• China Wind Power International Corp. (“China Wind” or the “Company”) is a Canadian-incorporated company that is well-
  positioned to capitalize on the growing demand for wind power in China. China Wind has the exclusive rights for wind energy
  development in Du Mon County, which is a very favourable location for wind power generation. The Company’s portfolio
  consists of 8 wind farms totaling 547MW to be developed in 5 development phases, with a longer-term potential for building out
  860MW.
• Wind Farm #1 (49MW Ruihao) is fully-financed and permitted, with construction now 60% complete. Wind Farm #1 has a 20-
  year power purchase agreement (“PPA”) in place and has forward-sold its green credits to Goldman Sachs.



                                                       China Wind – Investment Highlights
• Strong Government Support for Renewable Power in China with Guaranteed Demand:
    • 15% of all power in China from renewable sources by 2020, and power grid is obligated to purchase all renewable output
• Exclusivity in Du Mon County:
   • China Wind has exclusive rights to wind power generation in Du Mon County
• Compelling Economics:
   • >12% IRR generated through (i) 20-year PPA, (ii) forward-sale of green credits to Goldman Sachs, (iii) favourable debt terms,
     and (iv) competitive turbine pricing
• Achievable Development Plan:
   • 547MW to be developed in 5 phases by 2014 with $24M out of $25M required to complete equity financing for Wind Farm
     #2 already committed and bank financing secured subject to completion of equity financing


    Chinese Government Support for Wind Power                                                           Exclusivity in Du Mon County
• China’s target to have 15% of all power from renewable                               • China Wind has exclusive rights to wind power generation
  sources by 2020 is not just a goal … it’s the law!                                     in Du Mon County
• China’s Renewable Energy Law of 2005 requires power                                  • There is much need for renewable energy in the region as
  grid companies to buy all output of local renewable energy                             Daqing oilfield reserves and crude oil output decline, raising
  producers                                                                              fears of a looming energy shortage in the region
                                        Total Energy Demand
• Facing (1) continuously             (millions of tonnes of oil equivalent)
                                                                                       • Wind assessment studies in Du Mon County demonstrated
  increasing demand for       2000                                                       potential installed capacity of 860MW of wind energy
  energy, and (2) one of      1500                                                       developable over an area of 220 sq km
  the world’s biggest         1000                                                     • China Wind’s planned wind farms are included in the Power
  environmental     crisis,   500                                                        Grid Master Plan of Daqing City, which means there are no
  China’s installed wind        0
                                                                                         foreseeable barriers to hooking up to the grid
  capacity of +12GW
                                 91


                                        93


                                               95


                                                      97


                                                             99


                                                                    01


                                                                           03


                                                                                  05
                               19


                                      19


                                             19


                                                    19


                                                           19


                                                                  20


                                                                         20


                                                                                20




  currently ranks in the
  top 4 in the world, and                                                                                                      Power Grid <2km
                                                                                              Beijing
  by 2020, is projected to
  total 100GW (1st in the
                                                                                                 Shanghai
  world)                                                                                                                           Wind Speed
                                                                                                                                   70m: 6.9-7.5 m/s




                                                                                                                               Looming energy shortage




                                                                                                                      China Wind Power International – Page 1
Page 2



                                              Wind Farm #1 (49MW Ruihao)
            Status
             Status                  Turbines
                                     Turbines                   Financing Completed
                                                                  Financing Completed                            Total Equipment Cost
                                                                                                            Turbines/Towers   US$53.6M
                                                                                                            Construction      US$13.1M
                                                                                      26%                   Interest           US$4.1M
                                                                                     equity                 Other              US$2.2M
            50% of
           60% of                      23 of 36
                                       turbines                                                             Total             US$73.0M
        construction
       construction
          completed
         completed                     installed                          74%                               Capital Cost / MW <US$1.5M
                                                                          bank*
                                                                                                                  Project Economics
                                                                                                            Revenue (wind)      US$8.5M
                                                                                                            Revenue (credits)   US$1.8M
• • Power PurchasingAgreement
    Power Purchase Agreement          18 currently
                                         currently
    (US$89 / MWh)                                               * VariableVariable rate; 5.94%
                                                                        * rate; currently                   EBITDA              US$8.3M
• Grid Connection Agreement            producing
                                       producing
  • Green Credit Forward Sale            power                           currently 5.94%                    Net Income          US$3.2M
• Green Credit Forward Sale              power
   (US$14.81 / CO2 ton)                                                                                     Cash Flow to Equity US$3.9M
 • Grid Connection Agreement                                                                                Project IRR            >12%

                                                  Development Plan to 2014
                                                      Construction
                                                                                   Installed
      Phases              Projects                      Period                                                            Status
                                                                                Capacity (MW)
                                                     (quarter/year)
      Phase I     Wind Farm #1 (Ruihao)          Q3/2007-Q4/2009                                 49.0     Over 50% complete.
                                                                                                          All paperwork is finished.
    Phase II      Wind Farm #2 (Ruifeng)         Q2/2009-Q4/2009                                 49.5     Officially approved by
                                                                                                          Heilongjiang DRC.
                                                                                                          All paperwork is finished.
                  Wind Farms #3
    Phase III                                    Q2/2010-Q4/2011                               100.0      In the process of application
                  (Guofeng) and #4 (Ruili)
                                                                                                          for approval.
                                                                                                          In the process of feasibility
    Phase IV      Sino-Demark                    Q2/2011-Q4/2013                               200.0
                                                                                                          study.
                  Guofeng, Yuanfeng,                                                                      In the process of feasibility
    Phase V                                      Q2/2012-Q4/2014                               148.5
                  Tongfeng                                                                                study and paperwork.
    Total                                        Q3/2007 – Q4/2014                             547.0

                                                  China Wind Turbine Supply
                                • In 2007, 56% of all globally installed wind power equipment
                                  was manufactured in China
                                • Wind Farm #1:
                                     • 10 sets of 1MW turbines from Wuhan Guoce Nordic
                                     • 16 sets of 1.5MW turbines from Daqing Deta Electric
                                     • 10 sets of 1.5MW turbines from Hanwei Wind Power
                                • Wind Farm #2:
                                     • 33 HV-1500 Deta / Hanwei Wind wind turbines (same 1.5MW
                                       turbines used in Wind Farm #1) – US$908 / kW
                                • Future Wind Farms:
                                     • Hanwei will have the first refusal right to offer all future equipment
                                       for wind farms owned or controlled by China Wind, and Hanwei will
                                       allow China Wind to purchase all additional equipment
                                       manufactured by Hanwei at market prices

                                                                                                                China Wind Power International – Page 2

Mais conteúdo relacionado

Destaque

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 

Destaque (20)

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 

China Wind Power International Corp. Briefing Memo 20090601

  • 1. Page 1 China Wind – Overview • China Wind Power International Corp. (“China Wind” or the “Company”) is a Canadian-incorporated company that is well- positioned to capitalize on the growing demand for wind power in China. China Wind has the exclusive rights for wind energy development in Du Mon County, which is a very favourable location for wind power generation. The Company’s portfolio consists of 8 wind farms totaling 547MW to be developed in 5 development phases, with a longer-term potential for building out 860MW. • Wind Farm #1 (49MW Ruihao) is fully-financed and permitted, with construction now 60% complete. Wind Farm #1 has a 20- year power purchase agreement (“PPA”) in place and has forward-sold its green credits to Goldman Sachs. China Wind – Investment Highlights • Strong Government Support for Renewable Power in China with Guaranteed Demand: • 15% of all power in China from renewable sources by 2020, and power grid is obligated to purchase all renewable output • Exclusivity in Du Mon County: • China Wind has exclusive rights to wind power generation in Du Mon County • Compelling Economics: • >12% IRR generated through (i) 20-year PPA, (ii) forward-sale of green credits to Goldman Sachs, (iii) favourable debt terms, and (iv) competitive turbine pricing • Achievable Development Plan: • 547MW to be developed in 5 phases by 2014 with $24M out of $25M required to complete equity financing for Wind Farm #2 already committed and bank financing secured subject to completion of equity financing Chinese Government Support for Wind Power Exclusivity in Du Mon County • China’s target to have 15% of all power from renewable • China Wind has exclusive rights to wind power generation sources by 2020 is not just a goal … it’s the law! in Du Mon County • China’s Renewable Energy Law of 2005 requires power • There is much need for renewable energy in the region as grid companies to buy all output of local renewable energy Daqing oilfield reserves and crude oil output decline, raising producers fears of a looming energy shortage in the region Total Energy Demand • Facing (1) continuously (millions of tonnes of oil equivalent) • Wind assessment studies in Du Mon County demonstrated increasing demand for 2000 potential installed capacity of 860MW of wind energy energy, and (2) one of 1500 developable over an area of 220 sq km the world’s biggest 1000 • China Wind’s planned wind farms are included in the Power environmental crisis, 500 Grid Master Plan of Daqing City, which means there are no China’s installed wind 0 foreseeable barriers to hooking up to the grid capacity of +12GW 91 93 95 97 99 01 03 05 19 19 19 19 19 20 20 20 currently ranks in the top 4 in the world, and Power Grid <2km Beijing by 2020, is projected to total 100GW (1st in the Shanghai world) Wind Speed 70m: 6.9-7.5 m/s Looming energy shortage China Wind Power International – Page 1
  • 2. Page 2 Wind Farm #1 (49MW Ruihao) Status Status Turbines Turbines Financing Completed Financing Completed Total Equipment Cost Turbines/Towers US$53.6M Construction US$13.1M 26% Interest US$4.1M equity Other US$2.2M 50% of 60% of 23 of 36 turbines Total US$73.0M construction construction completed completed installed 74% Capital Cost / MW <US$1.5M bank* Project Economics Revenue (wind) US$8.5M Revenue (credits) US$1.8M • • Power PurchasingAgreement Power Purchase Agreement 18 currently currently (US$89 / MWh) * VariableVariable rate; 5.94% * rate; currently EBITDA US$8.3M • Grid Connection Agreement producing producing • Green Credit Forward Sale power currently 5.94% Net Income US$3.2M • Green Credit Forward Sale power (US$14.81 / CO2 ton) Cash Flow to Equity US$3.9M • Grid Connection Agreement Project IRR >12% Development Plan to 2014 Construction Installed Phases Projects Period Status Capacity (MW) (quarter/year) Phase I Wind Farm #1 (Ruihao) Q3/2007-Q4/2009 49.0 Over 50% complete. All paperwork is finished. Phase II Wind Farm #2 (Ruifeng) Q2/2009-Q4/2009 49.5 Officially approved by Heilongjiang DRC. All paperwork is finished. Wind Farms #3 Phase III Q2/2010-Q4/2011 100.0 In the process of application (Guofeng) and #4 (Ruili) for approval. In the process of feasibility Phase IV Sino-Demark Q2/2011-Q4/2013 200.0 study. Guofeng, Yuanfeng, In the process of feasibility Phase V Q2/2012-Q4/2014 148.5 Tongfeng study and paperwork. Total Q3/2007 – Q4/2014 547.0 China Wind Turbine Supply • In 2007, 56% of all globally installed wind power equipment was manufactured in China • Wind Farm #1: • 10 sets of 1MW turbines from Wuhan Guoce Nordic • 16 sets of 1.5MW turbines from Daqing Deta Electric • 10 sets of 1.5MW turbines from Hanwei Wind Power • Wind Farm #2: • 33 HV-1500 Deta / Hanwei Wind wind turbines (same 1.5MW turbines used in Wind Farm #1) – US$908 / kW • Future Wind Farms: • Hanwei will have the first refusal right to offer all future equipment for wind farms owned or controlled by China Wind, and Hanwei will allow China Wind to purchase all additional equipment manufactured by Hanwei at market prices China Wind Power International – Page 2