BY ABHIJEET B. BHOSALE
Info & history of Golden Gate
Bridge
 A suspension bridge spanning across Golden Gate, opening

into the san Francisco
 a link to the city of San Francisco by connecting the
northern tip of the San Francisco Peninsula to Marin
County as part of US Highway 101 and California State
Highway 1
 Built by Joseph Strauss
 Second longest suspension bridge in US
Principal of long suspension bridge
 the deck is always suspended by hangers, each attached to

the main cable, which in turn is anchored into the ground
at its ends.
 Suspension bridge usually has a slender deck which carries
bending only (no compression).
 In order to suspend something of uniform weight ‘for An
equation was developed to prove the cable deformed into a
parabola and the horizontal component force in the cable
was a constant value.
H=wl*l/8f
Construction
 Challenges
1. The bridge in this location should withstand brutal

winds, tide, and fog.
2. It is also located less than 13km from the epicenter of the
most catastrophic earthquake in history.
 Components
1. The anchorages - the massive blocks that grip the bridge's
supporting cables.
2. The north pier, which supports the tower, was built easily
on a bedrock ledge 6m below the water.
3. But on the southern San Francisco side, Strauss had to
build his pier in the open ocean, 30m below the surface.
4. Steel frame and steel cables
A parallel wire construction tech. is used
4. weight-blocks which ballast the cable anchorage.
 Provided for stabilization

5. Pier: The pier, made up of 147,600 tons of concrete, was
built in 37m of open water. This was achieved by the
concrete fender that in itself is a marvel of construction; it
is 108m long and 56m wide at the centre line of the bridge.
6. Suspended cantilever construction
Design Issue & Structure details
 Leon S. Moisseiff was named one of the consulting

engineers proposed a bridge far more efficient and
beautiful
 In addition to the suspension bridge the approaches
include a steel arch bridge, two concrete anchorages, two
steel truss viaducts and three concrete pylons.
 The Golden Gate followed this design below the roadbed,
but modified it above the deck to big open rectangles
without cross-members, framing the blue sky and
producing a lighter look.
 The bridge’s cable design
Structure details: 1. San Francisco (south) Approach Viaduct
2. San Francisco (south) Anchorage Housing and
Pylons S1 and S2
3. Fort Point Arch
4. Main Suspension Bridge
5. Marin (north) Approach Viaduct
6. Marin (north) Anchorage Housing and Pylons N1 and N2
 Total length of Bridge including approaches: = 2,737 m
 Length of suspension span including main span and side spans:
= 1,966 m
 Length of main span portion of suspended structure (distance
between towers): = 1,280 m
 Length of one side span: = 343
 Width of Bridge: = 27 m
 Clearance above mean higher high water: = 67 m
Asthetics
 Fulfillment of function The bridge fulfilled a high degree








of simplicity, which make the bridge beautiful.
Proportions:conveys a decent impression of balance
between its mass and voids, and between light and shadow
Order:The appearance of the bridge looks like a mirror
image of two similar towers with cables.
Integrating into the Environment
Texture:It has rough finishing for piers and
abutments, which makes sense for bridge design.
Colour :This colour brings a big contrast with the sky and
sea
Complexity :
Loading

 The most important types of loadings we need to consider on the bridge are:

1. Dead load,
2. Super-imposed dead load,
3. Live Traffic,
4. Wind,
5. Temperature
There are five combinations of load:
1. All permanent load + primary live loads (vertical
traffic loads)
2. Combination 1 + wind, and if erection considered, temporary erection loads.
3. Combination 1 + temperature, and if erection considered, temporary loads
4. All permanent loads + secondary live loads and associated primary live loads
5. All permanent loads + loads due to friction at support.
 Wind loads
max. wind gust: Vc=VK1S1S2
 Clear height of bridge = 67m
 V = 15m/s
 K1 = 1.53

 S1 = 1.00
 S2 = 1.39
 Therefore, Vc = 32m/s

 Horizontal wind load:Pt = qA1Cþ
q = 0.613Vc², A1 = solid horizontal projected area , Cþ = 1.3 (found
from b/d ratio = 3.6) Pt (factored) = 9.6kN/m
 Vertical wind load:Pv = qA3CL
q = 0.613Vc²
A3 = plan area = 27*1280 = 34560m²
CL = 0.4 (found from b/d ratio = 3.6)
Pv(factored) = 10.4kN/m
 Temperature effect
∆T

α

E

σ

20

12*10-6

200000

48 N/sq.mm

 Other load factors: shrinkage, creep, stress

relaxation, earthquake, earth pressure behind
abutments, erection loads and so on.
 Bending moments
σ

I =bd³/12

Y

M

48000kN/sq.
m

27*7.6³/12

3.8m

1.2MNm
Serviceability
 In addition to traffic loading, the Golden Gate Bridge

must withstand the following environments:
1. Earthquakes, primary originating on the San Andreas and
Hayward faults.
2. Wind of up to 70 miles per hour.
3. Strong ocean current.
4. Temperature stresses.
Creep effect
 Although the Golden Gate Bridge is regarded as a steel

frame and steel cable structure, large amount of concrete is
used on the bridge; including the anchorages, paving,
pylons, piers, approaches and so on.
 To minimize this effect, an antiseismic stop device for
girder structures of Golden Gate Bridge, is used.
Potential weakness and improvement of the
Golden Gate Bridge
 In 1989, the epicenter of the Loma Prieta earthquake was

too strong to damage the Golden Gate Bridge.
 After the earthquake,a restrainer retrofit project was
necessary in order to increase its earthquake resistance, as
scientific organizations say that there is a 62% probability
of at least one magnitude 6.7 or greater quake capable of
causing widespread damage, impacting the San Francisco
Bay within the next 30 years.
Improvement of bridge
 Phase 1 would retrofit the Marin (north) Approach Viaduct
 Phase 2 would retrofit the San Francisco (south) Approach

Viaduct, San Francisco (south) Anchorage Housing, Fort
Point Arch, and Pylons S1 and S2
 Phase 3 would Main Suspension Bridge and Marin (north)

Anchorage Housing

More Related Content

What's hot (20)

Taipei 101
Taipei 101Taipei 101
Taipei 101
 
Empire state building
Empire state buildingEmpire state building
Empire state building
 
Golden gate bridge 2
Golden gate bridge 2Golden gate bridge 2
Golden gate bridge 2
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge ppt
 
HEARST PPT.pptx
HEARST PPT.pptxHEARST PPT.pptx
HEARST PPT.pptx
 
PPT ON BURJ AL ARAB
PPT ON BURJ AL ARABPPT ON BURJ AL ARAB
PPT ON BURJ AL ARAB
 
Precast-concrete Details
Precast-concrete DetailsPrecast-concrete Details
Precast-concrete Details
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
Types of trusses
Types of trussesTypes of trusses
Types of trusses
 
Skyscrapers ppt
Skyscrapers pptSkyscrapers ppt
Skyscrapers ppt
 
Buildings Structure system
Buildings Structure systemBuildings Structure system
Buildings Structure system
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Piles, Piers and Caissons
Piles, Piers and CaissonsPiles, Piers and Caissons
Piles, Piers and Caissons
 
High rise building
High rise buildingHigh rise building
High rise building
 
Shore pile construction
Shore pile constructionShore pile construction
Shore pile construction
 
Bridge
BridgeBridge
Bridge
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)
 

Similar to Golden gate bridge

Engineering mistakes in the world
Engineering mistakes in the worldEngineering mistakes in the world
Engineering mistakes in the worldAnishaJalathota
 
Bridges new
Bridges newBridges new
Bridges newagtom02
 
Assignment 2
Assignment 2Assignment 2
Assignment 2Lisa Cain
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptxSauravShahane
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridgemominzaki
 
Bridge
BridgeBridge
Bridgeillpa
 
BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1Nur Zaas
 
Bridges (1)
Bridges (1)Bridges (1)
Bridges (1)wpooler
 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Buildingppt_master
 
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdfCase Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdfSANDEEPARIHANT
 
theory_of_structures.ppt
theory_of_structures.ppttheory_of_structures.ppt
theory_of_structures.pptAmgad Fahmy
 
Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Vivek Chauhan
 
Suspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed BridgesSuspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed BridgesHussein Zidan
 
Presentation on Suspension Bridge
Presentation on Suspension BridgePresentation on Suspension Bridge
Presentation on Suspension Bridgemantukr4ever
 

Similar to Golden gate bridge (20)

Descriptive text micro.pptx
Descriptive text micro.pptxDescriptive text micro.pptx
Descriptive text micro.pptx
 
Engineering mistakes in the world
Engineering mistakes in the worldEngineering mistakes in the world
Engineering mistakes in the world
 
Suspension Bridges
Suspension BridgesSuspension Bridges
Suspension Bridges
 
Bridges new
Bridges newBridges new
Bridges new
 
Busan Geoje
Busan GeojeBusan Geoje
Busan Geoje
 
Assignment 2
Assignment 2Assignment 2
Assignment 2
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptx
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
Bridge
BridgeBridge
Bridge
 
Babita
BabitaBabita
Babita
 
BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1
 
Bridges (1)
Bridges (1)Bridges (1)
Bridges (1)
 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Building
 
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdfCase Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
 
theory_of_structures.ppt
theory_of_structures.ppttheory_of_structures.ppt
theory_of_structures.ppt
 
1115
11151115
1115
 
Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)
 
S7
S7S7
S7
 
Suspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed BridgesSuspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed Bridges
 
Presentation on Suspension Bridge
Presentation on Suspension BridgePresentation on Suspension Bridge
Presentation on Suspension Bridge
 

More from Abhijeet Bhosale

Washington dc transit system
Washington dc transit systemWashington dc transit system
Washington dc transit systemAbhijeet Bhosale
 
Grading of bitumen by SURAJ KUMAR
Grading of bitumen by SURAJ KUMARGrading of bitumen by SURAJ KUMAR
Grading of bitumen by SURAJ KUMARAbhijeet Bhosale
 
production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen Abhijeet Bhosale
 
Quantity surveying -scope and purpose
Quantity surveying -scope and purposeQuantity surveying -scope and purpose
Quantity surveying -scope and purposeAbhijeet Bhosale
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with exampleAbhijeet Bhosale
 

More from Abhijeet Bhosale (8)

Washington dc transit system
Washington dc transit systemWashington dc transit system
Washington dc transit system
 
6 typesofvariables
6 typesofvariables6 typesofvariables
6 typesofvariables
 
Its technologies
Its technologiesIts technologies
Its technologies
 
Grading of bitumen by SURAJ KUMAR
Grading of bitumen by SURAJ KUMARGrading of bitumen by SURAJ KUMAR
Grading of bitumen by SURAJ KUMAR
 
production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen
 
design of questionnaire
design of questionnairedesign of questionnaire
design of questionnaire
 
Quantity surveying -scope and purpose
Quantity surveying -scope and purposeQuantity surveying -scope and purpose
Quantity surveying -scope and purpose
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with example
 

Recently uploaded

SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsKarakKing
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 

Recently uploaded (20)

SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 

Golden gate bridge

  • 1. BY ABHIJEET B. BHOSALE
  • 2. Info & history of Golden Gate Bridge  A suspension bridge spanning across Golden Gate, opening into the san Francisco  a link to the city of San Francisco by connecting the northern tip of the San Francisco Peninsula to Marin County as part of US Highway 101 and California State Highway 1  Built by Joseph Strauss  Second longest suspension bridge in US
  • 3. Principal of long suspension bridge  the deck is always suspended by hangers, each attached to the main cable, which in turn is anchored into the ground at its ends.  Suspension bridge usually has a slender deck which carries bending only (no compression).  In order to suspend something of uniform weight ‘for An equation was developed to prove the cable deformed into a parabola and the horizontal component force in the cable was a constant value. H=wl*l/8f
  • 4. Construction  Challenges 1. The bridge in this location should withstand brutal winds, tide, and fog. 2. It is also located less than 13km from the epicenter of the most catastrophic earthquake in history.  Components 1. The anchorages - the massive blocks that grip the bridge's supporting cables. 2. The north pier, which supports the tower, was built easily on a bedrock ledge 6m below the water. 3. But on the southern San Francisco side, Strauss had to build his pier in the open ocean, 30m below the surface. 4. Steel frame and steel cables
  • 5. A parallel wire construction tech. is used 4. weight-blocks which ballast the cable anchorage.  Provided for stabilization 
  • 6. 5. Pier: The pier, made up of 147,600 tons of concrete, was built in 37m of open water. This was achieved by the concrete fender that in itself is a marvel of construction; it is 108m long and 56m wide at the centre line of the bridge. 6. Suspended cantilever construction
  • 7. Design Issue & Structure details  Leon S. Moisseiff was named one of the consulting engineers proposed a bridge far more efficient and beautiful  In addition to the suspension bridge the approaches include a steel arch bridge, two concrete anchorages, two steel truss viaducts and three concrete pylons.  The Golden Gate followed this design below the roadbed, but modified it above the deck to big open rectangles without cross-members, framing the blue sky and producing a lighter look.  The bridge’s cable design
  • 8. Structure details: 1. San Francisco (south) Approach Viaduct 2. San Francisco (south) Anchorage Housing and Pylons S1 and S2 3. Fort Point Arch 4. Main Suspension Bridge 5. Marin (north) Approach Viaduct 6. Marin (north) Anchorage Housing and Pylons N1 and N2  Total length of Bridge including approaches: = 2,737 m  Length of suspension span including main span and side spans: = 1,966 m  Length of main span portion of suspended structure (distance between towers): = 1,280 m  Length of one side span: = 343  Width of Bridge: = 27 m  Clearance above mean higher high water: = 67 m
  • 9. Asthetics  Fulfillment of function The bridge fulfilled a high degree       of simplicity, which make the bridge beautiful. Proportions:conveys a decent impression of balance between its mass and voids, and between light and shadow Order:The appearance of the bridge looks like a mirror image of two similar towers with cables. Integrating into the Environment Texture:It has rough finishing for piers and abutments, which makes sense for bridge design. Colour :This colour brings a big contrast with the sky and sea Complexity :
  • 10. Loading  The most important types of loadings we need to consider on the bridge are: 1. Dead load, 2. Super-imposed dead load, 3. Live Traffic, 4. Wind, 5. Temperature There are five combinations of load: 1. All permanent load + primary live loads (vertical traffic loads) 2. Combination 1 + wind, and if erection considered, temporary erection loads. 3. Combination 1 + temperature, and if erection considered, temporary loads 4. All permanent loads + secondary live loads and associated primary live loads 5. All permanent loads + loads due to friction at support.
  • 11.  Wind loads max. wind gust: Vc=VK1S1S2  Clear height of bridge = 67m  V = 15m/s  K1 = 1.53  S1 = 1.00  S2 = 1.39  Therefore, Vc = 32m/s  Horizontal wind load:Pt = qA1Cþ q = 0.613Vc², A1 = solid horizontal projected area , Cþ = 1.3 (found from b/d ratio = 3.6) Pt (factored) = 9.6kN/m  Vertical wind load:Pv = qA3CL q = 0.613Vc² A3 = plan area = 27*1280 = 34560m² CL = 0.4 (found from b/d ratio = 3.6) Pv(factored) = 10.4kN/m
  • 12.  Temperature effect ∆T α E σ 20 12*10-6 200000 48 N/sq.mm  Other load factors: shrinkage, creep, stress relaxation, earthquake, earth pressure behind abutments, erection loads and so on.  Bending moments σ I =bd³/12 Y M 48000kN/sq. m 27*7.6³/12 3.8m 1.2MNm
  • 13. Serviceability  In addition to traffic loading, the Golden Gate Bridge must withstand the following environments: 1. Earthquakes, primary originating on the San Andreas and Hayward faults. 2. Wind of up to 70 miles per hour. 3. Strong ocean current. 4. Temperature stresses.
  • 14. Creep effect  Although the Golden Gate Bridge is regarded as a steel frame and steel cable structure, large amount of concrete is used on the bridge; including the anchorages, paving, pylons, piers, approaches and so on.  To minimize this effect, an antiseismic stop device for girder structures of Golden Gate Bridge, is used.
  • 15. Potential weakness and improvement of the Golden Gate Bridge  In 1989, the epicenter of the Loma Prieta earthquake was too strong to damage the Golden Gate Bridge.  After the earthquake,a restrainer retrofit project was necessary in order to increase its earthquake resistance, as scientific organizations say that there is a 62% probability of at least one magnitude 6.7 or greater quake capable of causing widespread damage, impacting the San Francisco Bay within the next 30 years.
  • 16. Improvement of bridge  Phase 1 would retrofit the Marin (north) Approach Viaduct  Phase 2 would retrofit the San Francisco (south) Approach Viaduct, San Francisco (south) Anchorage Housing, Fort Point Arch, and Pylons S1 and S2  Phase 3 would Main Suspension Bridge and Marin (north) Anchorage Housing