Presentation made by Ecolec at Spanish Forum on European Initiative of Critical Raw Materials organized by CDTI-Ministry of Science and Technology (Madrid, October 2011)
1. II FORO CDTI
European Innovation Partnership on Raw Materials
21/10/2011
WEEE TRACE – Full Traceability of the
management of WEEE
CIP-EIP-Eco-Innovation-2010
Capacidades ES - EIP Materias Primas
3. Descripción y objetivos del proyecto
Ensure “cradle-to-grave” traceability of complete
WEEE flow managed at ECOLEC by means of the
use of advanced ICT technologies (RFID, image
capturing, etc.).
Purpose
Reduce leaks from system
Increase volume of WEEE legally treated and recycled.
Increase the volume of materials recovered.
Ensure WEEE collected and managed is recycled
properly at plants using BATs i.e. WEEE-Labex (Life+)
Track incidences like scavenging, etc.
Facilitate enforcement and reporting
Duration: 36 months (Jul 2011 Jul 2014)
Capacidades ES - EIP Materias Primas
4. Papel y actividades de la entidad
ECOLEC: WEEE take-back compliance scheme (SIG) in Spain and chair of WEEE
TRACE Project Management Board
Main activities
Definition of specific needs of the appliances take-back in Spain
Support development of technical solution for pilot and full scale
Pilot test in Spain.
Full integral implementation 80 Temporarystorage
facilities
15 Logistics
Providers
40 Treatment
Plants
of the solution in ECOLEC’s take-back scheme
PT
Retalers
PT
80 collection points
15 logistics operators PT
40 treatment plants Municpal
Collection
Points
Logistics
Providers
Retail
Assess value of pilot in Czech Republic and establish replication opportunities
Capacidades ES - EIP Materias Primas
5. Otros socios relevantes a tener en cuenta
Full life-cycle coverage: 9 selected partners and associates take part in project
consortium for pilot and demonstration activities.
Partners
MCCTELECOM: Technology provider
FAGOR: Manufacturer of household
appliances
EMAUS: Logistics operator
ASPACE-Ecointegra: Treatment plant
ASEKOL: WEEE Compliance scheme in Associates
Czech Republic SIGRAUTO: End-of-life vehicles
compliance scheme.
CARREFOUR: Retail chain
CEGA: Logistics provider
Capacidades ES - EIP Materias Primas
6. Resultados y expectativas de continuidad
Environmental Economic
Materials recovery: 50.000 Pay-back: 3 years
tons/año
50% financing by Eco-
Proper treatment and recycling: Innovation program .
39%
5% reduction in costs
CO2: 34% as a result of
improvements in materials Market
recovery (29%) and logistics
Project replication and
(5%).
commercial applications
CFC emissions: 12%
Capacidades ES - EIP Materias Primas
7. 4/2/2011 Página 7
Capacidades ES - EIP Materias Primas