SlideShare uma empresa Scribd logo
1 de 22
Baixar para ler offline
FHA Streamlined 203(k)

Simple Process For Simple Repairs
FHA Streamlined 203(k) Review
•   Streamlined 203(k) Loan Program
•   Market Opportunity
•   Program Guidelines
•   Types of Improvements
•   Recent Examples
•   Financing Process
•   Commonly Asked Questions
FHA Streamlined 203(k) Loan Program
Through the Federal Housing Administration’s (FHA) Streamline
  203(k) program, borrowers can purchase or refinance their
  home and include rehabilitation and repair costs in the same
  loan.
This program can help you expand homeownership
  opportunities by offering a renovation program to people who
  want to revitalize the communities they serve.
FHA Streamlined 203(k) Program
    An affordable financing solution that combines the
    purchase or refinance of the home along with the costs of
    the improvements into a single loan.
•   Purchase or refinance a property
•   “Update” a property
•   Fix a required repair
•   Make optional improvements
Increased Market Opportunity
• Borrowers purchasing a home in need of rehabilitation
   – Perfect for HUD REOs, foreclosures, and short sales
   – Incomplete renovations
   – Out-dated kitchens, bathrooms, etc.
• Borrowers refinancing their principle residences and making
  improvements
   – Improve instead of move
   – Out-dated kitchen, bathrooms, etc.
   – Expand to accommodate a growing family
Improvements Allowed
•   Roofs, gutters and downspouts
•   Basement waterproofing
•   Mild mold remediation
•   Heating, ventilation and air conditioning systems
•   Plumbing and electrical systems
•   Flooring, exterior and interior painting
•   Minor remodeling that does not involve structural repairs
Improvements Allowed
• Weatherization, including storm windows and doors,
  insulation, weather stripping
• Replacement of window and doors and exterior wall re-siding
• Appliances, including free-standing ranges, refrigerators,
  washers and dryers, dishwashers and microwaves.
• Improvements for accessibility for persons with disabilities
• Lead-based paint stabilization or abatement of lead-based
  paint hazards
• Replacement/addition of exterior decks, patios, porches
Improvements Not Allowed
–   Major structural repairs
–   New construction (adding a room)
–   Repairs requiring detailed plans and specs
–   Any repair taking longer than 3 months
–   Repairs requiring more than 2 draws
–   Luxury items are not eligible
     • Swimming pools, hot tubs, tennis courts, gazebos, barbecue pits,
       saunas or alterations to support commercial use
Property Guidelines
•   Owner Occupied Properties Only
•   Single Family Residence
•   Manufactured
•   Approved Condo’s
•   PUD’s (planned unit development)
•   2-4 Unit Properties
•   REO, Short Sale, Foreclosure Ok!
    (need minimum of 12 mo. Cert. of completion, no builder spec foreclosures)
Streamlined 203(k) Loan
• Up to $35,000 in renovation allowed
   – Including all repair costs & contingency
• Must utilize borrower directed licensed contractor
   – No self help allowed
• 2 Draws-
   – Initial draw of up to 50% of repair costs is disbursed at funding
   – Final draw after final inspection
EXAMPLE: Purchase of a property with 96.5% LTV

Purchase and Renovation Cost
 Sales Price ("as-is" appraised value)                                           $120,000
 Labor / materials, inspection fee for renovation                                 $25,000
 Contingency (10% required)                                                        $2,500
 Total for Purchase and Renovation                                               $147,500

"As-Completed" Value (Determined by the appraiser)                               $160,000

 Value to use for determination of LTV must be the lesser of the total cost of purchase &
                        renovation or the "as-completed" value.

Maximum Loan Amount at 96.5% LTV                                                 $142,338
Recent AFR FHA Streamlined 203(k)
      Repairs / Renovation included:

•   New kitchen cabinets           •   New gutters / downspouts
•   Carpeting replacement          •   Garage door replacement
•   Laminate floors                •   Vinyl siding
•   Interior / Exterior painting   •   Ceiling repair
•   Electrical GFI installation    •   New smoke alarms
•   Bathroom upgrade               •   HVAC Replacement
•   Repair of decking / steps      •   Window replacement
Missing Appliances                 Mold on walls in Kitchen


                         Before
                         After




 New Laminate Flooring            New Appliances / Mold Removed
Before
After
Stairs in need of repair
No Smoke Alarms

                          Before
                          After




 Smoke Alarms installed            Stairs replaced
Missing Appliances & Floor            Mold & Vent leakage

                             Before
                             After




New Kitchen & Flooring                 Mold removed & painted
Simple Process To Financing
• Borrower purchase offer for “As Is” condition is accepted


• Buyer obtains estimates for repairs and /or rehabilitation


• Appraiser uses estimates to determine “as-is” and “to be improved” value


• Loan Amount requested based on purchase price & repair estimates


• Loan Processed, Underwritten, Closed as normal


• Up to 50% of repair costs disbursed at closing, remainder put in escrow


• Work is started within 30 days of closing and completed within 3 months.


• Any funds remaining in escrow will be applied to principal reduction of loan
Renovation Period
• Renovation should begin within 30 days of closing
• Borrowers will make their regular mortgage
  payments throughout the course of construction
• Maximum renovation period is 3 months.
Final Inspection - Completion
• When the work is complete, send an email to AFR requesting
  final funds
   • Include the Conditional Waiver & Release and the
      Mortgagor’s Letter of Completion
• Once the documents are received, AFR will order the final
  inspection from the original appraiser
• Upon the receipt of the acceptable final inspection, a final
  disbursement will be made to the contractor
• All remaining funds in escrow will be made as a principal
  reduction to the mortgage
A Few Commonly Asked Questions
                         (See guidelines for complete details)
•   What are the minimum and maximum amounts for repair costs under this program?
      – There are no minimum repair costs. The maximum total repair costs including the
         contingency reserve (10%) and costs are $35,000 subject to a maximum loan to value.
•   Is there a maximum mortgage amount worksheet that must be used?
      – Form HUD-92700, 203(k) Maximum Mortgage Worksheet must be used to calculate the
         mortgage amount.
•   Is there a final inspection required to be done once all the work is completed?
      – Yes, an inspection to determine that all listed repairs and or renovations were
         satisfactorily completed is required regardless of the amount borrowed for the repairs
•   Can this program be used for the purchase of HUD homes?
      – Yes. The Streamlined 203(k) program may be used for single-family housing sold by HUD.
         REO properties that have been designated by FHA's Management and Marketing
         contractor as "insurable" with repair escrow ($5,000 or less repairs) or "uninsurable"
         (with m ore than $5,000 but no more than $35,000 in required repairs) are eligible
•   How much time is permitted to complete the work?
      – The contractor must finish the work within 90 days. If the work is not completed within
         90 days of closing, a principal reduction will be made towards the remaining unpaid
         balance of the mortgage.
A Few Commonly Asked Questions
                       (See guidelines for complete details)
•   Are there additional costs to the mortgagor?
     – AFR will hold back $300 to be used towards final inspection. Unused
        inspection fees will be credited against the unpaid principal balance within 30
        days of the projects completion.
•   Can the Streamline 203(k) program be used for Manufactured Housing?
     – Yes. The program can be used for a loan on a manufactured home however, it
        cannot be used to permanently affix the home to the foundation. The home
        must be completely secured to the foundation as evidenced by an engineer's
        certification and appraisal prior to closing.
•   How much is the contingency reserve?
     – The contingency reserve is up to 10% of all repairs or rehabilitation expenses.
        The amount of reserve is at the underwriters discretion. All funds remaining in
        the escrow account after final payment to the contractor is made, including
        any remaining reserve amount will be used as a principle reduction.
•   Where can I go if I have questions or need additional information about the
    Streamlined 203(k) program
     – AFR Mortgage Loan Officer, www.AFRMortgage.com chat, or email at
        info@afrmortgage.com
American Financial Resources, Inc.
• About Us
  – AFR Residential, a division of American Financial Resources, Inc.
  – Nationwide residential mortgage lender
  – Headquartered in Parsippany, NJ.
  – GNMA approved seller/issuer, FHA Mortgagee and FNMA
    seller/servicer.
  – Serve thousands of clients each year throughout the country
  – In business since 1997
  – Grown to one of the largest FHA lenders in the country.

Mais conteúdo relacionado

Mais procurados

New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206Safe Rise
 
Consultancy case studies
Consultancy case studiesConsultancy case studies
Consultancy case studiesgrahamelanders
 
New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103Safe Rise
 
New York City Department of Buildings Filing rep course_203
New York City Department of Buildings Filing rep course_203New York City Department of Buildings Filing rep course_203
New York City Department of Buildings Filing rep course_203Safe Rise
 
NYSERDA Multifamily Performance Program
NYSERDA Multifamily Performance ProgramNYSERDA Multifamily Performance Program
NYSERDA Multifamily Performance Programjsmithwick0926
 
New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207Safe Rise
 
New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105Safe Rise
 
Renovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-inRenovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-inAnthony Boyko
 

Mais procurados (11)

Job Order Contracting 101
Job Order Contracting 101Job Order Contracting 101
Job Order Contracting 101
 
New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206New York City Department of Buildings Filing rep course_206
New York City Department of Buildings Filing rep course_206
 
Consultancy case studies
Consultancy case studiesConsultancy case studies
Consultancy case studies
 
New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103
 
Rich Gesimondo
Rich GesimondoRich Gesimondo
Rich Gesimondo
 
New York City Department of Buildings Filing rep course_203
New York City Department of Buildings Filing rep course_203New York City Department of Buildings Filing rep course_203
New York City Department of Buildings Filing rep course_203
 
Common Interest Repair Issues
Common Interest Repair IssuesCommon Interest Repair Issues
Common Interest Repair Issues
 
NYSERDA Multifamily Performance Program
NYSERDA Multifamily Performance ProgramNYSERDA Multifamily Performance Program
NYSERDA Multifamily Performance Program
 
New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207New York City Department of Buildings Filing rep course_207
New York City Department of Buildings Filing rep course_207
 
New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105New York City Department of Buildings Filing rep course_105
New York City Department of Buildings Filing rep course_105
 
Renovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-inRenovator's Presentation for Orderline Duplex Simplifed for linked-in
Renovator's Presentation for Orderline Duplex Simplifed for linked-in
 

Semelhante a FHA Streamline 203[k] Residential

Fha streamline 203k powerpoint
Fha streamline 203k powerpointFha streamline 203k powerpoint
Fha streamline 203k powerpointafrmarketing
 
Atlantic Bay 203 K Program Carol Millis
Atlantic Bay 203 K  Program   Carol MillisAtlantic Bay 203 K  Program   Carol Millis
Atlantic Bay 203 K Program Carol Milliscarolmillis
 
Taking the mystery (and fear) out of FHA 203K Rehab Loans
Taking the mystery (and fear) out of FHA 203K Rehab LoansTaking the mystery (and fear) out of FHA 203K Rehab Loans
Taking the mystery (and fear) out of FHA 203K Rehab LoansNatlMortgagePro
 
Short 203 K Presentation
Short 203 K PresentationShort 203 K Presentation
Short 203 K PresentationRoy Hard
 
FHA 203 Ks Program Power Point
FHA  203 Ks Program Power PointFHA  203 Ks Program Power Point
FHA 203 Ks Program Power PointRichard Simpson
 
Low inventory woes: Is now the right time for rehabs?
Low inventory woes: Is now the right time for rehabs?Low inventory woes: Is now the right time for rehabs?
Low inventory woes: Is now the right time for rehabs?GaryPhinith
 
FHA 203k & 203k Streamline Loans 101
FHA 203k & 203k Streamline Loans 101FHA 203k & 203k Streamline Loans 101
FHA 203k & 203k Streamline Loans 101YourRehabLoan
 
Blaine Final Revisions 10-13-16
Blaine Final Revisions 10-13-16Blaine Final Revisions 10-13-16
Blaine Final Revisions 10-13-16Sue Schinke
 
Vision 200 Renovation Realtor PP-revised 3-2-1015
Vision 200 Renovation Realtor PP-revised 3-2-1015Vision 200 Renovation Realtor PP-revised 3-2-1015
Vision 200 Renovation Realtor PP-revised 3-2-1015Barry A. Duffey
 
Rehab eem weatherization other repairs dec 2010
Rehab eem weatherization other repairs dec 2010Rehab eem weatherization other repairs dec 2010
Rehab eem weatherization other repairs dec 2010Go2Training
 
Sj Hauck Construction Presentation
Sj Hauck Construction PresentationSj Hauck Construction Presentation
Sj Hauck Construction PresentationMichaelDayer
 

Semelhante a FHA Streamline 203[k] Residential (20)

Fha 203 (k) rehab
Fha 203 (k) rehabFha 203 (k) rehab
Fha 203 (k) rehab
 
FHA 203 K
FHA 203 KFHA 203 K
FHA 203 K
 
Fha streamline 203k powerpoint
Fha streamline 203k powerpointFha streamline 203k powerpoint
Fha streamline 203k powerpoint
 
Atlantic Bay 203 K Program Carol Millis
Atlantic Bay 203 K  Program   Carol MillisAtlantic Bay 203 K  Program   Carol Millis
Atlantic Bay 203 K Program Carol Millis
 
Taking the mystery (and fear) out of FHA 203K Rehab Loans
Taking the mystery (and fear) out of FHA 203K Rehab LoansTaking the mystery (and fear) out of FHA 203K Rehab Loans
Taking the mystery (and fear) out of FHA 203K Rehab Loans
 
Short 203 K Presentation
Short 203 K PresentationShort 203 K Presentation
Short 203 K Presentation
 
FHA203k Financing
FHA203k FinancingFHA203k Financing
FHA203k Financing
 
Redbud Mortgage 203 k powerpoint
Redbud Mortgage 203 k powerpointRedbud Mortgage 203 k powerpoint
Redbud Mortgage 203 k powerpoint
 
203 k realtor_presentation
203 k realtor_presentation203 k realtor_presentation
203 k realtor_presentation
 
FHA 203 Ks Program Power Point
FHA  203 Ks Program Power PointFHA  203 Ks Program Power Point
FHA 203 Ks Program Power Point
 
FHA 203K Benefits
FHA 203K BenefitsFHA 203K Benefits
FHA 203K Benefits
 
Arizona energy efficiency mortgages
Arizona energy efficiency mortgagesArizona energy efficiency mortgages
Arizona energy efficiency mortgages
 
Low inventory woes: Is now the right time for rehabs?
Low inventory woes: Is now the right time for rehabs?Low inventory woes: Is now the right time for rehabs?
Low inventory woes: Is now the right time for rehabs?
 
FHA 203k & 203k Streamline Loans 101
FHA 203k & 203k Streamline Loans 101FHA 203k & 203k Streamline Loans 101
FHA 203k & 203k Streamline Loans 101
 
Blaine Final Revisions 10-13-16
Blaine Final Revisions 10-13-16Blaine Final Revisions 10-13-16
Blaine Final Revisions 10-13-16
 
Vision 200 Renovation Realtor PP-revised 3-2-1015
Vision 200 Renovation Realtor PP-revised 3-2-1015Vision 200 Renovation Realtor PP-revised 3-2-1015
Vision 200 Renovation Realtor PP-revised 3-2-1015
 
Rehab eem weatherization other repairs dec 2010
Rehab eem weatherization other repairs dec 2010Rehab eem weatherization other repairs dec 2010
Rehab eem weatherization other repairs dec 2010
 
Streamline 203k
Streamline 203kStreamline 203k
Streamline 203k
 
FHA 203k
FHA 203kFHA 203k
FHA 203k
 
Sj Hauck Construction Presentation
Sj Hauck Construction PresentationSj Hauck Construction Presentation
Sj Hauck Construction Presentation
 

Último

(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一S SDS
 
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...yordanosyohannes2
 
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办fqiuho152
 
Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713Sonam Pathan
 
Stock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfStock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfMichael Silva
 
Current Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxCurrent Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxuzma244191
 
(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)twfkn8xj
 
Governor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintGovernor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintSuomen Pankki
 
212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technologyz xss
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfHenry Tapper
 
government_intervention_in_business_ownership[1].pdf
government_intervention_in_business_ownership[1].pdfgovernment_intervention_in_business_ownership[1].pdf
government_intervention_in_business_ownership[1].pdfshaunmashale756
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证rjrjkk
 
Classical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithClassical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithAdamYassin2
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Commonwealth
 
The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarHarsh Kumar
 
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...Amil Baba Dawood bangali
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppmiss dipika
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingAggregage
 
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...Amil Baba Dawood bangali
 
The Core Functions of the Bangko Sentral ng Pilipinas
The Core Functions of the Bangko Sentral ng PilipinasThe Core Functions of the Bangko Sentral ng Pilipinas
The Core Functions of the Bangko Sentral ng PilipinasCherylouCamus
 

Último (20)

(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
 
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
 
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
 
Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713Call Girls Near Me WhatsApp:+91-9833363713
Call Girls Near Me WhatsApp:+91-9833363713
 
Stock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfStock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdf
 
Current Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxCurrent Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptx
 
(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)
 
Governor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintGovernor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraint
 
212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology212MTAMount Durham University Bachelor's Diploma in Technology
212MTAMount Durham University Bachelor's Diploma in Technology
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
 
government_intervention_in_business_ownership[1].pdf
government_intervention_in_business_ownership[1].pdfgovernment_intervention_in_business_ownership[1].pdf
government_intervention_in_business_ownership[1].pdf
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
 
Classical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithClassical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam Smith
 
Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]Monthly Market Risk Update: April 2024 [SlideShare]
Monthly Market Risk Update: April 2024 [SlideShare]
 
The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh Kumar
 
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsApp
 
How Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of ReportingHow Automation is Driving Efficiency Through the Last Mile of Reporting
How Automation is Driving Efficiency Through the Last Mile of Reporting
 
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
NO1 WorldWide online istikhara for love marriage vashikaran specialist love p...
 
The Core Functions of the Bangko Sentral ng Pilipinas
The Core Functions of the Bangko Sentral ng PilipinasThe Core Functions of the Bangko Sentral ng Pilipinas
The Core Functions of the Bangko Sentral ng Pilipinas
 

FHA Streamline 203[k] Residential

  • 1. FHA Streamlined 203(k) Simple Process For Simple Repairs
  • 2. FHA Streamlined 203(k) Review • Streamlined 203(k) Loan Program • Market Opportunity • Program Guidelines • Types of Improvements • Recent Examples • Financing Process • Commonly Asked Questions
  • 3. FHA Streamlined 203(k) Loan Program Through the Federal Housing Administration’s (FHA) Streamline 203(k) program, borrowers can purchase or refinance their home and include rehabilitation and repair costs in the same loan. This program can help you expand homeownership opportunities by offering a renovation program to people who want to revitalize the communities they serve.
  • 4. FHA Streamlined 203(k) Program An affordable financing solution that combines the purchase or refinance of the home along with the costs of the improvements into a single loan. • Purchase or refinance a property • “Update” a property • Fix a required repair • Make optional improvements
  • 5. Increased Market Opportunity • Borrowers purchasing a home in need of rehabilitation – Perfect for HUD REOs, foreclosures, and short sales – Incomplete renovations – Out-dated kitchens, bathrooms, etc. • Borrowers refinancing their principle residences and making improvements – Improve instead of move – Out-dated kitchen, bathrooms, etc. – Expand to accommodate a growing family
  • 6. Improvements Allowed • Roofs, gutters and downspouts • Basement waterproofing • Mild mold remediation • Heating, ventilation and air conditioning systems • Plumbing and electrical systems • Flooring, exterior and interior painting • Minor remodeling that does not involve structural repairs
  • 7. Improvements Allowed • Weatherization, including storm windows and doors, insulation, weather stripping • Replacement of window and doors and exterior wall re-siding • Appliances, including free-standing ranges, refrigerators, washers and dryers, dishwashers and microwaves. • Improvements for accessibility for persons with disabilities • Lead-based paint stabilization or abatement of lead-based paint hazards • Replacement/addition of exterior decks, patios, porches
  • 8. Improvements Not Allowed – Major structural repairs – New construction (adding a room) – Repairs requiring detailed plans and specs – Any repair taking longer than 3 months – Repairs requiring more than 2 draws – Luxury items are not eligible • Swimming pools, hot tubs, tennis courts, gazebos, barbecue pits, saunas or alterations to support commercial use
  • 9. Property Guidelines • Owner Occupied Properties Only • Single Family Residence • Manufactured • Approved Condo’s • PUD’s (planned unit development) • 2-4 Unit Properties • REO, Short Sale, Foreclosure Ok! (need minimum of 12 mo. Cert. of completion, no builder spec foreclosures)
  • 10. Streamlined 203(k) Loan • Up to $35,000 in renovation allowed – Including all repair costs & contingency • Must utilize borrower directed licensed contractor – No self help allowed • 2 Draws- – Initial draw of up to 50% of repair costs is disbursed at funding – Final draw after final inspection
  • 11. EXAMPLE: Purchase of a property with 96.5% LTV Purchase and Renovation Cost Sales Price ("as-is" appraised value) $120,000 Labor / materials, inspection fee for renovation $25,000 Contingency (10% required) $2,500 Total for Purchase and Renovation $147,500 "As-Completed" Value (Determined by the appraiser) $160,000 Value to use for determination of LTV must be the lesser of the total cost of purchase & renovation or the "as-completed" value. Maximum Loan Amount at 96.5% LTV $142,338
  • 12. Recent AFR FHA Streamlined 203(k) Repairs / Renovation included: • New kitchen cabinets • New gutters / downspouts • Carpeting replacement • Garage door replacement • Laminate floors • Vinyl siding • Interior / Exterior painting • Ceiling repair • Electrical GFI installation • New smoke alarms • Bathroom upgrade • HVAC Replacement • Repair of decking / steps • Window replacement
  • 13. Missing Appliances Mold on walls in Kitchen Before After New Laminate Flooring New Appliances / Mold Removed
  • 15. Stairs in need of repair No Smoke Alarms Before After Smoke Alarms installed Stairs replaced
  • 16. Missing Appliances & Floor Mold & Vent leakage Before After New Kitchen & Flooring Mold removed & painted
  • 17. Simple Process To Financing • Borrower purchase offer for “As Is” condition is accepted • Buyer obtains estimates for repairs and /or rehabilitation • Appraiser uses estimates to determine “as-is” and “to be improved” value • Loan Amount requested based on purchase price & repair estimates • Loan Processed, Underwritten, Closed as normal • Up to 50% of repair costs disbursed at closing, remainder put in escrow • Work is started within 30 days of closing and completed within 3 months. • Any funds remaining in escrow will be applied to principal reduction of loan
  • 18. Renovation Period • Renovation should begin within 30 days of closing • Borrowers will make their regular mortgage payments throughout the course of construction • Maximum renovation period is 3 months.
  • 19. Final Inspection - Completion • When the work is complete, send an email to AFR requesting final funds • Include the Conditional Waiver & Release and the Mortgagor’s Letter of Completion • Once the documents are received, AFR will order the final inspection from the original appraiser • Upon the receipt of the acceptable final inspection, a final disbursement will be made to the contractor • All remaining funds in escrow will be made as a principal reduction to the mortgage
  • 20. A Few Commonly Asked Questions (See guidelines for complete details) • What are the minimum and maximum amounts for repair costs under this program? – There are no minimum repair costs. The maximum total repair costs including the contingency reserve (10%) and costs are $35,000 subject to a maximum loan to value. • Is there a maximum mortgage amount worksheet that must be used? – Form HUD-92700, 203(k) Maximum Mortgage Worksheet must be used to calculate the mortgage amount. • Is there a final inspection required to be done once all the work is completed? – Yes, an inspection to determine that all listed repairs and or renovations were satisfactorily completed is required regardless of the amount borrowed for the repairs • Can this program be used for the purchase of HUD homes? – Yes. The Streamlined 203(k) program may be used for single-family housing sold by HUD. REO properties that have been designated by FHA's Management and Marketing contractor as "insurable" with repair escrow ($5,000 or less repairs) or "uninsurable" (with m ore than $5,000 but no more than $35,000 in required repairs) are eligible • How much time is permitted to complete the work? – The contractor must finish the work within 90 days. If the work is not completed within 90 days of closing, a principal reduction will be made towards the remaining unpaid balance of the mortgage.
  • 21. A Few Commonly Asked Questions (See guidelines for complete details) • Are there additional costs to the mortgagor? – AFR will hold back $300 to be used towards final inspection. Unused inspection fees will be credited against the unpaid principal balance within 30 days of the projects completion. • Can the Streamline 203(k) program be used for Manufactured Housing? – Yes. The program can be used for a loan on a manufactured home however, it cannot be used to permanently affix the home to the foundation. The home must be completely secured to the foundation as evidenced by an engineer's certification and appraisal prior to closing. • How much is the contingency reserve? – The contingency reserve is up to 10% of all repairs or rehabilitation expenses. The amount of reserve is at the underwriters discretion. All funds remaining in the escrow account after final payment to the contractor is made, including any remaining reserve amount will be used as a principle reduction. • Where can I go if I have questions or need additional information about the Streamlined 203(k) program – AFR Mortgage Loan Officer, www.AFRMortgage.com chat, or email at info@afrmortgage.com
  • 22. American Financial Resources, Inc. • About Us – AFR Residential, a division of American Financial Resources, Inc. – Nationwide residential mortgage lender – Headquartered in Parsippany, NJ. – GNMA approved seller/issuer, FHA Mortgagee and FNMA seller/servicer. – Serve thousands of clients each year throughout the country – In business since 1997 – Grown to one of the largest FHA lenders in the country.