turbine is the capability to meet the specific project requirements, to adapt plant configuration to the various applications to be served, and to offer the best customized solution with highest reliability, however without compromise on performance and environmental issues. For this segment, versatility is the key word. The GT13E2 gas turbine has already demonstrated to be a most versatile engine, being used in connection with many different applications, and meeting a very broad range of environment and operation conditions. The GT13E2 upgrade described in this paper further improves these capabilities. Russian gas power market development In the last two years the Russian power industry has gone through fundamental changes in regards to its power project developments. One goal of the Russian privatisation program was and still is to boost the installation of new and highly efficient power generation facilities, so that more gas could be sold on the international market. The recent trend has been to move away from highly standardised power generation towards optimised and tailored Combined Cycle Power Plants (CCPP). Together with the international procurement of main CCPP components such as the gas turbine(s), the heat recovery steam generator(s) (HRSG), the turbogenerator(s) and the steam turbine(s), this trend is just at its start and will steadily increase, so that the current project development process in general may have to be adjusted accordingly. Certified design institutes, for example, Russia Power 2012 05-07 March 2012, Moscow, Russia © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 5. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine will depend during the pre-feasibility stage more on the support and quality of input provided by equipment suppliers. Foreign Original Equipment Manufacturers (OEM’s) and EPC contractors have encountered difficulties when dealing with Russian codes and standards, as well as Russian work processes. In the course of these experiences many foreign OEM’s / EPC contractors are reluctant to offer turnkey CCPP’s. Hence, local Russian companies have to-date tended to build the combined cycle and/or cogeneration power plants and are still doing so. Depending on their experience, however, difficulties have occurred when the Russian EPC contractors have tried to integrate the main equipment components purchased abroad into a functional combined cycle power plant. The Russian EPC contractors have experienced challenges such as omitted/missing scope and final commissioning co-ordination issues, which in some cases, has made it extremely difficult to meet performance guarantees, project schedules and pricing budgets. This meanwhile has reached even federal authorities attention. One of the already initiated counter-measures for example is that the federal office GLAVGOSEXPERTIZA is putting increased attention to compliance of the complete development process (e.g. мдс -80-8.2000 “Guidelines”), in accordance with the Urban Planning Code, for the development of technical scope of tender documentation”), before a new CCPP permit is granted. With the different technical needs, EPC contractors are also faced with new commercial challenges. For example, balancing the risk profile in view of own capabilities versus scope of supply to be purchased and therefore level of risk outsourced becomes the important question for a competitive CCPP offer. For EPC contractors, with a strong in-house engineering division, it may look commercially more attractive to purchase individual equipment only and therefore take on more risk regarding possible omitted scope, overall performance guarantees, project time schedule etc. While for other EPC contractors it may be commercially more attractive to look for a greater risk-share with the main component supplier, e.g. in terms of Power Island (PI) overall performance guarantees, or commissioning schedule of the main PI components. With its unique power generation portfolio, Alstom has developed standard solutions ranging from the supply of main components to fully integrated power island solutions specifically engineered for the needs of the Russian market conditions. For all such solutions a scope description and clear division of work (DOW) will serve as a starting point with developers/owners and/or EPC contractors to tailor the project specific scope and DOW including the project risk sharing. With flexible product offerings, Alstom can tailor and customize its approach so that developers/owners and EPC contractors have more flexibility to optimise their in-house resources versus the technical and commercial requirements and finally the overall project risk profile. To-date, Alstom has supplied either directly or in consortium more than 170 turnkey Combined Cycle Power Plants worldwide, and continues to be one of the leading turnkey suppliers of CCPP solutions.
  • 6. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine Russian market requirements The Russian & CIS power market has grown rapidly over the last decade. Russia is the fourth largest electricity producer in the world, behind only the US, China and Japan, and electricity consumption in the near- to mid- term is expected to grow at about 2% per year. Demand for new capacity is driven both by economic growth and by the need to retire old plants. Nearly half of the installed capacity in Russia is over 30 years old, and a majority of these units are inefficient gas-fired steam plants. Based on new plant orders over the last five years, gas plants top nuclear, conventional steam, and hydro as Russia’s top choice for new capacity. This trend is expected to continue, with 60% of new capacity in the next ten years coming from gas turbine based power plants. A common market requirement is that the plant must be able to meet the steam needs of existing Combined Heat and Power (CHP) systems, which are prevalent throughout Russia. Repowering is another important market segment, where existing conventional steam plants are transformed into the steam cycle for a combined cycle plant. The choice of gas turbines is sometimes simply based on which provides the best fit with the existing power plant. The most challenging requirement for gas plants in the Russian market, however, is the need to deal with extremely wide ranges of ambient temperatures. Operating temperatures typically are specified as a range from –40°C to +40°C. To cope with all the diverse conditions and requirements, a highly versatile type of engine is required. The Alstom GT13E2 gas turbine is well adapted to the specific conditions of the Russian & CIS market and offers the highest performance in its class to produce economic and clean power. The GT13E2 operation and experience records show that the GT13E2 has proved to be the perfect fit for power generation projects, also including special applications like cogeneration projects for district heating, desalination or other industrial applications, or repowering opportunities. Only last year Alstom has been awarded 8 GT13E2 units for projects in the region. Most of them will be used in combined cycle CHP projects for district heating application. Russia Power 2012 05-07 March 2012, Moscow, Russia © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 7. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine 2 The GT13E2 Development History In 2013, we will celebrate the 20th birthday of the GT13E2 gas turbine. Since its first operation in 1993, the GT13E2 gas turbines have demonstrated significant user’s advantages of this technology platform. Unprecedented operational flexibility, robust design, high gas turbine efficiency, low emissions over a wide load range with world-class levels of reliability and availability are characteristics of these gas turbines. The GT13E2 is a medium sized gas turbine of the 200 MW class. It has a 21-stage compressor with a variable inlet guide vane, an annular combustion system with closed loop combustor cooling and a 5-stage turbine. Figure 2.1: GT13E2 gas turbine thermal block The annular combustion system includes 72 EV (EnVironmental) burners. The EV burner is a dry low NOx burner with a long operating history and is used in the entire Alstom gas turbine portfolio, which allows a concentrated development and cross feed of improvements between the different gas turbine platforms. To cover the different power output requirements different numbers of burners are used in the different platforms. In 1993 the first GT13E2 started operation. Major scope of the 2002 upgrade was a new turbine that pushed performance from 166 MW at 35.7% initially to 172 MW at 36.4% gas turbine efficiency. This upgrade also included TBC coating on the downstream part of the combustor, the so-called combustor zone 2, as well as the option to operate the engine at two different operation modes. These two different operation modes are using two different firing temperature levels such that for the lower temperature firing level the lifetime consumption is lower and hence operation intervals between inspections are longer. In parallel fuel switch
  • 8. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine over from natural gas to fuel oil and vice versa was optimized such that fuel switch over can reliably be done also at full load. • Alstom Standard EV • Compressor upflow • Incremental PERFORMANCE Burner improvements in Turbine • Turbine Blade 5 and and Combustor • M-Turbine upgrade Combustor Improvements implemented • Auxiliary system • Performance improvements • Performance Gross: 178 MW, 36.7% Gross: 172 MW, 36.4% 2006, 2009, 2010 180, 182, 184 MW 36.9, 37.4, 37.8 % 2012 Basis: ISO 2005 2002 FLEXIBILITY • Flexible lifetime concept • Extension of capability • High fogging power (performance optimized for low and high ambient augmentation and maintenance cost temperature optimized mode) • Fast start • High fuel flexibility Figure 2.2: GT13E2 performance and flexibility evolution In the 2005 upgrade the compressor stages 1-5 have been re-staggered to increase the mass flow by approximately 4%. The profile of the last turbine blade was optimized to match the increased mass flow. In the front part of the combustor, the so-called combustor zone 1 liner segments, thermal barrier coating (TBC) was applied and the film-cooling pattern was adapted. As a result improved flame stability and lower NOx emissions over a wider ambient temperature range were achieved. Continuous improvements and product care especially through the use of optimized coatings, through leakage reductions and reduction of auxiliary power consumption as result of feedback obtained from of over hundred operating GT13E2 engines in 2005 allowed stepwise performance increase to 184 MW and 37.8% gross efficiency. Upgrades of the control software and hardware resulted in faster start and higher load gradients. Implementation of power augmentation options like air inlet cooling, high fogging and water injection resulted in the possibility to keep the power output almost constant from 15°c ambient temperature up to 45°c. Today, the GT13E2 has been sold more than 150 times worldwide and the fleet has accumulated more than 7.5 million operating hours and over 54’000 starts. 21 engines have accumulated more than 100’000 fired hours with the fleet leader having achieved over 128’000 hours. 10 engines had more than 1’000 start/stop cycles. Russia Power 2012 05-07 March 2012, Moscow, Russia © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 9. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine RUSSIA & CIS SC – 3 UNITS WESTERN EUROPE CC – 9 UNITS SC – 5 UNITS MIDDLE EAST CC – 21 UNITS SC – 12 UNITS NORTH AFRICA CHINA SC – 12 UNITS SC – 1 UNITS CC – 2 UNITS ASIA WESTERN AFRICA SC – 27 UNITS SC – 6 UNITS CC – 4 UNITS CC – 3 UNITS INDIA SC – 1 UNITS GULF SC – 20 UNITS CC – 13 UNITS OCEANIA LATIN AMERICA SC – 12 UNITS CC – 2 UNITS CC – 4 UNITS Figure 2.3: GT13E2 global references The GT13E2 has demonstrated superior reliability. Figure 2.3 shows the latest reliability figures over the period from 3rd quarter 2010 to 3rd quarter 2011 from the ORAP report of the independent SPS/ORAP report. The reliability figures of the GT13E2 are clearly and consistently above that of the average of the industry. 100% 98% Reliability ( % ) 96% 94% 92% 90% 3Q 1 0 4 Q 10 1Q 1 1 2 Q 11 3Q 1 1 GT13E2 ORAP RAM Values GT13E2 (12 Month Rolling Averages) E Class Technology All Values are for Simple Cycle Plant (GT, Generator, and Station Equipment) Figure 2.3: GT13E2 reliability
  • 10. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine 3 GT13E2 – A most Versatile Engine Over the years, the GT13E2 has proved its unsurpassed versatility in countless projects around the world, being used with benefits in all kinds of applications or plant configurations, and under a wide range of operational conditions. - Used under very different ambient conditions, from cold to hot places, from dry sandy sites to wet seashores or polluted industrial areas - Used extensively for both simple cycle as well as combined cycle plants - Used in connection with very demanding industrial application, like aluminium smelters etc., often powering small island electrical grids, without connection or support from large utility networks - One third of the installed fleet used for simple cycle or combined cycle cogeneration applications (CHP plants), with heat supplied to district heating systems, desalination plants or industrial processes - Several projects were started as simple cycle then converted into full combined cycle plants through steam tail add-on, while some GT13E2 units have been used in repowering applications, for the conversion of existing steam power plants into combined cycle plants - Many combined cycle plants have been fitted with bypass stack, some of them for phased installation and operation first of the gas and later of the steam turbine(s) – i.e. steam tail add-on as above mentioned - Many of them, especially in very hot climatic regions, have been fitted with air inlet cooling systems - Running on very different types of fuel, with a broad range of gas or liquid fuel compositions, and also varying compositions during operation, etc., in gas only, dual fuel, or oil only configurations Figure 3.1 shows the example of Alba combined cycle plant, in Bahrain, based on three blocks KA13D-3 (3- on-1 configuration) and two blocks KA13E2-2 (2-on-1 configuration) for a total of 1530 MW, mostly operated in island configuration Figure 3.1: Alba – One of the largest aluminium smelter plants in the world Russia Power 2012 05-07 March 2012, Moscow, Russia © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 11. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine 4 GT13E2 Upgrade Development focus In the recent years even more challenging requirements for flexibility and environmental friendliness have emerged. New governmental regulations on emission reduction over a broad load range and for largely varying natural gas composition have or will be put in force. Varying energy demand during day/night and summer/ winter as well as the increasing number of wind and solar power generation units further make operational flexibility a key requirement. Already today Alstom gas turbines meet most of these future conditions and requirements. In order to further enhance performance and operational flexibility of the GT13E2 an upgrade has been defined, based on - integration of a proven compressor with higher mass flow and better turndown capability - upgraded combustion system Combustor Advanced EnVironmental (AEV) burners Compressor LP compressor of the GT26 gas turbine Figure 4.1: GT13E2 development focus Compressor To increase the power output and the turndown capability of the GT13E2 the first 16 stages of the proven compressor used in the GT26 have been integrated into the GT13E2 engine. Three variable guide vanes allow a wider range of turn down at higher compressor efficiency as compared to the previous compressor with single variable guide vane row. The mass flow of the engine is increased by approximately 10%. The compressor blades and vanes as well as the compressor housing and the compressor section of the rotor have
  • 12. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine been taken over from the GT26 with minor adaptations to the GT13E2. The air intake system and the rotor bearing on the compressor side are also adapted from the GT26 design so that the previously used intermediate shaft to the generator is no longer required resulting in a shorter arrangement. Compressor bleeds have been found to match well the turbine cooling system requirements. Blow off during start-up of the engine is injected into the exhaust system eliminating the previously used blow off silencers. GT26 Gas Turbine LP Compressor Figure 4.2– GT13E2 Gas Turbine compressor based on the GT26 compressor The compressor design builds on a fleet experience of more than sixty GT26 engines. It includes the air inlet cooling and power augmentation systems successfully in operation on many GT26 turbines. Combustor The combustion system has been upgraded to further enhance the emission behaviour and the operational flexibility of the GT13E2 by implementing the Advanced EnVironmental (AEV) burner. The AEV burner is based on the well proven standard Alstom gas turbine EV burner technology as an evolutionary approach for both gas and fuel oil operation. The design features of the AEV burner are shown in figure 4.3. Main difference between the AEV and the EV burner is the dedicated mixing section in the burner body downstream of the swirler. The design of the four- slot swirler is aerodynamically optimized with a higher throughput of combustion air as compared to the existing GT13E2 EV design. As a result the number of burners is reduced, from 72 EV burners to 48 AEV burners. Russia Power 2012 05-07 March 2012, Moscow, Russia © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 13. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine Figure 4.3: AEV burner design features The integration of the mixing section downstream of the swirler in the burner body ensures an almost perfectly homogeneous mixture of fuel and combustion air, resulting in very low NOx emissions on both gas and oil operation. For oil operation, the mixing section provides sufficient residence time for atomization, pre-vaporization and mixing of the liquid fuel. As a consequence less than half of the water is consumed for control of the NOx emissions compared to the EV burner. An important feature of the AEV burner is the front stage gas injection through multiple nozzles, which are arranged circumferentially around the burner exit plane. With this solution the stability of the flame generated by the internal fuel stage is increased against flame extinction and pulsations. Hence the AEV burner system can be permanently operated over the entire load range with low NOx emissions. A robust combustion is obtained by the presence of the mixing section, the flame front being insensitive to variations of air temperature and humidity as well as natural gas composition and gas temperature. Therefore, the GT13E2 upgrade with AEV burner sees its fuel and operational flexibility further enhanced. As a direct consequence of the AEV operation concept, the fuel system is simplified. Other improvement areas Further to the major changes on the compressor and combustor as described above, the GT13E2 upgrade can benefit from of a number of small design improvements and refinements: - The same turbine from the 2005 rating is used for this upgrade, as the large cross sectional flow of the last turbine stage allows accommodating the higher mass flow from the compressor. Because of the change of
  • 14. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine the firing temperature by less than 20°C, the first blade row received full thermal barrier coating (TBC) coverage for improved lifetime - A larger type of TOPAIR air-cooled generator is used to accommodate the higher power output of the gas turbine, with margins for power augmentation. It can be optimized to allowing for 3 different ratings in the range of 255 to 280 MVA, hence enabling adjustment to plant specific requirements at maximized generator efficiency - The arrangement of the gas turbine auxiliary systems has been optimised with increased modularization through the use of pre-engineered and factory tested functional modules - Further, to reduce and simplify maintenance several small improvements have been brought to the gas turbine to facilitate tasks like alignment or lifting of components 5 GT13E2 Benefits Performance The GT13E2 upgrade brings performance improvements in many regards: - Engine nominal output and efficiency - Combined cycle plant output - Simple cycle and combined cycle part load efficiency - Engine performance at high ambient conditions Nominal performance Since its first operation in 1993, the GT13E2 could claim the best performance in it class. With the new upgrade, it becomes even better: 202.7 MW / 38% gross engine performance at generator terminals, i.e. a 10% power output increase, and +0.2%-pt efficiency improvement. The combined cycle plant performance is also boosted, gaining 48 MW in a 2-on-1 plant configuration, with net plant efficiency maintained at high level. GT13E2 Engine Performance Gross electrical output MW 202.7 Gross electrical efficiency (LHV) % 38.0 - ISO Conditions Gross heat rate (LHV) kJ/kWh 9476 - Natural gas Btu/kWh 8982 - Gross performance at generator terminals no inlet/outlet losses KA13E2-2 Combined Cycle Power Plant Performance Net plant electrical output MW 565 - ISO Conditions Net plant electrical efficiency (LHV) % 53.8 - Natural gas Net plant heat rate (LHV) kJ/kWh 6696 - Double pressure non reheat CCPP configuration Btu/kWh 6347 - Net plant performance at main step-up transformer HV terminals Russia Power 2012 05-07 March 2012, Moscow, Russia © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 15. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine Part load behaviour The use of the GT26 low-pressure compressor with 3 variable guide vanes (VGV’s) instead of just one results in a better part-load efficiency characteristics for both simple cycle and combined cycle applications. The improved part-load performance permits to generate significant fuel savings. As an example, the GT13E2 upgrade operating on gas at 75% GT load will consume about 2% less fuel than with the previous rating, therefore positively contributing to any project economic results. Plant Relative Efficiency 100% > 1% GT13E2 Upgrade GT13E2 before upgrade 4-5% 100% 75% 50% Gas Turbine Load Figure 5.1: KA13E2-2 part load behaviour Figure 5.1 shows the gain in efficiency of a KA13E2-2 combined cycle 2-on-1 plant configuration. The part load behaviour of the upgrade permits to save more than 1% fuel when operating at 75% GT load, and as much as to 4-5% at 50% GT load. Performance at hot ambient conditions While the GT13E2 efficiency at low ambient conditions remains significantly better than any comparable machine, the characteristics of the 2012 upgrade permits to offer better efficiency at high ambient conditions. This is especially valuable in typical hot climate countries where hot summer conditions also mean the highest power demand, because of air conditioning loads. As an example, at 45°C ambient temperature, the new upgrade will still have 16 MW more power than the previous rating in simple cycle, with an efficiency benefit of more than 0.8%-pt. In addition, the range of air inlet cooling options (evaporative cooling, fogging, high fogging) permit to keep the power output characteristics flat over a wide range of ambient temperature.
  • 16. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine Emissions The introduction of the AEV burners permits to significantly improve the environmental performance of the machine: Running on natural gas, the full load NOx emissions are reduced from 25 vppm1 down to 15 vppm. The turndown is also improved, since the GT13E2 upgrade is able to operate down to 70% load meeting the low 15 vppm NOx emissions, and further down to 50% GT load not exceeding the 25 vppm NOx World Bank standards. The AEV burner brings also important benefits when running on #2 oil, as the GT13E2 is now able to run with 25 vppm NOx emission in the 100% down to 70% GT load range. The 42 vppm (typical European standard requirement) can even be met down to 50% load. NOx control on oil operation is by water injection, which could be strongly reduced. The amount of water required to meet 42 vppm NOx is about 60% lower. The AEV burner environmental performance is almost immune to variations of the air conditions at GT inlet, meaning that the gas turbine can deliver clean power at low ambient conditions as well as in hot climate, even with air inlet cooling systems in operation. Finally, it must be mentioned that the CO2 emissions are reduced as a direct consequence of the better efficiency of the gas turbine - both at full load and at part loads. Fuel flexibility The superior fuel flexibility demonstrated already with the GT13E2 fleet in operation is fully achieved with the AEV-equipped GT13E2 upgrade as well. The experience range with respect to the Wobbe Index extends from 31 MJ/m3 to 49 MJ/m3, i.e. a ±23% range. In terms of C2+ content, values of up to 25% in volume are demonstrated without negative impact on performance, reliability and compliance with emission requirements. The robustness of the combustion system and the associated control system allows these engines to operate under these varying conditions without the need for re-adjustment of settings or changes of hardware. The GT13E2 is not only capable to run on a wide range of fuel gas compositions, it can also allow fast and wide variations in the fuel gas quality. On-line fuel switch-over In case of decreasing fuel gas supply pressure, fast fuel switch over from gas to oil operation ensures uninterrupted stable power supply. Such fuel switch over can be executed while the machine remains at full load. Switch over at constant load is also possible at part loads down to 40% GT load. 1 Note: vppm to be read as vppm, dry (corrected to 15% O2) Russia Power 2012 05-07 March 2012, Moscow, Russia © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 17. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine Start-up The permanent operation of the AEV burner with two fuel stages allows a fast adjustment of the combustion resulting in an improved behaviour for transient operation conditions such as fast loading, frequency response or load rejection. The standard start-up time is 25 minutes from start initiation (push button) to more than 200 MW at the generator terminals (ISO conditions). With the upgrade GT13E2 the start-up time can be even reduced to 15 minutes (figure 5.2). This is done through increased start-up power during the rotor acceleration phase combined with a smart ramp-up load control, allowing for higher loading gradients within a selected load range. Warm and hot start-up times of 15 minutes are possible without additional lifetime counting on the gas turbine as compared to the 25 min start. By making use of an optional roller shutter in the air intake, the status “warm engine” can be extended up-to 60 hours from shut-down. Synchronization Acceleration Loading 100 (Base Load) 80 Parameters [%] rt Speed rt Sta ta 60 .S n. in m mi 25 15 40 20 0 0 5 15 20 25 Starting times including engine preparation time Time [min.] Over 200 MW in only 15 minutes Figure 5.2: GT13E2 start-up Operation at low ambient conditions Reliable operation at very low ambient condition is no exceptional feat for the GT13E2 upgrade, which became even more robust, and saw its capability at very low ambient conditions improved:   - Emission compliant operation without air pre-heater down to -10°C ambient temperature down to 50% relative GT load; as a consequence, the pre-heater size can be reduced for lower ambient temperatures as only -10°C must be achieved at GT inlet - Cold starts are allowed down to –30°C ambient temperature without air pre-heater in operation - With pre-heater the gas turbine is operational down to -50°C
  • 18. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine Cogeneration operation Cogeneration (CHP – Combined Heat and Power) operation very often requires that the heat supply can be ensured independently of the gas turbine power output. Also, the steam parameters must normally be kept constant so that the operation of the process using the steam is not disturbed. The use of three rows of variable guide vanes not only offers superior part load performance, but it also ensures that the gas turbine exhaust temperature remains high over a wide range of GT operating loads. This generally represents a key benefit for CHP plants, as it permits to keep the steam parameters constant independently of the gas turbine power output, over a wide load range. Maintenance improvements A number of small refinements and improvements have been made so as to increase the ease of maintenance. Measures have been taken to facilitate maintenance tasks such as alignments and lifting of components. Pre- engineered functional modules have been introduced for the auxiliary systems, and the fuel system has been simplified. Together with the reduction in the number of parts (e.g. from 72 EV burners down to 48 AEV burners), the duration of the maintenance work and effort is reduced. Further benefits of the GT13E2 In addition to the specific benefits of the GT13E2 above described, this machine also features many advanced characteristics inherited from the previous GT13E2 rating, such as: Flexible operation modes The GT13E2 can be operated either in the so-called “Performance Optimized” (PO) operation mode or in the “Maintenance Cost Optimized” (MCO) operation mode. For a slight decrease in the performance (<5% power, <0.5%-pt. efficiency), the intervals between inspections can be increased up to 50%. The operator can switch between the two operation modes at any time and, as a consequence, optimize the plant economics. The benefits of an operation in the MCO operation mode applies automatically at part load of less then around 95% GT load. Power augmentation options Like the previous rating, the GT13E2 can be equipped with an air inlet cooling system (evaporative cooling, fogging or high fogging) to further increase power output at high ambient temperatures. Alstom has developed in-house the systems using fogging or high fogging devices with the clear advantage of being designed and integrated by the gas turbine equipment manufacturer itself: - no impact of the inlet cooling system operation on interval between inspections - the compressor surge margin is maintained within safe limits at all operation points - the control and protection systems of both gas turbine and inlet cooling equipment are fully integrated - performance guarantees available for full Alstom air inlet cooling portfolio Russia Power 2012 05-07 March 2012, Moscow, Russia © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 19. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine GT13E2 based combined cycle power plants can easily be fitted with large supplementary firing, allowing high power supply flexibility, and increased power vs. heat production flexibility for CHP plants. Low Emissions CC CC + HF + SF CC Low Emissions SC PA CC SC + HF SC PA SC • SC Simple Cycle 50 100 150 200 250 300 350 MWel • CC Combined Cycle • HF High Fogging • SF Supplementary Firing • PA Power Augmentation SC CC SC CC min. Environmental Basis: One GT unit / ISO conditions Turndown Figure 5.3: SC13E2 / KA13E2 high power output flexibility Figure 5.3 shows the wide power output range at ISO conditions of the simple cycle and 1-on-1 combined cycle configurations. The emission-compliant range extends for the combined cycle case from 50% (min. environmental turndown) to + 118% (full load combined cycle power output, with HF and SF). This range increases at high ambient conditions, as the air inlet cooling will become more effective. 6 Field Experience Compressor The first 16 stages of the well-proven GT26 compressor are now used for the GT13E2 upgrade development. Extensive compressor testing, including surge test have been performed in 2002 at the Alstom test GT26 test power plant in Birr, Switzerland. This compressor design is now installed and running in more than sixty GT26 gas turbines where it could demonstrate its reliability. Today, the cumulated experience amounts to over 1.2 million fired hours, with the fleet leader having achieved more than 60’000 operating hours.
  • 20. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine Combustor After full-scale tests in the Alstom GT8C2 Test Power Plant, the AEV combustor upgrade package has been installed in three GT13E2 customer units, the first already in 2006, and was very successfully validated, demonstrating the improved operational flexibility and the reduced emissions. At different ambient conditions stable low NOx emissions well below the emission permit levels on gas fuel and on fuel oil could be demonstrated without any need for re-adjustment of the engine or tuning of the combustor system. Figure 6.1 – Alstom GT8C2 Test plant Figure 6.2 – Vattenfall’ Berlin Mitte Power Plant 2006 2007 2008 2009 2010 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 RWE Ludwigshaven 1st Gas GT13E2 AEV upgrade Vattenfall Berlin Mitte Dual fuel AEV upgrade GT13E2 Nuon Diemen 2nd Gas GT13E2 AEV upgrade Figure 6.3 – Plants operating with AEV Retrofit Upgrade To date the total operation experience with the AEV burners on GT13E2 gas turbines has exceeded 80’000 operation hours. The GT13E2 gas turbine with dual fuel operation is operating reliably for more than two years and has accumulated more than 16’500 OH with the AEV dual fuel burner. The AEV Burner is now offered both as retrofit to the existing fleet, as well as standard component for the new GT13E2 engines. Russia Power 2012 05-07 March 2012, Moscow, Russia © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 21. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine 7 Service Offering Alstom has more than 100 years of experience in engineering, procurement and construction (EPC) of new power plants, and our engineers are also experts in retrofitting, modernizing and servicing existing plants. With operations in over 70 countries, Alstom is close to their customers all over the world, ensuring rapid response and service at all times. Utilities, independent power producers and merchant power generators are all looking to maximize the returns on their investments, by optimizing operations and managing risks. As a leading Gas Turbine Original Equipment Manufacturer (OEM) and turnkey power plant provider, Alstom possesses the unique extensive technical expertise and equipment know-how to ensure that their client’s equipment remains competitive throughout the lifecycle of the product. The OEM commitment to continuous development efforts on all major equipment products, such as performance upgrade packages using the latest state-of-the-art gas turbine and combustion technology help the plant owners to produce more power, while using less fuel and reducing emissions. Extending operation intervals between scheduled outages enables more production and lower maintenance costs. Innovative reconditioning of hot gas path parts uses the latest proven technology to keep engines operational, with a quality assurance that can only be provided by the OEM supplier. Alstom’s flexible and customized expert services cover solutions at all stages of the plant lifecycle, including: - New and improved parts, reconditioning of parts - Advice and operational support - Field service - Performance improvements on components and full plant - Plant integration capabilities - Service contracts, also on other OEM gas turbine equipment Alstom’s service contracts for GT and CCPP are tailored to meet the needs of all operational, maintenance and support requirements. From Long Term Agreements (LTA) covering the supply of parts and provision of services, to Operation and Maintenance (O&M) contracts, which allow plant owners to devise completely new management strategies by outsourcing risks and responsibilities, Alstom’s O&M contracts allow clients to take advantage of performance and availability guarantees through tailored agreements that perfectly suit the required service and equipment scope. With existing commercial power plants in Armenia (Hrazdan, Yerevan), Belarus (Minsk) and Russia (Moscow), and a rapidly expanding GT13E2 fleet in Russia, Alstom’s commitment to provision of local services in Russia and CIS countries is in direct focus. The availability of local services from Russian-speaking teams is considered to be of vital importance to provide the necessary OEM support for the growing fleet.
  • 22. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine 8 Summary & Conclusions The very successful Alstom GT13E2 gas turbine with best-in-class performance, high reliability, high operational flexibility and unique versatility to adapt to a broad range of applications and operation conditions has been further improved. The GT13E2 upgrade significantly extends the already well-recognized benefits of the machine: - Increased simple cycle performance – more than 200 MW at 38% gross efficiency (+10% output / + 0.2%-pt efficiency) - Improved net combined cycle plant performance - 565 MW / 53.8% (+9% output / + 0.2%-pt efficiency) for a 2-on-1 power plant configuration - Improved part load efficiency - Improved high ambient temperature performance / improved low ambient temperature capability - Reduced emissions levels, improved environmental turndown and environment compliant power augmentation solutions - Fast GT start with >200 MW available in 15 minutes, without additional lifetime counting vs. 25 min. start, for warm and hot starts - High fuel composition flexibility without hardware changes - On-line fuel switch-over at constant load, for gas turbine loads between 40% and 100% - Switchable (on-line) operation modes to adjust the gas turbine performance according to market requirements and, therefore, optimize the plant economics - Improved capability for cogeneration operation, due to the improved gas turbine exhaust gas temperature characteristics - Full range of power augmentation options with guaranteed performance and no impact on intervals between inspections - Reduced maintenance requirements The development of the 2012 upgrade was entirely based on an evolutionary approach, making full use of the well-proven GT13E2 platform, together fully validated components: - The first 16 stages of the GT26 compressor design used for this upgrade is operating in more than sixty GT26 units, totalling more than 1’200’000 running hours experience. - The Advanced EV burner (AEV burner), a further development of the standard EV burner used in all Alstom gas turbines, is operating commercially in three customer engines, with more than 80’000 fired hours experience. …The Best becomes Better! Russia Power 2012 05-07 March 2012, Moscow, Russia © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 23. Increasing Power Generation Efficiency in Russia and CIS Countries through Further Development of the GT13E2 Gas Turbine 9 Bibliography [1] Upgrade of Alstom’s Highly Efficient GT13E2 Gas Turbine Stephen Philipson, Michael Ladwig, Frank Nickel, Klaus Döbbeling, Alexander Hoffs Paper presented at the Power-Gen Europe Conference 2006 [2] Combining Operational Flexibility with Clean, Reliable Power Generation in the Alstom Gas Turbine GT13E2 Klaus Döbbeling, Jürgen Pacholleck, Alexander Hoffs Paper presented at the Power-Gen Asia Sept. 2007 [3] Fuel Flexibility of the Alstom GT13E2 medium sized Gas Turbine Klaus Döbbeling, Thiemo Meeuwissen, Martin Zajadatz, Peter Flohr, Alstom Paper GT2008-50950 presented at ASME Turbo Expo Berlin, June 2008 [4] GT13E2 flexibility powering industrial plants Klaus Döbbeling, Lucas Fischer, Frank Nickel, ALSTOM Paper presented at the Power-Gen Middle East Conference 2009, Bahrain [5] Alstom GT13E2 Combustor Upgrade for Vattenfall's Berlin Mitte K. Döbbeling, M. Zajadatz, R. Zoli, ALSTOM, and E. Reichstein, Vattenfall Europe Wärme AG, Berlin Paper presented at the VGB Fachtagung, 2011
  • 24. Alstom Power © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Photo credit: www.alstom.com/power