Manual Plastering
What is Plaster?
Plaster is a building material used for coating walls and
ceilings. Sand-cement plaster is used extensively in building
work as a decorative or protective coating for concrete and
masonry walls .
Plaster is one of the oldest building materials, the most
primitive form was mud plaster, used to hold together
structures made of branches or wood for example. Today
internal plastering is used more as a way of smoothing out
surfaces and preparing them for decoration, it also adds
strength to the wall or ceiling and helps seal together building
materials.
Materials Required
 Cement
 Sand
 Water
 Masonry Trowel
 Smoothening Trowel
 Metal Float
 Measuring Tape
 Plumb Bob
 Mud Pan
 Chicken Mesh
 Hairs
 Recron Fibre6/9/2014
Know your Materials!
6/9/2014
Cement Sand Recron Fibre
Final Mortar mix (made from
mixing Cement,sand,water and
recron fibre) present in a Mudpan
Procedure
1. After the masonry wall made of bricks or aerated blocks is ready, it is
first cleaned properly before starting the plastering wall using brushes
and trowels.
6/9/2014
Brick wall Aerated Block wall
2. The scaffold is prepared for provide the labour a platform to stand and
materials required for plastering are transported at the site of plastering.
3. Cement Mortar is prepared by mixing cement and sand in ratio specified. For
ex-In our case the ratio specified is 1:4.So we use
1 unit volume of cement for 4 unit volume of
sand. The normal cement bag is 50 kg in mass
0.035 m3. So we prepare a container of volume
0.035 m3 and pour 4 containers of cement.
6/9/2014
Scaffolding
Container
for
measuring
sand
4. Recron fibre is added to it as it helps in avoiding cracks in plaster. We use 125
gm fibre for 1 bag of cement.
5. Water is added .As per as IS standards 0.025 m3 of water is added to 1 bag of
cement, but at site it is subjected to the workability requirements.
Note: The mortar mix should be used within it’s initial setting time = 45 min
6. Chicken mesh is used at the joint of Lintel and masonry wall to avoid cracks at
the joint in future.
6/9/2014
Chicken Mesh Labour putting Chicken Mesh
7. Making of Level Pads : Level pads are used for maintaining the thickness of
plaster coat required.They act as a reference for checking thickness of plaster.
- First we lay a reference line using rope and nails
- We check the distance of wall from this reference line and note it(say D1)
- Now we put the mortar of wall and smoothen it. We now calculate the
distance between the reference line and level pad’s surface(say D2)
D1-D2= Thickness of coat required
- If the thickness doesn’t matches then adjust the thickness of level pad
- Now make one level pad above the first level pad and check if it’s in line
with the help of plumb bob.It might happen the wall is not exactly vertical
either inwards or outwards which can be checked with help of plumb bob
hence thickness of level pad can be adjusted accordingly.
6/9/2014
6/9/2014
Labourers checking the distance of wall from reference
line
Making of level pad
6/9/2014
Level Pad
Labourers checking distance of level pad from reference
line
6/9/2014
Plumb Bob
No gap between wall and plumb
bob, signifying that wall is straight
Gap between wall and plumb
bob indicating that wall is
“Inwards”
- After checking for vertical alignment of level pads, check for horizontal
alignment with the help of a rope( pin a rope parallel to the first level pad
also vertical with adjacent wall).Adjust the level pads in thickness if the wall
is tilted sideways.
6/9/2014
Checking for vertical alignment of pads
Horizontally laid level pads
8. After making the level pads, wet the wall with help of diluted cement water slurry
to provide better adhesion with mortar.
9. The mason then applies the mortar on the walls
with the help of trowel.
6/9/2014
Masonry Trowel
10. With the help of metal float the mason creates a smooth reference plain of
required thickness by pressing the float against two vertical level pads.The
additional mortar is scrapped of with the help of float.
6/9/2014Metal Float
Reference Plain
11. The finishing of the plaster is done with the help of finishing trowel.
6/9/2014
Removing excess material with
float
Finishing Trowel
12. After smoothening, the plaster is roughened up for providing better adhesion in
case of a second coat. A hair is used for it or sometimes labour also uses chicken
mesh only.
6/9/2014
Hair used for roughening
surface
Rough Plaster coat
Challenges in Manual Plastering
1. A proper hierarchical system is not present on site. Ideally the engineer should
teach the supervisor as in what he requires and the supervisor should convey it to
the labour.But due to lack of number and agility of supervisors the engineer has
to do that part.
2. Due to above point, the engineer is not able to perform his main task efficiently
which is Quality Checks .Two examples in this regard are:-
(a) Amount of water is not as per as standards and the labour puts water
according to his will. This in turn degrades the quality of the mix.
(b) Checking of the thickness and alignment of level pads is not proper which
leads to lack of uniformity of plaster. Plumb checking is not also proper.
3. The mortar is not used within it’s initial setting time of 45 Minutes and sometimes
used beyond 4 hours. This again degrades the quality.
4. The floor is not cleaned properly before starting plaster and sacks are not always
laid down to collect the fallen mortar. So the mortar gets mixed with the mud and
is then used again which has serious implications on the quality.
6/9/2014
5. Due to lack of supervision the labour is idle for a lot of time.Also due to the fear of
loosing labour the supervisor also doesn’t say much to them as his performance is
judged by the way he handles the labourers.This leads to slow pace of work.
6/9/2014
Fallen Mortar getting mixed
with mud

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Plastering
PlasteringPlastering
Plastering
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Topic 9 finishes
Topic 9   finishesTopic 9   finishes
Topic 9 finishes
 
Materials for Repair (part 1) (RR&S)
Materials for Repair (part 1) (RR&S)Materials for Repair (part 1) (RR&S)
Materials for Repair (part 1) (RR&S)
 
Construction joints
Construction jointsConstruction joints
Construction joints
 
Plastering by mani
Plastering by maniPlastering by mani
Plastering by mani
 
Plastering and pointing
Plastering and pointingPlastering and pointing
Plastering and pointing
 
Deep excavation
Deep excavationDeep excavation
Deep excavation
 
waterproofing
waterproofingwaterproofing
waterproofing
 
Painting, Varnishing, Distempering and White washing
Painting, Varnishing, Distempering and White washingPainting, Varnishing, Distempering and White washing
Painting, Varnishing, Distempering and White washing
 
Plaster
PlasterPlaster
Plaster
 
Finishing work,Construction workshop.
Finishing work,Construction workshop.Finishing work,Construction workshop.
Finishing work,Construction workshop.
 
Foundation
FoundationFoundation
Foundation
 
Jointing & Pointing
Jointing & PointingJointing & Pointing
Jointing & Pointing
 
Brickwork and plastering
Brickwork and plasteringBrickwork and plastering
Brickwork and plastering
 
Brick
BrickBrick
Brick
 
Damp proofing ppt
Damp proofing pptDamp proofing ppt
Damp proofing ppt
 
Presentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and PlasteringPresentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and Plastering
 
Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)
 
construction study project sjce ctm
construction study project sjce ctmconstruction study project sjce ctm
construction study project sjce ctm
 

Semelhante a Manual plastering

Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)Chan Yifung
 
Laboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersLaboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersPhurba Tamang
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bmLin Hui
 
Construction basic SIP
Construction basic SIPConstruction basic SIP
Construction basic SIPMkh Nantu
 
project on multistoried infrastructure
project on multistoried infrastructureproject on multistoried infrastructure
project on multistoried infrastructureRohan chansoriya
 
educational program cob, lime and straw
educational program cob, lime and straweducational program cob, lime and straw
educational program cob, lime and strawlibnam
 
Brickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdfBrickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdfAbhinavSahu45
 
Ct & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall reportCt & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall reportSheng Zhe
 
Comparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay BricksComparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay BricksBhagyashreeNagpure2
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Vijay Patidar
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Vijay Patidar
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01Engr. Umair Razzaq
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptxHimanshumangal12
 
house construction
house constructionhouse construction
house constructionAbhinav Saha
 
HALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptxHALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptxswethaasukumar
 
Finishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningFinishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningANURAG KASHYAP
 
Everything you need to know about sheet piles
Everything you need to know about sheet pilesEverything you need to know about sheet piles
Everything you need to know about sheet pilesUniversal Piling Company
 

Semelhante a Manual plastering (20)

Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)
 
abcreport
abcreportabcreport
abcreport
 
Laboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersLaboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil Engineers
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bm
 
Construction basic SIP
Construction basic SIPConstruction basic SIP
Construction basic SIP
 
project on multistoried infrastructure
project on multistoried infrastructureproject on multistoried infrastructure
project on multistoried infrastructure
 
cereamic
cereamiccereamic
cereamic
 
educational program cob, lime and straw
educational program cob, lime and straweducational program cob, lime and straw
educational program cob, lime and straw
 
Brickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdfBrickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdf
 
paving_.pdf
paving_.pdfpaving_.pdf
paving_.pdf
 
Ct & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall reportCt & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall report
 
Comparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay BricksComparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay Bricks
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptx
 
house construction
house constructionhouse construction
house construction
 
HALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptxHALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptx
 
Finishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningFinishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinning
 
Everything you need to know about sheet piles
Everything you need to know about sheet pilesEverything you need to know about sheet piles
Everything you need to know about sheet piles
 

Último

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 

Último (20)

Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

Manual plastering

  • 2. What is Plaster? Plaster is a building material used for coating walls and ceilings. Sand-cement plaster is used extensively in building work as a decorative or protective coating for concrete and masonry walls . Plaster is one of the oldest building materials, the most primitive form was mud plaster, used to hold together structures made of branches or wood for example. Today internal plastering is used more as a way of smoothing out surfaces and preparing them for decoration, it also adds strength to the wall or ceiling and helps seal together building materials.
  • 3. Materials Required  Cement  Sand  Water  Masonry Trowel  Smoothening Trowel  Metal Float  Measuring Tape  Plumb Bob  Mud Pan  Chicken Mesh  Hairs  Recron Fibre6/9/2014
  • 4. Know your Materials! 6/9/2014 Cement Sand Recron Fibre Final Mortar mix (made from mixing Cement,sand,water and recron fibre) present in a Mudpan
  • 5. Procedure 1. After the masonry wall made of bricks or aerated blocks is ready, it is first cleaned properly before starting the plastering wall using brushes and trowels. 6/9/2014 Brick wall Aerated Block wall
  • 6. 2. The scaffold is prepared for provide the labour a platform to stand and materials required for plastering are transported at the site of plastering. 3. Cement Mortar is prepared by mixing cement and sand in ratio specified. For ex-In our case the ratio specified is 1:4.So we use 1 unit volume of cement for 4 unit volume of sand. The normal cement bag is 50 kg in mass 0.035 m3. So we prepare a container of volume 0.035 m3 and pour 4 containers of cement. 6/9/2014 Scaffolding Container for measuring sand
  • 7. 4. Recron fibre is added to it as it helps in avoiding cracks in plaster. We use 125 gm fibre for 1 bag of cement. 5. Water is added .As per as IS standards 0.025 m3 of water is added to 1 bag of cement, but at site it is subjected to the workability requirements. Note: The mortar mix should be used within it’s initial setting time = 45 min 6. Chicken mesh is used at the joint of Lintel and masonry wall to avoid cracks at the joint in future. 6/9/2014 Chicken Mesh Labour putting Chicken Mesh
  • 8. 7. Making of Level Pads : Level pads are used for maintaining the thickness of plaster coat required.They act as a reference for checking thickness of plaster. - First we lay a reference line using rope and nails - We check the distance of wall from this reference line and note it(say D1) - Now we put the mortar of wall and smoothen it. We now calculate the distance between the reference line and level pad’s surface(say D2) D1-D2= Thickness of coat required - If the thickness doesn’t matches then adjust the thickness of level pad - Now make one level pad above the first level pad and check if it’s in line with the help of plumb bob.It might happen the wall is not exactly vertical either inwards or outwards which can be checked with help of plumb bob hence thickness of level pad can be adjusted accordingly. 6/9/2014
  • 9. 6/9/2014 Labourers checking the distance of wall from reference line Making of level pad
  • 10. 6/9/2014 Level Pad Labourers checking distance of level pad from reference line
  • 11. 6/9/2014 Plumb Bob No gap between wall and plumb bob, signifying that wall is straight Gap between wall and plumb bob indicating that wall is “Inwards”
  • 12. - After checking for vertical alignment of level pads, check for horizontal alignment with the help of a rope( pin a rope parallel to the first level pad also vertical with adjacent wall).Adjust the level pads in thickness if the wall is tilted sideways. 6/9/2014 Checking for vertical alignment of pads Horizontally laid level pads
  • 13. 8. After making the level pads, wet the wall with help of diluted cement water slurry to provide better adhesion with mortar. 9. The mason then applies the mortar on the walls with the help of trowel. 6/9/2014 Masonry Trowel
  • 14. 10. With the help of metal float the mason creates a smooth reference plain of required thickness by pressing the float against two vertical level pads.The additional mortar is scrapped of with the help of float. 6/9/2014Metal Float Reference Plain
  • 15. 11. The finishing of the plaster is done with the help of finishing trowel. 6/9/2014 Removing excess material with float Finishing Trowel
  • 16. 12. After smoothening, the plaster is roughened up for providing better adhesion in case of a second coat. A hair is used for it or sometimes labour also uses chicken mesh only. 6/9/2014 Hair used for roughening surface Rough Plaster coat
  • 17. Challenges in Manual Plastering 1. A proper hierarchical system is not present on site. Ideally the engineer should teach the supervisor as in what he requires and the supervisor should convey it to the labour.But due to lack of number and agility of supervisors the engineer has to do that part. 2. Due to above point, the engineer is not able to perform his main task efficiently which is Quality Checks .Two examples in this regard are:- (a) Amount of water is not as per as standards and the labour puts water according to his will. This in turn degrades the quality of the mix. (b) Checking of the thickness and alignment of level pads is not proper which leads to lack of uniformity of plaster. Plumb checking is not also proper. 3. The mortar is not used within it’s initial setting time of 45 Minutes and sometimes used beyond 4 hours. This again degrades the quality. 4. The floor is not cleaned properly before starting plaster and sacks are not always laid down to collect the fallen mortar. So the mortar gets mixed with the mud and is then used again which has serious implications on the quality. 6/9/2014
  • 18. 5. Due to lack of supervision the labour is idle for a lot of time.Also due to the fear of loosing labour the supervisor also doesn’t say much to them as his performance is judged by the way he handles the labourers.This leads to slow pace of work. 6/9/2014 Fallen Mortar getting mixed with mud