Euclid Creek Tunnel

   Community Update
    March 19, 2013

                      euclidcreek.blogspot.com
Agenda
•   Project Overview
•   Construction Updates
•   Shaft Updates
•   Contact Info




                            euclidcreek.blogspot.com
Project Overview




               euclidcreek.blogspot.com
Euclid Creek Tunnel:
             By the Numbers
• Tunnel                    • Shafts: 5 total
  – 24’ diameter              – 24’ to 60’ diameter
  – 7110/17,750’              – 185-225’ deep
  – 60,100,000 gallons      • 2,440 linear feet of
• ~30 near surface            open cut pipe placed
  structures                • 2,110 linear feet of
  – 11 complete               microtunnel complete
  – 10 under construction     – 240 more to go

                                     euclidcreek.blogspot.com
Construction Updates
• New sewer, Lakeshore Boulevard
  East 150th Street to (east of) Collinwood Rec.
  – Work completed: Sept 2013
• New sewer, St. Clair Ave. and Nottingham Rd.
  – Work completed: Oct 2013




                                   euclidcreek.blogspot.com
Shaft #1
        Construction Staging Site
• “Mackenzie” tunneled and lined 7,125’
• Operating 24/7 with regularly-scheduled
  maintenance periods
• Currently beneath Lake Erie




                                 euclidcreek.blogspot.com
Project Overview
     2/19  3/19




         2/19




                   euclidcreek.blogspot.com
euclidcreek.blogspot.com
Shaft #2
 Easterly Wastewater Treatment Plant
• Shaft 2: 80 feet excavated (30’ to rock)
  – Blasting last 100 feet; will begin this year
• Structure 2-2: installing final lining
• Structure 2-8: installing support of excvation




                                         euclidcreek.blogspot.com
euclidcreek.blogspot.com
Shaft #3
                   Beulah Park
• Construction staging area
  – Sound wall installed along south side of
    Ms. Gordon’s house
  – Secant pile wall installation… complete!
     • Case (sub-contractor) de-mobilizing now
  – Next steps?
     • McNally/Kiewit will deliver excavation equipment
     • 35’ depth



                                          euclidcreek.blogspot.com
Shaft #3
                    Beulah Park
• East 156th Street
     • West side sidewalk still closed; replaced when feasible




                                            euclidcreek.blogspot.com
Shaft #3: Schedule*                     2013                                                                   2014
                                  January   February   March   April   May   June          July   Aug   Sept   Oct   Nov   Dec   Jan   Feb   Mar   April          May    June      July   Aug
Shaft Support & Excvation
Shaft Structural Work

Strs 3-2 & 3-3 (Btw Wadsworth &
Gordon)
Close E 156th Street
Diversion Sructure E 156th
Microtunneling
Str 3-5 (Lakeshore & E 156th)




Non-Working Holidays
Memorial Day
July 4th
Labor Day
Thanksgiving Day
Christmas Day
New Years Day




                                                                                                                                                           *Schedule subject to change




                                                                                                                                       euclidcreek.blogspot.com
Shaft #3: Schedule
                          4/13–3/14

 1/13–6/13
10/13–12/13
 1/14—8/14



                  8/13–11/13
                                      4/13–3/14




                                               4/14–8/14

                                 euclidcreek.blogspot.com
Site #4
                  Triangle Park
•   Excavation work is complete at this site
•   Currently installing baffle drop structures
•   Fencing will remain throughout 2014
•   Completed structure in Nottingham




                                      euclidcreek.blogspot.com
euclidcreek.blogspot.com
Site #4
                Triangle Park
• Additional sewer installation planned
  – Transfer from Lakeshore Blvd. Relief Sewer to
    Euclid Creek Tunnel
  – 66” trenchless sewer pipe, microtunneled from
    Euclid Creek Pump Station to Shaft 4
  – $4.4 million savings, minimal impact




                                     euclidcreek.blogspot.com
Site #5
         Nottingham & St. Clair
• Excavation complete of Shaft 5:
  225 feet excavated
• Commenced excavation of Structure 5-4




                                euclidcreek.blogspot.com
euclidcreek.blogspot.com
Stay Informed
• Blog
  – EuclidCreek.blogspot.com
• Collinwood Observer
  – Ads and articles
• Semi-Monthly Newsletter
  – E-mail distribution
  – eltingj@neorsd.org to be added to the list


                                      euclidcreek.blogspot.com
How to Reach Us
Social Media
      facebook.com/yoursewerdistrict
      @neorsd | @wallywaterdrop
Customer Service
  (216) 881-8247
Emergencies: NEORSD ECT Field Office
  (216) 268-5469
Ryan Sullivan, sullivanr@neorsd.org
  Jenn Elting, eltingj@neorsd.org

                                  euclidcreek.blogspot.com
Next Meeting
Tuesday, April 16 (or 23), 2013
  6:00 p.m.                            Date
                                        May
  Cleveland Public Library,
                                      Change!
  Memorial-Nottingham Branch

Save the Date!
  May 21             August 20
  June 18            September 17
  July 16            October 15
                                    euclidcreek.blogspot.com

Mais conteúdo relacionado

Semelhante a Euclid creek tunnel ppt mar2013

CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)Crosstown TO
 
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)Crosstown TO
 
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...Crosstown TO
 
Brentcliffe to Victoria Park - March 4, 2021
Brentcliffe to Victoria Park - March 4, 2021Brentcliffe to Victoria Park - March 4, 2021
Brentcliffe to Victoria Park - March 4, 2021Crosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCrosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingCrosstown TO
 
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018Crosstown TO
 
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)Crosstown TO
 
Brentcliffe-Victoria Park CLC Meeting - May 6, 2021
Brentcliffe-Victoria Park CLC Meeting - May 6, 2021Brentcliffe-Victoria Park CLC Meeting - May 6, 2021
Brentcliffe-Victoria Park CLC Meeting - May 6, 2021Crosstown TO
 
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting - ...
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting  - ...Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting  - ...
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting - ...Crosstown TO
 
Cedarvale & Forest Hill Construction Liaison Committee - July 2018
Cedarvale & Forest Hill Construction Liaison Committee - July 2018Cedarvale & Forest Hill Construction Liaison Committee - July 2018
Cedarvale & Forest Hill Construction Liaison Committee - July 2018Crosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCrosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Crosstown TO
 
CLC Pharmacy to Kennedy 2021
CLC Pharmacy to Kennedy 2021CLC Pharmacy to Kennedy 2021
CLC Pharmacy to Kennedy 2021Crosstown TO
 
Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018Crosstown TO
 
Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017
Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017
Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017Crosstown TO
 
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Crosstown TO
 
Brentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC MeetingBrentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC MeetingCrosstown TO
 
Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Crosstown TO
 

Semelhante a Euclid creek tunnel ppt mar2013 (20)

CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
 
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
 
Dugway Sewer Community Update: April 1, 2014
Dugway Sewer Community Update: April 1, 2014Dugway Sewer Community Update: April 1, 2014
Dugway Sewer Community Update: April 1, 2014
 
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
 
Brentcliffe to Victoria Park - March 4, 2021
Brentcliffe to Victoria Park - March 4, 2021Brentcliffe to Victoria Park - March 4, 2021
Brentcliffe to Victoria Park - March 4, 2021
 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
Fairbank & Oakwood Stations Construction Liaison Committee - Feb 2018
 
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
 
Brentcliffe-Victoria Park CLC Meeting - May 6, 2021
Brentcliffe-Victoria Park CLC Meeting - May 6, 2021Brentcliffe-Victoria Park CLC Meeting - May 6, 2021
Brentcliffe-Victoria Park CLC Meeting - May 6, 2021
 
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting - ...
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting  - ...Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting  - ...
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting - ...
 
Cedarvale & Forest Hill Construction Liaison Committee - July 2018
Cedarvale & Forest Hill Construction Liaison Committee - July 2018Cedarvale & Forest Hill Construction Liaison Committee - July 2018
Cedarvale & Forest Hill Construction Liaison Committee - July 2018
 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
 
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
 
CLC Pharmacy to Kennedy 2021
CLC Pharmacy to Kennedy 2021CLC Pharmacy to Kennedy 2021
CLC Pharmacy to Kennedy 2021
 
Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018
 
Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017
Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017
Cedarvale & Forest Hill Construction Liaison Committee - November 29, 2017
 
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
 
Brentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC MeetingBrentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC Meeting
 
Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)
 

Mais de Northeast Ohio Regional Sewer District

Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...
Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...
Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...Northeast Ohio Regional Sewer District
 
Water tweetment: How personality can help public services better engage, educ...
Water tweetment: How personality can help public services better engage, educ...Water tweetment: How personality can help public services better engage, educ...
Water tweetment: How personality can help public services better engage, educ...Northeast Ohio Regional Sewer District
 
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...Northeast Ohio Regional Sewer District
 
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwater
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwaterWhole lotta green: Hotel lot, roof in University Circle helps manage stormwater
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwaterNortheast Ohio Regional Sewer District
 
Your Sewer District and social media? How @neorsd is using it, learning from ...
Your Sewer District and social media? How @neorsd is using it, learning from ...Your Sewer District and social media? How @neorsd is using it, learning from ...
Your Sewer District and social media? How @neorsd is using it, learning from ...Northeast Ohio Regional Sewer District
 

Mais de Northeast Ohio Regional Sewer District (17)

Green Infrastructure Policy: An overview
Green Infrastructure Policy: An overviewGreen Infrastructure Policy: An overview
Green Infrastructure Policy: An overview
 
Sewer University #SewerU presented by @neorsd
Sewer University #SewerU presented by @neorsdSewer University #SewerU presented by @neorsd
Sewer University #SewerU presented by @neorsd
 
Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...
Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...
Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...
 
DWIRS public meeting 2015 March 24
DWIRS public meeting 2015 March 24DWIRS public meeting 2015 March 24
DWIRS public meeting 2015 March 24
 
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
 
Water tweetment: How personality can help public services better engage, educ...
Water tweetment: How personality can help public services better engage, educ...Water tweetment: How personality can help public services better engage, educ...
Water tweetment: How personality can help public services better engage, educ...
 
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...
 
NEORSD Lakeshore Blvd Relief Sewer Project
NEORSD Lakeshore Blvd Relief Sewer ProjectNEORSD Lakeshore Blvd Relief Sewer Project
NEORSD Lakeshore Blvd Relief Sewer Project
 
7 ways wastewater treatment is like the first day back to school
7 ways wastewater treatment is like the first day back to school7 ways wastewater treatment is like the first day back to school
7 ways wastewater treatment is like the first day back to school
 
Collinwood Nottingham Dev Corp 072313
Collinwood Nottingham Dev Corp 072313Collinwood Nottingham Dev Corp 072313
Collinwood Nottingham Dev Corp 072313
 
Lakeshore boulevard relief sewer presentation
Lakeshore boulevard relief sewer presentationLakeshore boulevard relief sewer presentation
Lakeshore boulevard relief sewer presentation
 
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwater
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwaterWhole lotta green: Hotel lot, roof in University Circle helps manage stormwater
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwater
 
Whole lot of green: Hotel roof, lot help manage stormwater
Whole lot of green: Hotel roof, lot help manage stormwaterWhole lot of green: Hotel roof, lot help manage stormwater
Whole lot of green: Hotel roof, lot help manage stormwater
 
Dwirs overview handout
Dwirs overview handoutDwirs overview handout
Dwirs overview handout
 
Dwirs community impact pres 4 4-13-v3
Dwirs community impact pres 4 4-13-v3Dwirs community impact pres 4 4-13-v3
Dwirs community impact pres 4 4-13-v3
 
Your Sewer District and social media? How @neorsd is using it, learning from ...
Your Sewer District and social media? How @neorsd is using it, learning from ...Your Sewer District and social media? How @neorsd is using it, learning from ...
Your Sewer District and social media? How @neorsd is using it, learning from ...
 
#successatwork tweetable tips for social media
#successatwork tweetable tips for social media#successatwork tweetable tips for social media
#successatwork tweetable tips for social media
 

Euclid creek tunnel ppt mar2013

  • 1. Euclid Creek Tunnel Community Update March 19, 2013 euclidcreek.blogspot.com
  • 2. Agenda • Project Overview • Construction Updates • Shaft Updates • Contact Info euclidcreek.blogspot.com
  • 3. Project Overview euclidcreek.blogspot.com
  • 4. Euclid Creek Tunnel: By the Numbers • Tunnel • Shafts: 5 total – 24’ diameter – 24’ to 60’ diameter – 7110/17,750’ – 185-225’ deep – 60,100,000 gallons • 2,440 linear feet of • ~30 near surface open cut pipe placed structures • 2,110 linear feet of – 11 complete microtunnel complete – 10 under construction – 240 more to go euclidcreek.blogspot.com
  • 5. Construction Updates • New sewer, Lakeshore Boulevard East 150th Street to (east of) Collinwood Rec. – Work completed: Sept 2013 • New sewer, St. Clair Ave. and Nottingham Rd. – Work completed: Oct 2013 euclidcreek.blogspot.com
  • 6. Shaft #1 Construction Staging Site • “Mackenzie” tunneled and lined 7,125’ • Operating 24/7 with regularly-scheduled maintenance periods • Currently beneath Lake Erie euclidcreek.blogspot.com
  • 7. Project Overview 2/19  3/19 2/19 euclidcreek.blogspot.com
  • 9. Shaft #2 Easterly Wastewater Treatment Plant • Shaft 2: 80 feet excavated (30’ to rock) – Blasting last 100 feet; will begin this year • Structure 2-2: installing final lining • Structure 2-8: installing support of excvation euclidcreek.blogspot.com
  • 11. Shaft #3 Beulah Park • Construction staging area – Sound wall installed along south side of Ms. Gordon’s house – Secant pile wall installation… complete! • Case (sub-contractor) de-mobilizing now – Next steps? • McNally/Kiewit will deliver excavation equipment • 35’ depth euclidcreek.blogspot.com
  • 12. Shaft #3 Beulah Park • East 156th Street • West side sidewalk still closed; replaced when feasible euclidcreek.blogspot.com
  • 13. Shaft #3: Schedule* 2013 2014 January February March April May June July Aug Sept Oct Nov Dec Jan Feb Mar April May June July Aug Shaft Support & Excvation Shaft Structural Work Strs 3-2 & 3-3 (Btw Wadsworth & Gordon) Close E 156th Street Diversion Sructure E 156th Microtunneling Str 3-5 (Lakeshore & E 156th) Non-Working Holidays Memorial Day July 4th Labor Day Thanksgiving Day Christmas Day New Years Day *Schedule subject to change euclidcreek.blogspot.com
  • 14. Shaft #3: Schedule 4/13–3/14 1/13–6/13 10/13–12/13 1/14—8/14 8/13–11/13 4/13–3/14 4/14–8/14 euclidcreek.blogspot.com
  • 15. Site #4 Triangle Park • Excavation work is complete at this site • Currently installing baffle drop structures • Fencing will remain throughout 2014 • Completed structure in Nottingham euclidcreek.blogspot.com
  • 16.
  • 18. Site #4 Triangle Park • Additional sewer installation planned – Transfer from Lakeshore Blvd. Relief Sewer to Euclid Creek Tunnel – 66” trenchless sewer pipe, microtunneled from Euclid Creek Pump Station to Shaft 4 – $4.4 million savings, minimal impact euclidcreek.blogspot.com
  • 19. Site #5 Nottingham & St. Clair • Excavation complete of Shaft 5: 225 feet excavated • Commenced excavation of Structure 5-4 euclidcreek.blogspot.com
  • 21. Stay Informed • Blog – EuclidCreek.blogspot.com • Collinwood Observer – Ads and articles • Semi-Monthly Newsletter – E-mail distribution – eltingj@neorsd.org to be added to the list euclidcreek.blogspot.com
  • 22. How to Reach Us Social Media facebook.com/yoursewerdistrict @neorsd | @wallywaterdrop Customer Service (216) 881-8247 Emergencies: NEORSD ECT Field Office (216) 268-5469 Ryan Sullivan, sullivanr@neorsd.org Jenn Elting, eltingj@neorsd.org euclidcreek.blogspot.com
  • 23. Next Meeting Tuesday, April 16 (or 23), 2013 6:00 p.m. Date May Cleveland Public Library, Change! Memorial-Nottingham Branch Save the Date! May 21 August 20 June 18 September 17 July 16 October 15 euclidcreek.blogspot.com