What is Six Sigma?
How is it related to
Lean?
Deb Lucia
Practice Manager, Lean Manufacturing
& Engineering
Six Sigma Vs.
Lean Manufacturing


Six sigma and lean manufacturing are methods to improve business and
manufacturing processes and drive profitability of companies.  Both six sigma
and lean manufacturing, are proven concepts and have saved companies
billions of dollars and are the leading continuous improvement methods
utilized today. 



Lean Manufacturing Focuses on eliminating the 7 or 8 wastes and is based
on the philosophy of getting all levels of an organization involved. It was
developed by Toyota in the late 1950’s. TPS - Toyota Production System
means lean manufacturing.



Six sigma is a philosophy of doing business with a focus on eliminating
defects through fundamental process knowledge.  Six sigma methods
integrate principles of business, statistics and engineering to achieve tangible
results.
7 or 8 Wastes of Lean
1. Defects
2. Overproduction
3. Transportation
4. Waiting
5. Inventory
6. Motion
7. Processing
8. Skills – Not utilizing people’s talents
Use the acronym 'DOTWIMP' to remember the 7 Wastes of
Lean.
Use ‘Tim Woods’ to remember the 8 Wastes
Lean Terminology
ABNORMALITY MANAGEMENT — The ability to see and respond to an abnormality (any violation of standard
operations) in a timely manner.
ACTIVITY BASED COSTING – An accounting system that assigns costs to a product based on the amount of resources
used to design, order and make it.
ANDON — A visual signal. Typically, a light mounted on a machine or line to indicate a potential problem or work
stoppage.
AUTONOMATION — English translation of Jidoka. Imparting human intelligence to a machine so that it automatically
Jidoka.
stops when a problem arises.
BALANCED PLANT — A plant where all available capacity is balanced exactly to market demand.
BOTTLENECK — An area or workstation in a manufacturing environment that limits throughput of the entire process.
CHAKU-CHAKU LINE — Meaning load-load in Japanese, this describes a work cell where machines off-load parts
automatically so that operators can take a piece directly from one machine to the next without waiting.
CHANGE AGENT —One who leads cultural change in an organization to move from the current state to a lean state.
CELLULAR MANUFACTURING — An alignment of machines in correct process sequence, where operators remain
within the cell and materials are presented to them from outside.
CONSTRAINT — A workstation or a process that limits the output of the entire system.
CONTINUOUS IMPROVEMENT — The commitment to creating a better product, work environment and business, every
day or Kaizen.
CYCLE TIME — The time it takes an operator to complete one full repetition of work. Globally, it is the time it takes before
the cycle repeats itself.
3Ds — Dirty, dangerous, difficult.
3P – Production Preparation Process is the development of a designed low waste product with low manufacturing
capital cost
ELEMENTAL TIME — Time allotted to a specific operational step, within standard work.
ERROR PROOFING – Poka Yoke Process used to prevent errors for occurring or to immediately point out a defect as it
occurs.
EXTERNAL SET-UP — Elements of tooling set-up that can be performed safely while the machine is still running.
FIFO – First in First Out
Lean Terminology
FIVE S (5S) — The primary conditioning discipline for kaizen, the five Ss are defined as: Seiri, Sort to segregate and discard.
Seiri,
Seiton, Set in order to arrange and identify. Seiso, Sanitize or Shine to clean and inspect daily. Seiketsu, Standarize to
Seiton,
Seiso,
Seiketsu,
revisit frequently, and Shitsuke, Sustain.
Shitsuke,
GLOBAL PRODUCTION SYSTEM — An expansion of the Toyota Production System, this is a strategy to enable lean
System,
manufacturing using kaizen methodology.
HANEDASHI — A device that allows a machine to automatically unload a part without waiting for an operator.
HEIJUNKA — Production leveling; creating a build sequence that is determined by SKU average demand.
Hoshin Kanri - The selection of goals, projects to achieve goals, designation of people and resources for project complement
and the establishment of metrics.
Hoshin Planning: Breakthrough Strategic Planning
INTERNAL SET-UP — Elements of tooling set-up that must be performed while the machine is not in motion.
INVENTORY — Usually the highest cost category, inventory is all raw materials, purchased parts, work-in-progress and
finished goods that are not yet sold to a customer.
JIDOKA — See "autonomation." Japanese term for transferring human intelligence to a machine.
"autonomation."
JUST IN TIME (JIT) — Manufacturing what is needed, when it is needed, in the quantity it is needed.
KAIKAKU — Radical improvement, usually in a business process, that affects the future value stream.
KAIZEN — A combination of two Japanese words Kai (change) and Zen (good). Usually defined as "continuous
improvement."
KAIZEN BREAKTHROUGH — A time-sensitive, rapid-deployment methodology that employs a focused, team-based
approach. Continuous improvement.
KANBAN — Visual signal. Typically a re-order card or other method of triggering the pull system, based on actual usage of
material. It should be located for use at the point of manufacturing.
KITTING – Supplying parts to assemblers in “kits”
LEAD TIME — The amount of time required to produce a single product, from the time of customer order to shipping.
LEAN MANUFACTURING — Using the minimum amount of total resources — man, materials, money, machines, etc. — to
produce a product and deliver it on time.
MACHINE AUTOMATIC TIME — The time is takes for a machine to produce one unit, exclusive of loading and unloading.
MACHINE CYCLE TIME — The time it takes for a machine to produce one unit, including the time it takes to load and
unload.
Lean Terminology
MUDA — Any activity that adds to cost without adding to value of the product.
MURA — Variations in process quality, cost and delivery
MURI — Unreasonableness; demand exceeds capacity.
NAGARA SYSTEM — Accomplishing two or more activities with one motion.
NON-VALUE ADDED — Any activity that adds cost without adding value to the product or process.
ONE-TOUCH EXCHANGE OF DIES — The reduction of die set-up activities down to a single step.
ONE-PIECE FLOW — A manufacturing philosophy which supports the movement of product from one workstation to the
next, one piece at a time, without allowing inventory to build up in between.
OPERATOR CYCLE TIME — The time it takes for a person to complete a predetermined sequence of operations,
inclusive of loading and unloading, exclusive of time spent waiting.
OVERALL EQUIPMENT EFFECTIVENESS – OEE – The equipment’s operational availability, performance effeciency or
first-pass yield.
PACEMAKER — A technique for pacing a process to takt time.
time.
PDCA - (plan-do-check-act)
POLICY DEPLOYMENT — Matching the strategic business goals of an organization to its available resources.
Communicating those goals throughout the organization and linking everyone to the same objectives.
POKA YOKE — A Japanese word for mistake proofing, a poka yoke device prevents a human error from affecting a
machine or process; prevents operator mistakes from becoming defects.
POINT KAIZEN — An improvement activity intensely directed at a single workstation, performed quickly by two or three
specialists. Typically follows a full-blown kaizen event.
PROCESS CAPACITY TABLE — A chart primarily used in a machining environment that compares machine load to
available capacity.
PRODUCTION SMOOTHING — A method of production scheduling that, over a period of time, takes the fluctuation of
customer demand out of manufacturing. Producing every part, every day.
PULL SYSTEM – A method of replenishment that is signaled by a “pull” on the system indicating a need to replenish.
Lean Terminology
QUALITY FUNCTION DEPLOYMENT — A methodology in which a cross-functional team reaches consensus about
final product specifications, in accord with the wishes of the customer.
QUEUE TIME – The time a product spends in a line waiting for the next process.
QUICK CHANGEOVER (SMED) – The ability to change tooling and fixtures rapidly to run multiple products on the
same machine.
SENSI — A revered master or teacher.
SET-UP REDUCTION — Reducing the amount of downtime during changeover from the last good piece to the first
good piece of the next order.
SINGLE-MINUTE EXCHANGE OF DIES (SMED) — From the last good part to the first good part on the new set-up
accomplished in anything less than 10 minutes. AKA "Single-digit set-up."
STANDARD OPERATIONS — The best combination of people and machines utilizing the minimum amount of labor,
space, inventory and equipment.
STANDARD WORK — Pre-determined sequence of tasks for the operator to complete within takt time.
time.
STANDARD WORK COMBINATION SHEET — A document showing the sequence of production steps assigned to a
single operator. It is used to illustrate the best combination of worker and machine.
STANDARD WORK LAYOUT — A diagram of a work station or cell showing how standard work is accomplished.
STANDARD WORK IN PROCESS — Minimum material required to complete one cycle of operator work without delay.
STOP-THE-LINE AUTHORITY — When abnormalities occur, workers have power to stop the process and prevent the
defect or variation from being passed along.
SUB-OPTIMIZATION — Optimizing each piece of equipment; keeping all machines running, no matter the cost or
consequence. Typically this inflates the number-one cost of production: material.
SUPERMARKET — A shop floor, line-side location where parts are sorted and made ready for presentation to
operators.
Lean Terminology
TAKT TIME — The total net daily operating time divided by the total daily customer demand.
THEORY OF CONTRAINTS (TOC) – A lean management philosophy that stresses removal of constraints to increase
throughput while decreasing inventory and operating expenses. TOC’’s set of tools examine the entire continuos
improvement system.
THROUGHPUT — The rate at which the entire system generates money.
TIME-BASED STRATEGY — Organizing business objectives around economy-of-time principles.
TOYOTA PRODUCTION SYSTEM — Based on some of the first principles of Henry Ford, this describes the
philosophies of one of the world’s most successful companies. The foundation of TPS is production smoothing,
the supports are just-in-time and jidoka.
jidoka.
VALUE ADDED — Any activity that transforms a product or service to meet the customer need.
VALUE ANALYSIS — Evaluating the total lead-time and value-added time to identify the percentage spent in value
added activities.
VALUE STREAM MAP (or Value Chain Map) — A visual picture of how material and information flows from suppliers,
through manufacturing, to the customer. It includes calculations of total cycle time and value-added time. Typically
written for the current state of the value chain and the future, to indicate where the business is going.
VISUAL CONTROLS — Creating standards in the workplace that make it obvious if anything is out of order.
VISUAL MANAGEMENT — System enabling anyone to quickly spot abnormalities in the workplace, regardless of their
knowledge of the process.
WASTE – Any activity that consumes resources but does not add value to the product or service a customer receives
(muda).
WORK-IN-PROCESS (WIP) — Inventory waiting between operation steps.
WORK SEQUENCE — The correct steps the operator takes, in the order in which they should be taken.
Six Sigma Vs.
Lean Manufacturing


Huge difference between "lean Tools" and Six Sigma tools.



Lean = Improved process flow and the elimination of waste
in a continual mode of improvement
Any of the following mean Lean Manufacturing:
TPS, Continuous Improvement, Kaizen, Lean
Manufacturing, JIT
TPS engages all the employees of a company from the
CEO to factory worker.








Six Sigma = Reduced process variation
Six Sigma holds the improvement process in the hands of a
select group of “belted” individuals
Six Sigma










In 1986, Bill Smith, a senior engineer and scientist at Motorola,
introduced the concept of Six Sigma to standardize the way defects
are counted.
Six Sigma provided Motorola the key to addressing quality concerns
throughout the organization, from manufacturing to support
functions. The application of Six Sigma also contributed to Motorola
winning the Malcolm Baldrige National Quality award in 1988.
Since then, the impact of the Six Sigma process on improving
business performance has been dramatic and well documented by
other leading global organizations, such as General Electric, Allied
Signal, and Citibank.
Today, Motorola continues to implement Six Sigma throughout its
own enterprise, and extends the benefit of its Six Sigma expertise to
other organizations worldwide through Motorola University.
Six Sigma was derived from the statistical term of sigma which
measures deviations from perfection
Six Sigma History










1986: Motorola Defines Six Sigma and in 1987 Chief Executive declares
Motorola will be at 6σ by 1992 (5-year goal)
1988: Original Six Sigma consortium is formed:
Motorola, Raytheon, ABB, CDI, Kodak
1989/1990: IBM, DEC try Six Sigma -- and fail
1993: AlliedSignal adds a new level to Six Sigma : Dedicated Black Belts
with a supporting infrastructure
1995: Jack Welch of General Electric adopts Six Sigma
1996-1998: Six Sigma implementation expands significantly as companies
observe the success of Allied and GE :Siebel, Bombardier, Whirlpool,
Navistar, Gencorp, Lockheed Martin, Polaroid,Sony, Nokia, John Deere
Siemens, BBA, Seagate, Compaq, PACCAR, Toshiba, McKesson,
AmEx, ...
1999: Starting to see exponential growth. Formal Six Sigma training begins
at ASQ: Johnson & Johnson, Air Products, Maytag, Dow Chemical,
DuPont, Honeywell, PraxAir, Ford, BMW, Johnson Controls, Samsung
Sigma Levels
Sigma Level
A value from 1 to 6 that signifies the maximum number
of defects per million:
1 Sigma = 690,000 defects/million = 31% accurate
2 Sigma = 308,537 defects/million = 69.1463%
accurate
3 Sigma = 66,807 defects/million = 93.3193% accurate
4 Sigma = 6,210 defects/million = 99.3790% accurate
5 Sigma = 233 defects/million = 99.9767% accurate
6 Sigma = 3.4 defects/million = 99.999997% accurate
Six Sigma Key Concepts








At its core, Six Sigma revolves around a few key
concepts.
Critical to Quality: Attributes most important to the
customer
Defect: Failing to deliver what the customer wants
Process Capability: What your process can deliver
Variation: What the customer sees and feels
Stable Operations: Ensuring consistent, predictable
processes to improve what the customer sees and feels
Design for Six Sigma (DFSS): Designing to meet
customer needs and process capability
Six Sigma Methodology







Six Sigma has two key methodologies:
DMAIC and DMADV.
DMAIC is used to improve an existing business
process.
DMADV is used to create new product designs or
process designs in such a way that it results in a more
predictable, mature and defect free performance.
Sometimes a DMAIC project may turn into a DFSS
project because the process in question requires
complete re-design to bring about the desired degree of
improvement.
Statistical Process Control Methodology







Statistical process control is an important part of Six Sigma
methodology, which proceeds through the following steps, also
called DMAIC (Define, Measure, Analyze, Improve and
Control):
1. Define - benchmarking, process flow mapping, flowcharts
2. Measure - defect metrics, data collection, sampling
3. Analyze - Fishbone diagrams, failure analysis, root cause
analysis
4. Improve - modeling, tolerance control, defect control, design
changes
5. Control - SPC control charts, performance management
Six Sigma Five Phases






Basic methodology consists of the following five phases
DMADV (Define, Measure, Analyze, Design, and Verify):
Define - formally define the goals of the design activity that are
consistent with customer demands and enterprise strategy.
Measure - identify CTQs (Critical to Quality), product
capabilities, production process capability, risk assessment, etc.
Analyze - develop design alternatives, create high-level design
and evaluate design capability to select the best design.
Design - develop detail design, optimize design, and plan for
design verification. This phase may require simulations.
Verify - verify design, setup pilot runs, implement production
process and handover to process owners. This phase may also
require simulations.
Six Sigma Tool Box
Define

Measure

Analyze

Improve

Control

Benchmarking

Value Stream Map

Fishbone Diagrams Modeling

SPC Charts

Process Flow
Mapping

Cause & Effect

FMEA

Tolerance Control

Performance
Metrics

Flow charts

Defect Metrics

Root Cause
Analysis

Defect Control

Multiple
Regression

Project Charter as a Statistical Analysis
Team

ANOVA

Design Changes

Train

Set Up a Plan &
Guidelines for
Team

Data Collection
Run Charts, Time
Series Chars, Time
Value Charts,
Pareto Charts

Cause & Effect
Diagram

Piloting

Review Existing
Data

Sampling

Scatter Plots

Best Practices

SIPOC
Six Sigma Key People Roles










Executive Leadership includes CEO and other key top management team members.
They are responsible for setting up a vision for Six Sigma implementation. They also
empower the other role holders with the freedom and resources to explore new ideas
for breakthrough improvements.
Champions are responsible for the Six Sigma implementation across the organization
in an integrated manner. The Executive Leadership draws them from the upper
management. Champions also act as mentor to Black Belts.
Master Black Belts, identified by champions, act as in-house expert coach for the
organization on Six Sigma. They devote 100% of their time to Six Sigma. They assist
champions and guide Black Belts and Green Belts. Apart from the usual rigor of
statistics, their time is spent on ensuring integrated deployment of Six Sigma across
various functions and departments.
Black Belts operate under Master Black Belts to apply Six Sigma methodology to
specific projects. They devote 100% of their time to Six Sigma. They primarily focus
on Six Sigma project execution, whereas Champions and Master Black Belts focus on
identifying projects/functions for Six Sigma.
Green Belts are the employees who take up Six Sigma implementation along with
their other job responsibilities. They operate under the guidance of Black Belts and
support them in achieving the overall results.
Minimum Training









Executive – 1 to 2 day workshop
Champion – 1 week Green Belt training
Green Belt – 2 weeks of classes over 2 months
Cert: 3 years of work and one project $2000 -$4000
Black Belt – 4 weeks of study over 4 months
Cert: 3 yrs of work, 2 documented projects, recertify every 3 yrs.
$5000 - $6500
Master Black Belt – two weeks extensive training with
additional mathematical theory, quality, lean, super project,
mentoring
Cert: 3 years of work, additional projects, recertify every three
yrs. $5000
Recognized Training







GE
Motorola
ASQ American Society for Quality
Six Sigma Academy
Institute of Industrial Engineers
ISSSP International Society of Six Sigma
Professionals
Six Sigma Quotes


"... the most powerful breakthrough management tool
ever devised"

Mikel Harry and Richard Schroeder
Six Sigma: The BREAKTHROUGH Management Strategy Revolutionizing the World's Top Corporations



"Six Sigma is arguably the most important business and
industry initiative that has involved statistical thinking
and methods."

Ronald D. Snee
"Impact of Six Sigma on Quality Engineering"
Quality Engineering Volume 12, Number 3, 2000



"Six Sigma has spread like wildfire across the company
and its transforming everything we do."

Jack Welch, CEO, GE
Business Week special report
June 8, 1998
Next step in Lean & Six Sigma?


Next step is the Lean Six Sigma Process that
combines the benefits of both lean TPS systems
and six sigma into one program.

Mais conteúdo relacionado

Mais procurados (20)

just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
 
Lean manufacturing and the toyota production system
Lean manufacturing and the toyota production systemLean manufacturing and the toyota production system
Lean manufacturing and the toyota production system
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)
 
Lean, Just-in-time, and Toyota Production System
Lean, Just-in-time,and Toyota Production SystemLean, Just-in-time,and Toyota Production System
Lean, Just-in-time, and Toyota Production System
 
Ppt jit
Ppt jitPpt jit
Ppt jit
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Operation dic
Operation dicOperation dic
Operation dic
 
Jit
JitJit
Jit
 
Just In Time (JIT) Systems
Just In Time (JIT) SystemsJust In Time (JIT) Systems
Just In Time (JIT) Systems
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturing
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Just in time
Just in timeJust in time
Just in time
 
Just in time
Just in timeJust in time
Just in time
 
Just in-time
Just in-timeJust in-time
Just in-time
 
Jit ppt with case study
Jit ppt with case studyJit ppt with case study
Jit ppt with case study
 
just in time manufacturing
just in time manufacturingjust in time manufacturing
just in time manufacturing
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Just In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter PresentationJust In Time and Lean Operation Chapter Presentation
Just In Time and Lean Operation Chapter Presentation
 
Jit principles
Jit principlesJit principles
Jit principles
 
Lean Production
Lean ProductionLean Production
Lean Production
 

Destaque

Overstated role of capital
Overstated role of capitalOverstated role of capital
Overstated role of capitalAakash Kulkarni
 
Proctergamble 090329014100-phpapp02
Proctergamble 090329014100-phpapp02Proctergamble 090329014100-phpapp02
Proctergamble 090329014100-phpapp02Aakash Kulkarni
 
Crp fdi opportunities in dubai and its international attractiveness - aakash
Crp  fdi opportunities in dubai and its international attractiveness - aakashCrp  fdi opportunities in dubai and its international attractiveness - aakash
Crp fdi opportunities in dubai and its international attractiveness - aakashAakash Kulkarni
 
Portfolio management sessions 1&2
Portfolio management sessions 1&2Portfolio management sessions 1&2
Portfolio management sessions 1&2Aakash Kulkarni
 
Israel 100224205701-phpapp02
Israel 100224205701-phpapp02Israel 100224205701-phpapp02
Israel 100224205701-phpapp02Aakash Kulkarni
 
Banking without banks group 1
Banking without banks group 1Banking without banks group 1
Banking without banks group 1Aakash Kulkarni
 
Market efficiency and portfolio theory
Market efficiency and portfolio theoryMarket efficiency and portfolio theory
Market efficiency and portfolio theoryAakash Kulkarni
 
Introduction to business statistics
Introduction to business statisticsIntroduction to business statistics
Introduction to business statisticsAakash Kulkarni
 
Merger And Acquisition - Reasons for Failure and Counter Measures
Merger And Acquisition - Reasons for Failure and Counter MeasuresMerger And Acquisition - Reasons for Failure and Counter Measures
Merger And Acquisition - Reasons for Failure and Counter MeasuresAakash Kulkarni
 

Destaque (19)

Overstated role of capital
Overstated role of capitalOverstated role of capital
Overstated role of capital
 
Tuapr 2011 figures_web
Tuapr 2011 figures_webTuapr 2011 figures_web
Tuapr 2011 figures_web
 
Lecture11
Lecture11Lecture11
Lecture11
 
Poke yoke
Poke yokePoke yoke
Poke yoke
 
Us shut down
Us   shut downUs   shut down
Us shut down
 
Proctergamble 090329014100-phpapp02
Proctergamble 090329014100-phpapp02Proctergamble 090329014100-phpapp02
Proctergamble 090329014100-phpapp02
 
Fdi india
Fdi   indiaFdi   india
Fdi india
 
Crp fdi opportunities in dubai and its international attractiveness - aakash
Crp  fdi opportunities in dubai and its international attractiveness - aakashCrp  fdi opportunities in dubai and its international attractiveness - aakash
Crp fdi opportunities in dubai and its international attractiveness - aakash
 
Portfolio management sessions 1&2
Portfolio management sessions 1&2Portfolio management sessions 1&2
Portfolio management sessions 1&2
 
Israel 100224205701-phpapp02
Israel 100224205701-phpapp02Israel 100224205701-phpapp02
Israel 100224205701-phpapp02
 
Meddeb riad 29-04-08
Meddeb riad 29-04-08Meddeb riad 29-04-08
Meddeb riad 29-04-08
 
Plant location
Plant locationPlant location
Plant location
 
Banking without banks group 1
Banking without banks group 1Banking without banks group 1
Banking without banks group 1
 
9akk105151d0113 5 whys
9akk105151d0113 5 whys9akk105151d0113 5 whys
9akk105151d0113 5 whys
 
5 whys
5 whys5 whys
5 whys
 
Market efficiency and portfolio theory
Market efficiency and portfolio theoryMarket efficiency and portfolio theory
Market efficiency and portfolio theory
 
Asset pricing models
Asset pricing modelsAsset pricing models
Asset pricing models
 
Introduction to business statistics
Introduction to business statisticsIntroduction to business statistics
Introduction to business statistics
 
Merger And Acquisition - Reasons for Failure and Counter Measures
Merger And Acquisition - Reasons for Failure and Counter MeasuresMerger And Acquisition - Reasons for Failure and Counter Measures
Merger And Acquisition - Reasons for Failure and Counter Measures
 

Semelhante a What is-six-sigma69

Lean system and innovation in strategic Cost Management
Lean system and innovation in strategic Cost ManagementLean system and innovation in strategic Cost Management
Lean system and innovation in strategic Cost ManagementYash Maheshwari
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)Ashima Kandari
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherAlan Desrocher
 
Report on JIT , for Projects and Seminars
Report on JIT , for Projects and SeminarsReport on JIT , for Projects and Seminars
Report on JIT , for Projects and Seminarsomkar jagtap
 
Resume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IEResume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IEPiyush Agarwal
 
Management Presentation on Managing Operations.
Management Presentation on Managing Operations.Management Presentation on Managing Operations.
Management Presentation on Managing Operations.Atif Imam
 
Productionplanning control power point presentation
Productionplanning control power point presentationProductionplanning control power point presentation
Productionplanning control power point presentationmahadeopg
 
Operations intro (1)
Operations intro (1)Operations intro (1)
Operations intro (1)RizaetRahim
 
2012 lean toolbox_4 asq
2012 lean toolbox_4 asq2012 lean toolbox_4 asq
2012 lean toolbox_4 asqArek Rajtar
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryIRJET Journal
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...PERUMALSAMY M
 
MARMAC MANUFACTURING LEAN PRESENTATION (1)
MARMAC MANUFACTURING LEAN PRESENTATION (1)MARMAC MANUFACTURING LEAN PRESENTATION (1)
MARMAC MANUFACTURING LEAN PRESENTATION (1)Joe Johnson MSc, CSSMBB
 

Semelhante a What is-six-sigma69 (20)

Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Lean Manufacturing(2)
Lean Manufacturing(2)Lean Manufacturing(2)
Lean Manufacturing(2)
 
Lean Manufacturing(2)
Lean Manufacturing(2)Lean Manufacturing(2)
Lean Manufacturing(2)
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
MANT 265 S01.ppt
MANT 265 S01.pptMANT 265 S01.ppt
MANT 265 S01.ppt
 
Lean system and innovation in strategic Cost Management
Lean system and innovation in strategic Cost ManagementLean system and innovation in strategic Cost Management
Lean system and innovation in strategic Cost Management
 
15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)15 lean mfg toyota production system (1)
15 lean mfg toyota production system (1)
 
Lean Terminology
Lean TerminologyLean Terminology
Lean Terminology
 
JUST IN TIME
JUST IN TIMEJUST IN TIME
JUST IN TIME
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
Report on JIT , for Projects and Seminars
Report on JIT , for Projects and SeminarsReport on JIT , for Projects and Seminars
Report on JIT , for Projects and Seminars
 
Resume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IEResume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IE
 
Management Presentation on Managing Operations.
Management Presentation on Managing Operations.Management Presentation on Managing Operations.
Management Presentation on Managing Operations.
 
Productionplanning control power point presentation
Productionplanning control power point presentationProductionplanning control power point presentation
Productionplanning control power point presentation
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Operations intro (1)
Operations intro (1)Operations intro (1)
Operations intro (1)
 
2012 lean toolbox_4 asq
2012 lean toolbox_4 asq2012 lean toolbox_4 asq
2012 lean toolbox_4 asq
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
 
MARMAC MANUFACTURING LEAN PRESENTATION (1)
MARMAC MANUFACTURING LEAN PRESENTATION (1)MARMAC MANUFACTURING LEAN PRESENTATION (1)
MARMAC MANUFACTURING LEAN PRESENTATION (1)
 

Mais de Aakash Kulkarni

Portfolio management sessions 4&5 (1)
Portfolio management sessions 4&5 (1)Portfolio management sessions 4&5 (1)
Portfolio management sessions 4&5 (1)Aakash Kulkarni
 
The global business environment presentation slides - sessions 2-8
The global business environment   presentation slides - sessions 2-8The global business environment   presentation slides - sessions 2-8
The global business environment presentation slides - sessions 2-8Aakash Kulkarni
 
Pokayokefinalppt 1334856991612-phpapp01-120419123833-phpapp01
Pokayokefinalppt 1334856991612-phpapp01-120419123833-phpapp01Pokayokefinalppt 1334856991612-phpapp01-120419123833-phpapp01
Pokayokefinalppt 1334856991612-phpapp01-120419123833-phpapp01Aakash Kulkarni
 
Introduction to business statistics
Introduction to business statisticsIntroduction to business statistics
Introduction to business statisticsAakash Kulkarni
 
Capstone presentation (2)
Capstone presentation (2)Capstone presentation (2)
Capstone presentation (2)Aakash Kulkarni
 

Mais de Aakash Kulkarni (13)

Aakash Kulkarni
Aakash KulkarniAakash Kulkarni
Aakash Kulkarni
 
Portfolio management sessions 4&5 (1)
Portfolio management sessions 4&5 (1)Portfolio management sessions 4&5 (1)
Portfolio management sessions 4&5 (1)
 
The global business environment presentation slides - sessions 2-8
The global business environment   presentation slides - sessions 2-8The global business environment   presentation slides - sessions 2-8
The global business environment presentation slides - sessions 2-8
 
Poli30 session14 2008
Poli30 session14 2008Poli30 session14 2008
Poli30 session14 2008
 
Cima certification dof
Cima certification dofCima certification dof
Cima certification dof
 
Pokayokefinalppt 1334856991612-phpapp01-120419123833-phpapp01
Pokayokefinalppt 1334856991612-phpapp01-120419123833-phpapp01Pokayokefinalppt 1334856991612-phpapp01-120419123833-phpapp01
Pokayokefinalppt 1334856991612-phpapp01-120419123833-phpapp01
 
Mproof smpl 1
Mproof smpl 1Mproof smpl 1
Mproof smpl 1
 
Metabical
MetabicalMetabical
Metabical
 
Introduction to business statistics
Introduction to business statisticsIntroduction to business statistics
Introduction to business statistics
 
Class op sys
Class op sysClass op sys
Class op sys
 
Capstone presentation
Capstone presentationCapstone presentation
Capstone presentation
 
Capstone presentation (2)
Capstone presentation (2)Capstone presentation (2)
Capstone presentation (2)
 
Autocorrelation
AutocorrelationAutocorrelation
Autocorrelation
 

Último

business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsGOKUL JS
 
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Associazione Digital Days
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 

Último (20)

business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebs
 
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 

What is-six-sigma69

  • 1. What is Six Sigma? How is it related to Lean? Deb Lucia Practice Manager, Lean Manufacturing & Engineering
  • 2. Six Sigma Vs. Lean Manufacturing  Six sigma and lean manufacturing are methods to improve business and manufacturing processes and drive profitability of companies.  Both six sigma and lean manufacturing, are proven concepts and have saved companies billions of dollars and are the leading continuous improvement methods utilized today.   Lean Manufacturing Focuses on eliminating the 7 or 8 wastes and is based on the philosophy of getting all levels of an organization involved. It was developed by Toyota in the late 1950’s. TPS - Toyota Production System means lean manufacturing.  Six sigma is a philosophy of doing business with a focus on eliminating defects through fundamental process knowledge.  Six sigma methods integrate principles of business, statistics and engineering to achieve tangible results.
  • 3. 7 or 8 Wastes of Lean 1. Defects 2. Overproduction 3. Transportation 4. Waiting 5. Inventory 6. Motion 7. Processing 8. Skills – Not utilizing people’s talents Use the acronym 'DOTWIMP' to remember the 7 Wastes of Lean. Use ‘Tim Woods’ to remember the 8 Wastes
  • 4. Lean Terminology ABNORMALITY MANAGEMENT — The ability to see and respond to an abnormality (any violation of standard operations) in a timely manner. ACTIVITY BASED COSTING – An accounting system that assigns costs to a product based on the amount of resources used to design, order and make it. ANDON — A visual signal. Typically, a light mounted on a machine or line to indicate a potential problem or work stoppage. AUTONOMATION — English translation of Jidoka. Imparting human intelligence to a machine so that it automatically Jidoka. stops when a problem arises. BALANCED PLANT — A plant where all available capacity is balanced exactly to market demand. BOTTLENECK — An area or workstation in a manufacturing environment that limits throughput of the entire process. CHAKU-CHAKU LINE — Meaning load-load in Japanese, this describes a work cell where machines off-load parts automatically so that operators can take a piece directly from one machine to the next without waiting. CHANGE AGENT —One who leads cultural change in an organization to move from the current state to a lean state. CELLULAR MANUFACTURING — An alignment of machines in correct process sequence, where operators remain within the cell and materials are presented to them from outside. CONSTRAINT — A workstation or a process that limits the output of the entire system. CONTINUOUS IMPROVEMENT — The commitment to creating a better product, work environment and business, every day or Kaizen. CYCLE TIME — The time it takes an operator to complete one full repetition of work. Globally, it is the time it takes before the cycle repeats itself. 3Ds — Dirty, dangerous, difficult. 3P – Production Preparation Process is the development of a designed low waste product with low manufacturing capital cost ELEMENTAL TIME — Time allotted to a specific operational step, within standard work. ERROR PROOFING – Poka Yoke Process used to prevent errors for occurring or to immediately point out a defect as it occurs. EXTERNAL SET-UP — Elements of tooling set-up that can be performed safely while the machine is still running. FIFO – First in First Out
  • 5. Lean Terminology FIVE S (5S) — The primary conditioning discipline for kaizen, the five Ss are defined as: Seiri, Sort to segregate and discard. Seiri, Seiton, Set in order to arrange and identify. Seiso, Sanitize or Shine to clean and inspect daily. Seiketsu, Standarize to Seiton, Seiso, Seiketsu, revisit frequently, and Shitsuke, Sustain. Shitsuke, GLOBAL PRODUCTION SYSTEM — An expansion of the Toyota Production System, this is a strategy to enable lean System, manufacturing using kaizen methodology. HANEDASHI — A device that allows a machine to automatically unload a part without waiting for an operator. HEIJUNKA — Production leveling; creating a build sequence that is determined by SKU average demand. Hoshin Kanri - The selection of goals, projects to achieve goals, designation of people and resources for project complement and the establishment of metrics. Hoshin Planning: Breakthrough Strategic Planning INTERNAL SET-UP — Elements of tooling set-up that must be performed while the machine is not in motion. INVENTORY — Usually the highest cost category, inventory is all raw materials, purchased parts, work-in-progress and finished goods that are not yet sold to a customer. JIDOKA — See "autonomation." Japanese term for transferring human intelligence to a machine. "autonomation." JUST IN TIME (JIT) — Manufacturing what is needed, when it is needed, in the quantity it is needed. KAIKAKU — Radical improvement, usually in a business process, that affects the future value stream. KAIZEN — A combination of two Japanese words Kai (change) and Zen (good). Usually defined as "continuous improvement." KAIZEN BREAKTHROUGH — A time-sensitive, rapid-deployment methodology that employs a focused, team-based approach. Continuous improvement. KANBAN — Visual signal. Typically a re-order card or other method of triggering the pull system, based on actual usage of material. It should be located for use at the point of manufacturing. KITTING – Supplying parts to assemblers in “kits” LEAD TIME — The amount of time required to produce a single product, from the time of customer order to shipping. LEAN MANUFACTURING — Using the minimum amount of total resources — man, materials, money, machines, etc. — to produce a product and deliver it on time. MACHINE AUTOMATIC TIME — The time is takes for a machine to produce one unit, exclusive of loading and unloading. MACHINE CYCLE TIME — The time it takes for a machine to produce one unit, including the time it takes to load and unload.
  • 6. Lean Terminology MUDA — Any activity that adds to cost without adding to value of the product. MURA — Variations in process quality, cost and delivery MURI — Unreasonableness; demand exceeds capacity. NAGARA SYSTEM — Accomplishing two or more activities with one motion. NON-VALUE ADDED — Any activity that adds cost without adding value to the product or process. ONE-TOUCH EXCHANGE OF DIES — The reduction of die set-up activities down to a single step. ONE-PIECE FLOW — A manufacturing philosophy which supports the movement of product from one workstation to the next, one piece at a time, without allowing inventory to build up in between. OPERATOR CYCLE TIME — The time it takes for a person to complete a predetermined sequence of operations, inclusive of loading and unloading, exclusive of time spent waiting. OVERALL EQUIPMENT EFFECTIVENESS – OEE – The equipment’s operational availability, performance effeciency or first-pass yield. PACEMAKER — A technique for pacing a process to takt time. time. PDCA - (plan-do-check-act) POLICY DEPLOYMENT — Matching the strategic business goals of an organization to its available resources. Communicating those goals throughout the organization and linking everyone to the same objectives. POKA YOKE — A Japanese word for mistake proofing, a poka yoke device prevents a human error from affecting a machine or process; prevents operator mistakes from becoming defects. POINT KAIZEN — An improvement activity intensely directed at a single workstation, performed quickly by two or three specialists. Typically follows a full-blown kaizen event. PROCESS CAPACITY TABLE — A chart primarily used in a machining environment that compares machine load to available capacity. PRODUCTION SMOOTHING — A method of production scheduling that, over a period of time, takes the fluctuation of customer demand out of manufacturing. Producing every part, every day. PULL SYSTEM – A method of replenishment that is signaled by a “pull” on the system indicating a need to replenish.
  • 7. Lean Terminology QUALITY FUNCTION DEPLOYMENT — A methodology in which a cross-functional team reaches consensus about final product specifications, in accord with the wishes of the customer. QUEUE TIME – The time a product spends in a line waiting for the next process. QUICK CHANGEOVER (SMED) – The ability to change tooling and fixtures rapidly to run multiple products on the same machine. SENSI — A revered master or teacher. SET-UP REDUCTION — Reducing the amount of downtime during changeover from the last good piece to the first good piece of the next order. SINGLE-MINUTE EXCHANGE OF DIES (SMED) — From the last good part to the first good part on the new set-up accomplished in anything less than 10 minutes. AKA "Single-digit set-up." STANDARD OPERATIONS — The best combination of people and machines utilizing the minimum amount of labor, space, inventory and equipment. STANDARD WORK — Pre-determined sequence of tasks for the operator to complete within takt time. time. STANDARD WORK COMBINATION SHEET — A document showing the sequence of production steps assigned to a single operator. It is used to illustrate the best combination of worker and machine. STANDARD WORK LAYOUT — A diagram of a work station or cell showing how standard work is accomplished. STANDARD WORK IN PROCESS — Minimum material required to complete one cycle of operator work without delay. STOP-THE-LINE AUTHORITY — When abnormalities occur, workers have power to stop the process and prevent the defect or variation from being passed along. SUB-OPTIMIZATION — Optimizing each piece of equipment; keeping all machines running, no matter the cost or consequence. Typically this inflates the number-one cost of production: material. SUPERMARKET — A shop floor, line-side location where parts are sorted and made ready for presentation to operators.
  • 8. Lean Terminology TAKT TIME — The total net daily operating time divided by the total daily customer demand. THEORY OF CONTRAINTS (TOC) – A lean management philosophy that stresses removal of constraints to increase throughput while decreasing inventory and operating expenses. TOC’’s set of tools examine the entire continuos improvement system. THROUGHPUT — The rate at which the entire system generates money. TIME-BASED STRATEGY — Organizing business objectives around economy-of-time principles. TOYOTA PRODUCTION SYSTEM — Based on some of the first principles of Henry Ford, this describes the philosophies of one of the world’s most successful companies. The foundation of TPS is production smoothing, the supports are just-in-time and jidoka. jidoka. VALUE ADDED — Any activity that transforms a product or service to meet the customer need. VALUE ANALYSIS — Evaluating the total lead-time and value-added time to identify the percentage spent in value added activities. VALUE STREAM MAP (or Value Chain Map) — A visual picture of how material and information flows from suppliers, through manufacturing, to the customer. It includes calculations of total cycle time and value-added time. Typically written for the current state of the value chain and the future, to indicate where the business is going. VISUAL CONTROLS — Creating standards in the workplace that make it obvious if anything is out of order. VISUAL MANAGEMENT — System enabling anyone to quickly spot abnormalities in the workplace, regardless of their knowledge of the process. WASTE – Any activity that consumes resources but does not add value to the product or service a customer receives (muda). WORK-IN-PROCESS (WIP) — Inventory waiting between operation steps. WORK SEQUENCE — The correct steps the operator takes, in the order in which they should be taken.
  • 9. Six Sigma Vs. Lean Manufacturing  Huge difference between "lean Tools" and Six Sigma tools.  Lean = Improved process flow and the elimination of waste in a continual mode of improvement Any of the following mean Lean Manufacturing: TPS, Continuous Improvement, Kaizen, Lean Manufacturing, JIT TPS engages all the employees of a company from the CEO to factory worker.     Six Sigma = Reduced process variation Six Sigma holds the improvement process in the hands of a select group of “belted” individuals
  • 10. Six Sigma      In 1986, Bill Smith, a senior engineer and scientist at Motorola, introduced the concept of Six Sigma to standardize the way defects are counted. Six Sigma provided Motorola the key to addressing quality concerns throughout the organization, from manufacturing to support functions. The application of Six Sigma also contributed to Motorola winning the Malcolm Baldrige National Quality award in 1988. Since then, the impact of the Six Sigma process on improving business performance has been dramatic and well documented by other leading global organizations, such as General Electric, Allied Signal, and Citibank. Today, Motorola continues to implement Six Sigma throughout its own enterprise, and extends the benefit of its Six Sigma expertise to other organizations worldwide through Motorola University. Six Sigma was derived from the statistical term of sigma which measures deviations from perfection
  • 11. Six Sigma History        1986: Motorola Defines Six Sigma and in 1987 Chief Executive declares Motorola will be at 6σ by 1992 (5-year goal) 1988: Original Six Sigma consortium is formed: Motorola, Raytheon, ABB, CDI, Kodak 1989/1990: IBM, DEC try Six Sigma -- and fail 1993: AlliedSignal adds a new level to Six Sigma : Dedicated Black Belts with a supporting infrastructure 1995: Jack Welch of General Electric adopts Six Sigma 1996-1998: Six Sigma implementation expands significantly as companies observe the success of Allied and GE :Siebel, Bombardier, Whirlpool, Navistar, Gencorp, Lockheed Martin, Polaroid,Sony, Nokia, John Deere Siemens, BBA, Seagate, Compaq, PACCAR, Toshiba, McKesson, AmEx, ... 1999: Starting to see exponential growth. Formal Six Sigma training begins at ASQ: Johnson & Johnson, Air Products, Maytag, Dow Chemical, DuPont, Honeywell, PraxAir, Ford, BMW, Johnson Controls, Samsung
  • 12. Sigma Levels Sigma Level A value from 1 to 6 that signifies the maximum number of defects per million: 1 Sigma = 690,000 defects/million = 31% accurate 2 Sigma = 308,537 defects/million = 69.1463% accurate 3 Sigma = 66,807 defects/million = 93.3193% accurate 4 Sigma = 6,210 defects/million = 99.3790% accurate 5 Sigma = 233 defects/million = 99.9767% accurate 6 Sigma = 3.4 defects/million = 99.999997% accurate
  • 13. Six Sigma Key Concepts        At its core, Six Sigma revolves around a few key concepts. Critical to Quality: Attributes most important to the customer Defect: Failing to deliver what the customer wants Process Capability: What your process can deliver Variation: What the customer sees and feels Stable Operations: Ensuring consistent, predictable processes to improve what the customer sees and feels Design for Six Sigma (DFSS): Designing to meet customer needs and process capability
  • 14. Six Sigma Methodology      Six Sigma has two key methodologies: DMAIC and DMADV. DMAIC is used to improve an existing business process. DMADV is used to create new product designs or process designs in such a way that it results in a more predictable, mature and defect free performance. Sometimes a DMAIC project may turn into a DFSS project because the process in question requires complete re-design to bring about the desired degree of improvement.
  • 15. Statistical Process Control Methodology      Statistical process control is an important part of Six Sigma methodology, which proceeds through the following steps, also called DMAIC (Define, Measure, Analyze, Improve and Control): 1. Define - benchmarking, process flow mapping, flowcharts 2. Measure - defect metrics, data collection, sampling 3. Analyze - Fishbone diagrams, failure analysis, root cause analysis 4. Improve - modeling, tolerance control, defect control, design changes 5. Control - SPC control charts, performance management
  • 16. Six Sigma Five Phases      Basic methodology consists of the following five phases DMADV (Define, Measure, Analyze, Design, and Verify): Define - formally define the goals of the design activity that are consistent with customer demands and enterprise strategy. Measure - identify CTQs (Critical to Quality), product capabilities, production process capability, risk assessment, etc. Analyze - develop design alternatives, create high-level design and evaluate design capability to select the best design. Design - develop detail design, optimize design, and plan for design verification. This phase may require simulations. Verify - verify design, setup pilot runs, implement production process and handover to process owners. This phase may also require simulations.
  • 17. Six Sigma Tool Box Define Measure Analyze Improve Control Benchmarking Value Stream Map Fishbone Diagrams Modeling SPC Charts Process Flow Mapping Cause & Effect FMEA Tolerance Control Performance Metrics Flow charts Defect Metrics Root Cause Analysis Defect Control Multiple Regression Project Charter as a Statistical Analysis Team ANOVA Design Changes Train Set Up a Plan & Guidelines for Team Data Collection Run Charts, Time Series Chars, Time Value Charts, Pareto Charts Cause & Effect Diagram Piloting Review Existing Data Sampling Scatter Plots Best Practices SIPOC
  • 18. Six Sigma Key People Roles      Executive Leadership includes CEO and other key top management team members. They are responsible for setting up a vision for Six Sigma implementation. They also empower the other role holders with the freedom and resources to explore new ideas for breakthrough improvements. Champions are responsible for the Six Sigma implementation across the organization in an integrated manner. The Executive Leadership draws them from the upper management. Champions also act as mentor to Black Belts. Master Black Belts, identified by champions, act as in-house expert coach for the organization on Six Sigma. They devote 100% of their time to Six Sigma. They assist champions and guide Black Belts and Green Belts. Apart from the usual rigor of statistics, their time is spent on ensuring integrated deployment of Six Sigma across various functions and departments. Black Belts operate under Master Black Belts to apply Six Sigma methodology to specific projects. They devote 100% of their time to Six Sigma. They primarily focus on Six Sigma project execution, whereas Champions and Master Black Belts focus on identifying projects/functions for Six Sigma. Green Belts are the employees who take up Six Sigma implementation along with their other job responsibilities. They operate under the guidance of Black Belts and support them in achieving the overall results.
  • 19. Minimum Training       Executive – 1 to 2 day workshop Champion – 1 week Green Belt training Green Belt – 2 weeks of classes over 2 months Cert: 3 years of work and one project $2000 -$4000 Black Belt – 4 weeks of study over 4 months Cert: 3 yrs of work, 2 documented projects, recertify every 3 yrs. $5000 - $6500 Master Black Belt – two weeks extensive training with additional mathematical theory, quality, lean, super project, mentoring Cert: 3 years of work, additional projects, recertify every three yrs. $5000
  • 20. Recognized Training       GE Motorola ASQ American Society for Quality Six Sigma Academy Institute of Industrial Engineers ISSSP International Society of Six Sigma Professionals
  • 21. Six Sigma Quotes  "... the most powerful breakthrough management tool ever devised" Mikel Harry and Richard Schroeder Six Sigma: The BREAKTHROUGH Management Strategy Revolutionizing the World's Top Corporations  "Six Sigma is arguably the most important business and industry initiative that has involved statistical thinking and methods." Ronald D. Snee "Impact of Six Sigma on Quality Engineering" Quality Engineering Volume 12, Number 3, 2000  "Six Sigma has spread like wildfire across the company and its transforming everything we do." Jack Welch, CEO, GE Business Week special report June 8, 1998
  • 22. Next step in Lean & Six Sigma?  Next step is the Lean Six Sigma Process that combines the benefits of both lean TPS systems and six sigma into one program.