This schedule outlines the tasks and timeline for a student's HA4 SIMS concept project over 3 drafts. It includes tutorials for LightBot as well as tasks such as choosing areas to model, taking measurements and photos, beginning modeling, adding details, and a final evaluation. Time is allocated each week for modeling, updating logs, and getting feedback. The schedule aims to carefully plan and break the work into chunks to complete the two virtual space models on time.
1. L3 CMP Games Design – Group 01
HA4 - SIMS Concept Schedule
John Forest
DRAFT ONE
Monday Tuesday Wednesday Thursday Friday Saturday Sunday
AM P EV A P EV AM PM EV AM PM EV AM P EV A P EV A P EV
M E M M E E E M E M M E M M E
w/b LightBot LightBot LightBot
Tutorial 07 Tutorial 08 Tutorial 08
30.01.1
2
w/b HA4 – Task LightBot LRC and LightBot HA4 – Task HA4 – Task 2 HA4 – Task 2
1 Tutorial 09 Cafe Bar Tutorial 09 1 LRC – Begin Cafe Bar –
06.02.1 Walkabout HA4 – Task Complete measuring Begin
2 and 1 Begin schedule and measuring
choose schedule. and start photograph and
areas. production y photograph
log. y
w/b HA4 – Task HA4 – Task HA4 – Task HA4 – Task HA4 – Task HA4 – Task 3 HA4 – Task 3
2 LRC and 3 3 3 3 Build basic Screenshots
13.02.1 Cafe Bar – Scale Additional Build basic Additional shell for of work to
2 Measured template measuring shell for measuring both areas. date. Email
diagrams footprints and both and Update home.
and check diagrams. areas. diagrams. production Update
proportions Update log. production
. productio log.
Update n log.
production
log.
w/b
20.02.12
H/T
w/b HA4 – Task Update HA4 – Task HA4 – Task HA4 – Task 3 Update
3 productio 3 3 LRC and production
27.02.1 LRC and n log. LRC and Additional Cafe Bar log.
2 Cafe Bar Cafe Bar measuring surfaces
detail detail and confirmed.
added – added – diagrams.
furniture, furniture,
plants, plants, Update
mouldings mouldings production
etc. etc. log.
w/b HA4 – Task HA4 – Task Update HA4 – Task HA4 – Task Final checks Upload HA4 DL
4 3 productio 3 4 and renders. front sheet 01
05.03.1 Begin LRC and n log. LRC and Evaluation Update to Moodle.
2 evaluation Cafe Bar Cafe Bar . Upload production
. Review models models production log and blog.
production rendered rendered log to
log. through through blog.
2. Layout. Layout.
Harry’s Sessions
Self-Directed
Other Sessions
Task 1 - Outline
Choose and commit to model two areas
Produce Schedule – include LightBot overrun and new Deadline.
List any problems you might have that you need to take into account – Modeller skills, time management etc.
Start production log.
Task 2 - Plan
Shoot reference imagery and textures, make measurements and draw diagrams – Include this in your production log – either directly blogged or within a PowerPoint presentation / Word document.
Schedule in review sessions.
Task3 - Respond
Build the two objects in stages – be careful not to focus on just one or parts of one.
Plan out the production carefully – break it up into chunks.
Task 4 - Review
Write an evaluation of your project. Leave enough time for this before the deadline.
You can’t fully evaluate the work until the project is finished and presented.
L3 CMP Games Design – Group 01
3. HA4 - SIMS Concept Schedule
DRAFT TWO
Monday Tuesday Wednesday Thursday Friday Saturday Sunday
AM P EV A P EV AM PM EV AM PM EV AM PM EV A P EV A P EV
M E M M E E E E M M E M M E
w/b LightBot LightBot Lightbot
Tutorial 07 Tutorial tutorial 08
30.01.1 07
2
w/b LightBot HA4 Task LRC and HA4 Task HA4 Task 2:
Tutorial 09 1: Choose Cafe Bar 2: Start to Create basic
06.02.1 areas and HA4 Task take outline for
2 walk 1: Begin photograp LRC taking
around Schedule hs of both and using
of my measuremen
selected ts
areas.
w/b HA4 Task2: HA4 Task HA4 Task HA4 Task 3: HA4 Task
Start taking 2: Start 3: Start Continue to 2: E-mail
13.02.1 measuremen productio modelling model details updated
2 ts for the n log for details within the screenshot
details in the the LRC within LRC s to home
LRC. area the LRC and
update
production
log.
w/b
20.02.12
H/T
w/b HA4 Task HA4 Task 3: HA4 Task HA4 Task HA4 – Task HA4 Task 3: HA4 – Task
2: Continue to 2: 3: 1: Update Finish 2 Cafe Bar –
27.02.1 Measure model details Measure Continue production modelling Begin
2 details on and furniture details to model log. the LRC, measuring
the LRC of the LRC and details review and and
furniture and update photograph
of the furniture production y
LRC. of the log
LRC
w/b HA4 Task 2: HA4 – HA4 – HA4 – Task HA4 – Task 3 HA4 – Task DL 01
Create basic Task 3 Task 3 3 Cafe Bar 3
05.03.1 outline for Additiona Build Additional Screensho
2 Cafe Bar l Cafe Bar basic measuring ts of work
taking and measurin shell for and to date.
using g and both diagrams Email
measuremen diagrams. areas. for Cafe home.
t. Edit Update Bar Update
production productio production
log n log. log.
w/b HA4 – Task 3 Update HA4 – HA4 – Task HA4 – Task 3 Update
Cafe Bar productio Task 3 3 Cafe Bar production
12.03.1 detail added n log. Cafe Bar Additional log.
4. 2 – furniture, detail measuring
plants, added – and
mouldings furniture, diagrams.
etc. plants,
moulding Update
s etc. production
log.
w/b HA4 – Task 3 Update HA4 – HA4 – Task HA4 – Task 3 Update
Cafe Bar productio Task 3 3 LRC and Cafe production
19.03.1 detail added n log. Cafe Bar Additional Bar surfaces log.
2 – furniture, detail measuring confirmed.
plants, added – and
mouldings furniture, diagrams.
etc. plants,
moulding Update
s etc. production
log.
w/b HA4 – HA4 – Task 3 Update HA4 – HA4 – Task Final checks Upload DL 02
Task 4 LRC and Cafe productio Task 3 4 and renders. HA4 front
26.03.1 Begin Bar models n log. LRC and Evaluation. Update sheet to
2 evaluatio rendered Cafe Bar Upload production Moodle.
n. Review through models production log and blog.
productio Layout. rendered log to blog.
n log. through
Layout.
Harry’s Sessions
Self-Directed
Other Sessions
DRAFT THREE
Monday Tuesday Wednesday Thursday Friday Saturday Sunday
5. AM P EV A P EV AM PM EV AM PM EV AM PM EV A P EV A P EV
M E M M E E E E M M E M M E
w/b LightBot LightBot Lightbot
Tutorial 07 Tutorial tutorial 08
30.01.1 07
2
w/b LightBot HA4 Task LRC and HA4 Task HA4 Task 2:
Tutorial 09 1: Choose Cafe Bar 2: Start to Create basic
06.02.1 areas and HA4 Task take outline for
2 walk 1: Begin photograp LRC taking
around Schedule hs of both and using
of my measuremen
selected ts
areas.
w/b HA4 Task2: HA4 Task HA4 Task HA4 Task 3: HA4 Task
Start taking 2: Start 3: Start Continue to 2: E-mail
13.02.1 measuremen productio modelling model details updated
2 ts for the n log for details within the screenshot
details in the the LRC within LRC s to home
LRC. area the LRC and
update
production
log.
w/b
20.02.12
H/T
w/b HA4 Task HA4 Task 3: HA4 Task HA4 Task HA4 – Task HA4 Task 3: HA4 – Task
2: Continue to 2: 3: 1: Update Finish 2 Cafe Bar –
27.02.1 Measure model details Measure Continue production modelling Begin
2 details on and furniture details to model log. the LRC, measuring
the LRC of the LRC and details review and and
furniture and update photograph
of the furniture production y
LRC. of the log
LRC
w/b HA4 Task 2: HA4 – HA4 – HA4 – Task HA4 – Task 3 HA4 – Task DL 01
Create basic Task 3 Task 3 3 Cafe Bar 3
05.03.1 outline for Additiona Build Additional Screensho
2 Cafe Bar l Cafe Bar basic measuring ts of work
taking and measurin shell for and to date.
using g and both diagrams Email
measuremen diagrams. areas. for Cafe home.
t. Edit Update Bar Update
production productio production
log n log. log.
w/b HA4 – Task 3 Update HA4 – HA4 – Task HA4 – Task 3 Update
Cafe Bar productio Task 3 3 Cafe Bar production
12.03.1 detail added n log. Cafe Bar Additional log.
2 – furniture, detail measuring
plants, added – and
mouldings furniture, diagrams.
etc. plants,
moulding Update
s etc. production
6. log.
w/b HA4 – Task 3 Update HA4 – HA4 – Task HA4 – Task 3 Update
Cafe Bar productio Task 3 3 LRC and Cafe production
19.03.1 detail added n log. Cafe Bar Additional Bar surfaces log.
2 – furniture, detail measuring confirmed.
plants, added – and
mouldings furniture, diagrams.
etc. plants,
moulding Update
s etc. production
log.
w/b HA4 – HA4 – Task 3 Update HA4 – HA4 – Task Final checks Upload DL 02
Task 4 LRC and Cafe productio Task 3 4 and renders. HA4 front
26.03.1 Begin Bar models n log. LRC and Evaluation. Update sheet to
2 evaluatio rendered Cafe Bar Upload production Moodle.
n. Review through models production log and blog.
productio Layout. rendered log to blog.
n log. through
Layout.
Harry’s Sessions
Self-Directed
Other Sessions