Nov-13

Project Management Processes

Project Management
Processes
ABDULLAH ALKHADRAWY, PMP

successful project
for a project to be successful, the project team should:
 Select appropriate processes required to meet the project objectives;
 Use a defined approach that can be adapted to meet requirements;
 Establish and maintain appropriate communication and engagement with
stakeholders;
 Comply with requirements to meet stakeholder needs and expectations; and
 Balance the competing constraints of scope, schedule, budget, quality, resources,
and risk to produce the specified product, service, or result.

١

Abdullah Alkhadrawy, PMP- PMBOK 5th. ed.
2013
Nov-13

Project Management Processes

The Project Management Processes
Process Groups:
Initiating processes – recognize when project or phase should begin
Planning processes – designing and maintaining a scheme which leads to successful
accomplishment of a project
Executing processes – coordinating people and resources to carry out the plan
Controlling processes – monitoring and measuring progress and taking corrective actions when
necessary
Closing processes – analyzing acceptance of the project or phase and bringing it to an end

Links between process groups =>

The Project Process Groups
1.
2.

Project Management Process Groups

3.

Initiating Process Group

4.

Planning Process Group

5.

Executing Process Group

6.

Monitoring and controlling Process Group

7.

Closing Process Group

8.

Project Information

9.

Role of the Knowledge Areas

10.

٢

Common Project Management Process Interactions

The Standard for Project Management of a Project

Abdullah Alkhadrawy, PMP- PMBOK 5th. ed.
2013
Nov-13

Project Management Processes

1- Common Project Management Process
Interactions
Initiating
Process
Group

Planning
Process
Group

Executing
Process
Group

Monitoring
and Controlling
Process Group

Closing
Process
Group

Level of
Process
Interaction

Start

Finish

TIME

2- The Project Process Groups
Monitoring &
Controlling Processes
Planning
Processes

Enter Phase/
Start project

Initiating
Processes

Closing
Processes

Exit Phase/
End project

Executing
Processes

٣

Abdullah Alkhadrawy, PMP- PMBOK 5th. ed.
2013
Nov-13

Project Management Processes

2- The Project Process Groups
Project Management Process Groups
Monitoring &
Initiating
Planning
Executing
Closing
Controlling
Process Group Process Group Process Group
Process Group
Process Group
Processes
PMP test rel/wt

٤

2
13%

24
24%

8
30%

11
25%

2
8%

TOTALS

47
100%

Abdullah Alkhadrawy, PMP- PMBOK 5th. ed.
2013
Nov-13

Project Management Processes

Processes

Percentage

3- Initiating Process Group
Initiating Process Group. Those processes performed to define a new project or a new phase of an existing
project by obtaining authorization to start the project or phase.
 the initial scope is defined
 Initial financial resources are committed.
 Internal and external stakeholders the overall outcome of the project are
identified.
 If not already assigned, the project manager will be selected.
 This information is captured in the project charter and stakeholder
register.
 When the project charter is approved, the project becomes officially
authorized.

Processes

Percentage

3- Initiating Process Group
Project
Boundaries
Monitoring &
Controlling Processes
Planning
Processes

Project
Initiator/
Sponsor

Project
Inputs

Initiating
Processes

End
Users

Project
Records

Process
Assets

Closing
Processes

Executing
Processes

٥

Project
Deliverables

Abdullah Alkhadrawy, PMP- PMBOK 5th. ed.
2013
Nov-13

Project Management Processes

Processes

Percentage

4- Planning Process Group
• Planning Process Group. Those processes required to establish the scope of the project, refine the objectives,
and define the course of action required to attain the objectives that the project was undertaken to achieve.
 The complex nature of project management may require the use of
repeated feedback loops for additional analysis.
 As more project information or characteristics are gathered and
understood, additional planning will likely be required.
 This progressive detailing of the project management plan is called
progressive elaboration, indicating that planning and documentation are
iterative and ongoing activities.
 The project team seeks input and encourages involvement from all stakeholders
when planning the project and developing the project management plan and
project documents.

Processes

Progressive Elaboration

Percentage

5- Executing Process Group
Executing Process Group. Those processes performed to complete the work defined in the project management
plan to satisfy the project specifications.
 This Process Group involves coordinating people and resources,
 Managing stakeholder expectations, as well as
 Integrating and performing the activities of the project in accordance with
the project management plan.
 A large portion of the project’s budget will be expended in performing the
Executing Process Group processes.

٦

Abdullah Alkhadrawy, PMP- PMBOK 5th. ed.
2013
Nov-13

Project Management Processes

Processes

Percentage

6- Monitoring and controlling
Process Group
Monitoring and controlling Process Group. Those processes required to track, review, and regulate the progress
and performance of the project; identify any areas in which changes to the plan are required; and initiate the
corresponding changes.
 Controlling changes and recommending corrective or preventive action in
anticipation of possible problems,
 Monitoring the ongoing project activities against the project management
plan and the project performance measurement baseline, and
 Influencing the factors that could circumvent integrated change control or
configuration management so only approved changes are implemented.

Processes

Percentage

7- Closing Process Group
Closing Process Group. Those processes performed to finalize all activities across all Process Groups to formally
close the project or phase.
 Obtain acceptance by the customer or sponsor to formally close the
project or phase,
 Conduct post-project or phase-end review,
 Record impacts of tailoring to any process,
 Document lessons learned,
 Apply appropriate updates to organizational process assets,
 Archive all relevant project documents in the project management
information system (PMIS) to be used as historical data,
 Close out all procurement activities ensuring termination of all relevant
agreements, and
 Perform team members’ assessments and release project resources.

٧

Abdullah Alkhadrawy, PMP- PMBOK 5th. ed.
2013
Nov-13

Project Management Processes

8- Project Information
 Work performance data. The raw observations and measurements
identified during activities performed to carry out the project work.
- E.g. include reported percent of work physically completed, quality and
technical performance measures, actual dates of schedule activities, number
of change requests, number of defects, actual costs, actual durations, etc.
 Work performance information. The performance data collected from
various controlling processes, analyzed in context and integrated based
on relationships across areas.
- E.g. status of deliverables, implementation status for change requests, and
forecasted estimates to complete.
 Work performance reports. The physical or electronic representation of
work performance information compiled in project documents, intended to
generate decisions or raise issues, actions, or awareness.
 E.g. status reports, memos, justifications, information notes, electronic
dashboards, recommendations, and updates.

8- Project Information
Project
Execution
Work Performance Data
Controlling
Processes
Work Performance Information

Project
Management
Plan Updates

Overall
Project
Control
Work Performance Reports
Project
Change
Control

Change
Requests

Project
Management
Plan

Project Team Members

Project
Communications

Reports

Project Stakeholders

٨

Abdullah Alkhadrawy, PMP- PMBOK 5th. ed.
2013
Nov-13

Project Management Processes

Processes

Percentage

Processes

Percentage

9- Role of the Knowledge Areas
1. Project Integration Management.
2. Project Scope Management.
3. Project Time Management.
4. Project Cost Management.
5. Project Quality Management.
6. Project Human Resource Management.
7. Project Communications Management.
8. Project Risk Management.
9. Project Procurement Management.
10. Project Stakeholder Management.

9- Role of the Knowledge Areas
1
2

٩

Abdullah Alkhadrawy, PMP- PMBOK 5th. ed.
2013
Nov-13

Project Management Processes

Processes

Percentage

9- Role of the Knowledge Areas
2
2

١٠

Abdullah Alkhadrawy, PMP- PMBOK 5th. ed.
2013

Mais conteúdo relacionado

Mais procurados

An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
Ashish Mittal
 
Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides
SlideTeam
 

Mais procurados (20)

Episode 21 : Project Scope Management
Episode 21 :  Project Scope ManagementEpisode 21 :  Project Scope Management
Episode 21 : Project Scope Management
 
PMP chap 1 - PMP Introduction (PMBOK 6)
PMP chap 1 - PMP  Introduction (PMBOK 6)PMP chap 1 - PMP  Introduction (PMBOK 6)
PMP chap 1 - PMP Introduction (PMBOK 6)
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life Cycle
 
PMP 47 process definitions
PMP 47 process definitionsPMP 47 process definitions
PMP 47 process definitions
 
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
PMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management OverviewPMP Chap 5.0 Scope Management Overview
PMP Chap 5.0 Scope Management Overview
 
HM 418 2e hcpm05 (1)
HM 418 2e hcpm05 (1)HM 418 2e hcpm05 (1)
HM 418 2e hcpm05 (1)
 
Project scope management
Project scope managementProject scope management
Project scope management
 
Project Management
Project ManagementProject Management
Project Management
 
PMP
PMPPMP
PMP
 
Instructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th EditionInstructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th Edition
 
Pmp integration management
Pmp integration managementPmp integration management
Pmp integration management
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycle
 
PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2PMP Chap 5 - Project Scope Management - Part 2
PMP Chap 5 - Project Scope Management - Part 2
 
PMP PMBOK 6th
PMP PMBOK 6thPMP PMBOK 6th
PMP PMBOK 6th
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Management
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 
Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides Project Closure Activities In Project Management PowerPoint Presentation Slides
Project Closure Activities In Project Management PowerPoint Presentation Slides
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project Work
 

Semelhante a PMP PMBok 5th Project management processes

01 3 day elearning executing process v2
01 3 day elearning executing process v201 3 day elearning executing process v2
01 3 day elearning executing process v2
Joyce Wong
 
Smsvn pmp training_slides_chapter_13_4
Smsvn pmp training_slides_chapter_13_4Smsvn pmp training_slides_chapter_13_4
Smsvn pmp training_slides_chapter_13_4
Nam Trung
 

Semelhante a PMP PMBok 5th Project management processes (20)

PMP PMBOK5 project management processes
PMP PMBOK5 project management processesPMP PMBOK5 project management processes
PMP PMBOK5 project management processes
 
Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3
 
CAPM Muzette Charles Chapter3-4
CAPM Muzette Charles Chapter3-4CAPM Muzette Charles Chapter3-4
CAPM Muzette Charles Chapter3-4
 
209560525-PMP-Study-Sheet.pdf
209560525-PMP-Study-Sheet.pdf209560525-PMP-Study-Sheet.pdf
209560525-PMP-Study-Sheet.pdf
 
1. project integration management
1. project integration management1. project integration management
1. project integration management
 
01 3 day elearning executing process v2
01 3 day elearning executing process v201 3 day elearning executing process v2
01 3 day elearning executing process v2
 
2) PMT & PIM.pptx
2) PMT & PIM.pptx2) PMT & PIM.pptx
2) PMT & PIM.pptx
 
Pmp Complete Notes
Pmp Complete NotesPmp Complete Notes
Pmp Complete Notes
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
3 scope Management
3 scope Management 3 scope Management
3 scope Management
 
Online PMP Prep Material for PMP Exam - Project management process groups
Online PMP Prep Material for PMP Exam - Project management process groupsOnline PMP Prep Material for PMP Exam - Project management process groups
Online PMP Prep Material for PMP Exam - Project management process groups
 
PMP Training Project Scope Management Part 1
PMP Training Project Scope Management Part 1PMP Training Project Scope Management Part 1
PMP Training Project Scope Management Part 1
 
Topic 6 - Project Integration Management.pdf
Topic 6 - Project Integration Management.pdfTopic 6 - Project Integration Management.pdf
Topic 6 - Project Integration Management.pdf
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management Terms
 
Smsvn pmp training_slides_chapter_13_4
Smsvn pmp training_slides_chapter_13_4Smsvn pmp training_slides_chapter_13_4
Smsvn pmp training_slides_chapter_13_4
 
Integration Masterclass
Integration MasterclassIntegration Masterclass
Integration Masterclass
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
 
PMP Prep Handout_Integration
PMP Prep Handout_IntegrationPMP Prep Handout_Integration
PMP Prep Handout_Integration
 
Project management processes Groups
Project management processes GroupsProject management processes Groups
Project management processes Groups
 

Mais de Abdullah Ahmed, PMP, RMP

ENGINEERING CONTRACTS العقود الهندسية
  ENGINEERING CONTRACTS العقود الهندسية  ENGINEERING CONTRACTS العقود الهندسية
ENGINEERING CONTRACTS العقود الهندسية
Abdullah Ahmed, PMP, RMP
 

Mais de Abdullah Ahmed, PMP, RMP (18)

Sr. Planning Engineer/ Lead Planner resume
Sr. Planning Engineer/ Lead Planner resume Sr. Planning Engineer/ Lead Planner resume
Sr. Planning Engineer/ Lead Planner resume
 
Float paths
Float pathsFloat paths
Float paths
 
EDIT-ADD WBS FOR ORACLE PRIMAVERA P6® USING NOTEPAD`& MS EXCEL
EDIT-ADD WBS FOR ORACLE PRIMAVERA P6® USING NOTEPAD`& MS EXCELEDIT-ADD WBS FOR ORACLE PRIMAVERA P6® USING NOTEPAD`& MS EXCEL
EDIT-ADD WBS FOR ORACLE PRIMAVERA P6® USING NOTEPAD`& MS EXCEL
 
Strategic Planning first entry - that everybody should know
Strategic Planning first entry - that everybody should knowStrategic Planning first entry - that everybody should know
Strategic Planning first entry - that everybody should know
 
Organizational Risk Management
Organizational Risk Management Organizational Risk Management
Organizational Risk Management
 
Pm study project risk management test
Pm study project  risk management testPm study project  risk management test
Pm study project risk management test
 
Q+&+as+
Q+&+as+Q+&+as+
Q+&+as+
 
RMP risk management-final exam
RMP risk management-final examRMP risk management-final exam
RMP risk management-final exam
 
Self test engine PSP-PMI-SP
Self test engine PSP-PMI-SPSelf test engine PSP-PMI-SP
Self test engine PSP-PMI-SP
 
PMP PMBOK 5th Ch 11 Project Risk Management
PMP PMBOK 5th Ch 11 Project Risk ManagementPMP PMBOK 5th Ch 11 Project Risk Management
PMP PMBOK 5th Ch 11 Project Risk Management
 
Pmi rmp
Pmi rmpPmi rmp
Pmi rmp
 
PMI-RMP a test mod 00
PMI-RMP a test  mod 00PMI-RMP a test  mod 00
PMI-RMP a test mod 00
 
PMP PMBOK 5TH Ch 6 time management
PMP PMBOK 5TH Ch 6 time managementPMP PMBOK 5TH Ch 6 time management
PMP PMBOK 5TH Ch 6 time management
 
ENGINEERING CONTRACTS العقود الهندسية
  ENGINEERING CONTRACTS العقود الهندسية  ENGINEERING CONTRACTS العقود الهندسية
ENGINEERING CONTRACTS العقود الهندسية
 
PMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope managementPMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope management
 
PMP PMBOK5 Ch4 integration management
PMP PMBOK5 Ch4 integration managementPMP PMBOK5 Ch4 integration management
PMP PMBOK5 Ch4 integration management
 
PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2PMP PMbok 5th CH1 - CH2
PMP PMbok 5th CH1 - CH2
 
Ch1 ch2
Ch1 ch2Ch1 ch2
Ch1 ch2
 

Último

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 

Último (20)

Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 

PMP PMBok 5th Project management processes

  • 1. Nov-13 Project Management Processes Project Management Processes ABDULLAH ALKHADRAWY, PMP successful project for a project to be successful, the project team should:  Select appropriate processes required to meet the project objectives;  Use a defined approach that can be adapted to meet requirements;  Establish and maintain appropriate communication and engagement with stakeholders;  Comply with requirements to meet stakeholder needs and expectations; and  Balance the competing constraints of scope, schedule, budget, quality, resources, and risk to produce the specified product, service, or result. ١ Abdullah Alkhadrawy, PMP- PMBOK 5th. ed. 2013
  • 2. Nov-13 Project Management Processes The Project Management Processes Process Groups: Initiating processes – recognize when project or phase should begin Planning processes – designing and maintaining a scheme which leads to successful accomplishment of a project Executing processes – coordinating people and resources to carry out the plan Controlling processes – monitoring and measuring progress and taking corrective actions when necessary Closing processes – analyzing acceptance of the project or phase and bringing it to an end Links between process groups => The Project Process Groups 1. 2. Project Management Process Groups 3. Initiating Process Group 4. Planning Process Group 5. Executing Process Group 6. Monitoring and controlling Process Group 7. Closing Process Group 8. Project Information 9. Role of the Knowledge Areas 10. ٢ Common Project Management Process Interactions The Standard for Project Management of a Project Abdullah Alkhadrawy, PMP- PMBOK 5th. ed. 2013
  • 3. Nov-13 Project Management Processes 1- Common Project Management Process Interactions Initiating Process Group Planning Process Group Executing Process Group Monitoring and Controlling Process Group Closing Process Group Level of Process Interaction Start Finish TIME 2- The Project Process Groups Monitoring & Controlling Processes Planning Processes Enter Phase/ Start project Initiating Processes Closing Processes Exit Phase/ End project Executing Processes ٣ Abdullah Alkhadrawy, PMP- PMBOK 5th. ed. 2013
  • 4. Nov-13 Project Management Processes 2- The Project Process Groups Project Management Process Groups Monitoring & Initiating Planning Executing Closing Controlling Process Group Process Group Process Group Process Group Process Group Processes PMP test rel/wt ٤ 2 13% 24 24% 8 30% 11 25% 2 8% TOTALS 47 100% Abdullah Alkhadrawy, PMP- PMBOK 5th. ed. 2013
  • 5. Nov-13 Project Management Processes Processes Percentage 3- Initiating Process Group Initiating Process Group. Those processes performed to define a new project or a new phase of an existing project by obtaining authorization to start the project or phase.  the initial scope is defined  Initial financial resources are committed.  Internal and external stakeholders the overall outcome of the project are identified.  If not already assigned, the project manager will be selected.  This information is captured in the project charter and stakeholder register.  When the project charter is approved, the project becomes officially authorized. Processes Percentage 3- Initiating Process Group Project Boundaries Monitoring & Controlling Processes Planning Processes Project Initiator/ Sponsor Project Inputs Initiating Processes End Users Project Records Process Assets Closing Processes Executing Processes ٥ Project Deliverables Abdullah Alkhadrawy, PMP- PMBOK 5th. ed. 2013
  • 6. Nov-13 Project Management Processes Processes Percentage 4- Planning Process Group • Planning Process Group. Those processes required to establish the scope of the project, refine the objectives, and define the course of action required to attain the objectives that the project was undertaken to achieve.  The complex nature of project management may require the use of repeated feedback loops for additional analysis.  As more project information or characteristics are gathered and understood, additional planning will likely be required.  This progressive detailing of the project management plan is called progressive elaboration, indicating that planning and documentation are iterative and ongoing activities.  The project team seeks input and encourages involvement from all stakeholders when planning the project and developing the project management plan and project documents. Processes Progressive Elaboration Percentage 5- Executing Process Group Executing Process Group. Those processes performed to complete the work defined in the project management plan to satisfy the project specifications.  This Process Group involves coordinating people and resources,  Managing stakeholder expectations, as well as  Integrating and performing the activities of the project in accordance with the project management plan.  A large portion of the project’s budget will be expended in performing the Executing Process Group processes. ٦ Abdullah Alkhadrawy, PMP- PMBOK 5th. ed. 2013
  • 7. Nov-13 Project Management Processes Processes Percentage 6- Monitoring and controlling Process Group Monitoring and controlling Process Group. Those processes required to track, review, and regulate the progress and performance of the project; identify any areas in which changes to the plan are required; and initiate the corresponding changes.  Controlling changes and recommending corrective or preventive action in anticipation of possible problems,  Monitoring the ongoing project activities against the project management plan and the project performance measurement baseline, and  Influencing the factors that could circumvent integrated change control or configuration management so only approved changes are implemented. Processes Percentage 7- Closing Process Group Closing Process Group. Those processes performed to finalize all activities across all Process Groups to formally close the project or phase.  Obtain acceptance by the customer or sponsor to formally close the project or phase,  Conduct post-project or phase-end review,  Record impacts of tailoring to any process,  Document lessons learned,  Apply appropriate updates to organizational process assets,  Archive all relevant project documents in the project management information system (PMIS) to be used as historical data,  Close out all procurement activities ensuring termination of all relevant agreements, and  Perform team members’ assessments and release project resources. ٧ Abdullah Alkhadrawy, PMP- PMBOK 5th. ed. 2013
  • 8. Nov-13 Project Management Processes 8- Project Information  Work performance data. The raw observations and measurements identified during activities performed to carry out the project work. - E.g. include reported percent of work physically completed, quality and technical performance measures, actual dates of schedule activities, number of change requests, number of defects, actual costs, actual durations, etc.  Work performance information. The performance data collected from various controlling processes, analyzed in context and integrated based on relationships across areas. - E.g. status of deliverables, implementation status for change requests, and forecasted estimates to complete.  Work performance reports. The physical or electronic representation of work performance information compiled in project documents, intended to generate decisions or raise issues, actions, or awareness.  E.g. status reports, memos, justifications, information notes, electronic dashboards, recommendations, and updates. 8- Project Information Project Execution Work Performance Data Controlling Processes Work Performance Information Project Management Plan Updates Overall Project Control Work Performance Reports Project Change Control Change Requests Project Management Plan Project Team Members Project Communications Reports Project Stakeholders ٨ Abdullah Alkhadrawy, PMP- PMBOK 5th. ed. 2013
  • 9. Nov-13 Project Management Processes Processes Percentage Processes Percentage 9- Role of the Knowledge Areas 1. Project Integration Management. 2. Project Scope Management. 3. Project Time Management. 4. Project Cost Management. 5. Project Quality Management. 6. Project Human Resource Management. 7. Project Communications Management. 8. Project Risk Management. 9. Project Procurement Management. 10. Project Stakeholder Management. 9- Role of the Knowledge Areas 1 2 ٩ Abdullah Alkhadrawy, PMP- PMBOK 5th. ed. 2013
  • 10. Nov-13 Project Management Processes Processes Percentage 9- Role of the Knowledge Areas 2 2 ١٠ Abdullah Alkhadrawy, PMP- PMBOK 5th. ed. 2013