John Muir Memorial Co Park                    Marquette, Co. Wisconsin


                                                 A park revitalization project.




  A DESIGN TO PRESERVE A LANDSCAPE.



              A VISION TO PRESERVE A LEGACY.




                    A Senior Capstone Project
                 Prespared under the mentorship
            of Dr. Susan Thering & MR. Shawn T. kelly




                                                            ALEX DESMIDT
                                                               UW-Madison
                                                   Landscape Architecture
                                                   Senior Capstone Project
                                                               Spring 2010
Table of Contents


PART I

    INTRODUCTION                       1-3
    LITERATURE REVIEW                  4-6
    JOHN MUIR                          7-8
    MARQUETTE COUNTY                   9-10
    FOX-WISCONSIN HERITAGE PARKWAY     11
    REGIONAL ANALYSIS                  12-14
    REGIONAL RECOMMENDATIONS           15-16
    MASTERPLAN INVENTORY & ANALYSIS    17
    SITEPLAN INVENTORY & ANALYSIS      18
    EXISTING PARK CONDITIONS           19
    DESIGN GOALS                       20-22
    DESIGN ETHICS                      23-24
    JOHN MUIR HERITAGE CENTER DESIGN   25
    PRECEDENT STUDY                    26-27
    CRITICAL PERSPECTIVE               28
    EXPECTED RESULTS                   29-30


PART II
    MASTERPLAN DESIGN                  31-32
    SITEPLAN DESIGN                    33-39
    DRAINAGE CALCULATIONS              40-41
    GRADING CALCULATIONS               42
    PLANT LIST                         43
    CONCLUSION                         44
    REFERENCES                         45
    APPENDIX                           46-49
Introduction

This study proposes to investigate how an E-Way may inform the design of the John Muir Memo-
rial County Park Masterplan. This investigation will be given context and focus by the concerns and
goals of the John Muir Legacy Group, which will involve providing recreation within areas of eco-
logical restoration. The John Muir Memorial County Park will be the site for this study.


E-ways

The term E-way was first created by Phil Lewis, a landscape architect, as a method for designing an
environmental system offering opportunities for education, ecology, esthetics, and exercise. An E-
way is a means of connecting people with the land and history around them, by providing access to
public open spaces, such as, recreational lands, historical and cultural features, and sensitive natu-
ral areas. The value of E-ways in preserving our natural and cultural resources is gaining momentum
as urban sprawl encroaches upon these places. This system of landscape connection through envi-
ronmental corridors has become a key approach in regional design and planning.


The ultimate goal of this study will be to identify how an E-Way that supports tourism and environ-
mental education through recreation will influence the design of John Muir Memorial Park. Identi-
fication of an E-way encompassing the park will guide urban development and future park acqui-
sitions to ensure the preservation of significant natural and cultural features for the pleasure of
future generations. The cultural and natural features surrounding John Muir Memorial County Park
combined with extensive public lands and development of the Ice Age Trail offer a prime location
for such an E-way. This study will show that John Muir Memorial County Park has the potential to
become a center of a recreational E-way that serve as a teaching tool for environmental education
and ecological restoration while promoting tourism within Marquette County.




                                                                                                   1
County Park Masterplan

As the central core of an E-Way, John Muir Memorial County Park will require a new park master-
plan. This plan will guide the future development and management of the entire property, which is
currently separated into a park, a State Natural Area, a National Historic Landmark, and segment of
the Ice Age Trail. Given the multiple entities within the park, an organizing theme is required to in-
corporate recreation with ecological restoration in a manner that is beneficial to the landscape and
visitors. Traditionally, the idea of recreation has meant the degradation of the land and resources
as a park is loved to death by its users. The creation of a masterplan that incorporates the needs of
restoration efforts with the wants of recreational users is the key to a successful design for a park
lacking a sense of place.


The development of a new masterplan will make this site an ideal nucleus of an E-way. Its rich
diversity of natural vegetative communities, historic glaciation, Ice Age Trail loop, and connection
to John Muir (1838-1914), the pioneering promoter of natural preservation, already exhibit every-
thing that an E-way stands for. The site incorporates exercise and outdoor recreation along the two
mile Ice Age Trail loop. The WDNR’s ecological restoration efforts of the diverse natural vegetation
communities provide the ecological aspect, while the beautiful views of the 30 acre Ennis Lake
combined with the intense fall colors of the tamaracks, dogwoods, and oaks offer an esthetic that
is unrivaled in the state. The historical connection to John Muir opens the door to environmental
education, relating to preservation, conservation, flora, and fauna. These amenities need to be
organized cohesively so that restoration efforts and recreational opportunities work as an intercon-
nected system, each one enhancing the other.


The park encompasses 160 acres historically known as Fountain Lake Farm, settled by the Muir
family in 1849 after they immigrated from Scotland (Stanley 2). As the boyhood home of John Muir,
the nation’s premier advocate for preservation of natural places, the park offers a unique connec-
tion to him. It is here that Muir developed his appreciation for the natural beauty of the world, and
traced the formation of his conservation philosophy (Stanley xiv). Muir’s preservation efforts origi-
nated at Fountain Lake in 1964 when he attempted to preserve a portion of the farm for its natu-
ral beauty alone by buying it from his brother. This attempt was unsuccessful and the place went
unpreserved until 1972 when the Wisconsin Department of Natural Resources designated it a State
Natural Area for its exemplary diversity of upland and wetland communities. The vegetation sur-
rounding the 30-acre Ennis Lake, a spring-fed kettle lake, is diverse and includes a rich fen, sedge
meadow, open bog, northern wet forest dominated by tamarack, southern dry forest, oak opening,
and wet-mesic prairie. A new park masterplan will utilize ecological restoration along with sustain-
able recreational planning in order to accommodate high volumes of visitors without degrading
these sensitive natural areas.


                                                                                                   2
Recreation in areas of Ecological Restoration

The John Muir Memorial County Park is located in Marquette County and is its only county park. The
county has, in the eyes of some, mismanaged this jewel causing added stress upon a sensitive re-
source. This mismanagement has resulted in the formation of the John Muir Legacy Group (JMLG),
an organization of park neighbors, county residents, and WDNR employees deeply concerned about
the future of the park. The goal of the JMLG is to develop a long term management plan for John
Muir Park with a focus “to create a place in which people can appreciate John Muir’s glorious Wis-
consin wilderness (as he saw it); to inspire visitors to reflect on the natural beauty of the landscape
and all its flora and fauna.” The priorities of the JMLG will be met through ecological restoration of
native vegetation communities combined with recreation within the park. The unique and diverse
flora of this area will be restored to the time of Muir’s occupancy here. This will be done through
the use of Muir’s works describing the landscape and the vegetation along with naturalists from the
WDNR.


Plant communities go through successional phases as factors around them change, such as the
settlement of towns reducing the regular occurrence of fire. These natural changes need to be ana-
lyzed in order to determine when and how rapidly these changes progressed. Next, the undesired
species have to be identified and management strategies need to be developed for eradicating
them. Concurrently, the development of facilities, such as trails, need to be planned so that they
can offer access to public as well as restoration management crews. These trails can offer fire-
breaks and transition zones to slow the progress of invasive species, while providing recreational
opportunities. The recreational opportunities if planned accordingly can work in favor of restora-
tion rather than hinder it.


       As an intern with Dane County Parks I have learned a great deal in the development of
County Parks. Through the development and planning of trails I have worked with naturalists on the
layout of trails through prairies in order to maintain firebreaks while providing recreational oppor-
tunities. This is a give and take process to meet the needs of the public while meeting the needs of
the ecosystem within the park. If done correctly, the rewards are worth the extra effort as restora-
tion crews, maintenance crews, and the public impact the site as little as possible.




                                                                                                   3
Literature Review
The E-way system was developed by Phil Lewis, emeritus professor of Landscape Architecture at
the University of Wisconsin, as part of his Regional Design Process. As Lewis defines it, an E-Way
is an ecological, educational, environmental, aesthetic, exercise way: a corridor with a trail or
pathway accommodating pedestrians, bicyclists, cross-country skiers, and other non-motorized use
(Lewis 240). The function of an E-Way is to create environmental continuity of natural and cultural
resources of a region or community along recreational routes to promote education and a sense of
place. An E-Way is specific to a region or community. It is a system that brings many environmen-
tal aspects of the community clearly into focus by unifying prominent educational, ecological, and
environmental characteristics across a recreational medium such as a trail or bike path.

An E-way is a more specific type of environmental corridor. In general, environmental corridors
encompass linear landscape features containing concentrations of natural and cultural resource
amenities. Phil Lewis defines environmental corridors as “spatial patterns of occurrence of any or
all of the combined features of water, wetlands, and steep topography of 12.5% or greater found in
an urban or urbanizing environment” (Lewis 239). Corridors have evolved over time and are being
used in many facets today. They are used as conservation tools creating habitat connectivity for
animals (Gustafsson 182). In this capacity they offer an expanded ecosystem to a variety of species
in order to ensure the survival of wildlife as humans develop more land. However, more recently
environmental corridors are used as a means to guide urban growth and development to ensure
the survival of all species. The guiding principles for this growth are centered around the preserva-
tion of especially high value natural, scenic, historic, scientific, and recreational features strung
together like jewels on a necklace ( The Regional Design Process, developed by Phil Lewis, utilizes
these value patterns as form determinants to guide new and sustainable development (Lewis 21).
The identification and protection of critical natural and cultural resources is the key to success-
fully developing urban and rural landscapes into a cohesive entity, and therefore an integral part
of sustainability. Sustainable development as defined by the World Commission on Environment and
Development is that which “meets the needs of the present without compromising the ability of
future generations to meet their own needs” (Steiner 11). By identifying these resource areas and
protecting them, urban development can be designed to accentuate the regional character of the
landscape rather than encroaching upon it. (Lewis 21)

The book Tomorrow By Design by Phil Lewis is the guiding light on E-way design and planning. He
has created the rule for small to large scale connections of land for the purpose of guiding our
urban development in a way that protects our cultural and natural resources. This system ensures
we have places to recreate and educate ourselves and children about the landscape around us. The
techniques Lewis has developed for defining environmental corridors are solid. He has identified
that water, wetlands, steep topography, and timber/woodlands combine into linear corridor pat-
terns, and within these corridors 85-90% of both biological and aesthetic diversity is found (Lewis
78). These resources combined with aquifer recharge areas, class A farmland, and regionally spe-
cific major vegetation types identifies the area where development is prohibited. This makes the
data collection process and regional analysis much simpler. All developments can then be carefully
planned outside these areas of constraint and integrated sustainably around the cultural and natu-
ral resources.
                                                                                                  4
However, it is apparent Lewis has separated the needs of humans from the needs of other species. The guide-
lines that Lewis as developed with such detail are concerned only with the welfare of the people. The identifica-
tion and the design of E-ways and environmental corridors are fundamentally important to the survival of the
wildlife, as well as us. As we grow in population and expand our cities outward the habitat of other species is
diminishing. As he stated, “these resources are not only the basis of our life-support system and our economic
well-being but are also the basis for quality of life, sense of place, diversity, and options of choice” (Lewis 21).
This mentions nothing of the circle of life and Muir’s idea that everything is hitched to everything else. The fo-
cus of E-ways must therefore not pertain only to human enjoyment, but building and preserving critical habitat
for the species we share the land with, since our survival is ultimately dependent upon theirs.

An article that identifies the correlation between environmental corridors and species success is Corridors as a
Conservation Tool by Lena Gustafsson and Lennart Hannson. This article identifies that often our nature re-
serves and conservation areas are too small and too separated to provide adequate habitat for certain species.
The amount of interconnectedness of these patches of land is key to the success of species dispersal and biodi-
versity. This article stresses the need of environmental corridors as places for nature conservation rather than
recreation. The authors of this article have cited studies that have shown habitat connections increase species
survival, but do not provide standards for specific species requirements. Where the authors lack in providing
suggestions for designing in this fashion they succeed in expressing the importance of large scale connections of
bigger parcels instead of small scattered tracts of land. The article makes it apparent that when identifying and
designing corridors and E-ways we must look at more than the cultural and natural resources, we must look at
species habitat. The argument made here is that species need expansive lands to thrive, but the amount cannot
be quantified. Thus, we must preserve as much land as possible in connected expanses to ensure the longevity of
species around us.

Environmental Corridors appear at widely different scales, from narrow strips along small pathways to passages
that extend along continents (Gustafsson 186). John Muir Park lies within the 280 mile Fox-Wisconsin Heritage
Parkway that extends from Green Bay to Prairie du Chien, following the route taken by Father Jacques Mar-
quette and explorer Louis Joliet to discover the Mississippi River in 1673. The concept for this Parkway was
developed in 1991, “with the purpose of highlighting and enhancing the unique heritage of the state of Wiscon-
sin by exemplifying and promoting the cultural, historical, and recreational resources of the rivers” (FWHP iii).
The parkway is seeking designation as a National Heritage Parkway to ensure the future preservation of the rich
cultural and natural history of the Fox and Wisconsin riverway. This form of corridor has broad ideals to pre-
serve historically and culturally significant features. However, at a more regionally specific scale the vision of
this parkway is lost.

Thus, it is necessary within such an expansive connection of resources that smaller environmental corridors are
developed that focus on regional and community specific concerns. These smaller more manageable expanses of
land and resources can guide the development of communities and ensure the preservation of regionally specific
cultural and natural resources so that the combined efforts contribute to the greater preservation of the whole
system. In the case of John Muir Park, a 20 mile environmental corridor from Montello to Portage would pre-
serve the extensive effigy mounds along the Fox River. This would also identify opportunities for more county
parks within Marquette County, which would reduce the amount of users impacting John Muir Park’s sensitive
resources.




                                                                                                                 5
1
Within these regional specific corridors E-ways can create recreational and educational opportunities that con-
nect people to the region they live in, as well as provide expansive connected habitats that increase animal
biodiversity. A proposed E-way connecting John Muir Memorial Park with Endeavor Wisconsin would promote
recreation and cultural education through heritage tourism, a growing type or tourism defined by the National
Trust for Historic Preservation as, “traveling to experience the places, artifacts and activities that authentically
represent the stories and people of the past and present”. The development of such E-ways as this would pro-
vide local recreational opportunities, promote local cultural and natural education, ensure wildlife habitat is
protected, and boost the economy of villages and small towns as heritage tourism grows throughout the country.
The need for these large and small scale environmental corridors working together as a system is the key to the
preservation and conservation of our sensitive resources and success of all species that share the land.




                                                                                                                 6
John Muir

                          “Oh, that glorious Wisconsin wilderness!”
                          John Muir Memorial County Park is located adjacent to the boyhood
                          home of John Muir, the father of our National Parks. In 1849, at the
                          age of 11, Muir and his family immigrated from Scotland and settled
                          here at, what was known then as,
                           Fountain Lake Farm. During the
                          course of his childhood, Muir
                          developed a deep connection with
                          the landscape found here. Although
                          the Muir home is no longer standing
JOHN MUIR                 and the property is currently a
Foster son of Wisconsin   private residence, the National Park
Born in Scotland          Service designated the site a National
April 21, 1838            Historic Place in 1990.




                                                          Sketch of Muir Home
                                                          By John Muir




                                                                                             7
The landscape Muir found and adored at Fountain Lake             Sketch of Fountain Lake By John Muir
Farm inspired him with the idea of preserving natural
areas simply for their beauty. Muir attempted to pre-
serve this land several times, “I want to keep it un-
trampled for the sake of its ferns and flowers”, but his
borther in law refused and the property was sold to the
Ennis Brothers in 1867. Although he was unsuccussful in
his attempts, the notion of land preservation had been
planted in his heart. This place has been called “the
cradle of our national parks”, as it planted the seed of
preserving land for its natural beauty alone. Muirs love of nature germinated here at Fountain Lake
Farm and later blossomed into his contribution to the formation of the national park system.

             “Some of the happiest days of my life were in that old slantwalled garret and
             among the smooth creeks that trickled among the sedges of the Fountain Lake
             Meadow.” - JM




                                                                                                  8
Marquette County, WI




J h M i M
John Muir Memorial County Park is located in the Town of Buffalo in Marquette County. It is the only
                   i lC      P ki l        di h T          fB
County Park within the county. Marquette County is named after Jacques Marquette (1637-1675) a
French missionary that accompanied Louis Joliet on the expedition to discover the Mississippi River.
Marquette Co. is in the Central Sand Hills region of Wisconsin and was sculpted by the Green Bay
Lobe durinng the last glaciation period. The rural landscape consists of old farmsteads, cornfields,
oak hardwoods, and fen and marsh lowlands. It is a premier rural setting that offers countless
opportunities for recreation and heritage tourism. Marquette county offers quiet and relaxing
setting that is a stark contrast from the kitschy tourist town found to the West in Wisconsin Dells.




                                                                                                 9
Marquette County offers countless opportunites for exploration, tourism, and recreation. It’s old
farmsteads and quaint little towns provide a glimpse back in history. Portage and Montello, the
county’s two largest towns are rich with heritage and historical significance, and provide many
opprotunities for tourists, such as historic downtowns, Wisconsin’s largest tree, and granite water
falls.




The wildlife refuges within the county are some of the best in the state, and not only provide great
habitat for wildlife, but also offer a great brid watching opportunites.




The Ice Age Trail has multiple sections of trail throughout the county and will one day be a continu-
ous trail that runs completely through the county from north to south. Although, Marquette County
boasts such great ammenties it is lacking in parks and open space. It’s only major park, is John Muir
Memorial County Park, which currently offers little more than some nice views and a walk around
the lake. The need for more county parks and more recreational opportunites is urgent.




                                                                                                  10
Fox -Wisconsin Heritage Parkway
Marquette County lies within the Fox River Region of the Fox - Wisconsin
Heritage Parkway. The Parkway is seeking NPS designation as a National
                          kway
Heritage Area. The natural, historical, and cultural resources found
                         l, histo
                                orical,
along the parkway make it an ideal candidate.
                         t    ideal

The boundaries of the Fox-Wisconsin Heritage
Parkway derive from the Fox and Lower
Wisconsin Rivers. These rivers span 280 miles
across the State of Wisconsin,from the bay of
Green Bay to Prairie du Chien, at the
confluence of the Wisconsin
and Mississippi Rivers.           Effigy Mounds
                                  Natural Areas
The rivers are
geographically divided into
the Lower Fox,Upper Fox,
and Lower
Wisconsin. Fifteen counties
comprise the total area which
consists of 1,444 square miles.



                                                                                FWHP


                                       The Parkway follows the route taken by Jacques Marquette
                                       and Louis Joliet to discover the Mississippi River. They en-
                                       countered and were guided by the Native Americans that
                                       lived along the Fox River, like the Ho-Chunk (or Winnebago).

Effigy Mounds like these are found along the entire Park-
way. However, many have been destroyed by develop-
ment and many of those that do remain are on private
property. Preservation of these fragile resources is the
key to recreation and heritage tourism in this area. The
history of the region could be lost forever if more parks
are not created and its resources are left unpreserved.                                          11
Regional Analysis


   Natural & Cultural Features                                                         Civil Features


This 20 mile stretch is one of the most cultural-                        Portage and Montello are midsized cities con-
ly & historically rich regions within the Parkway.                       nected state and nation-wide by bus, train,
The landscape is dotted with Effigy Mounds, but                           and plane. These cities bring people and money
most are under private ownership. There are                              to the region. An Environmental Corridor will
several natural areas, but only one county park.                         direct growth of the cities and protect natural
                                                                         cultural sites.




                            Historic Place`         Boat Landing                                   Train Station   Airplane
                            Effigy Mound             Natural/Cultural                               Hospital        School
                            State & Federal Lands   Limited Access SNA
                                                                                                   Bus Station
                            Full Access SNA




                                                                                                                              12
Regional Analysis



                 Trails                                                        Landcover


The Ice Age Trail brings recreational users                     The extensive wetlands throughout the region
to the area. Several on-road bike loops run                     combined with the prime agricultural land
throughout the region allowing recreational                     make this region a key area for preservation.
users to enjoy the rural beauty of the land-                    By preserving the rural landscape and its re-
scape. Limited trails extend outward from the                   sources this region will be a center for Heri-
cities.                                                         tage Tourism and recreation.




                            John Muir Loop      Scenic Tour                                 Wetlands    Prime Ag Land
                            Buffalo Lake Loop   Oxford Loop
                                                                                            Forest
                            Briggsville Loop    Proposed
                                                Ice Age Trail




                                                                                                                  13
Regional Analysis

                                                          Closest Nature Centers
                                                          - 20+ miles away


                                                          - Not within Marquette County


                                                          - Not providing revenue for the
                                                            Marquette County


                                                          - Not integrated into the
                                                            community through recreational
                                                            opportunities



                       20 Mile Radius




                                                                                                    r
                                                                                                   e
                                                                                               iv
                                                                                               R
                                                                                           x
                                                                                       o
                                                                                   F




                                                                 Montello
            W
            is
                co
                   ns
                      in




                                                         _
                                                         ^ John Muir Park
Leopold Center             Wisconsin

                   jj
                   kk
                               Dells
Upham Woods
Nature Center                  Riv
                                   er




                                                     Portage




                              McKenzie Env. Ed. Center   j
                                                         k Poynette            0           3            6
                                                                                                            Ü   12
                                                                                                                 Miles
                                                                                                                    14
Regional Recommendations

Environmental Education & Recreation Center

It is my recommendation that John Muir Memorial Park become an Environmatal education and
recreation center. Aldo Leopold, seminal ecologist, had also envisioned the Muir farm as an “edu-
cational institution”. As a boy Muir developed a love of nature here and learned countless lessons
about ecosystems, botany, and the environment. A center that provided children and adults with
this same opportunity would instill a greater appreciation for the land and the environment within
our socitety.

An education and recreation center would also bring funding to marquette county which would be
beneficial for park enhancement projects and also the acquisition of new park land.




An Educational & Recreational Center located at John Muir Co. Park would promote:

 - Importance of experiencing and protecting Marquette Co. History & natural landscapes
- Inspiration for environmentalists and conservationists everywhere
- A love of nature in children and adults
- Recreation & Heritage Tourism
- County park expansion in marquette county
                                                                                                15
Regional Recommendations

John Muir EWAY

It is my recommendation that Marquette County create an E-way from John Muir Memorial Park to
the town of Endeavor. This E-way would create a recreational corridor while protecting the land
surrounding the park and all ecologically important sites along the river. The Eway would incorpo-
rate biking, hiking, and a water trail that tourists will use to explore the beautiful countyside. This
Eway would bring revenue into the town of endeavor from interstate travelers and make John Muir
Park and the Education Center more well known to the public. It will serve as a gateway to Mar-
quette county and the rest of the Heritage Parkway.




                                        Effigy Mounds                            12 Mile Bike Trail
                                        Natural Areas                           8 Mile Water Trail

                 Eway from Endeavor, WI to John Muir Co. Park                                        16
Masterplan Inventory & Analysis

                                                        O
                                                        Opportunities:
                                           Muir’s Old    - Ice Age Trail connection
    WDNR State Natural Area                Homestead     - Topography
                                           (Private )    - County Park & Homestead site
                                                            have potential for
                                                            development

                                                         - Heritage Tourism potential
Marquette
Co. Park                      Ice Age
                              Trail Loop
                                                             Constraints:
                                                         - Conflicting ideas between
                                                           invested parties
                                                         - Bounded on all sides
                                                         - SNA & NHL limit development
                                                         - Erosive sandy soils
                                                         - Oak Wilt

                                                         - Trail location



                                                        K
                                                        Key Elements:
                                                         - Ice Age Trail
                                                         - State Natural Area
                                                         - National Historic Landmark
                                                         - Sensitive vegetation
                                                           communities
                                                         - 30 acre spring-fed lake
                                                         - Glacial history




                                Existing Vegetaion Communities
                                                                                        17
Siteplan Inventory & Analysis

                                     Ice Age Trailhead

                     No Trails to
Uninviting           Ice Age Trail
Entrance
                          Small
                          Parking     No Seating
                          Lot
                                          Runoff flows
                         Restrooms
             Expansive                    into lake
               lawn                                   Boat
             requires                                Ramp
             mowing                                  & Pier


    Old Baseball                       Good Views
       Field                           From Hill topp

     Ice Age Trailhead

John Muir Memorial Co.Park
                                                         18
Existing Conditions at Muir Park




     Acres of lawn             Picturesque views




Outdated infrastructure         Varied Topography




      Vandalism                  Lake Access        19
Design Goals

This proposed Master Plan kicks off 2010 - The Year of John Muir in Marquette County.


Vision for the future of John Muir Co. Park:


“Create a place where people can come to appreciate the Wisconsin wilderness of
John Muir’s boyhood; and to inspire one to reflect on the natural beauty of the land-
scape, so as “to be not on the world but in it”.
                                                            - John Muir Legacy Group
Design Goals:

- Create a meaningful place

- Create continuity within the park

- Enhance park entrances

- Restore native vegetation communities

- Protect existing senstive vegetation communities

- Have park “Dedicated” to ensure its protection

- Establish the park as a premier natural landscape in WI

- Increase park visitors without degrading the land

- Increase revenue for restoration and maintenance

- Create a place to enjoy nature

- Create a place Muir would be proud of
                                                                                  20
The Park Masterplan of the John Muir Memorial Park will focus on combing ecological restoration
with recreation while providing a public space that encourages environmental education and his-
torical awareness of the landscape. Due to the number of invested parties at the park, (Marquette
County, Wisconsin Department of Natural Resources, the Ice Age Trail, the Sierra Club, and others)
the John Muir Legacy Group has been formed to develop a guiding focus for the park in the form
of a long term management plan. The John Muir Legacy Group aims to return the natural flora and
fauna back to its state during John Muir’s time here. The park’s historical significance as the birth
place for Muir’s idea of large scale natural preservation combined with the network of public open
space, natural and cultural features, and rural setting give the site potential to become a center
for environmental education and ecological restoration.


The focus of my client group is to preserve the natural qualities of the park. There is concern that
the Ice Age Trail does not belong and its presence will increase the volume of park visitors and
degrade the sensitive environment as the park is loved to death by its patrons. Numerous occasions
of vandalism and interference with the WDNR restoration efforts have raised concerns that further
promotion of this place could stress the park and its resources to its breaking point. The need for a
management plan is required more than ever as separate entities within the park determine what
is best for their own needs. However, within the John Muir Legacy Group there is a difference in
vision for the park, as some view it as a place to be preserved and untouched while others see op-
portunities for recreation and education. As Marquette County celebrates the year of John Muir, in
2010, the timing is perfect to develop a long term vision for the park as its history is celebrated.


My goal for the park is to create a park masterplan that addresses the concerns of the JMLG while
promoting the legacy of John Muir. In order to accomplish this I aim to keep the space as natural
as possible while accentuating the value of the park as a recreational and educational facility. The
park has developed over the years into two separate entities. The first part is a State Natural Area
overseen by the WDNR whose concerned with the restoration of natural vegetation communities.
The other section of the park is a park setting overseen by Marquette County and has no real pur-
pose other than a parking lot for the Ice Age Trail and SNA. A third part of the park has been lost
completely to private ownership, and was the original site of the Muir homestead. This section is
designated a National Historic Site. I aim to unify these pieces into a complete park by establish
a connective theme throughout the park which encourages exercise and education. By establish-
ing this connection and giving the park a holistic purpose it will become the nucleus of the E-way
within the region.




                                                                                                  21
Through my experience in landscape architecture and intern at Dane County Parks I have developed an under-
standing of the value of a masterplan in the visioning process of a park. The development of a masterplan in
combination with a management plan that the JMLG is seeking will give the park a sense of place and ensure
that the separate entities within the park work together to create a unified place. A park masterplan will give the
John Muir Memorial Park a sense of place using ecological restoration to transform the landscape back to the
time of Muir and thus strengthen the connection visitors have to John Muir and his legacy through recreation.

My specific landscape architecture approach in designing the John Muir Memorial Park will focus on recreation
within areas of ecological restoration. The ecological restoration of the landscape back to Muir’s boyhood will
promote the sites recreational and educational opportunities as its historical significance is returned to the writ-
ings of Muir’s time. Visitors will become more connected to Muir and his words when they feel they are expe-
riencing the landscape he knew. His ideals and appreciation for the land will develop in the minds and hearts of
visitors that experience this place after reading his words. The restoration of the landscape and its natural veg-
etation communities will preserve the qualities of the place that Muir loved so much, but was unable to preserve
himself.

One of the most widely cited definitions of restoration was issued in a report from the U.S. National Research
Council: ... restoration is defined as the return of an ecosystem to a close approximation of its condition prior to
disturbance. In restoration, ecological damage to the resource is repaired. Both the structure and the functions of
the ecosystem are recreated. The goal of ecological restoration is to emulate a natural, functioning, self-regulat-
ing system that is integrated with the ecological landscape in which it occurs. Therefore, in order for restoration
to be successful the system must not only look natural, but functions as a natural ecosystem. Often, natural re-
source restoration requires one of the following processes: reconstruction of antecedent physical hydrologic and
morphologic conditions; chemical cleanup or adjustment of the environment; and/or biological manipulation,
including re-vegetation and the reintroduction of absent or currently nonviable native species (Higgs 340).

My focus for the Ecological Restoration of John Muir Memorial Park will be biological manipulation, through
the reestablishment of natural vegetation communities that existed during Muir’s time. This will be done with
the help of Muir’s writings of the place, as his detailed descriptions combined with tracing the evolution of the
landscape back to his boyhood. However, it will not be a complete restoration as that would require the removal
of the Ice Age Trail and all other human-made structures. Rather my ecological ambitions as a designer of this
park are to integrate the natural communities with the man-made elements in order to connect education, ecol-
ogy, esthetics, and exercise within an environmental system.

The integration of restoration and recreation is critical to the success of the design for this park. As part of park
has been designated a National Historic Site I will treat the site as the National Park Service would a cultural
landscape. A cultural landscape is defined as a geographic area, including both natural and cultural resources,
associated with a historic event, activity, or person (NPS). There are four categories of cultural landscapes
defined by the NPS, but John Muir Park falls within the definition of a historic site because of its connection
with Muir. At these areas, existing features and conditions are defined and interpreted primarily in terms of what
happened there at particular times in the past. Therefore, I will be using the NPS-28: Cultural Resource Man-
agement Guidelines to ensure the protection of the landscape and significance of its history. These guidelines
direct the layout of trails, the architectural style of buildings, and the integration of signage and education with
recreational opportunities. As, the trail development throughout the sensitive vegetation communities will have
the greatest impact on the landscape I will also be following the guidelines of the Ice Age National Scenic Trail
Handbook for Trail Design, Construction, and Maintenance as this provides standards for trails that are user
friendly, but have a low environmental impact. By adhering to these strict guidelines developed by the National
Park Service the network of restoration and recreation within the park will be a success.

                                                                                                                 22
Design Ethics

In order to design John Muir Memorial County Park one must ask what would Muir do? As the father
of our national parks he strongly believed in the preservation and conservation of natural places.
He was an environmentalist and outdoor enthusiast at heart. So a successful design of a park dedi-
cated to the memory of all that he has done for the protection of natural places would first and
foremost protect the place he loved. Many would argue that Muir would like to see this park be-
come a preserve and only admired from a far. However, his life as tramp and dedication to preserv-
ing places for the public to enjoy suggests otherwise. His career was spent wandering the wilds of
this country learning, observing, and living. Thus, the only way to create a memorial that is repre-
sentative of everything he believed in would be to open it to the public so that they can learn and
connect with the land as he did.


As the site grows in popularity certain considerations must be made to ensure the longevity of this
place and all the flora and fauna it has to offer. To do this the design needs to create a sense of
freedom for users within the park while incorporating designed restrictions that are not seen as
built barriers. By working with the land and vegetation the design will limit user activities to spe-
cific areas while not calling areas as “off-limits”. By creating a sense of freedom within the park
visitors will experience the land as John Muir did when he had no limits and thought of the country
as his backyard, walking where he pleased.


By restoring the landscape and the vegetation communities on site to the time of Muir’s boyhood
the site will have a deeper connection to him and his writings. By reestablishing these communi-
ties users can relate to his writings and create a relationship with the park as he did when he lived
here. Connecting people emotionally to the land generates a respect for the natural world around
them and encourages ideals about the land that they can take with them after they leave. This site
must serve as a learning tool for environmental education and the need for preservation and con-
servation of all our natural resources.


As a central point for a regional E-way the park must incorporate the E’s Phil Lewis established as
the basis for E-way design. In order to be successful the park needs to promote exercise through
outdoor recreation. There also needs to be a strong educational component within the park that
expresses the historical significance of the environmental history of this place as well as the history
of John Muir and what he did for our nation’s natural places. The ecology needs to become part of
the story of the park so people understand how the glacial processes formed the landscape they
see and how the vegetation communities established themselves over time. The successful imple-
mentation of these elements will tie the park together.                                             23
The design of the park in order to maintain its appeal and beauty as a natural place must utilize
sustainable practices to ensure the quality of the resources and create a sense of place. All struc-
tures and facilities will be made of local, or onsite material when possible, to connect the buildings
with the land and the region. The use of solar lighting and porous pavement will add another di-
mension to the environmental education of visitors and teach them about alternative energy sourc-
es and stormwater harvesting and runoff. Trails and nodes along the trail will utilize natural materi-
als and blend within the surrounding landscape. This consistency throughout the park will make it a
center for sustainable restoration and recreation.


The historical significance of this place in the realm of preservation and conservation of natural ar-
eas is amazing. The landscape here influenced a man who influenced a national movement that has
preserved millions of acres for the public’s enjoyment. With this in mind, it is easy to forget that
it is the landscape within this park that is its most important attribute. Without it John Muir may
have never enjoyed the outdoors like he did. Thus, it is the landscape and the restoration of veg-
etation communities that must take precedents over all else. A thriving ecosystem which supports a
diverse list of native species is more beneficial to the environment and the educational experience
the landscape offers than the recreational opportunities the same land can provide. However, it is
my goal to design a park that incorporates these two different ideals in a way that enhance each
other and provide people of all abilities the opportunity to experience a landscape through the
eyes of John Muir.




                                                                                                   24
John Muir Heritage Center Design

The project program for John Muir Memorial Park is an environmental education and heritage cen-
ter within an E-way system that provides recreation and learning experiences to the public. The
park will offer a host of outdoor recreational activities for enjoying natural beauty, such as, hiking,
bird watching, fishing, canoeing, and cross country skiing. The main program element of the site
will be an educational center where kids and adults can learn about the landscape and John Muir’s
connection to it. The park will promote the natural and cultural resources of the area as well as
the historical significance of the place to John Muir’s life.


The majority of the design efforts will fall upon the first ten acres of the park, as this is the gate-
way to the entire park and Ice Age Trail. All amenities in this section of the park will be relocated
or redesigned with more thought given to their placement in order to create a harmonious space
that is user friendly. Informational signs and memorials will become focal points located in key
areas that relate to the information they provide. A more prominent entrance to the park will be
designed to establish the importance of the park and encourage cars driving past to investigate.
The parking lot and road will be expanded and redesigned to accommodate more visitors as well
as utilize porous paving to promote infiltration. Alternatives to sand and salt applications for deic-
ing the road down to the lake will be investigated, as the current practices are having ill effects on
the lake. Solar lighting will be utilized to enhance security after hours. The underutilized expansive
lawn area with overgrown baseball backstop will be redesigned as it is the first thing visitors see
before entering the park. This space is ideal for community gardens, a larger picnic shelter, and or
visitor center for promoting local tourist attractions and the history of the region. A new pier will
be implemented to provide room for both fishermen and those just enjoying the view.


Within the natural area of the park a few things will be proposed. The National Historic Site, cur-
rently under private ownership will be connected back to the park under ownership, or through
strategic lookout points so that visits can see where the Muir homestead was in relation to the rest
of the park. The Ice Age Trail will be relocated in certain areas to prevent soil erosion and increase
universal accessibility. The trail corridor will be maintained and rid of poison Ivy and poison su-
mac. Benches will be added and/or relocated to take advantage of natural views and shade. Nodes
will be added along the trail to accommodate educational groups and picnickers. Educational and
informational signs will be strategically placed along the trail to promote environmental education
and better understanding of the geological processes that formed the landscape. Features such as
benches, nodes, and signs will be kept with the trail corridor in order to restrict the degradation of
the soil and plant life. The incorporation of these recreational amenities to the restoration of the
landscape will create a unique experience for people of all ages.                                   25
Precedent Studies

Several precedent projects influenced the design of John Muir Memorial Park. These projects are
closely related in size, function, and/or design and provide knowledge of what works and what
does not work in certain situation. These projects all share common traits with the park and their
successes and shortcomings have made the design of John Muir Memorial Park even better.


The first precedent project is Bohn Lake State Ice Age Trail Area, located in the Central Sand Hills
Region of Wisconsin. Since it is in the same ecological landscape as Muir Park and both have seg-
ments of the Ice Age Trail comparisons of recreational effects on sensitive resources can be com-
pared. The future management goals of the Bohn SNA is to provide maximum outdoor recreation
potential and the conservation and enjoyment of the nationally significant scenic, historic, natural,
or cultural qualities of the areas through which trails may pass. The Bohn Lake SNA guidelines for
the trail corridor for the Ice Age National Scenic Trail states that a path be cleared up to seven
feet wide and ten feet in height. This is a large corridor for a trail tread of only 36” in width. The
clearing of such a large strip through the landscape accommodates large numbers of users, but also
provides opportunities for excessive erosion of soil. A smaller manicured trail corridor would pro-
vide grass buffers along the tread and minimize runoff and erosion. The natural surface of the trail
increases infiltration, reduces the impact on the surrounding environment, and adds to the natural-
ized feel of the entire park. This large trail corridor would not work with the landscape and natu-
ralized theme at John Muir Park. A smaller more rustic trail that blends into its surroundings rather
that cutting through them is a more appropriate design.


The Landscape Restoration at Faristed, the Frederick Law Olmsted National Historic Site, is another
precedent study investigated for John Muir Park. While it is not a park masterplan, it does compare
to the John Muir Memorial Park as both are National Historic National Historic Sites of important
figures in the design and preservation of natural landscapes. In 1883 Olmsted acquired this site for
his home and office, and the landscape surrounding the home represents his domestic landscape
Ideals. This restoration project illustrates that “although historic landscapes are composed of many
types of materials and features, it is the vegetation that distinguishes them from other cultural re-
sources” (Meier 29). This is true of designed landscapes as well as natural landscapes. At Muir Park
the vegetative communities are the driving force behind the beauty of Muir Park and they are the
reason the Muir family settled there. The restoration efforts at the Olmsted National Historic Site
focused primarily on improving the health and condition of the existing plant material. The sites
1.74 acres in comparison to the 160+ acres John Muir park make this an easier task. However, the
Olmsted restoration project raises some interesting questions that need to be raised during histori-
cal as well as ecological restorations. The first question to be asked is what time period should 26
the landscape be restored to? As landscapes are ever evolving, not static like a building, several
factors must go into deciding the best time period to restore a landscape. In the case of the Ol-
msted site the landscape was restored to a date of 1930 since this was the height of the Olmsted
Brothers firm, all existing structures were present, and there was sufficient documentation to make
an accurate restoration possible. The documentation or history of sites has great deal to do with
the accuracy of which the restoration can most closely resemble the desired outcome. Although the
two site scales are immensely different and one is a natural landscape while the other has been
designed, the strategies used at the Olmsted Site provide questions that will guide the restoration
efforts at Muir Park.


The final precedent study that will guide the design of John Muir Park is The Muir Woods restora-
tion, on the University of Wisconsin campus. The restoration effort is one component of the 2006
Lakeshore Nature Preserve Master Plan the University of Wisconsin has developed. The plan envi-
sions a variety of cultural and ecological projects that will enhance educational opportunities,
improve visitor experiences, and protect resources. This is an excellent example for the basis of
a Park Masterplan of John Muir Memorial Park, its focus reflects the importance of environmental
education and protecting natural and cultural resources while providing a unique experience for
the public. The Muir Woods restoration project provides examples of vegetation restoration tech-
niques that are applicable to the Muir Park site.


First and foremost, the restoration of the plant communities has been setup to monitor how the
ecological restoration activities affect the plant communities over time. By identifying and taking
inventory of herbaceous and woody species present students can monitor the health of the plant
communities and determine if the ecological restoration is successful. The removal of all invasive
species is another aspect of the management plan. However, the plan does not indicate methods of
removal of eradication. Are herbicides being used? If so what types? This is important information
as the actions taking at this point affect the surrounding vegetation, as herbicides are not selective
killers. The next step identified was the replanting of the understory with native plants. By estab-
lishing an understory the invasive species are less likely to return quickly. Although, the plan identi-
fies which plants will be used for the understory, wild geranium, elm leaf goldenrod, Penn sedge,
and button brush plants, it does not identify, other than being native, why these specific plants
were used. Do these species compete with garlic mustard, honeysuckle, and buckthorn and thus
keep them out? Or are these plants part of a large restoration effort to encourage certain types of
insects of butterflies and discourage others?


The restoration effort also mapped trails and determined routes that were least likely to promote
erosion and or damage of the fragile soil and vegetation. Trails have been rerouted, retired, or sta-
bilized throughout the site. The plan does not identify if views and slopes were taken into account
in determine trail layout, this could be a big oversight in providing universal access to visitors. This
sites goals and needs are closely related to those at John Muir Park.                                 27
Critical Perspective

The detailed research and development of ideas and goals for this project over the course of
the semester was both tedious and educational. During the process of visiting the site and learn-
ing about its history I found that many people have a passion for this park. Although, differences
in opinions of its purpose are present the love of the landscape and history are a common trait.
Within the John Muir Legacy Group it was clear that a vision for the future management of the park
would be hard to coordinate. Community members felt that the park was over-utilized and the pro-
motion of it would bring more visitors and the landscape would suffer. At first I felt the same, but
as I delved deeper into Muir’s ideals and what E-ways and heritage tourism are all about it became
clear that the only way to preserve this site is to promote it and invite the public to use it.


The most challenging aspect for this site was the development of precedents. My goals combined
with those of the John Muir Legacy Group are so intrinsic to this particular site that finding proj-
ects of the same complexity and vision was difficult. The combination of recreation within areas of
ecological restoration turned out to be a subject not widely written about. Identifying projects that
combined these two things within close proximity so that they work together was not an easy task.
I was able to identify a few precedents that compared in many ways to Muir Park, and these raised
questions that I would not have otherwise thought about.


Other aspects of the project were easily identified such as the site scales for design. The park
boundary had already been established making the masterplan scale easy to identify. There was a
visual disconnect of three separate areas within the park I noticed on my first visit. This made it
apparent that a cohesive theme was needed to create a park with a sense of place. The park set-
ting and the National Historic site were receiving little attention and needed to be tied into the
State Natural Area. This provided the idea for recreation within areas of restoration. The sites
overall historical significance makes it a natural tourist site which steered my thinking of connect-
ing the site to other cultural and natural resources through an E-way system.


All in all, I was surprised to find that my research topic and specialized landscape architectural
practices, although very different in scale and purpose, came together to steer the direction of my
specific type of project. I was skeptical at first if an E-way really could inform the design of a park
masterplan. It turns out that it can; and the issues of recreation within areas of restoration apply
to design of E-ways and historical sites and cultural landscapes such as John Muir Memorial Park.



                                                                                                  28
Expected Result

The expected results for the John Muir Memorial Park project are to identify how the incorporation
of ecological restoration with recreation can benefit public use and function collectively within an
ecosystem. As part of a state-wide heritage parkway, an environmental corridor, and a community
specific E-way the park must support a multitude of roles as it is seen as a National Historic Site,
State Natural Area, and County park. My hope is that the park can function at these three levels
without losing its regional character and being loved to death by the public.


The park, through my design and guidance of the John Muir Legacy Group, will become much more
than a county park. It will become a educational facility, a recreational opportunity, a heritage
tourism site, and a meaningful place for the community of Marquette County to cherish. By incor-
porating the precedents studies investigated the design of this park will satisfy the goals of the
JMLG as well as my own be creating a place where restoration and recreation coexist and the pub-
lic are not a detriment to the landscape.


The research I have done on E-ways will be incorporated into the design of this park so that it be-
comes part of a larger system connected to the village of Endeavor, the county of Marquette, and
the State of Wisconsin. No longer will this park be a place viewed from the window of a car driv-
ing past, it will become a place beckoning people to explore. It will serve as a gateway for further
exploration of the state through recreation as its connections spread out into the region and state
through bike trails and hiking trails. It will be a teaching tool for all adults and children.


I hope that through this project my clients will learn that preservation and conservation is more
than protecting one place, it is about protecting a network of places. The connection of places
and resources guide our development as a growing population and ensures that our culture is not
lost in the process. The preservation of significant places such as John Muir Park is a small piece of
a larger process. The importance of preserving woodlots and farm fields cannot be overlooked as
part of conservation corridors in order to provide habitat for wildlife and maintain a rural context
for natural and cultural resources. The need for the public to experience, first-hand, cultural land-
scapes like John Muir Park provides them a sense of place and contributes to their quality of life.
An increasing popularity of heritage tourism will provide funding for the preservation of places like
John Muir Park as people travel and visit these places bringing money into communities and raising
awareness for endangered resources. The public’s role is key to the preservation of natural places.



                                                                                                   29
I hope this project will serve as an example as to the benefits of combining recreation and restora-
tion so that the public becomes aware of environmental issues and the impacts they have on the
environment. As a center for environmental education and preservation within a statewide heritage
parkway and along the Ice Age National Scenic Trail this site has the potential to reach millions and
educate them using John Muir’s ideals of nature. This landscape has already inspired one boy to
change the world; my hope is that it will inspire countless more.




                                                                                                  30
Masterplan



                                                                                              Old
                                                                                              Homestead
                                                         Restored Prairie                     open to
                                                                                              public
 Typical Points of Interest along trail.


     Bird Watching                                                                                        Nature School

                                                       Sensitive
                                                       Fen
                                                                                Oak Opening




         Overlooks
                                           Sensitive                                                      Story Circle
                                           Fen




Pinic Shelter & Back-                                                   Sedge Meadow
  packing Campsite
                                                                                                          Fort Building
                                                                                                                             31
Masterplan Rationale

The Masterplan was developed to create a natural park like setting that feels untouched and as it did during
Muirs time here. The three seperate areas have been combined into one continues park to allow full public ac-
cess. The existing trails still remained, but new trails have been added to act as fire breaks betweeen vegetation
communties and allow more visitor access. Muir’s old homestead has been reclaimed from private ownership
and is now a Nature School, so children can learn about nature and realize that everything is connected to ev-
erything else. The Ice Age Trail encompassing the lake will have several nodes for resting and for classes to be
taught. A large group picnic shelter is designed for large workshop classes, rentals for cub scout camping trips,
and can be utilized for through-hikers of the Ice Age Trail. Several overlooks have been stragetically placed to
allow visitors excellent views and resting points with minimal erosive impacts on the soil.




                                                                                                               32
Siteplan
                                                Ice Age Trail Trailhead
                                                Existing Kiosk



                                                Edible Orchard
                                                Glacial Geologic Landforms Nat-
                                                ural Playground w/ Shelter

                                                Amphitheater

                                                Berry Patch
                                 Open
                                 Lawn

                                                Wildflower Garden w/ Seating
                       Permeable
                       Parking Lot              Fishing Pier & Canoe Launch
                                     Heritage
                                      Center    Grassy Paver Patio

Existing Park Layout                            Council Ring Fire Pit

                                                Seating Area



                                                Wildlife Viewing Area
                                                                                  33
Siteplan Rationale

The Masterplan was developed as an Environmental Education and Heritage Center. This design will transform
an otherwise underutilized open field and boat launch into the jewel that Marquette County needs for its only
county park. This park is the gateway to the rest of the site and will now act as such by providing an educational
basis for the landscape found here as well as historic significance to one of the countries most influential natu-
ralists. The entrance has been moved, and the boat launch access removed to minimize car traffic onsite. The
previous layout was stressing the vegetation, water quality, and maintence fees. The lack of trails on site has
been rectified by providing numerous trails natural material, most of which are ADA accessible. Several shelters
have been placed onsite to allow for picnicing, resting, and classes. These can also be rented out to generate
revenue for teh park. The Center will also rent canoes, kayaks, and bicycles for use at and around the park. Am
edible orchard has been implemented to teach kids about native plant species and attract wildlife. A geologic
glacial landform natural playground will teach kids about the Wisconsin landscape while they play. A large am-
phitheater will accomodate numerous guests for preformances, demonstrations, and classes. This design will put
John Muir Memorial Park on the map as a favorite destination of Wisconsinites, and not just a rest stop.




                                                                                                              34
Environmental Education & Heritage Center

A 12,000 square foot Heritage Center built into the hillside will accomodate several functions at any given time. The
facility can serve as an office for an onsite management specialist, teachers, and guides. The facility will have space
to rent out to generate revenue, as well as a Muir muesum and history timeline of the property. A 53 car parking lot
will provide ample space for the increased number of visitors expected. The building although not completely Solar
will incorporate new green tachnologies and serve as an educational tool for vistiors.
                                                                                                                                       12,000 sq. ft.
                                                                                                                                      Heritage Center




                                                                                                                                  52 car parking lot




                                                                                                                                                   Reclaimed local barn lumber shall be used
                                                                                                                                                   with modern building technology.




                                                                                                                                                                                               35
ADA Accessible Trail
                                         The implementation of numerous trails, and a large ADA
                                         accessible trails will provid fun for all ages & abilities.
                                         It will also reduce runoff as it is completely permeable.
                                         At 8 feet wide it will allow for emergency vehicle access
                                         as well as maintence vehicles and snow removal. Several
                                         nodes are placed around the trail network to provide
                                         ample seating and offer excellent views of the land muir
                                         himself once admired.




Permeable 8’ - 0” ADA accessible trail
                                                                                             36
Amphitheater
A large amphitheater will provide vistors with seating for classes, demonstrations, pre-
formances, and views of the surrounding scenery. Grassy terraces with stone seating
areas allow for comfortable seating of all ages. The uppermost row is fully ADA acces-
sible and incorporates an engraving that is currently onsite. A brickwall and large oaks
will provide a nice backdrop and allow for white noise reduction and amplify speakers
voices.




                                                                                           B                  37
Planting Plan

The Planting Plan for John Muir Memorial Co. Park utilizes all native species. A palette of decidious fruit and nut trees mixed with a
variety of berries will ensure the presence of wildlife allowing visitors to experience them in a natural setting up close. Several Seed
mixes will be used onsite to create seperation of space and feel while also tying the site to the rest of the masterplan and existing
vegetation communities. The most prominent mixes used will be a dry prairie mix which will create a cohesive connection to the
adjacent State Natural Area. A Woodland mix will be used in conjunction with srhubs and plants to create an understory beneath
denser canopiers. The boundaries are planted more densely keeping most of the wildlife in a more natural setting. This also creates
a more open central park atmosphere that will be planted with oaks to create an oak savanna setting, which once existed here.




                                                                                                                                     38
Grading Plan

The Grading Plan for John Muir Memorial Co. Park is quite complex. The most prominent changes are the Heritage Center, which is
built directly into the hillside. This creates a unity of the built with the natural and also allows for existing views around the lake
to be unaffected by the sight of a large building. The second major change in grading was the previous small swale along the road
to the boat launch has been enhanced and reconfigured to accomodate an amphitheater and create a more dramatic view of the
lake. Several swales have been designed to capture stormwater and allow it to infiltrate rather than just run-off site. Two large sub-
surface storage basins have been designed to capture the majority of onsite stormwater. One is located beneath the parking lot, and
the other is beneath the amphitheater swale. Both basins are two feet deep, to allow for a five foot buffer from the water table.




                                                                                                                                    39
Pre-Construction Drainage Calculations

                                                                                          100 year Storm cfs = CIA/43,560   Storm Duration
   Sub watershed                Area Type         Runoff coef.   Area (sq. ft.)                                                              Total Cubic Feet
                                                                                              (3"/hr)        ft sq/acre        (seconds)
          A                 Bldg/road/Imperm         0.95           15,150                     3.00              0.99            10,800          10,705
                           Improved Landscape        0.40            8,586                     3.00              0.24            10,800           2,555
                              Improved Grass         0.35           44,000                     3.00              1.06            10,800          11,455
                              Native Plantings       0.35           17,500                     3.00              0.42            10,800           4,556
                            Prairie/GrassPavers      0.28            2,160                     3.00              0.04            10,800            450
                             Porous Pavement         0.20           19,700        107,096      3.00              0.27            10,800          2,931          32,650
          B                 Bldg/road/Imperm         0.95            1,700                     3.00              0.11            10,800           1,201
                              Improved Grass         0.35           20,200                     3.00              0.49            10,800           5,259
                              Native Plantings       0.35            2,400                     3.00              0.06            10,800            625
                             Porous Pavement         0.20            2,000         26,300      3.00              0.03            10,800            298             7,382
          C                 Bldg/road/Imperm         0.95            1,200                     3.00              0.08            10,800            848
                              Improved Grass         0.35            5,000                     3.00              0.12            10,800           1,302
                              Native Plantings       0.35           3,700           9,900      3.00              0.09            10,800            963             3,113
          D                 Bldg/road/Imperm         0.95             500                      3.00              0.03            10,800            353
                              Improved Grass         0.35            2,500                     3.00              0.06            10,800            651
                              Native Plantings       0.35           1,800           4,800      3.00              0.04            10,800            469             1,473
          E                 Bldg/road/Imperm         0.95             700                      3.00              0.05            10,800            495
                           Improved Landscape        0.40            1,300                     3.00              0.04            10,800            387
                              Improved Grass         0.35            5,200                     3.00              0.13            10,800           1,354
                              Native Plantings       0.35            5,700                     3.00              0.14            10,800           1,484
                             Porous Pavement         0.20             800          13,700      3.00              0.01            10,800            119             3,838
          F                 Bldg/road/Imperm         0.95            3,000                     3.00              0.20            10,800           2,120
                              Improved Grass         0.35            8,400                     3.00              0.20            10,800           2,187
                              Native Plantings       0.35            9,700                     3.00              0.23            10,800          2,525
                             Porous Pavement         0.20            1,500        22,600       3.00              0.02            10,800            223             7,055
          G                 Bldg/road/Imperm         0.95             700                      3.00              0.05            10,800            495
                              Improved Grass         0.35            3,700                     3.00              0.09            10,800            963
                              Native Plantings       0.35            2,100                     3.00              0.05            10,800            547
                             Porous Pavement         0.20             600          7,100       3.00              0.01            10,800            89              2,094
          H                   Improved Grass         0.35            5,500                     3.00              0.13            10,800           1,432
                              Native Plantings       0.35            1,300                     3.00              0.03            10,800            338
                             Porous Pavement         0.20             900          7,700       3.00              0.01            10,800            134             1,904
          I                 Bldg/road/Imperm         0.95            2,500                     3.00              0.16            10,800           1,767
                              Improved Grass         0.35           33,400                     3.00              0.81            10,800           8,695
                              Native Plantings       0.35           10,900                     3.00              0.26            10,800           2,838
                            Prairie/GrassPavers      0.28            8,600                     3.00              0.17            10,800           1,791
                             Porous Pavement         0.20            4,900        57,800       3.00              0.07            10,800            729          15,819
     PERIMETER                Improved Grass         0.35           35,600                     3.00              0.86            10,800           9,268
                              Native Plantings       0.35           40,700                     3.00              0.98            10,800          10,595
                                Undisturbed          0.15           30,300                     3.00              0.31            10,800          3,381
                             Porous Pavement         0.20            4,300        110,900      3.00              0.06            10,800            640          23,883

Post Construction Totals                                                          367,896 sq ft                       9.19 cfs                         99,212 cf




                                                                                                                                                                     40
Post-Construction Drainage Calculations

                                                                                                  100 year Storm cfs = CIA/43,560   Storm Duration
   Sub watershed                  Area Type             Runoff coef.     Area (sq. ft.)                                                              Total Cubic Feet
                                                                                                      (3"/hr)        ft sq/acre        (seconds)
          A                   Bldg/road/Imperm              0.95             6,625                     3.00              0.43            10,800           4,681
                                  Native Site               0.35           100,471        107,096      3.00              2.42            10,800          26,156         30,837
          B                   Bldg/road/Imperm              0.95             2,825                     3.00              0.18            10,800           1,996
                                  Native Site               0.35            23,475        26,300       3.00              0.57            10,800           6,111           8,107
          C                   Bldg/road/Imperm              0.95             1,800                     3.00              0.12            10,800           1,272
                                  Native Site               0.35             8,100         9,900       3.00              0.20            10,800           2,109           3,381
          D                   Bldg/road/Imperm              0.95             1,000                     3.00              0.07            10,800            707
                                  Native Site               0.35             3,800         4,800       3.00              0.09            10,800            989            1,696
          E                       Native Site               0.35            13,700         13,700      3.00              0.33            10,800           3,567           3,567
          F                       Native Site               0.35            22,600         22,600      3.00              0.54            10,800           5,883           5,883
          G                       Native Site               0.35             7,100          7,100      3.00              0.17            10,800           1,848           1,848
          H                       Native Site               0.35             7,700          7,700      3.00              0.19            10,800           2,005           2,005
          I                   Bldg/road/Imperm              0.95             1,400                     3.00              0.09            10,800            989
                                  Native Site               0.35            56,400         57,800      3.00              1.36            10,800          14,683         15,672
     PERIMETER                Bldg/road/Imperm              0.95             7,400                     3.00              0.48            10,800           5,229
                                  Native Site               0.35           103,500        110,900      3.00              2.49            10,800          26,944         32,173

Post Construction Totals                                                                  367,896 sq ft                       9.74 cfs                       105,169 cf




                           Cubic Feet / Second (cfs)   Cubic Feet (cf)
 Post Construction Q                 9.19                99,212.00

 Pre Construction Q                  9.74               105,169.00

       DELTA Q                       0.55                 5,957.00




                                                                                                                                                                           41
Grading Calculations


                                       Grading Calculations

Cut Depth (ft)   Cubic Yards                Fill Depth (ft) Cubic Yards
     1.00              745.90                     1.00          1,724.11
     2.00              418.50                     2.00           344.38
     3.00              316.60                     3.00           277.70
     4.00
     4 00              292.60
                       292 60                     4.00
                                                  4 00           300.00
                                                                 300 00
     5.00              134.50                     5.00           355.50
     6.00              133.30                     6.00           166.60
     7.00              103.70                     7.00            77.70
     8.00              207.00                     8.00            74.10
     9.00              200.00                     9.00            50.00
    10.00
     0 00              222.200                    10.00
                                                   0 00
    11.00              203.70                     11.00
    12.00              400.00                     12.00
    13.00              240.70                     13.00
    14.00              648.20                     14.00
    Total Cubic Yards Cut        4,266.90        Total Cubic Yards Fill      3,370.09   Cut:Fill = 1.27:1

   T t l Cut Below Grade*
   Total C t B l   G d *                                                *Total C t B l
                                                                        *T t l Cut Below Grade
                                                                                         G d
                                   +
Cut Depth (ft)   Cubic Yards                                Basin 1        350*177*2           4,588.90
     1.00            2,592.55                               Basin 2        200*50*2              740.70
     2.00            2,592.55    5,328.70
                                    =
     Total Cubic Yards Cut       9,595.60      Total Cubic Yards Fill        3,370.09    Cut:Fill = 2.8:1

Pre Construction Totals
              367,896 sq ft                                9.74 cfs             105,169 cf
Post Construction Totals
              367,896 sq ft                                9.19 cfs              99,212 cf




                                                                                                        42
Plant List


        KEY              BOTANICAL NAME                        COMMON NAME                    QTY          SIZE      ROOTS                NOTES
TREES
        AG    Amelanchier x grandiflora 'Princess Diana'   Princess Diana Serviceberry         8       1.75" C        BB       Multi stemmed, Plant in spring
        BA             Betula alleghaniensis                       Yellow Birch                6         2" C         BB               Plant in spring
        CA              Corylus Americana                       American Hazelnut             10       1.75" C        BB               Plant in spring
       COA                  Carya Ovata                          Shagbark Hickory              9        2" C          BB               Plant in spring
        CO              Celtis Occidentalis                         Hackberry                 13        2" C          BB               Plant in spring
        FG              Fagus Grandifolia                        American Beech                4         2" C         BB               Plant in spring
        GD             Gymnocladius Diocas                     Kentucky Coffeetree             5       1.75" C        BB               Plant in spring
        PA              Prunus Americana                          American Plum               12       1.75" C        BB               Plant in spring
       PDM       Populus deltoides var. monilifera                 Cottonwood                 7         2" C          BB               Plant in spring
        PN          Prunus nigra 'Princess Kay'             Princess Kay Canada Plum           9       1.75 C         BB               Plant in spring
        PT                Ptelea trifoliata                          Hoptree                  14       1.75" C        BB               Plant in spring
        QA                 Quercus alba                             White Oak                 17         2" C         BB               Plant in spring
        QS              Quercus x schuetti                     Macrocarpa x bicolor            7        2" C          BB               Plant in spring
SEED MIXES
       SM1     Prairie Moon Nursery Woodland Mix                                               3      1 acre bag                      60 seeds/sq ft
       SM2            Agrecol Wildflowers Mix                                                  1      1 acre bag                      60 seeds/sq ft
       SM3       Agrecol Dry Prairie Short Height                                              3      1 acre bag                      60 seeds/sq ft
       SM4         Agrecol Infiltration Swale Mix                                              3      1 acre bag                      60 seeds/sq ft
       SM5     Prairie Moon Nursery No Mow Mix                                                180      5 lbs bag                     5 lbs/1,000 sq ft




SHRUBS & BERRIES
   AC        Amorpha canescens                      Leadplant            100       1 lb bag                       Hand disperse throughout Woodland Mix
  CEA       Ceanothus americanus                 New Jersey Tea          100       1 lb bag                       Hand disperse throughout Woodland Mix
   CS         Celastrus scandens              American Bittersweet         6        1 Gal           Cont            To be grown on pergola for support
   CP        Comptonia peregrina                   Sweet Fern            100       1 lb bag                       Hand disperse throughout Woodland Mix
   HK       Hypericum kalmianum               Kalm's St. John's Wort     100       1 lb bag                        Spaced < 2' throughout Woodland Mix
   RG             Rhus glabra                     Smooth Sumac            15        2 Gal           Cont                    Spaced 7' On Center
   RT            Rhus typhina                    Staghorn Sumac           15        2 Gal           Cont                    Spaced 7' On Center
   RA         Ribes americanum                  Wild Black Currant        15        1 Gal           Cont                    Spaced 6' On Center
  RM          Ribes Missouriense              Missouri Gooseberry         15        1 Gal           Cont                    Spaced 6' On Center
   RC            Rosa carolina                  Smooth Wild Rose          10        3 Gal           Cont                    Spaced 3' On Center
   RP            Rosa palustris                    Swamp Rose             10        3 Gal           Cont                    Spaced 3' On Center
  RW             Rosa woodsii                      Woods' Rose            10        3 Gal           Cont                    Spaced 3' On Center
  RUA        Rubus allegheniensis              Highbush Blackberry        20        1 Gal           Cont                    Spaced 6' On Center
    RI           Rubus idaeus                     Red Raspberry           15        1 Gal           Cont                    Spaced 3' On Center
   RO         Rubus occidnetalis               Blackcap Raspberry         15        1 Gal           Cont                    Spaced 3' On Center
   SC       Sambucus canadensis                   Common Elder            15        3 Gal           Cont                    Spaced 8' On Center
   SA       Symphoricarpos albus                    Snowberry             10        3 Gal           Cont                    Spaced 6' On Center
   VA      Vaccinium angustifolium             Low bush Blueberry         50        2 Gal           Cont                    Spaced 2' On Center
   VVI       Vaccinium vitis idaea             Low bush Cranberry         50        2 Gal           Cont                    Spaced 2' On Center




                                                                                                                                                            43
2010 UW-Madison Capstone
2010 UW-Madison Capstone
2010 UW-Madison Capstone
2010 UW-Madison Capstone
2010 UW-Madison Capstone
2010 UW-Madison Capstone

More Related Content

What's hot

MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...UNESCO Venice Office
 
Executive summary heritage preserve
Executive summary heritage preserveExecutive summary heritage preserve
Executive summary heritage preservecookcountyblog
 
Forest Preserve District Executive Summary of Oak Forest Heritage Preserve Ma...
Forest Preserve District Executive Summary of Oak Forest Heritage Preserve Ma...Forest Preserve District Executive Summary of Oak Forest Heritage Preserve Ma...
Forest Preserve District Executive Summary of Oak Forest Heritage Preserve Ma...cookcountyblog
 
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...UNESCO Venice Office
 
Poster65: Landscape management and the provision of soil ecosystem services i...
Poster65: Landscape management and the provision of soil ecosystem services i...Poster65: Landscape management and the provision of soil ecosystem services i...
Poster65: Landscape management and the provision of soil ecosystem services i...CIAT
 
Beach Chalet Soccer Fields - the threat to Golden Gate Park & Ocean Beach
Beach Chalet Soccer Fields - the threat to Golden Gate Park & Ocean BeachBeach Chalet Soccer Fields - the threat to Golden Gate Park & Ocean Beach
Beach Chalet Soccer Fields - the threat to Golden Gate Park & Ocean BeachSFOceanEdge
 
Environmental Impacts of Clay harvesting
Environmental Impacts of Clay harvestingEnvironmental Impacts of Clay harvesting
Environmental Impacts of Clay harvestingCOLLINS KUFFOUR
 
Impact of limestone quarries
Impact of limestone quarriesImpact of limestone quarries
Impact of limestone quarriesBhagya Silva
 
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...UNESCO Venice Office
 
Evaluation of Land Suitability for Stone Pine (Pinus pinea) plantation in Leb...
Evaluation of Land Suitability for Stone Pine (Pinus pinea) plantation in Leb...Evaluation of Land Suitability for Stone Pine (Pinus pinea) plantation in Leb...
Evaluation of Land Suitability for Stone Pine (Pinus pinea) plantation in Leb...IJEAB
 
92202102
9220210292202102
92202102IJRAT
 
Effectiveness and sustainability of remedial actions for land restoration in ...
Effectiveness and sustainabilityof remedial actions for land restorationin ...Effectiveness and sustainabilityof remedial actions for land restorationin ...
Effectiveness and sustainability of remedial actions for land restoration in ...Zainab Arshad
 
F1 b forest road
F1 b forest roadF1 b forest road
F1 b forest roadpcntc
 
Chapter 7 ecosystem ppt english
Chapter 7 ecosystem ppt  englishChapter 7 ecosystem ppt  english
Chapter 7 ecosystem ppt englishMosesPackiaraj2
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Conservation In The Middle Mn Valley
Conservation In The Middle Mn ValleyConservation In The Middle Mn Valley
Conservation In The Middle Mn ValleyTodd Rexine
 
Sequoia Task Force Recommendations for Giant Sequoia National Monument Manage...
Sequoia Task Force Recommendations for Giant Sequoia National Monument Manage...Sequoia Task Force Recommendations for Giant Sequoia National Monument Manage...
Sequoia Task Force Recommendations for Giant Sequoia National Monument Manage...Kern-Kaweah Chapter, Sierrra Club
 
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...UNESCO Venice Office
 

What's hot (20)

MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
 
Executive summary heritage preserve
Executive summary heritage preserveExecutive summary heritage preserve
Executive summary heritage preserve
 
Execsumrev
ExecsumrevExecsumrev
Execsumrev
 
Forest Preserve District Executive Summary of Oak Forest Heritage Preserve Ma...
Forest Preserve District Executive Summary of Oak Forest Heritage Preserve Ma...Forest Preserve District Executive Summary of Oak Forest Heritage Preserve Ma...
Forest Preserve District Executive Summary of Oak Forest Heritage Preserve Ma...
 
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
 
Poster65: Landscape management and the provision of soil ecosystem services i...
Poster65: Landscape management and the provision of soil ecosystem services i...Poster65: Landscape management and the provision of soil ecosystem services i...
Poster65: Landscape management and the provision of soil ecosystem services i...
 
Beach Chalet Soccer Fields - the threat to Golden Gate Park & Ocean Beach
Beach Chalet Soccer Fields - the threat to Golden Gate Park & Ocean BeachBeach Chalet Soccer Fields - the threat to Golden Gate Park & Ocean Beach
Beach Chalet Soccer Fields - the threat to Golden Gate Park & Ocean Beach
 
Environmental Impacts of Clay harvesting
Environmental Impacts of Clay harvestingEnvironmental Impacts of Clay harvesting
Environmental Impacts of Clay harvesting
 
Impact of limestone quarries
Impact of limestone quarriesImpact of limestone quarries
Impact of limestone quarries
 
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
 
Evaluation of Land Suitability for Stone Pine (Pinus pinea) plantation in Leb...
Evaluation of Land Suitability for Stone Pine (Pinus pinea) plantation in Leb...Evaluation of Land Suitability for Stone Pine (Pinus pinea) plantation in Leb...
Evaluation of Land Suitability for Stone Pine (Pinus pinea) plantation in Leb...
 
92202102
9220210292202102
92202102
 
Effectiveness and sustainability of remedial actions for land restoration in ...
Effectiveness and sustainabilityof remedial actions for land restorationin ...Effectiveness and sustainabilityof remedial actions for land restorationin ...
Effectiveness and sustainability of remedial actions for land restoration in ...
 
F1 b forest road
F1 b forest roadF1 b forest road
F1 b forest road
 
Chapter 7 ecosystem ppt english
Chapter 7 ecosystem ppt  englishChapter 7 ecosystem ppt  english
Chapter 7 ecosystem ppt english
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Conservation In The Middle Mn Valley
Conservation In The Middle Mn ValleyConservation In The Middle Mn Valley
Conservation In The Middle Mn Valley
 
Sequoia Task Force Recommendations for Giant Sequoia National Monument Manage...
Sequoia Task Force Recommendations for Giant Sequoia National Monument Manage...Sequoia Task Force Recommendations for Giant Sequoia National Monument Manage...
Sequoia Task Force Recommendations for Giant Sequoia National Monument Manage...
 
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
MAB-IHP Regional Symposium: Managing Water Resources in Biosphere Reserves in...
 
EdgeW
EdgeWEdgeW
EdgeW
 

Viewers also liked

Viewers also liked (8)

Media studies, covers, contents, spreds 4
Media studies, covers, contents, spreds 4Media studies, covers, contents, spreds 4
Media studies, covers, contents, spreds 4
 
Evaluation
EvaluationEvaluation
Evaluation
 
1402 scantrans ve acma
1402 scantrans ve acma1402 scantrans ve acma
1402 scantrans ve acma
 
Storyboard
StoryboardStoryboard
Storyboard
 
Evaluation
EvaluationEvaluation
Evaluation
 
Part 2.5
Part 2.5Part 2.5
Part 2.5
 
Evaluation
EvaluationEvaluation
Evaluation
 
Part 1
Part 1Part 1
Part 1
 

Similar to 2010 UW-Madison Capstone

Reimagining Johnson Park- A Design Proposal for Swampscott, MA Cantell ● Faye...
Reimagining Johnson Park- A Design Proposal for Swampscott, MA Cantell ● Faye...Reimagining Johnson Park- A Design Proposal for Swampscott, MA Cantell ● Faye...
Reimagining Johnson Park- A Design Proposal for Swampscott, MA Cantell ● Faye...Anna (Cantell) McGinty
 
Ogilvie ldn 1 12 pt text t5
Ogilvie ldn 1 12 pt text t5Ogilvie ldn 1 12 pt text t5
Ogilvie ldn 1 12 pt text t5elogilvie
 
Trial for online
Trial for onlineTrial for online
Trial for onlineelogilvie
 
Landscape architecture
Landscape architectureLandscape architecture
Landscape architectureVaishnavi Siva
 
Final presentation for The Parklands
Final presentation for The Parklands Final presentation for The Parklands
Final presentation for The Parklands Matthew Crane
 
WrightParkMgmtPlan
WrightParkMgmtPlanWrightParkMgmtPlan
WrightParkMgmtPlanGioia Kuss
 
METROPOLITAN BRIEFING BOOK 2007NATURAL ASSET.docx
METROPOLITAN BRIEFING BOOK 2007NATURAL ASSET.docxMETROPOLITAN BRIEFING BOOK 2007NATURAL ASSET.docx
METROPOLITAN BRIEFING BOOK 2007NATURAL ASSET.docxARIV4
 
10 3-12 shp public mtg-compressed- final
10 3-12 shp public mtg-compressed- final10 3-12 shp public mtg-compressed- final
10 3-12 shp public mtg-compressed- finaljbuerkle
 
USDA - Whitten Charrette Final Report 2-8-08
USDA - Whitten Charrette Final Report 2-8-08USDA - Whitten Charrette Final Report 2-8-08
USDA - Whitten Charrette Final Report 2-8-08Matt Pilger - CPRP - MBA
 
Memorial Park Tomorrow November 2014
Memorial Park Tomorrow November 2014Memorial Park Tomorrow November 2014
Memorial Park Tomorrow November 2014MemParkTomorrow
 
Laguna Gloria Site Assessment and Natural Area Management Guidelines by Siglo...
Laguna Gloria Site Assessment and Natural Area Management Guidelines by Siglo...Laguna Gloria Site Assessment and Natural Area Management Guidelines by Siglo...
Laguna Gloria Site Assessment and Natural Area Management Guidelines by Siglo...Jonathan Ogren
 
A REVIEW ON CRITERIA FOR GREEN INFRASTRUCTURE TO BE ADOPTED BY LOCAL AUTHORITIES
A REVIEW ON CRITERIA FOR GREEN INFRASTRUCTURE TO BE ADOPTED BY LOCAL AUTHORITIESA REVIEW ON CRITERIA FOR GREEN INFRASTRUCTURE TO BE ADOPTED BY LOCAL AUTHORITIES
A REVIEW ON CRITERIA FOR GREEN INFRASTRUCTURE TO BE ADOPTED BY LOCAL AUTHORITIESRichard Hogue
 
Memorial Park Tomorrow Nov.14
Memorial Park Tomorrow Nov.14Memorial Park Tomorrow Nov.14
Memorial Park Tomorrow Nov.14MemParkTomorrow
 
Contemporary landscape practices
Contemporary landscape practices   Contemporary landscape practices
Contemporary landscape practices Zehra Wazir
 
HUNTERS POINT SOUTH_PROJECT_
HUNTERS POINT SOUTH_PROJECT_HUNTERS POINT SOUTH_PROJECT_
HUNTERS POINT SOUTH_PROJECT_Christian Gabriel
 

Similar to 2010 UW-Madison Capstone (20)

Reimagining Johnson Park- A Design Proposal for Swampscott, MA Cantell ● Faye...
Reimagining Johnson Park- A Design Proposal for Swampscott, MA Cantell ● Faye...Reimagining Johnson Park- A Design Proposal for Swampscott, MA Cantell ● Faye...
Reimagining Johnson Park- A Design Proposal for Swampscott, MA Cantell ● Faye...
 
Ogilvie ldn 1 12 pt text t5
Ogilvie ldn 1 12 pt text t5Ogilvie ldn 1 12 pt text t5
Ogilvie ldn 1 12 pt text t5
 
Trial for online
Trial for onlineTrial for online
Trial for online
 
Landscape architecture
Landscape architectureLandscape architecture
Landscape architecture
 
Portfolio
PortfolioPortfolio
Portfolio
 
Final presentation for The Parklands
Final presentation for The Parklands Final presentation for The Parklands
Final presentation for The Parklands
 
WrightParkMgmtPlan
WrightParkMgmtPlanWrightParkMgmtPlan
WrightParkMgmtPlan
 
Parks
ParksParks
Parks
 
METROPOLITAN BRIEFING BOOK 2007NATURAL ASSET.docx
METROPOLITAN BRIEFING BOOK 2007NATURAL ASSET.docxMETROPOLITAN BRIEFING BOOK 2007NATURAL ASSET.docx
METROPOLITAN BRIEFING BOOK 2007NATURAL ASSET.docx
 
10 3-12 shp public mtg-compressed- final
10 3-12 shp public mtg-compressed- final10 3-12 shp public mtg-compressed- final
10 3-12 shp public mtg-compressed- final
 
Urban Acupuncture
Urban AcupunctureUrban Acupuncture
Urban Acupuncture
 
Maverick park presentation
Maverick park presentationMaverick park presentation
Maverick park presentation
 
USDA - Whitten Charrette Final Report 2-8-08
USDA - Whitten Charrette Final Report 2-8-08USDA - Whitten Charrette Final Report 2-8-08
USDA - Whitten Charrette Final Report 2-8-08
 
Memorial Park Tomorrow November 2014
Memorial Park Tomorrow November 2014Memorial Park Tomorrow November 2014
Memorial Park Tomorrow November 2014
 
Laguna Gloria Site Assessment and Natural Area Management Guidelines by Siglo...
Laguna Gloria Site Assessment and Natural Area Management Guidelines by Siglo...Laguna Gloria Site Assessment and Natural Area Management Guidelines by Siglo...
Laguna Gloria Site Assessment and Natural Area Management Guidelines by Siglo...
 
A REVIEW ON CRITERIA FOR GREEN INFRASTRUCTURE TO BE ADOPTED BY LOCAL AUTHORITIES
A REVIEW ON CRITERIA FOR GREEN INFRASTRUCTURE TO BE ADOPTED BY LOCAL AUTHORITIESA REVIEW ON CRITERIA FOR GREEN INFRASTRUCTURE TO BE ADOPTED BY LOCAL AUTHORITIES
A REVIEW ON CRITERIA FOR GREEN INFRASTRUCTURE TO BE ADOPTED BY LOCAL AUTHORITIES
 
Memorial Park Tomorrow Nov.14
Memorial Park Tomorrow Nov.14Memorial Park Tomorrow Nov.14
Memorial Park Tomorrow Nov.14
 
Contemporary landscape practices
Contemporary landscape practices   Contemporary landscape practices
Contemporary landscape practices
 
HUNTERS POINT SOUTH_PROJECT_
HUNTERS POINT SOUTH_PROJECT_HUNTERS POINT SOUTH_PROJECT_
HUNTERS POINT SOUTH_PROJECT_
 
Project Proposal
Project ProposalProject Proposal
Project Proposal
 

2010 UW-Madison Capstone

  • 1. John Muir Memorial Co Park Marquette, Co. Wisconsin A park revitalization project. A DESIGN TO PRESERVE A LANDSCAPE. A VISION TO PRESERVE A LEGACY. A Senior Capstone Project Prespared under the mentorship of Dr. Susan Thering & MR. Shawn T. kelly ALEX DESMIDT UW-Madison Landscape Architecture Senior Capstone Project Spring 2010
  • 2. Table of Contents PART I INTRODUCTION 1-3 LITERATURE REVIEW 4-6 JOHN MUIR 7-8 MARQUETTE COUNTY 9-10 FOX-WISCONSIN HERITAGE PARKWAY 11 REGIONAL ANALYSIS 12-14 REGIONAL RECOMMENDATIONS 15-16 MASTERPLAN INVENTORY & ANALYSIS 17 SITEPLAN INVENTORY & ANALYSIS 18 EXISTING PARK CONDITIONS 19 DESIGN GOALS 20-22 DESIGN ETHICS 23-24 JOHN MUIR HERITAGE CENTER DESIGN 25 PRECEDENT STUDY 26-27 CRITICAL PERSPECTIVE 28 EXPECTED RESULTS 29-30 PART II MASTERPLAN DESIGN 31-32 SITEPLAN DESIGN 33-39 DRAINAGE CALCULATIONS 40-41 GRADING CALCULATIONS 42 PLANT LIST 43 CONCLUSION 44 REFERENCES 45 APPENDIX 46-49
  • 3. Introduction This study proposes to investigate how an E-Way may inform the design of the John Muir Memo- rial County Park Masterplan. This investigation will be given context and focus by the concerns and goals of the John Muir Legacy Group, which will involve providing recreation within areas of eco- logical restoration. The John Muir Memorial County Park will be the site for this study. E-ways The term E-way was first created by Phil Lewis, a landscape architect, as a method for designing an environmental system offering opportunities for education, ecology, esthetics, and exercise. An E- way is a means of connecting people with the land and history around them, by providing access to public open spaces, such as, recreational lands, historical and cultural features, and sensitive natu- ral areas. The value of E-ways in preserving our natural and cultural resources is gaining momentum as urban sprawl encroaches upon these places. This system of landscape connection through envi- ronmental corridors has become a key approach in regional design and planning. The ultimate goal of this study will be to identify how an E-Way that supports tourism and environ- mental education through recreation will influence the design of John Muir Memorial Park. Identi- fication of an E-way encompassing the park will guide urban development and future park acqui- sitions to ensure the preservation of significant natural and cultural features for the pleasure of future generations. The cultural and natural features surrounding John Muir Memorial County Park combined with extensive public lands and development of the Ice Age Trail offer a prime location for such an E-way. This study will show that John Muir Memorial County Park has the potential to become a center of a recreational E-way that serve as a teaching tool for environmental education and ecological restoration while promoting tourism within Marquette County. 1
  • 4. County Park Masterplan As the central core of an E-Way, John Muir Memorial County Park will require a new park master- plan. This plan will guide the future development and management of the entire property, which is currently separated into a park, a State Natural Area, a National Historic Landmark, and segment of the Ice Age Trail. Given the multiple entities within the park, an organizing theme is required to in- corporate recreation with ecological restoration in a manner that is beneficial to the landscape and visitors. Traditionally, the idea of recreation has meant the degradation of the land and resources as a park is loved to death by its users. The creation of a masterplan that incorporates the needs of restoration efforts with the wants of recreational users is the key to a successful design for a park lacking a sense of place. The development of a new masterplan will make this site an ideal nucleus of an E-way. Its rich diversity of natural vegetative communities, historic glaciation, Ice Age Trail loop, and connection to John Muir (1838-1914), the pioneering promoter of natural preservation, already exhibit every- thing that an E-way stands for. The site incorporates exercise and outdoor recreation along the two mile Ice Age Trail loop. The WDNR’s ecological restoration efforts of the diverse natural vegetation communities provide the ecological aspect, while the beautiful views of the 30 acre Ennis Lake combined with the intense fall colors of the tamaracks, dogwoods, and oaks offer an esthetic that is unrivaled in the state. The historical connection to John Muir opens the door to environmental education, relating to preservation, conservation, flora, and fauna. These amenities need to be organized cohesively so that restoration efforts and recreational opportunities work as an intercon- nected system, each one enhancing the other. The park encompasses 160 acres historically known as Fountain Lake Farm, settled by the Muir family in 1849 after they immigrated from Scotland (Stanley 2). As the boyhood home of John Muir, the nation’s premier advocate for preservation of natural places, the park offers a unique connec- tion to him. It is here that Muir developed his appreciation for the natural beauty of the world, and traced the formation of his conservation philosophy (Stanley xiv). Muir’s preservation efforts origi- nated at Fountain Lake in 1964 when he attempted to preserve a portion of the farm for its natu- ral beauty alone by buying it from his brother. This attempt was unsuccessful and the place went unpreserved until 1972 when the Wisconsin Department of Natural Resources designated it a State Natural Area for its exemplary diversity of upland and wetland communities. The vegetation sur- rounding the 30-acre Ennis Lake, a spring-fed kettle lake, is diverse and includes a rich fen, sedge meadow, open bog, northern wet forest dominated by tamarack, southern dry forest, oak opening, and wet-mesic prairie. A new park masterplan will utilize ecological restoration along with sustain- able recreational planning in order to accommodate high volumes of visitors without degrading these sensitive natural areas. 2
  • 5. Recreation in areas of Ecological Restoration The John Muir Memorial County Park is located in Marquette County and is its only county park. The county has, in the eyes of some, mismanaged this jewel causing added stress upon a sensitive re- source. This mismanagement has resulted in the formation of the John Muir Legacy Group (JMLG), an organization of park neighbors, county residents, and WDNR employees deeply concerned about the future of the park. The goal of the JMLG is to develop a long term management plan for John Muir Park with a focus “to create a place in which people can appreciate John Muir’s glorious Wis- consin wilderness (as he saw it); to inspire visitors to reflect on the natural beauty of the landscape and all its flora and fauna.” The priorities of the JMLG will be met through ecological restoration of native vegetation communities combined with recreation within the park. The unique and diverse flora of this area will be restored to the time of Muir’s occupancy here. This will be done through the use of Muir’s works describing the landscape and the vegetation along with naturalists from the WDNR. Plant communities go through successional phases as factors around them change, such as the settlement of towns reducing the regular occurrence of fire. These natural changes need to be ana- lyzed in order to determine when and how rapidly these changes progressed. Next, the undesired species have to be identified and management strategies need to be developed for eradicating them. Concurrently, the development of facilities, such as trails, need to be planned so that they can offer access to public as well as restoration management crews. These trails can offer fire- breaks and transition zones to slow the progress of invasive species, while providing recreational opportunities. The recreational opportunities if planned accordingly can work in favor of restora- tion rather than hinder it. As an intern with Dane County Parks I have learned a great deal in the development of County Parks. Through the development and planning of trails I have worked with naturalists on the layout of trails through prairies in order to maintain firebreaks while providing recreational oppor- tunities. This is a give and take process to meet the needs of the public while meeting the needs of the ecosystem within the park. If done correctly, the rewards are worth the extra effort as restora- tion crews, maintenance crews, and the public impact the site as little as possible. 3
  • 6. Literature Review The E-way system was developed by Phil Lewis, emeritus professor of Landscape Architecture at the University of Wisconsin, as part of his Regional Design Process. As Lewis defines it, an E-Way is an ecological, educational, environmental, aesthetic, exercise way: a corridor with a trail or pathway accommodating pedestrians, bicyclists, cross-country skiers, and other non-motorized use (Lewis 240). The function of an E-Way is to create environmental continuity of natural and cultural resources of a region or community along recreational routes to promote education and a sense of place. An E-Way is specific to a region or community. It is a system that brings many environmen- tal aspects of the community clearly into focus by unifying prominent educational, ecological, and environmental characteristics across a recreational medium such as a trail or bike path. An E-way is a more specific type of environmental corridor. In general, environmental corridors encompass linear landscape features containing concentrations of natural and cultural resource amenities. Phil Lewis defines environmental corridors as “spatial patterns of occurrence of any or all of the combined features of water, wetlands, and steep topography of 12.5% or greater found in an urban or urbanizing environment” (Lewis 239). Corridors have evolved over time and are being used in many facets today. They are used as conservation tools creating habitat connectivity for animals (Gustafsson 182). In this capacity they offer an expanded ecosystem to a variety of species in order to ensure the survival of wildlife as humans develop more land. However, more recently environmental corridors are used as a means to guide urban growth and development to ensure the survival of all species. The guiding principles for this growth are centered around the preserva- tion of especially high value natural, scenic, historic, scientific, and recreational features strung together like jewels on a necklace ( The Regional Design Process, developed by Phil Lewis, utilizes these value patterns as form determinants to guide new and sustainable development (Lewis 21). The identification and protection of critical natural and cultural resources is the key to success- fully developing urban and rural landscapes into a cohesive entity, and therefore an integral part of sustainability. Sustainable development as defined by the World Commission on Environment and Development is that which “meets the needs of the present without compromising the ability of future generations to meet their own needs” (Steiner 11). By identifying these resource areas and protecting them, urban development can be designed to accentuate the regional character of the landscape rather than encroaching upon it. (Lewis 21) The book Tomorrow By Design by Phil Lewis is the guiding light on E-way design and planning. He has created the rule for small to large scale connections of land for the purpose of guiding our urban development in a way that protects our cultural and natural resources. This system ensures we have places to recreate and educate ourselves and children about the landscape around us. The techniques Lewis has developed for defining environmental corridors are solid. He has identified that water, wetlands, steep topography, and timber/woodlands combine into linear corridor pat- terns, and within these corridors 85-90% of both biological and aesthetic diversity is found (Lewis 78). These resources combined with aquifer recharge areas, class A farmland, and regionally spe- cific major vegetation types identifies the area where development is prohibited. This makes the data collection process and regional analysis much simpler. All developments can then be carefully planned outside these areas of constraint and integrated sustainably around the cultural and natu- ral resources. 4
  • 7. However, it is apparent Lewis has separated the needs of humans from the needs of other species. The guide- lines that Lewis as developed with such detail are concerned only with the welfare of the people. The identifica- tion and the design of E-ways and environmental corridors are fundamentally important to the survival of the wildlife, as well as us. As we grow in population and expand our cities outward the habitat of other species is diminishing. As he stated, “these resources are not only the basis of our life-support system and our economic well-being but are also the basis for quality of life, sense of place, diversity, and options of choice” (Lewis 21). This mentions nothing of the circle of life and Muir’s idea that everything is hitched to everything else. The fo- cus of E-ways must therefore not pertain only to human enjoyment, but building and preserving critical habitat for the species we share the land with, since our survival is ultimately dependent upon theirs. An article that identifies the correlation between environmental corridors and species success is Corridors as a Conservation Tool by Lena Gustafsson and Lennart Hannson. This article identifies that often our nature re- serves and conservation areas are too small and too separated to provide adequate habitat for certain species. The amount of interconnectedness of these patches of land is key to the success of species dispersal and biodi- versity. This article stresses the need of environmental corridors as places for nature conservation rather than recreation. The authors of this article have cited studies that have shown habitat connections increase species survival, but do not provide standards for specific species requirements. Where the authors lack in providing suggestions for designing in this fashion they succeed in expressing the importance of large scale connections of bigger parcels instead of small scattered tracts of land. The article makes it apparent that when identifying and designing corridors and E-ways we must look at more than the cultural and natural resources, we must look at species habitat. The argument made here is that species need expansive lands to thrive, but the amount cannot be quantified. Thus, we must preserve as much land as possible in connected expanses to ensure the longevity of species around us. Environmental Corridors appear at widely different scales, from narrow strips along small pathways to passages that extend along continents (Gustafsson 186). John Muir Park lies within the 280 mile Fox-Wisconsin Heritage Parkway that extends from Green Bay to Prairie du Chien, following the route taken by Father Jacques Mar- quette and explorer Louis Joliet to discover the Mississippi River in 1673. The concept for this Parkway was developed in 1991, “with the purpose of highlighting and enhancing the unique heritage of the state of Wiscon- sin by exemplifying and promoting the cultural, historical, and recreational resources of the rivers” (FWHP iii). The parkway is seeking designation as a National Heritage Parkway to ensure the future preservation of the rich cultural and natural history of the Fox and Wisconsin riverway. This form of corridor has broad ideals to pre- serve historically and culturally significant features. However, at a more regionally specific scale the vision of this parkway is lost. Thus, it is necessary within such an expansive connection of resources that smaller environmental corridors are developed that focus on regional and community specific concerns. These smaller more manageable expanses of land and resources can guide the development of communities and ensure the preservation of regionally specific cultural and natural resources so that the combined efforts contribute to the greater preservation of the whole system. In the case of John Muir Park, a 20 mile environmental corridor from Montello to Portage would pre- serve the extensive effigy mounds along the Fox River. This would also identify opportunities for more county parks within Marquette County, which would reduce the amount of users impacting John Muir Park’s sensitive resources. 5
  • 8. 1 Within these regional specific corridors E-ways can create recreational and educational opportunities that con- nect people to the region they live in, as well as provide expansive connected habitats that increase animal biodiversity. A proposed E-way connecting John Muir Memorial Park with Endeavor Wisconsin would promote recreation and cultural education through heritage tourism, a growing type or tourism defined by the National Trust for Historic Preservation as, “traveling to experience the places, artifacts and activities that authentically represent the stories and people of the past and present”. The development of such E-ways as this would pro- vide local recreational opportunities, promote local cultural and natural education, ensure wildlife habitat is protected, and boost the economy of villages and small towns as heritage tourism grows throughout the country. The need for these large and small scale environmental corridors working together as a system is the key to the preservation and conservation of our sensitive resources and success of all species that share the land. 6
  • 9. John Muir “Oh, that glorious Wisconsin wilderness!” John Muir Memorial County Park is located adjacent to the boyhood home of John Muir, the father of our National Parks. In 1849, at the age of 11, Muir and his family immigrated from Scotland and settled here at, what was known then as, Fountain Lake Farm. During the course of his childhood, Muir developed a deep connection with the landscape found here. Although the Muir home is no longer standing JOHN MUIR and the property is currently a Foster son of Wisconsin private residence, the National Park Born in Scotland Service designated the site a National April 21, 1838 Historic Place in 1990. Sketch of Muir Home By John Muir 7
  • 10. The landscape Muir found and adored at Fountain Lake Sketch of Fountain Lake By John Muir Farm inspired him with the idea of preserving natural areas simply for their beauty. Muir attempted to pre- serve this land several times, “I want to keep it un- trampled for the sake of its ferns and flowers”, but his borther in law refused and the property was sold to the Ennis Brothers in 1867. Although he was unsuccussful in his attempts, the notion of land preservation had been planted in his heart. This place has been called “the cradle of our national parks”, as it planted the seed of preserving land for its natural beauty alone. Muirs love of nature germinated here at Fountain Lake Farm and later blossomed into his contribution to the formation of the national park system. “Some of the happiest days of my life were in that old slantwalled garret and among the smooth creeks that trickled among the sedges of the Fountain Lake Meadow.” - JM 8
  • 11. Marquette County, WI J h M i M John Muir Memorial County Park is located in the Town of Buffalo in Marquette County. It is the only i lC P ki l di h T fB County Park within the county. Marquette County is named after Jacques Marquette (1637-1675) a French missionary that accompanied Louis Joliet on the expedition to discover the Mississippi River. Marquette Co. is in the Central Sand Hills region of Wisconsin and was sculpted by the Green Bay Lobe durinng the last glaciation period. The rural landscape consists of old farmsteads, cornfields, oak hardwoods, and fen and marsh lowlands. It is a premier rural setting that offers countless opportunities for recreation and heritage tourism. Marquette county offers quiet and relaxing setting that is a stark contrast from the kitschy tourist town found to the West in Wisconsin Dells. 9
  • 12. Marquette County offers countless opportunites for exploration, tourism, and recreation. It’s old farmsteads and quaint little towns provide a glimpse back in history. Portage and Montello, the county’s two largest towns are rich with heritage and historical significance, and provide many opprotunities for tourists, such as historic downtowns, Wisconsin’s largest tree, and granite water falls. The wildlife refuges within the county are some of the best in the state, and not only provide great habitat for wildlife, but also offer a great brid watching opportunites. The Ice Age Trail has multiple sections of trail throughout the county and will one day be a continu- ous trail that runs completely through the county from north to south. Although, Marquette County boasts such great ammenties it is lacking in parks and open space. It’s only major park, is John Muir Memorial County Park, which currently offers little more than some nice views and a walk around the lake. The need for more county parks and more recreational opportunites is urgent. 10
  • 13. Fox -Wisconsin Heritage Parkway Marquette County lies within the Fox River Region of the Fox - Wisconsin Heritage Parkway. The Parkway is seeking NPS designation as a National kway Heritage Area. The natural, historical, and cultural resources found l, histo orical, along the parkway make it an ideal candidate. t ideal The boundaries of the Fox-Wisconsin Heritage Parkway derive from the Fox and Lower Wisconsin Rivers. These rivers span 280 miles across the State of Wisconsin,from the bay of Green Bay to Prairie du Chien, at the confluence of the Wisconsin and Mississippi Rivers. Effigy Mounds Natural Areas The rivers are geographically divided into the Lower Fox,Upper Fox, and Lower Wisconsin. Fifteen counties comprise the total area which consists of 1,444 square miles. FWHP The Parkway follows the route taken by Jacques Marquette and Louis Joliet to discover the Mississippi River. They en- countered and were guided by the Native Americans that lived along the Fox River, like the Ho-Chunk (or Winnebago). Effigy Mounds like these are found along the entire Park- way. However, many have been destroyed by develop- ment and many of those that do remain are on private property. Preservation of these fragile resources is the key to recreation and heritage tourism in this area. The history of the region could be lost forever if more parks are not created and its resources are left unpreserved. 11
  • 14. Regional Analysis Natural & Cultural Features Civil Features This 20 mile stretch is one of the most cultural- Portage and Montello are midsized cities con- ly & historically rich regions within the Parkway. nected state and nation-wide by bus, train, The landscape is dotted with Effigy Mounds, but and plane. These cities bring people and money most are under private ownership. There are to the region. An Environmental Corridor will several natural areas, but only one county park. direct growth of the cities and protect natural cultural sites. Historic Place` Boat Landing Train Station Airplane Effigy Mound Natural/Cultural Hospital School State & Federal Lands Limited Access SNA Bus Station Full Access SNA 12
  • 15. Regional Analysis Trails Landcover The Ice Age Trail brings recreational users The extensive wetlands throughout the region to the area. Several on-road bike loops run combined with the prime agricultural land throughout the region allowing recreational make this region a key area for preservation. users to enjoy the rural beauty of the land- By preserving the rural landscape and its re- scape. Limited trails extend outward from the sources this region will be a center for Heri- cities. tage Tourism and recreation. John Muir Loop Scenic Tour Wetlands Prime Ag Land Buffalo Lake Loop Oxford Loop Forest Briggsville Loop Proposed Ice Age Trail 13
  • 16. Regional Analysis Closest Nature Centers - 20+ miles away - Not within Marquette County - Not providing revenue for the Marquette County - Not integrated into the community through recreational opportunities 20 Mile Radius r e iv R x o F Montello W is co ns in _ ^ John Muir Park Leopold Center Wisconsin jj kk Dells Upham Woods Nature Center Riv er Portage McKenzie Env. Ed. Center j k Poynette 0 3 6 Ü 12 Miles 14
  • 17. Regional Recommendations Environmental Education & Recreation Center It is my recommendation that John Muir Memorial Park become an Environmatal education and recreation center. Aldo Leopold, seminal ecologist, had also envisioned the Muir farm as an “edu- cational institution”. As a boy Muir developed a love of nature here and learned countless lessons about ecosystems, botany, and the environment. A center that provided children and adults with this same opportunity would instill a greater appreciation for the land and the environment within our socitety. An education and recreation center would also bring funding to marquette county which would be beneficial for park enhancement projects and also the acquisition of new park land. An Educational & Recreational Center located at John Muir Co. Park would promote: - Importance of experiencing and protecting Marquette Co. History & natural landscapes - Inspiration for environmentalists and conservationists everywhere - A love of nature in children and adults - Recreation & Heritage Tourism - County park expansion in marquette county 15
  • 18. Regional Recommendations John Muir EWAY It is my recommendation that Marquette County create an E-way from John Muir Memorial Park to the town of Endeavor. This E-way would create a recreational corridor while protecting the land surrounding the park and all ecologically important sites along the river. The Eway would incorpo- rate biking, hiking, and a water trail that tourists will use to explore the beautiful countyside. This Eway would bring revenue into the town of endeavor from interstate travelers and make John Muir Park and the Education Center more well known to the public. It will serve as a gateway to Mar- quette county and the rest of the Heritage Parkway. Effigy Mounds 12 Mile Bike Trail Natural Areas 8 Mile Water Trail Eway from Endeavor, WI to John Muir Co. Park 16
  • 19. Masterplan Inventory & Analysis O Opportunities: Muir’s Old - Ice Age Trail connection WDNR State Natural Area Homestead - Topography (Private ) - County Park & Homestead site have potential for development - Heritage Tourism potential Marquette Co. Park Ice Age Trail Loop Constraints: - Conflicting ideas between invested parties - Bounded on all sides - SNA & NHL limit development - Erosive sandy soils - Oak Wilt - Trail location K Key Elements: - Ice Age Trail - State Natural Area - National Historic Landmark - Sensitive vegetation communities - 30 acre spring-fed lake - Glacial history Existing Vegetaion Communities 17
  • 20. Siteplan Inventory & Analysis Ice Age Trailhead No Trails to Uninviting Ice Age Trail Entrance Small Parking No Seating Lot Runoff flows Restrooms Expansive into lake lawn Boat requires Ramp mowing & Pier Old Baseball Good Views Field From Hill topp Ice Age Trailhead John Muir Memorial Co.Park 18
  • 21. Existing Conditions at Muir Park Acres of lawn Picturesque views Outdated infrastructure Varied Topography Vandalism Lake Access 19
  • 22. Design Goals This proposed Master Plan kicks off 2010 - The Year of John Muir in Marquette County. Vision for the future of John Muir Co. Park: “Create a place where people can come to appreciate the Wisconsin wilderness of John Muir’s boyhood; and to inspire one to reflect on the natural beauty of the land- scape, so as “to be not on the world but in it”. - John Muir Legacy Group Design Goals: - Create a meaningful place - Create continuity within the park - Enhance park entrances - Restore native vegetation communities - Protect existing senstive vegetation communities - Have park “Dedicated” to ensure its protection - Establish the park as a premier natural landscape in WI - Increase park visitors without degrading the land - Increase revenue for restoration and maintenance - Create a place to enjoy nature - Create a place Muir would be proud of 20
  • 23. The Park Masterplan of the John Muir Memorial Park will focus on combing ecological restoration with recreation while providing a public space that encourages environmental education and his- torical awareness of the landscape. Due to the number of invested parties at the park, (Marquette County, Wisconsin Department of Natural Resources, the Ice Age Trail, the Sierra Club, and others) the John Muir Legacy Group has been formed to develop a guiding focus for the park in the form of a long term management plan. The John Muir Legacy Group aims to return the natural flora and fauna back to its state during John Muir’s time here. The park’s historical significance as the birth place for Muir’s idea of large scale natural preservation combined with the network of public open space, natural and cultural features, and rural setting give the site potential to become a center for environmental education and ecological restoration. The focus of my client group is to preserve the natural qualities of the park. There is concern that the Ice Age Trail does not belong and its presence will increase the volume of park visitors and degrade the sensitive environment as the park is loved to death by its patrons. Numerous occasions of vandalism and interference with the WDNR restoration efforts have raised concerns that further promotion of this place could stress the park and its resources to its breaking point. The need for a management plan is required more than ever as separate entities within the park determine what is best for their own needs. However, within the John Muir Legacy Group there is a difference in vision for the park, as some view it as a place to be preserved and untouched while others see op- portunities for recreation and education. As Marquette County celebrates the year of John Muir, in 2010, the timing is perfect to develop a long term vision for the park as its history is celebrated. My goal for the park is to create a park masterplan that addresses the concerns of the JMLG while promoting the legacy of John Muir. In order to accomplish this I aim to keep the space as natural as possible while accentuating the value of the park as a recreational and educational facility. The park has developed over the years into two separate entities. The first part is a State Natural Area overseen by the WDNR whose concerned with the restoration of natural vegetation communities. The other section of the park is a park setting overseen by Marquette County and has no real pur- pose other than a parking lot for the Ice Age Trail and SNA. A third part of the park has been lost completely to private ownership, and was the original site of the Muir homestead. This section is designated a National Historic Site. I aim to unify these pieces into a complete park by establish a connective theme throughout the park which encourages exercise and education. By establish- ing this connection and giving the park a holistic purpose it will become the nucleus of the E-way within the region. 21
  • 24. Through my experience in landscape architecture and intern at Dane County Parks I have developed an under- standing of the value of a masterplan in the visioning process of a park. The development of a masterplan in combination with a management plan that the JMLG is seeking will give the park a sense of place and ensure that the separate entities within the park work together to create a unified place. A park masterplan will give the John Muir Memorial Park a sense of place using ecological restoration to transform the landscape back to the time of Muir and thus strengthen the connection visitors have to John Muir and his legacy through recreation. My specific landscape architecture approach in designing the John Muir Memorial Park will focus on recreation within areas of ecological restoration. The ecological restoration of the landscape back to Muir’s boyhood will promote the sites recreational and educational opportunities as its historical significance is returned to the writ- ings of Muir’s time. Visitors will become more connected to Muir and his words when they feel they are expe- riencing the landscape he knew. His ideals and appreciation for the land will develop in the minds and hearts of visitors that experience this place after reading his words. The restoration of the landscape and its natural veg- etation communities will preserve the qualities of the place that Muir loved so much, but was unable to preserve himself. One of the most widely cited definitions of restoration was issued in a report from the U.S. National Research Council: ... restoration is defined as the return of an ecosystem to a close approximation of its condition prior to disturbance. In restoration, ecological damage to the resource is repaired. Both the structure and the functions of the ecosystem are recreated. The goal of ecological restoration is to emulate a natural, functioning, self-regulat- ing system that is integrated with the ecological landscape in which it occurs. Therefore, in order for restoration to be successful the system must not only look natural, but functions as a natural ecosystem. Often, natural re- source restoration requires one of the following processes: reconstruction of antecedent physical hydrologic and morphologic conditions; chemical cleanup or adjustment of the environment; and/or biological manipulation, including re-vegetation and the reintroduction of absent or currently nonviable native species (Higgs 340). My focus for the Ecological Restoration of John Muir Memorial Park will be biological manipulation, through the reestablishment of natural vegetation communities that existed during Muir’s time. This will be done with the help of Muir’s writings of the place, as his detailed descriptions combined with tracing the evolution of the landscape back to his boyhood. However, it will not be a complete restoration as that would require the removal of the Ice Age Trail and all other human-made structures. Rather my ecological ambitions as a designer of this park are to integrate the natural communities with the man-made elements in order to connect education, ecol- ogy, esthetics, and exercise within an environmental system. The integration of restoration and recreation is critical to the success of the design for this park. As part of park has been designated a National Historic Site I will treat the site as the National Park Service would a cultural landscape. A cultural landscape is defined as a geographic area, including both natural and cultural resources, associated with a historic event, activity, or person (NPS). There are four categories of cultural landscapes defined by the NPS, but John Muir Park falls within the definition of a historic site because of its connection with Muir. At these areas, existing features and conditions are defined and interpreted primarily in terms of what happened there at particular times in the past. Therefore, I will be using the NPS-28: Cultural Resource Man- agement Guidelines to ensure the protection of the landscape and significance of its history. These guidelines direct the layout of trails, the architectural style of buildings, and the integration of signage and education with recreational opportunities. As, the trail development throughout the sensitive vegetation communities will have the greatest impact on the landscape I will also be following the guidelines of the Ice Age National Scenic Trail Handbook for Trail Design, Construction, and Maintenance as this provides standards for trails that are user friendly, but have a low environmental impact. By adhering to these strict guidelines developed by the National Park Service the network of restoration and recreation within the park will be a success. 22
  • 25. Design Ethics In order to design John Muir Memorial County Park one must ask what would Muir do? As the father of our national parks he strongly believed in the preservation and conservation of natural places. He was an environmentalist and outdoor enthusiast at heart. So a successful design of a park dedi- cated to the memory of all that he has done for the protection of natural places would first and foremost protect the place he loved. Many would argue that Muir would like to see this park be- come a preserve and only admired from a far. However, his life as tramp and dedication to preserv- ing places for the public to enjoy suggests otherwise. His career was spent wandering the wilds of this country learning, observing, and living. Thus, the only way to create a memorial that is repre- sentative of everything he believed in would be to open it to the public so that they can learn and connect with the land as he did. As the site grows in popularity certain considerations must be made to ensure the longevity of this place and all the flora and fauna it has to offer. To do this the design needs to create a sense of freedom for users within the park while incorporating designed restrictions that are not seen as built barriers. By working with the land and vegetation the design will limit user activities to spe- cific areas while not calling areas as “off-limits”. By creating a sense of freedom within the park visitors will experience the land as John Muir did when he had no limits and thought of the country as his backyard, walking where he pleased. By restoring the landscape and the vegetation communities on site to the time of Muir’s boyhood the site will have a deeper connection to him and his writings. By reestablishing these communi- ties users can relate to his writings and create a relationship with the park as he did when he lived here. Connecting people emotionally to the land generates a respect for the natural world around them and encourages ideals about the land that they can take with them after they leave. This site must serve as a learning tool for environmental education and the need for preservation and con- servation of all our natural resources. As a central point for a regional E-way the park must incorporate the E’s Phil Lewis established as the basis for E-way design. In order to be successful the park needs to promote exercise through outdoor recreation. There also needs to be a strong educational component within the park that expresses the historical significance of the environmental history of this place as well as the history of John Muir and what he did for our nation’s natural places. The ecology needs to become part of the story of the park so people understand how the glacial processes formed the landscape they see and how the vegetation communities established themselves over time. The successful imple- mentation of these elements will tie the park together. 23
  • 26. The design of the park in order to maintain its appeal and beauty as a natural place must utilize sustainable practices to ensure the quality of the resources and create a sense of place. All struc- tures and facilities will be made of local, or onsite material when possible, to connect the buildings with the land and the region. The use of solar lighting and porous pavement will add another di- mension to the environmental education of visitors and teach them about alternative energy sourc- es and stormwater harvesting and runoff. Trails and nodes along the trail will utilize natural materi- als and blend within the surrounding landscape. This consistency throughout the park will make it a center for sustainable restoration and recreation. The historical significance of this place in the realm of preservation and conservation of natural ar- eas is amazing. The landscape here influenced a man who influenced a national movement that has preserved millions of acres for the public’s enjoyment. With this in mind, it is easy to forget that it is the landscape within this park that is its most important attribute. Without it John Muir may have never enjoyed the outdoors like he did. Thus, it is the landscape and the restoration of veg- etation communities that must take precedents over all else. A thriving ecosystem which supports a diverse list of native species is more beneficial to the environment and the educational experience the landscape offers than the recreational opportunities the same land can provide. However, it is my goal to design a park that incorporates these two different ideals in a way that enhance each other and provide people of all abilities the opportunity to experience a landscape through the eyes of John Muir. 24
  • 27. John Muir Heritage Center Design The project program for John Muir Memorial Park is an environmental education and heritage cen- ter within an E-way system that provides recreation and learning experiences to the public. The park will offer a host of outdoor recreational activities for enjoying natural beauty, such as, hiking, bird watching, fishing, canoeing, and cross country skiing. The main program element of the site will be an educational center where kids and adults can learn about the landscape and John Muir’s connection to it. The park will promote the natural and cultural resources of the area as well as the historical significance of the place to John Muir’s life. The majority of the design efforts will fall upon the first ten acres of the park, as this is the gate- way to the entire park and Ice Age Trail. All amenities in this section of the park will be relocated or redesigned with more thought given to their placement in order to create a harmonious space that is user friendly. Informational signs and memorials will become focal points located in key areas that relate to the information they provide. A more prominent entrance to the park will be designed to establish the importance of the park and encourage cars driving past to investigate. The parking lot and road will be expanded and redesigned to accommodate more visitors as well as utilize porous paving to promote infiltration. Alternatives to sand and salt applications for deic- ing the road down to the lake will be investigated, as the current practices are having ill effects on the lake. Solar lighting will be utilized to enhance security after hours. The underutilized expansive lawn area with overgrown baseball backstop will be redesigned as it is the first thing visitors see before entering the park. This space is ideal for community gardens, a larger picnic shelter, and or visitor center for promoting local tourist attractions and the history of the region. A new pier will be implemented to provide room for both fishermen and those just enjoying the view. Within the natural area of the park a few things will be proposed. The National Historic Site, cur- rently under private ownership will be connected back to the park under ownership, or through strategic lookout points so that visits can see where the Muir homestead was in relation to the rest of the park. The Ice Age Trail will be relocated in certain areas to prevent soil erosion and increase universal accessibility. The trail corridor will be maintained and rid of poison Ivy and poison su- mac. Benches will be added and/or relocated to take advantage of natural views and shade. Nodes will be added along the trail to accommodate educational groups and picnickers. Educational and informational signs will be strategically placed along the trail to promote environmental education and better understanding of the geological processes that formed the landscape. Features such as benches, nodes, and signs will be kept with the trail corridor in order to restrict the degradation of the soil and plant life. The incorporation of these recreational amenities to the restoration of the landscape will create a unique experience for people of all ages. 25
  • 28. Precedent Studies Several precedent projects influenced the design of John Muir Memorial Park. These projects are closely related in size, function, and/or design and provide knowledge of what works and what does not work in certain situation. These projects all share common traits with the park and their successes and shortcomings have made the design of John Muir Memorial Park even better. The first precedent project is Bohn Lake State Ice Age Trail Area, located in the Central Sand Hills Region of Wisconsin. Since it is in the same ecological landscape as Muir Park and both have seg- ments of the Ice Age Trail comparisons of recreational effects on sensitive resources can be com- pared. The future management goals of the Bohn SNA is to provide maximum outdoor recreation potential and the conservation and enjoyment of the nationally significant scenic, historic, natural, or cultural qualities of the areas through which trails may pass. The Bohn Lake SNA guidelines for the trail corridor for the Ice Age National Scenic Trail states that a path be cleared up to seven feet wide and ten feet in height. This is a large corridor for a trail tread of only 36” in width. The clearing of such a large strip through the landscape accommodates large numbers of users, but also provides opportunities for excessive erosion of soil. A smaller manicured trail corridor would pro- vide grass buffers along the tread and minimize runoff and erosion. The natural surface of the trail increases infiltration, reduces the impact on the surrounding environment, and adds to the natural- ized feel of the entire park. This large trail corridor would not work with the landscape and natu- ralized theme at John Muir Park. A smaller more rustic trail that blends into its surroundings rather that cutting through them is a more appropriate design. The Landscape Restoration at Faristed, the Frederick Law Olmsted National Historic Site, is another precedent study investigated for John Muir Park. While it is not a park masterplan, it does compare to the John Muir Memorial Park as both are National Historic National Historic Sites of important figures in the design and preservation of natural landscapes. In 1883 Olmsted acquired this site for his home and office, and the landscape surrounding the home represents his domestic landscape Ideals. This restoration project illustrates that “although historic landscapes are composed of many types of materials and features, it is the vegetation that distinguishes them from other cultural re- sources” (Meier 29). This is true of designed landscapes as well as natural landscapes. At Muir Park the vegetative communities are the driving force behind the beauty of Muir Park and they are the reason the Muir family settled there. The restoration efforts at the Olmsted National Historic Site focused primarily on improving the health and condition of the existing plant material. The sites 1.74 acres in comparison to the 160+ acres John Muir park make this an easier task. However, the Olmsted restoration project raises some interesting questions that need to be raised during histori- cal as well as ecological restorations. The first question to be asked is what time period should 26
  • 29. the landscape be restored to? As landscapes are ever evolving, not static like a building, several factors must go into deciding the best time period to restore a landscape. In the case of the Ol- msted site the landscape was restored to a date of 1930 since this was the height of the Olmsted Brothers firm, all existing structures were present, and there was sufficient documentation to make an accurate restoration possible. The documentation or history of sites has great deal to do with the accuracy of which the restoration can most closely resemble the desired outcome. Although the two site scales are immensely different and one is a natural landscape while the other has been designed, the strategies used at the Olmsted Site provide questions that will guide the restoration efforts at Muir Park. The final precedent study that will guide the design of John Muir Park is The Muir Woods restora- tion, on the University of Wisconsin campus. The restoration effort is one component of the 2006 Lakeshore Nature Preserve Master Plan the University of Wisconsin has developed. The plan envi- sions a variety of cultural and ecological projects that will enhance educational opportunities, improve visitor experiences, and protect resources. This is an excellent example for the basis of a Park Masterplan of John Muir Memorial Park, its focus reflects the importance of environmental education and protecting natural and cultural resources while providing a unique experience for the public. The Muir Woods restoration project provides examples of vegetation restoration tech- niques that are applicable to the Muir Park site. First and foremost, the restoration of the plant communities has been setup to monitor how the ecological restoration activities affect the plant communities over time. By identifying and taking inventory of herbaceous and woody species present students can monitor the health of the plant communities and determine if the ecological restoration is successful. The removal of all invasive species is another aspect of the management plan. However, the plan does not indicate methods of removal of eradication. Are herbicides being used? If so what types? This is important information as the actions taking at this point affect the surrounding vegetation, as herbicides are not selective killers. The next step identified was the replanting of the understory with native plants. By estab- lishing an understory the invasive species are less likely to return quickly. Although, the plan identi- fies which plants will be used for the understory, wild geranium, elm leaf goldenrod, Penn sedge, and button brush plants, it does not identify, other than being native, why these specific plants were used. Do these species compete with garlic mustard, honeysuckle, and buckthorn and thus keep them out? Or are these plants part of a large restoration effort to encourage certain types of insects of butterflies and discourage others? The restoration effort also mapped trails and determined routes that were least likely to promote erosion and or damage of the fragile soil and vegetation. Trails have been rerouted, retired, or sta- bilized throughout the site. The plan does not identify if views and slopes were taken into account in determine trail layout, this could be a big oversight in providing universal access to visitors. This sites goals and needs are closely related to those at John Muir Park. 27
  • 30. Critical Perspective The detailed research and development of ideas and goals for this project over the course of the semester was both tedious and educational. During the process of visiting the site and learn- ing about its history I found that many people have a passion for this park. Although, differences in opinions of its purpose are present the love of the landscape and history are a common trait. Within the John Muir Legacy Group it was clear that a vision for the future management of the park would be hard to coordinate. Community members felt that the park was over-utilized and the pro- motion of it would bring more visitors and the landscape would suffer. At first I felt the same, but as I delved deeper into Muir’s ideals and what E-ways and heritage tourism are all about it became clear that the only way to preserve this site is to promote it and invite the public to use it. The most challenging aspect for this site was the development of precedents. My goals combined with those of the John Muir Legacy Group are so intrinsic to this particular site that finding proj- ects of the same complexity and vision was difficult. The combination of recreation within areas of ecological restoration turned out to be a subject not widely written about. Identifying projects that combined these two things within close proximity so that they work together was not an easy task. I was able to identify a few precedents that compared in many ways to Muir Park, and these raised questions that I would not have otherwise thought about. Other aspects of the project were easily identified such as the site scales for design. The park boundary had already been established making the masterplan scale easy to identify. There was a visual disconnect of three separate areas within the park I noticed on my first visit. This made it apparent that a cohesive theme was needed to create a park with a sense of place. The park set- ting and the National Historic site were receiving little attention and needed to be tied into the State Natural Area. This provided the idea for recreation within areas of restoration. The sites overall historical significance makes it a natural tourist site which steered my thinking of connect- ing the site to other cultural and natural resources through an E-way system. All in all, I was surprised to find that my research topic and specialized landscape architectural practices, although very different in scale and purpose, came together to steer the direction of my specific type of project. I was skeptical at first if an E-way really could inform the design of a park masterplan. It turns out that it can; and the issues of recreation within areas of restoration apply to design of E-ways and historical sites and cultural landscapes such as John Muir Memorial Park. 28
  • 31. Expected Result The expected results for the John Muir Memorial Park project are to identify how the incorporation of ecological restoration with recreation can benefit public use and function collectively within an ecosystem. As part of a state-wide heritage parkway, an environmental corridor, and a community specific E-way the park must support a multitude of roles as it is seen as a National Historic Site, State Natural Area, and County park. My hope is that the park can function at these three levels without losing its regional character and being loved to death by the public. The park, through my design and guidance of the John Muir Legacy Group, will become much more than a county park. It will become a educational facility, a recreational opportunity, a heritage tourism site, and a meaningful place for the community of Marquette County to cherish. By incor- porating the precedents studies investigated the design of this park will satisfy the goals of the JMLG as well as my own be creating a place where restoration and recreation coexist and the pub- lic are not a detriment to the landscape. The research I have done on E-ways will be incorporated into the design of this park so that it be- comes part of a larger system connected to the village of Endeavor, the county of Marquette, and the State of Wisconsin. No longer will this park be a place viewed from the window of a car driv- ing past, it will become a place beckoning people to explore. It will serve as a gateway for further exploration of the state through recreation as its connections spread out into the region and state through bike trails and hiking trails. It will be a teaching tool for all adults and children. I hope that through this project my clients will learn that preservation and conservation is more than protecting one place, it is about protecting a network of places. The connection of places and resources guide our development as a growing population and ensures that our culture is not lost in the process. The preservation of significant places such as John Muir Park is a small piece of a larger process. The importance of preserving woodlots and farm fields cannot be overlooked as part of conservation corridors in order to provide habitat for wildlife and maintain a rural context for natural and cultural resources. The need for the public to experience, first-hand, cultural land- scapes like John Muir Park provides them a sense of place and contributes to their quality of life. An increasing popularity of heritage tourism will provide funding for the preservation of places like John Muir Park as people travel and visit these places bringing money into communities and raising awareness for endangered resources. The public’s role is key to the preservation of natural places. 29
  • 32. I hope this project will serve as an example as to the benefits of combining recreation and restora- tion so that the public becomes aware of environmental issues and the impacts they have on the environment. As a center for environmental education and preservation within a statewide heritage parkway and along the Ice Age National Scenic Trail this site has the potential to reach millions and educate them using John Muir’s ideals of nature. This landscape has already inspired one boy to change the world; my hope is that it will inspire countless more. 30
  • 33. Masterplan Old Homestead Restored Prairie open to public Typical Points of Interest along trail. Bird Watching Nature School Sensitive Fen Oak Opening Overlooks Sensitive Story Circle Fen Pinic Shelter & Back- Sedge Meadow packing Campsite Fort Building 31
  • 34. Masterplan Rationale The Masterplan was developed to create a natural park like setting that feels untouched and as it did during Muirs time here. The three seperate areas have been combined into one continues park to allow full public ac- cess. The existing trails still remained, but new trails have been added to act as fire breaks betweeen vegetation communties and allow more visitor access. Muir’s old homestead has been reclaimed from private ownership and is now a Nature School, so children can learn about nature and realize that everything is connected to ev- erything else. The Ice Age Trail encompassing the lake will have several nodes for resting and for classes to be taught. A large group picnic shelter is designed for large workshop classes, rentals for cub scout camping trips, and can be utilized for through-hikers of the Ice Age Trail. Several overlooks have been stragetically placed to allow visitors excellent views and resting points with minimal erosive impacts on the soil. 32
  • 35. Siteplan Ice Age Trail Trailhead Existing Kiosk Edible Orchard Glacial Geologic Landforms Nat- ural Playground w/ Shelter Amphitheater Berry Patch Open Lawn Wildflower Garden w/ Seating Permeable Parking Lot Fishing Pier & Canoe Launch Heritage Center Grassy Paver Patio Existing Park Layout Council Ring Fire Pit Seating Area Wildlife Viewing Area 33
  • 36. Siteplan Rationale The Masterplan was developed as an Environmental Education and Heritage Center. This design will transform an otherwise underutilized open field and boat launch into the jewel that Marquette County needs for its only county park. This park is the gateway to the rest of the site and will now act as such by providing an educational basis for the landscape found here as well as historic significance to one of the countries most influential natu- ralists. The entrance has been moved, and the boat launch access removed to minimize car traffic onsite. The previous layout was stressing the vegetation, water quality, and maintence fees. The lack of trails on site has been rectified by providing numerous trails natural material, most of which are ADA accessible. Several shelters have been placed onsite to allow for picnicing, resting, and classes. These can also be rented out to generate revenue for teh park. The Center will also rent canoes, kayaks, and bicycles for use at and around the park. Am edible orchard has been implemented to teach kids about native plant species and attract wildlife. A geologic glacial landform natural playground will teach kids about the Wisconsin landscape while they play. A large am- phitheater will accomodate numerous guests for preformances, demonstrations, and classes. This design will put John Muir Memorial Park on the map as a favorite destination of Wisconsinites, and not just a rest stop. 34
  • 37. Environmental Education & Heritage Center A 12,000 square foot Heritage Center built into the hillside will accomodate several functions at any given time. The facility can serve as an office for an onsite management specialist, teachers, and guides. The facility will have space to rent out to generate revenue, as well as a Muir muesum and history timeline of the property. A 53 car parking lot will provide ample space for the increased number of visitors expected. The building although not completely Solar will incorporate new green tachnologies and serve as an educational tool for vistiors. 12,000 sq. ft. Heritage Center 52 car parking lot Reclaimed local barn lumber shall be used with modern building technology. 35
  • 38. ADA Accessible Trail The implementation of numerous trails, and a large ADA accessible trails will provid fun for all ages & abilities. It will also reduce runoff as it is completely permeable. At 8 feet wide it will allow for emergency vehicle access as well as maintence vehicles and snow removal. Several nodes are placed around the trail network to provide ample seating and offer excellent views of the land muir himself once admired. Permeable 8’ - 0” ADA accessible trail 36
  • 39. Amphitheater A large amphitheater will provide vistors with seating for classes, demonstrations, pre- formances, and views of the surrounding scenery. Grassy terraces with stone seating areas allow for comfortable seating of all ages. The uppermost row is fully ADA acces- sible and incorporates an engraving that is currently onsite. A brickwall and large oaks will provide a nice backdrop and allow for white noise reduction and amplify speakers voices. B 37
  • 40. Planting Plan The Planting Plan for John Muir Memorial Co. Park utilizes all native species. A palette of decidious fruit and nut trees mixed with a variety of berries will ensure the presence of wildlife allowing visitors to experience them in a natural setting up close. Several Seed mixes will be used onsite to create seperation of space and feel while also tying the site to the rest of the masterplan and existing vegetation communities. The most prominent mixes used will be a dry prairie mix which will create a cohesive connection to the adjacent State Natural Area. A Woodland mix will be used in conjunction with srhubs and plants to create an understory beneath denser canopiers. The boundaries are planted more densely keeping most of the wildlife in a more natural setting. This also creates a more open central park atmosphere that will be planted with oaks to create an oak savanna setting, which once existed here. 38
  • 41. Grading Plan The Grading Plan for John Muir Memorial Co. Park is quite complex. The most prominent changes are the Heritage Center, which is built directly into the hillside. This creates a unity of the built with the natural and also allows for existing views around the lake to be unaffected by the sight of a large building. The second major change in grading was the previous small swale along the road to the boat launch has been enhanced and reconfigured to accomodate an amphitheater and create a more dramatic view of the lake. Several swales have been designed to capture stormwater and allow it to infiltrate rather than just run-off site. Two large sub- surface storage basins have been designed to capture the majority of onsite stormwater. One is located beneath the parking lot, and the other is beneath the amphitheater swale. Both basins are two feet deep, to allow for a five foot buffer from the water table. 39
  • 42. Pre-Construction Drainage Calculations 100 year Storm cfs = CIA/43,560 Storm Duration Sub watershed Area Type Runoff coef. Area (sq. ft.) Total Cubic Feet (3"/hr) ft sq/acre (seconds) A Bldg/road/Imperm 0.95 15,150 3.00 0.99 10,800 10,705 Improved Landscape 0.40 8,586 3.00 0.24 10,800 2,555 Improved Grass 0.35 44,000 3.00 1.06 10,800 11,455 Native Plantings 0.35 17,500 3.00 0.42 10,800 4,556 Prairie/GrassPavers 0.28 2,160 3.00 0.04 10,800 450 Porous Pavement 0.20 19,700 107,096 3.00 0.27 10,800 2,931 32,650 B Bldg/road/Imperm 0.95 1,700 3.00 0.11 10,800 1,201 Improved Grass 0.35 20,200 3.00 0.49 10,800 5,259 Native Plantings 0.35 2,400 3.00 0.06 10,800 625 Porous Pavement 0.20 2,000 26,300 3.00 0.03 10,800 298 7,382 C Bldg/road/Imperm 0.95 1,200 3.00 0.08 10,800 848 Improved Grass 0.35 5,000 3.00 0.12 10,800 1,302 Native Plantings 0.35 3,700 9,900 3.00 0.09 10,800 963 3,113 D Bldg/road/Imperm 0.95 500 3.00 0.03 10,800 353 Improved Grass 0.35 2,500 3.00 0.06 10,800 651 Native Plantings 0.35 1,800 4,800 3.00 0.04 10,800 469 1,473 E Bldg/road/Imperm 0.95 700 3.00 0.05 10,800 495 Improved Landscape 0.40 1,300 3.00 0.04 10,800 387 Improved Grass 0.35 5,200 3.00 0.13 10,800 1,354 Native Plantings 0.35 5,700 3.00 0.14 10,800 1,484 Porous Pavement 0.20 800 13,700 3.00 0.01 10,800 119 3,838 F Bldg/road/Imperm 0.95 3,000 3.00 0.20 10,800 2,120 Improved Grass 0.35 8,400 3.00 0.20 10,800 2,187 Native Plantings 0.35 9,700 3.00 0.23 10,800 2,525 Porous Pavement 0.20 1,500 22,600 3.00 0.02 10,800 223 7,055 G Bldg/road/Imperm 0.95 700 3.00 0.05 10,800 495 Improved Grass 0.35 3,700 3.00 0.09 10,800 963 Native Plantings 0.35 2,100 3.00 0.05 10,800 547 Porous Pavement 0.20 600 7,100 3.00 0.01 10,800 89 2,094 H Improved Grass 0.35 5,500 3.00 0.13 10,800 1,432 Native Plantings 0.35 1,300 3.00 0.03 10,800 338 Porous Pavement 0.20 900 7,700 3.00 0.01 10,800 134 1,904 I Bldg/road/Imperm 0.95 2,500 3.00 0.16 10,800 1,767 Improved Grass 0.35 33,400 3.00 0.81 10,800 8,695 Native Plantings 0.35 10,900 3.00 0.26 10,800 2,838 Prairie/GrassPavers 0.28 8,600 3.00 0.17 10,800 1,791 Porous Pavement 0.20 4,900 57,800 3.00 0.07 10,800 729 15,819 PERIMETER Improved Grass 0.35 35,600 3.00 0.86 10,800 9,268 Native Plantings 0.35 40,700 3.00 0.98 10,800 10,595 Undisturbed 0.15 30,300 3.00 0.31 10,800 3,381 Porous Pavement 0.20 4,300 110,900 3.00 0.06 10,800 640 23,883 Post Construction Totals 367,896 sq ft 9.19 cfs 99,212 cf 40
  • 43. Post-Construction Drainage Calculations 100 year Storm cfs = CIA/43,560 Storm Duration Sub watershed Area Type Runoff coef. Area (sq. ft.) Total Cubic Feet (3"/hr) ft sq/acre (seconds) A Bldg/road/Imperm 0.95 6,625 3.00 0.43 10,800 4,681 Native Site 0.35 100,471 107,096 3.00 2.42 10,800 26,156 30,837 B Bldg/road/Imperm 0.95 2,825 3.00 0.18 10,800 1,996 Native Site 0.35 23,475 26,300 3.00 0.57 10,800 6,111 8,107 C Bldg/road/Imperm 0.95 1,800 3.00 0.12 10,800 1,272 Native Site 0.35 8,100 9,900 3.00 0.20 10,800 2,109 3,381 D Bldg/road/Imperm 0.95 1,000 3.00 0.07 10,800 707 Native Site 0.35 3,800 4,800 3.00 0.09 10,800 989 1,696 E Native Site 0.35 13,700 13,700 3.00 0.33 10,800 3,567 3,567 F Native Site 0.35 22,600 22,600 3.00 0.54 10,800 5,883 5,883 G Native Site 0.35 7,100 7,100 3.00 0.17 10,800 1,848 1,848 H Native Site 0.35 7,700 7,700 3.00 0.19 10,800 2,005 2,005 I Bldg/road/Imperm 0.95 1,400 3.00 0.09 10,800 989 Native Site 0.35 56,400 57,800 3.00 1.36 10,800 14,683 15,672 PERIMETER Bldg/road/Imperm 0.95 7,400 3.00 0.48 10,800 5,229 Native Site 0.35 103,500 110,900 3.00 2.49 10,800 26,944 32,173 Post Construction Totals 367,896 sq ft 9.74 cfs 105,169 cf Cubic Feet / Second (cfs) Cubic Feet (cf) Post Construction Q 9.19 99,212.00 Pre Construction Q 9.74 105,169.00 DELTA Q 0.55 5,957.00 41
  • 44. Grading Calculations Grading Calculations Cut Depth (ft) Cubic Yards Fill Depth (ft) Cubic Yards 1.00 745.90 1.00 1,724.11 2.00 418.50 2.00 344.38 3.00 316.60 3.00 277.70 4.00 4 00 292.60 292 60 4.00 4 00 300.00 300 00 5.00 134.50 5.00 355.50 6.00 133.30 6.00 166.60 7.00 103.70 7.00 77.70 8.00 207.00 8.00 74.10 9.00 200.00 9.00 50.00 10.00 0 00 222.200 10.00 0 00 11.00 203.70 11.00 12.00 400.00 12.00 13.00 240.70 13.00 14.00 648.20 14.00 Total Cubic Yards Cut 4,266.90 Total Cubic Yards Fill 3,370.09 Cut:Fill = 1.27:1 T t l Cut Below Grade* Total C t B l G d * *Total C t B l *T t l Cut Below Grade G d + Cut Depth (ft) Cubic Yards Basin 1 350*177*2 4,588.90 1.00 2,592.55 Basin 2 200*50*2 740.70 2.00 2,592.55 5,328.70 = Total Cubic Yards Cut 9,595.60 Total Cubic Yards Fill 3,370.09 Cut:Fill = 2.8:1 Pre Construction Totals 367,896 sq ft 9.74 cfs 105,169 cf Post Construction Totals 367,896 sq ft 9.19 cfs 99,212 cf 42
  • 45. Plant List KEY BOTANICAL NAME COMMON NAME QTY SIZE ROOTS NOTES TREES AG Amelanchier x grandiflora 'Princess Diana' Princess Diana Serviceberry 8 1.75" C BB Multi stemmed, Plant in spring BA Betula alleghaniensis Yellow Birch 6 2" C BB Plant in spring CA Corylus Americana American Hazelnut 10 1.75" C BB Plant in spring COA Carya Ovata Shagbark Hickory 9 2" C BB Plant in spring CO Celtis Occidentalis Hackberry 13 2" C BB Plant in spring FG Fagus Grandifolia American Beech 4 2" C BB Plant in spring GD Gymnocladius Diocas Kentucky Coffeetree 5 1.75" C BB Plant in spring PA Prunus Americana American Plum 12 1.75" C BB Plant in spring PDM Populus deltoides var. monilifera Cottonwood 7 2" C BB Plant in spring PN Prunus nigra 'Princess Kay' Princess Kay Canada Plum 9 1.75 C BB Plant in spring PT Ptelea trifoliata Hoptree 14 1.75" C BB Plant in spring QA Quercus alba White Oak 17 2" C BB Plant in spring QS Quercus x schuetti Macrocarpa x bicolor 7 2" C BB Plant in spring SEED MIXES SM1 Prairie Moon Nursery Woodland Mix 3 1 acre bag 60 seeds/sq ft SM2 Agrecol Wildflowers Mix 1 1 acre bag 60 seeds/sq ft SM3 Agrecol Dry Prairie Short Height 3 1 acre bag 60 seeds/sq ft SM4 Agrecol Infiltration Swale Mix 3 1 acre bag 60 seeds/sq ft SM5 Prairie Moon Nursery No Mow Mix 180 5 lbs bag 5 lbs/1,000 sq ft SHRUBS & BERRIES AC Amorpha canescens Leadplant 100 1 lb bag Hand disperse throughout Woodland Mix CEA Ceanothus americanus New Jersey Tea 100 1 lb bag Hand disperse throughout Woodland Mix CS Celastrus scandens American Bittersweet 6 1 Gal Cont To be grown on pergola for support CP Comptonia peregrina Sweet Fern 100 1 lb bag Hand disperse throughout Woodland Mix HK Hypericum kalmianum Kalm's St. John's Wort 100 1 lb bag Spaced < 2' throughout Woodland Mix RG Rhus glabra Smooth Sumac 15 2 Gal Cont Spaced 7' On Center RT Rhus typhina Staghorn Sumac 15 2 Gal Cont Spaced 7' On Center RA Ribes americanum Wild Black Currant 15 1 Gal Cont Spaced 6' On Center RM Ribes Missouriense Missouri Gooseberry 15 1 Gal Cont Spaced 6' On Center RC Rosa carolina Smooth Wild Rose 10 3 Gal Cont Spaced 3' On Center RP Rosa palustris Swamp Rose 10 3 Gal Cont Spaced 3' On Center RW Rosa woodsii Woods' Rose 10 3 Gal Cont Spaced 3' On Center RUA Rubus allegheniensis Highbush Blackberry 20 1 Gal Cont Spaced 6' On Center RI Rubus idaeus Red Raspberry 15 1 Gal Cont Spaced 3' On Center RO Rubus occidnetalis Blackcap Raspberry 15 1 Gal Cont Spaced 3' On Center SC Sambucus canadensis Common Elder 15 3 Gal Cont Spaced 8' On Center SA Symphoricarpos albus Snowberry 10 3 Gal Cont Spaced 6' On Center VA Vaccinium angustifolium Low bush Blueberry 50 2 Gal Cont Spaced 2' On Center VVI Vaccinium vitis idaea Low bush Cranberry 50 2 Gal Cont Spaced 2' On Center 43