       Statistical process control is an effective method for improving a firm’s quality

and productivity. There has been an increased interest in their effective implementation in

American industry, brought about by increased competition and improvements in quality

in foreign-made products. Many tools may be utilized to gain the desired information on

a firm’s quality and productivity. Some of the more commonly used tools are control

charts, which are useful in determining any changes in process performance. These

include a variety of charts such as p charts, c charts and x bar and R charts. In this paper,

I will be focusing on the latter two mentioned.

X bar Charts defined

       An x bar chart is used to monitor the average value, or mean, of a process over

time. For each subgroup, the x bar value is plotted. The upper and lower control limits

define the range of inherent variation in the subgroup means when the process is in

control.

R Chart defined

       An R Chart is a control chart that is used to monitor process variation when the

variable of interest is a quantitative measure. Now, what does all this mean? These

charts will allow us to see any deviations from desired limits within the quality process

and, in effect, allow the firm to make necessary adjustments to improve quality.

The Chart Construction Process

       In order to construct x bar and R charts, we must first find our upper- and lower-

control limits. This is done by utilizing the following formulae:
UCL = µ+ 3σ
                 √n

        LCL = µ - 3σ
                  √n


        While theoretically possible, since we do not know either the population process

mean or standard deviation, these formulas cannot be used directly and both must be

estimated from the process itself. First, the R chart is constructed. If the R chart validates

that the process variation is in statistical control, the x bar chart is constructed.

Steps in Constructing an R chart


1. Select k successive subgroups where k is at least 20, in which there are n
   measurements in each subgroup. Typically n is between 1 and 9. 3, 4, or 5
   measurements per subgroup is quite common.
2. Find the range of each subgroup R(i) where R(i)=biggest value - smallest value for
   each subgroup i.
3. Find the centerline for the R chart, denoted by




4. Find the UCL and LCL with the following formulas: UCL= D(4)RBAR and
   LCL=D(3)RBAR with D(3) and D(4) can be found in the following table:

        Table of D(3) and D(4)
        n D(3) D(4)        n D(3) D(4)
        2 0      3.267    6 0    2.004
        3 0      2.574    7 .076 1.924
        4 0      2.282    8 .136 1.864
        5 0      2.114    9 .184 1.816

5. Plot the subgroup data and determine if the process is in statistical control. If not,
   determine the reason for the assignable cause, eliminate it, and the subgroup(s) and
   repeat the previous 3 steps. Do NOT eliminate subgroups with points out of range for
   which assignable causes cannot be found.
6. Once the R chart is in a state of statistical control and the centerline RBAR can be
   considered a reliable estimate of the range, the process standard deviation can be
   estimated using:
d(2) can be found in the following table:

      n    d(2) n    d(2)
      2    1.128 6    2.534
      3    1.693 7    2.704
      4    2.059 8    2.847
      5    2.326 9    2.970


Steps in Constructing the XBAR Chart

   1. Find the mean of each subgroup XBAR(1), XBAR(2), XBAR(3)... XBAR(k) and
      the grand mean of all subgroups using:




   2. Find the UCL and LCL using the following equations:




      A(2) can be found in the following table:
      n   A(2)     n   A(2)
      2   1.880    6   .483
      3   1.023    7   .419
      4    .729    8   .373
      5    .577    9   .337

   3. Plot the LCL, UCL, centerline, and subgroup means
   4. Interpret the data using the following guidelines to determine if the process is in
      control:

      a.  one point outside the 3 sigma control limits
      b.  eight successive points on the same side of the centerline
      c.  six successive points that increase or decrease
      d.  two out of three points that are on the same side of the centerline,
         both at a distance exceeding 2 sigma’s from the centerline
      e. four out of five points that are on the same side of the centerline,
         four at a distance exceeding 1 sigma from the centerline
      f. using an average run length (ARL) for determining process anomalies
Example:

The following data consists of 20 sets of three measurements of the diameter of an engine

shaft.

n    meas#1 meas#2 meas#3       Range XBAR
1    2.0000 1.9998 2.0002    0.0004 2.0000
2    1.9998 2.0003 2.0002    0.0005 2.0001
3    1.9998 2.0001 2.0005    0.0007 2.0001
4    1.9997 2.0000 2.0004    0.0007 2.0000
5    2.0003 2.0003 2.0002    0.0001 2.0003
6    2.0004 2.0003 2.0000    0.0004 2.0002
7    1.9998 1.9998 1.9998    0.0000 1.9998
8    2.0000 2.0001 2.0001    0.0001 2.0001
9    2.0005 2.0000 1.9999    0.0006 2.0001
10   1.9995 1.9998 2.0001    0.0006 1.9998
11   2.0002 1.9999 2.0001    0.0003 2.0001
12   2.0002 1.9998 2.0005    0.0007 2.0002
13   2.0000 2.0001 1.9998    0.0003 2.0000
14   2.0000 2.0002 2.0004    0.0004 2.0002
15   1.9994 2.0001 1.9996    0.0007 1.9997
16   1.9999 2.0003 1.9993    0.0010 1.9998
17   2.0002 1.9998 2.0004    0.0006 2.0001
18   2.0000 2.0001 2.0001    0.0001 2.0001
19   1.9997 1.9994 1.9998    0.0004 1.9996
20   2.0003 2.0007 1.9999    0.0008 2.0003

RBAR CHART LIMITS:

RBAR = 0.0005

UCL=D(4)*RBAR = 2.574 * .0005 = 0.001287
LCL=D(3)*RBAR = 0.000 * .0005 = 0.000


XBAR CHART LIMITS:

XDBLBAR = 2.0000

UCL = XDBLBAR + A(2)*RBAR = 2.000+1.023*.0005 = 2.0005115
LCL = XDBLBAR - A(2)*RBAR = 2.000-1.023*.0005 = 1.9994885
R - Chart:




XBAR - Chart:
Works Cited

Erwin M. Saniga, Economic Statistical Control-Chart Designs With an Application to
      Xbar and R Charts (University of Delaware, Department of Business
      Administration, Newark DE, 1989)

Richard L. Marcellus, Operating characteristics of X-bar charts with asymmetric control
       limits (Department of Industrial Engineering, Northern Illinois University,
       DeKalb IL, 1998)

W. H. Woodall, “The Statistical Design of Quality Control Charts,” The Statistician, 34,
      155-160.

Business Statistics: A Decision-Making Approach, Groebner, David F., Shannon, Patrick
W., Fry, Phillip C., and Smith, Kent D.; Prentice Hall, UpperSaddle River, NJ, 2001.

Paul A. Keller, “When to use and X-bar/R Chart,” Internet
       http://www.qualityamerica.com/knowledgecente/knowctrWhen_to_Use_an__Xba
       r__R_Chart.htm (10/13/2004)

More Related Content

What's hot

control Chart u np c p
control Chart u np c pcontrol Chart u np c p
control Chart u np c pblactigger401
 
IE-002 Control Chart For Variables
IE-002 Control Chart For VariablesIE-002 Control Chart For Variables
IE-002 Control Chart For Variableshandbook
 
Seven QC Tools Training; Control Charts (Mean Chart and Range Chart)
Seven QC Tools Training; Control Charts (Mean Chart and Range Chart)Seven QC Tools Training; Control Charts (Mean Chart and Range Chart)
Seven QC Tools Training; Control Charts (Mean Chart and Range Chart)Shakehand with Life
 
Statistical Quality Control Tools - Total Quality Management
Statistical Quality Control Tools - Total Quality ManagementStatistical Quality Control Tools - Total Quality Management
Statistical Quality Control Tools - Total Quality ManagementAniket Joshi
 
The Effect of Sample Size On (Cusum and ARIMA) Control Charts
The Effect of Sample Size On (Cusum and ARIMA) Control ChartsThe Effect of Sample Size On (Cusum and ARIMA) Control Charts
The Effect of Sample Size On (Cusum and ARIMA) Control ChartsINFOGAIN PUBLICATION
 
Statistical quality__control_2
Statistical  quality__control_2Statistical  quality__control_2
Statistical quality__control_2Tech_MX
 
Msa manual 4 th edition
Msa manual 4 th editionMsa manual 4 th edition
Msa manual 4 th editionSANKUSI
 
Applications Residual Control Charts Based on Variable Limits
Applications Residual Control Charts Based on Variable LimitsApplications Residual Control Charts Based on Variable Limits
Applications Residual Control Charts Based on Variable LimitsIJERA Editor
 
Time Series Analysis - 2 | Time Series in R | ARIMA Model Forecasting | Data ...
Time Series Analysis - 2 | Time Series in R | ARIMA Model Forecasting | Data ...Time Series Analysis - 2 | Time Series in R | ARIMA Model Forecasting | Data ...
Time Series Analysis - 2 | Time Series in R | ARIMA Model Forecasting | Data ...Simplilearn
 
Scatter diagram and control chart
Scatter diagram and control chartScatter diagram and control chart
Scatter diagram and control chartnithyanithi26
 

What's hot (17)

control Chart u np c p
control Chart u np c pcontrol Chart u np c p
control Chart u np c p
 
X Bar R Charts
X Bar R ChartsX Bar R Charts
X Bar R Charts
 
P Charts
P ChartsP Charts
P Charts
 
IE-002 Control Chart For Variables
IE-002 Control Chart For VariablesIE-002 Control Chart For Variables
IE-002 Control Chart For Variables
 
Control Charts[1]
Control Charts[1]Control Charts[1]
Control Charts[1]
 
Seven QC Tools Training; Control Charts (Mean Chart and Range Chart)
Seven QC Tools Training; Control Charts (Mean Chart and Range Chart)Seven QC Tools Training; Control Charts (Mean Chart and Range Chart)
Seven QC Tools Training; Control Charts (Mean Chart and Range Chart)
 
control charts
control chartscontrol charts
control charts
 
Final notes on s1 qc
Final notes on s1 qcFinal notes on s1 qc
Final notes on s1 qc
 
Statistical Quality Control Tools - Total Quality Management
Statistical Quality Control Tools - Total Quality ManagementStatistical Quality Control Tools - Total Quality Management
Statistical Quality Control Tools - Total Quality Management
 
The Effect of Sample Size On (Cusum and ARIMA) Control Charts
The Effect of Sample Size On (Cusum and ARIMA) Control ChartsThe Effect of Sample Size On (Cusum and ARIMA) Control Charts
The Effect of Sample Size On (Cusum and ARIMA) Control Charts
 
Statistical quality__control_2
Statistical  quality__control_2Statistical  quality__control_2
Statistical quality__control_2
 
Factor analysis
Factor analysisFactor analysis
Factor analysis
 
Msa manual 4 th edition
Msa manual 4 th editionMsa manual 4 th edition
Msa manual 4 th edition
 
Applications Residual Control Charts Based on Variable Limits
Applications Residual Control Charts Based on Variable LimitsApplications Residual Control Charts Based on Variable Limits
Applications Residual Control Charts Based on Variable Limits
 
Six sigma
Six sigma Six sigma
Six sigma
 
Time Series Analysis - 2 | Time Series in R | ARIMA Model Forecasting | Data ...
Time Series Analysis - 2 | Time Series in R | ARIMA Model Forecasting | Data ...Time Series Analysis - 2 | Time Series in R | ARIMA Model Forecasting | Data ...
Time Series Analysis - 2 | Time Series in R | ARIMA Model Forecasting | Data ...
 
Scatter diagram and control chart
Scatter diagram and control chartScatter diagram and control chart
Scatter diagram and control chart
 

Viewers also liked

Variable control chart
Variable control chartVariable control chart
Variable control chartJassfer Alina
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentationvivekissar
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best pptRabia Sgh S
 
5 M Web Ex Run Chart Analysis Slides 04.02.08
5 M Web Ex Run Chart Analysis Slides 04.02.085 M Web Ex Run Chart Analysis Slides 04.02.08
5 M Web Ex Run Chart Analysis Slides 04.02.08David Velasquez
 
Data Charts: Histogram, Pareto Chart, Control Chart
Data Charts: Histogram, Pareto Chart, Control ChartData Charts: Histogram, Pareto Chart, Control Chart
Data Charts: Histogram, Pareto Chart, Control ChartGoLeanSixSigma.com
 
An introduction to x-BAR chart
An introduction to x-BAR chartAn introduction to x-BAR chart
An introduction to x-BAR chartMrinmoy Bharadwaz
 
Statistical process control technique with example - xbar chart and R chart
Statistical process control technique with example - xbar chart and R chartStatistical process control technique with example - xbar chart and R chart
Statistical process control technique with example - xbar chart and R chartkevin Richard
 
Control Charts28 Modified
Control Charts28 ModifiedControl Charts28 Modified
Control Charts28 Modifiedvaliamoley
 
Haemoglobin quality control by maintaining levey jennings chart
Haemoglobin quality control by maintaining levey jennings chartHaemoglobin quality control by maintaining levey jennings chart
Haemoglobin quality control by maintaining levey jennings chartDr Rashmi Sood
 
Sample project-Quality Circle
Sample project-Quality CircleSample project-Quality Circle
Sample project-Quality CircleMohamed Yusuff
 
Control chart qm
Control chart qmControl chart qm
Control chart qmAshu0711
 

Viewers also liked (20)

Variable control chart
Variable control chartVariable control chart
Variable control chart
 
X bar theory
X bar theoryX bar theory
X bar theory
 
CONTROL CHARTS
CONTROL CHARTSCONTROL CHARTS
CONTROL CHARTS
 
Control charts
Control charts Control charts
Control charts
 
Six sigma ppt
Six sigma pptSix sigma ppt
Six sigma ppt
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
 
5 M Web Ex Run Chart Analysis Slides 04.02.08
5 M Web Ex Run Chart Analysis Slides 04.02.085 M Web Ex Run Chart Analysis Slides 04.02.08
5 M Web Ex Run Chart Analysis Slides 04.02.08
 
X bar
X barX bar
X bar
 
Data Charts: Histogram, Pareto Chart, Control Chart
Data Charts: Histogram, Pareto Chart, Control ChartData Charts: Histogram, Pareto Chart, Control Chart
Data Charts: Histogram, Pareto Chart, Control Chart
 
Control chart example
Control chart exampleControl chart example
Control chart example
 
An introduction to x-BAR chart
An introduction to x-BAR chartAn introduction to x-BAR chart
An introduction to x-BAR chart
 
Statistical process control technique with example - xbar chart and R chart
Statistical process control technique with example - xbar chart and R chartStatistical process control technique with example - xbar chart and R chart
Statistical process control technique with example - xbar chart and R chart
 
Xbar theory
Xbar theoryXbar theory
Xbar theory
 
Control Charts28 Modified
Control Charts28 ModifiedControl Charts28 Modified
Control Charts28 Modified
 
Haemoglobin quality control by maintaining levey jennings chart
Haemoglobin quality control by maintaining levey jennings chartHaemoglobin quality control by maintaining levey jennings chart
Haemoglobin quality control by maintaining levey jennings chart
 
Control Charts[1]
Control Charts[1]Control Charts[1]
Control Charts[1]
 
P Chart Tutorial
P Chart TutorialP Chart Tutorial
P Chart Tutorial
 
Sample project-Quality Circle
Sample project-Quality CircleSample project-Quality Circle
Sample project-Quality Circle
 
Control chart qm
Control chart qmControl chart qm
Control chart qm
 

Similar to X Bar R Charts

JF608: Quality Control - Unit 3
JF608: Quality Control - Unit 3JF608: Quality Control - Unit 3
JF608: Quality Control - Unit 3Asraf Malik
 
Control Charts in Lab and Trend Analysis
Control Charts in Lab and Trend AnalysisControl Charts in Lab and Trend Analysis
Control Charts in Lab and Trend Analysissigmatest2011
 
Use of control charts in laboratory as per ISO 17025:2017
Use of control charts in laboratory as per ISO 17025:2017Use of control charts in laboratory as per ISO 17025:2017
Use of control charts in laboratory as per ISO 17025:2017Rahul Gupta
 
Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...
Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...
Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...CSCJournals
 
Introduction to Six Sigma
Introduction to Six SigmaIntroduction to Six Sigma
Introduction to Six SigmaKanriConsulting
 
Statistical process control
Statistical process control Statistical process control
Statistical process control Hardil Shah
 
CONTROL CHART V.VIGNESHWARAN 2023HT79026.pdf
CONTROL CHART V.VIGNESHWARAN   2023HT79026.pdfCONTROL CHART V.VIGNESHWARAN   2023HT79026.pdf
CONTROL CHART V.VIGNESHWARAN 2023HT79026.pdfvignesh waran
 
TQM control charts for variables and attributes
TQM control charts for variables and attributesTQM control charts for variables and attributes
TQM control charts for variables and attributesTamilselvan S
 
6 statistical quality control
6   statistical quality control6   statistical quality control
6 statistical quality controlIjan Rahman Ode
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process ControlNAVEENBANSHIWAL
 
Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrolceutics1315
 

Similar to X Bar R Charts (20)

JF608: Quality Control - Unit 3
JF608: Quality Control - Unit 3JF608: Quality Control - Unit 3
JF608: Quality Control - Unit 3
 
Control Charts in Lab and Trend Analysis
Control Charts in Lab and Trend AnalysisControl Charts in Lab and Trend Analysis
Control Charts in Lab and Trend Analysis
 
Six sigma pedagogy
Six sigma pedagogySix sigma pedagogy
Six sigma pedagogy
 
Spc la
Spc laSpc la
Spc la
 
Use of control charts in laboratory as per ISO 17025:2017
Use of control charts in laboratory as per ISO 17025:2017Use of control charts in laboratory as per ISO 17025:2017
Use of control charts in laboratory as per ISO 17025:2017
 
Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...
Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...
Use Fuzzy Midrange Transformation Method to Construction Fuzzy Control Charts...
 
Control charts
Control chartsControl charts
Control charts
 
Introduction to Six Sigma
Introduction to Six SigmaIntroduction to Six Sigma
Introduction to Six Sigma
 
Lwrb ms
Lwrb msLwrb ms
Lwrb ms
 
Statistical process control
Statistical process control Statistical process control
Statistical process control
 
Statistics
StatisticsStatistics
Statistics
 
CONTROL CHART V.VIGNESHWARAN 2023HT79026.pdf
CONTROL CHART V.VIGNESHWARAN   2023HT79026.pdfCONTROL CHART V.VIGNESHWARAN   2023HT79026.pdf
CONTROL CHART V.VIGNESHWARAN 2023HT79026.pdf
 
TQM control charts for variables and attributes
TQM control charts for variables and attributesTQM control charts for variables and attributes
TQM control charts for variables and attributes
 
6 statistical quality control
6   statistical quality control6   statistical quality control
6 statistical quality control
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
Cluto presentation
Cluto presentationCluto presentation
Cluto presentation
 
Shewhart Charts for Variables
Shewhart Charts for VariablesShewhart Charts for Variables
Shewhart Charts for Variables
 
7 QC - NEW.ppt
7 QC - NEW.ppt7 QC - NEW.ppt
7 QC - NEW.ppt
 
Control charts
Control chartsControl charts
Control charts
 
Statisticalqualitycontrol
StatisticalqualitycontrolStatisticalqualitycontrol
Statisticalqualitycontrol
 

More from ahmad bassiouny (20)

Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work Study
Work StudyWork Study
Work Study
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
 
Motion Study
Motion StudyMotion Study
Motion Study
 
The Christmas Story
The Christmas StoryThe Christmas Story
The Christmas Story
 
Turkey Photos
Turkey PhotosTurkey Photos
Turkey Photos
 
Mission Bo Kv3
Mission Bo Kv3Mission Bo Kv3
Mission Bo Kv3
 
Miramar
MiramarMiramar
Miramar
 
Mom
MomMom
Mom
 
Linearization
LinearizationLinearization
Linearization
 
Kblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean ManufacturingKblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean Manufacturing
 
How To Survive
How To SurviveHow To Survive
How To Survive
 
Dad
DadDad
Dad
 
Ancient Hieroglyphics
Ancient HieroglyphicsAncient Hieroglyphics
Ancient Hieroglyphics
 
Dubai In 2009
Dubai In 2009Dubai In 2009
Dubai In 2009
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
 
Organizational Behavior
Organizational BehaviorOrganizational Behavior
Organizational Behavior
 
Work Study Workshop
Work Study WorkshopWork Study Workshop
Work Study Workshop
 
Workstudy
WorkstudyWorkstudy
Workstudy
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 

Recently uploaded

Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...liera silvan
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEaurabinda banchhor
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 

Recently uploaded (20)

Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSE
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 

X Bar R Charts

  • 1. Jim Waite OM 380 10/14/2004 x bar and R Charts Statistical process control is an effective method for improving a firm’s quality and productivity. There has been an increased interest in their effective implementation in American industry, brought about by increased competition and improvements in quality in foreign-made products. Many tools may be utilized to gain the desired information on a firm’s quality and productivity. Some of the more commonly used tools are control charts, which are useful in determining any changes in process performance. These include a variety of charts such as p charts, c charts and x bar and R charts. In this paper, I will be focusing on the latter two mentioned. X bar Charts defined An x bar chart is used to monitor the average value, or mean, of a process over time. For each subgroup, the x bar value is plotted. The upper and lower control limits define the range of inherent variation in the subgroup means when the process is in control. R Chart defined An R Chart is a control chart that is used to monitor process variation when the variable of interest is a quantitative measure. Now, what does all this mean? These charts will allow us to see any deviations from desired limits within the quality process and, in effect, allow the firm to make necessary adjustments to improve quality. The Chart Construction Process In order to construct x bar and R charts, we must first find our upper- and lower- control limits. This is done by utilizing the following formulae:
  • 2. UCL = µ+ 3σ √n LCL = µ - 3σ √n While theoretically possible, since we do not know either the population process mean or standard deviation, these formulas cannot be used directly and both must be estimated from the process itself. First, the R chart is constructed. If the R chart validates that the process variation is in statistical control, the x bar chart is constructed. Steps in Constructing an R chart 1. Select k successive subgroups where k is at least 20, in which there are n measurements in each subgroup. Typically n is between 1 and 9. 3, 4, or 5 measurements per subgroup is quite common. 2. Find the range of each subgroup R(i) where R(i)=biggest value - smallest value for each subgroup i. 3. Find the centerline for the R chart, denoted by 4. Find the UCL and LCL with the following formulas: UCL= D(4)RBAR and LCL=D(3)RBAR with D(3) and D(4) can be found in the following table: Table of D(3) and D(4) n D(3) D(4) n D(3) D(4) 2 0 3.267 6 0 2.004 3 0 2.574 7 .076 1.924 4 0 2.282 8 .136 1.864 5 0 2.114 9 .184 1.816 5. Plot the subgroup data and determine if the process is in statistical control. If not, determine the reason for the assignable cause, eliminate it, and the subgroup(s) and repeat the previous 3 steps. Do NOT eliminate subgroups with points out of range for which assignable causes cannot be found. 6. Once the R chart is in a state of statistical control and the centerline RBAR can be considered a reliable estimate of the range, the process standard deviation can be estimated using:
  • 3. d(2) can be found in the following table: n d(2) n d(2) 2 1.128 6 2.534 3 1.693 7 2.704 4 2.059 8 2.847 5 2.326 9 2.970 Steps in Constructing the XBAR Chart 1. Find the mean of each subgroup XBAR(1), XBAR(2), XBAR(3)... XBAR(k) and the grand mean of all subgroups using: 2. Find the UCL and LCL using the following equations: A(2) can be found in the following table: n A(2) n A(2) 2 1.880 6 .483 3 1.023 7 .419 4 .729 8 .373 5 .577 9 .337 3. Plot the LCL, UCL, centerline, and subgroup means 4. Interpret the data using the following guidelines to determine if the process is in control: a. one point outside the 3 sigma control limits b. eight successive points on the same side of the centerline c. six successive points that increase or decrease d. two out of three points that are on the same side of the centerline, both at a distance exceeding 2 sigma’s from the centerline e. four out of five points that are on the same side of the centerline, four at a distance exceeding 1 sigma from the centerline f. using an average run length (ARL) for determining process anomalies
  • 4. Example: The following data consists of 20 sets of three measurements of the diameter of an engine shaft. n meas#1 meas#2 meas#3 Range XBAR 1 2.0000 1.9998 2.0002 0.0004 2.0000 2 1.9998 2.0003 2.0002 0.0005 2.0001 3 1.9998 2.0001 2.0005 0.0007 2.0001 4 1.9997 2.0000 2.0004 0.0007 2.0000 5 2.0003 2.0003 2.0002 0.0001 2.0003 6 2.0004 2.0003 2.0000 0.0004 2.0002 7 1.9998 1.9998 1.9998 0.0000 1.9998 8 2.0000 2.0001 2.0001 0.0001 2.0001 9 2.0005 2.0000 1.9999 0.0006 2.0001 10 1.9995 1.9998 2.0001 0.0006 1.9998 11 2.0002 1.9999 2.0001 0.0003 2.0001 12 2.0002 1.9998 2.0005 0.0007 2.0002 13 2.0000 2.0001 1.9998 0.0003 2.0000 14 2.0000 2.0002 2.0004 0.0004 2.0002 15 1.9994 2.0001 1.9996 0.0007 1.9997 16 1.9999 2.0003 1.9993 0.0010 1.9998 17 2.0002 1.9998 2.0004 0.0006 2.0001 18 2.0000 2.0001 2.0001 0.0001 2.0001 19 1.9997 1.9994 1.9998 0.0004 1.9996 20 2.0003 2.0007 1.9999 0.0008 2.0003 RBAR CHART LIMITS: RBAR = 0.0005 UCL=D(4)*RBAR = 2.574 * .0005 = 0.001287 LCL=D(3)*RBAR = 0.000 * .0005 = 0.000 XBAR CHART LIMITS: XDBLBAR = 2.0000 UCL = XDBLBAR + A(2)*RBAR = 2.000+1.023*.0005 = 2.0005115 LCL = XDBLBAR - A(2)*RBAR = 2.000-1.023*.0005 = 1.9994885
  • 5. R - Chart: XBAR - Chart:
  • 6. Works Cited Erwin M. Saniga, Economic Statistical Control-Chart Designs With an Application to Xbar and R Charts (University of Delaware, Department of Business Administration, Newark DE, 1989) Richard L. Marcellus, Operating characteristics of X-bar charts with asymmetric control limits (Department of Industrial Engineering, Northern Illinois University, DeKalb IL, 1998) W. H. Woodall, “The Statistical Design of Quality Control Charts,” The Statistician, 34, 155-160. Business Statistics: A Decision-Making Approach, Groebner, David F., Shannon, Patrick W., Fry, Phillip C., and Smith, Kent D.; Prentice Hall, UpperSaddle River, NJ, 2001. Paul A. Keller, “When to use and X-bar/R Chart,” Internet http://www.qualityamerica.com/knowledgecente/knowctrWhen_to_Use_an__Xba r__R_Chart.htm (10/13/2004)